Experience Summary Commercial Dollar Academy St Columba’s School Science Block Refurbishment SWB Linburn Sport Hall Quintiles Laboratory Refurbishment Edinburgh University – Business School Glasgow Caledonian University, Refurbishment University of Lincoln AMC Building University of Lincoln, AMD Building Hampton Community School Easton College Witham Leisure Centre Hertfordshire BSF Leeds BSF Edinburgh University, DHT Refurbishment 55-60 George Square Refurbishment REMT Office Refurbishment Biggar Museum Project ADAM, MOD Marine Lab, Aberdeen RBS Critical Point of Failure Building 254, MOD RyanAir Hanger Kirkcaldy WwTW Healthcare Reydon Healthy Living Centre Greyfriars Clinic NCH Stroke Unit Moorfields Eye Hospital Gorlestone Medical Centre Residential 158 High Street, Biggar LVMH Potters Bar Retail Dalkeith Stables Country Park RAF Lakenheath, Base Exchange Curriculum Vitae Stuart Kennedy Senior Mechanical Engineer MCIBSE Low Carbon Energy Assessor Background I am a mechanical design engineer and environmental modeller with over nine years experience delivering multi- million pound building projects in a variety of geographic locations through all stages of design. I have experience of surveying, refurbishments and new building design within the following sectors: commercial, healthcare, education, leisure and industrial. Project tasks have included but are not limited to: conceptual building physics assessments, energy strategies, feasibility studies, environmental modelling, LZC studies, condition surveys, stage A to construction detail specifications and drawings. In addition to my design experience, I was the Project Manager of two multi-million pound healthcare centres in Great Yarmouth and Reydon. I was tasked with ensuring deliverables are met on budget and compliant with quality assurance and health and safety procedures. I am an enthusiastic and driven person. I have a passion for building services and thoroughly enjoy the daily challenges. I am an efficient worker and I do not shy away from the extra effort required to meet tight deadlines. The next goal in my career is to achieve CIBSE Chartership. I believe I have the expertise, experience and knowledge required. I have completed my Technical Report which was approved by CIBSE and I have my final presentation and interview in April to gain Chartered Engineer status. Career 2014 to Present Tuv Sud Senior Mechanical Building Services Design Consultant 2013 to 2014 Harley Haddow Senior Mechanical Building Services Design Consultant

Upload: stuart-kennedy

Post on 11-Apr-2017

80 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Stuart Kennedy - Linkedin

Experience Summary

Commercial Dollar Academy St Columba’s School Science

Block Refurbishment SWB Linburn Sport Hall Quintiles Laboratory

Refurbishment Edinburgh University – Business

School Glasgow Caledonian University,

Refurbishment University of Lincoln AMC Building University of Lincoln, AMD Building Hampton Community School Easton College Witham Leisure Centre Hertfordshire BSF Leeds BSF Edinburgh University, DHT

Refurbishment 55-60 George Square

Refurbishment REMT Office Refurbishment Biggar Museum Project ADAM, MOD Marine Lab, Aberdeen RBS Critical Point of Failure Building 254, MOD RyanAir Hanger Kirkcaldy WwTW

Healthcare Reydon Healthy Living Centre Greyfriars Clinic NCH Stroke Unit Moorfields Eye Hospital Gorlestone Medical Centre

Residential 158 High Street, Biggar LVMH Potters Bar

Retail Dalkeith Stables Country Park RAF Lakenheath, Base Exchange Edinburgh St James

Key Attributes

MCIBSE LCEA Level 3,4 and 5 Low Carbon Consultant Mechanical Design Public Health Energy Modelling

Curriculum VitaeStuart Kennedy Senior Mechanical EngineerMCIBSELow Carbon Energy Assessor

Background

I am a mechanical design engineer and environmental modeller with over nine years experience delivering multi-million pound building projects in a variety of geographic locations through all stages of design. I have experience of surveying, refurbishments and new building design within the following sectors: commercial, healthcare, education, leisure and industrial.

Project tasks have included but are not limited to: conceptual building physics assessments, energy strategies, feasibility studies, environmental modelling, LZC studies, condition surveys, stage A to construction detail specifications and drawings.

In addition to my design experience, I was the Project Manager of two multi-million pound healthcare centres in Great Yarmouth and Reydon. I was tasked with ensuring deliverables are met on budget and compliant with quality assurance and health and safety procedures.

I am an enthusiastic and driven person. I have a passion for building services and thoroughly enjoy the daily challenges. I am an efficient worker and I do not shy away from the extra effort required to meet tight deadlines.

The next goal in my career is to achieve CIBSE Chartership. I believe I have the expertise, experience and knowledge required. I have completed my Technical Report which was approved by CIBSE and I have my final presentation and interview in April to gain Chartered Engineer status.

Career

2014 to Present Tuv Sud Senior Mechanical Building Services Design Consultant2013 to 2014 Harley Haddow Senior Mechanical Building Services Design Consultant2007 to 2013 Mott MacDonald Mechanical Building Services Design Consultant2006 to 2007 WSP Group Trainee Mechanical Building Services Design Consultant

Project Experience

Commercial

Dollar Academy (£2.2m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new teaching block at Dollar Academy. Production of Stage F detailed Employer’s Requirements documentation and drawings then novated onto the Contractor’s Design Team as part of Design and Build Contract.

The project incorporated low energy design by adopting a tight envelope with advanced natural ventilation systems utilising chimneys and a bespoke controls system.

St Columba’s School Science Block Refurbishment (£1.2m)Lead Mechanical Engineer delivering the mechanical and public health for the Strip out and refurbishment of the Science Block at St Columba’s School. Production of Stage F detailed Employer’s Requirements documentation and drawings then Technical Assessor as part of Design and Build Contract.

The project included fume cupboards, multi service student benches, emergency shut off systems and specialist drainage to serve the requirements of the facility, utilising the existing equipment where possible.

SWB Linburn Sports Hall and Housing Development (£2.4m)

Page 2: Stuart Kennedy - Linkedin

Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the sports hall and housing development. Production of Stage F documentation as part of a traditional construction contract.

The project incorporated low energy design by adopting a centralised ground source heat pump with district heating to serve each of the houses.

Quintiles Laboratory Refurbishment (£1.6m)Lead Mechanical Engineer delivering the mechanical and public health for the Strip out and refurbishment of the laboratory. Production of Stage F detailed documentation as part of a traditional build contract.

This project consists of the phased redevelopment of a live Quintiles facility in Livingstone to provide ACDP Containment Level II Laboratories. Services provided to laboratories include a centralised UPS, specialist gases (CO2 & N2), lab grade de-ionised water and close control systems.

Business School Refurbishment & Extension - UoE (£2.6m)Lead Mechanical Engineer delivering the mechanical and public health for the Strip out and refurbishment of the teaching facility. Production of Stage F detailed documentation as part of a traditional build contract.

This project consisted of extension into basement car park to increase the teaching facility in addition to refurbishment part of the existing building. The works were to the University of Edinburgh technical specifications.

Teaching Facility Remodelling - Glasgow Caledonian University (£0.4m)Lead Mechanical Engineer delivering the mechanical and public health for the Strip out and refurbishment of remodelling part of the teaching facility. Production of Stage F detailed documentation as part of a traditional build contract.

This project consisted of a phased approach in a live building to deliver the remodelled areas of the building. The works included installation of air handling units, cooling systems, drainage and modifications to existing heating and ventilation systems.

University of Lincoln – AMC building Refurbishment (£3.2m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the Strip out and refurbishment of remodelling part of the 6000m² teaching facility. Production of Stage E detailed documentation as part of a design and build contract.

This project consisted of a phased approach in a live building to deliver the remodelled areas of the building. The building contains typical teaching spaces as well as mechanical workshops, dark rooms and photography spaces. In addition to general mechanical and public health systems, modifications were also required to process HVAC systems due to the incorporation of new specialist systems and increased loads.

University of Lincoln – AMD New Build (£12m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new specialist teaching facility. Production of Stage E detailed Employer’s Requirements documentation and drawings as part of Design and Build Contract.

The building contains typical teaching spaces as well as mechanical workshops, dark rooms and photography spaces requiring process HVAC systems.

Hampton Community School (£4m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new specialist teaching facility. Production of Stage E detailed design documentation and drawings as part of contractor design team.

The building incorporates a low carbon design requiring biomass boilers and photovoltaic cells. BREEAM Excellent building.

Easton College (£3m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new teaching block at Dollar Academy. Production of Stage F detailed design documentation and drawings as part of traditional design contract.

Page 3: Stuart Kennedy - Linkedin

The BREEAM Excellent project incorporated low energy design by adopting a tight envelope with advanced natural ventilation systems utilising chimneys and a bespoke controls system, a green roof, rainwater harvesting and ground source heat pump utilising aquifer as a medium.

Witham Leisure Centre and Swimming Pool (£9.5m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new leisure centre and swimming pool. Production of Stage E detailed Employer’s Requirements documentation and drawings then Technical Assessor as part of Design and Build Contract.

The building incorporates a low carbon design requiring Combined Heat and Power and photovoltaic cells. BREEAM Very Good building. The process involved extensive integration with the pool specialist requirements that were under our employment.

Hertfordshire Building Schools for the Future (BSF) (£16m)Lead Sustainability Consultant within framework to redevelop seven school buildings as part Contractor Design Team. Role entailed extensive thermal, CFD, energy, carbon dioxide, and daylight modelling of alternative construction materials, passive design solutions and hybrid design solutions. Additional duties included SBEM (simplified building energy model) calculations and preparation of Part L2A documentation.

Leeds Building Schools for the Future (BSF) (£12m)Lead Sustainability Consultant within framework to redevelop seven school buildings as part Contractor Design Team. Role entailed extensive thermal, CFD, energy, carbon dioxide, and daylight modelling of alternative construction materials, passive design solutions and hybrid design solutions. Additional duties included SBEM (simplified building energy model) calculations and preparation of Part L2A documentation.

David Hume Tower Refurbishment (£15m) Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the strip out and refurbishment of the teaching facility. Production of Stage D documentation.

55 to 60 George Square - UoE (£0.8m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the Strip out and refurbishment of the office facility. Production of detailed documentation and drawings as part of a traditional build contract.

REMT Office Refurbishment (£1.8m)Lead Mechanical Engineer delivering the mechanical services design and public health for the Strip out and refurbishment of the office facility. Production of Stage F detailed documentation and drawings as part of a traditional build contract.

The building offered significant obstacles due to the complex nature of the building which spanned 5 seperate town houses

Biggar Museum (£2.1m)Lead Mechanical Engineer delivering the mechanical and public health for the Strip out and refurbishment of remodelling of a petrol station into a Museum. Production of Stage F detailed documentation and drawings as part of a traditional build contract.

This project consisted of specialist archive and display areas to store national artefacts. The building services entail conservation heating using relative humidity sensors to vary the temperature to achieve a predefined RH band. The building also utilising close control systems for special exhibition rooms.

Project Adam, Ministry of Defence (MoD) Lead Mechanical Engineer is the remedial works investigation report. Project comprised of site surveys, inspection of maintenance records, re-modelling and checking of installed design, checking as built drawings against the installation and delivering a report of the findings offering potential low cost solutions to those issues found on site.

Marine Lab, AberdeenMechanical Engineer as part of team for an investigation report. Project comprised of site surveys, inspection of maintenance records, re-modelling and checking of installed design, checking as built drawings against the installation and delivering a report of the findings offering

Page 4: Stuart Kennedy - Linkedin

potential low cost solutions to those issues found on site.

R.B.S Critical Point of FailureMechanical Engineer as part of team for an investigation report. Project comprised of site surveys, inspection of maintenance checking of installed design, checking as built drawings against the installation and delivering a report of the findings highlighting locations of single point of failure.

Building 254 (MoD)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the Contractor’s Proposals documentation and drawings as part of a Design and Build contract.

The project was a new build, flight simulator facility and command centre. The building incorporated a typical office environment with specialist areas such as: laboratories, high density IT suites and communications rooms. The building was DREEAM ‘Very Good’.

RyanAir Hangar, Stansted AirportLead sustainability engineer for the refurbishment of existing aircraft hangar. Calculation of building loads, thermal analysis and CFD assessment of alternative ventilation schemes against the requirements of the air craft and specialised simulators. Part L2A compliance calculation and collation of compliance documentation.

Kirkcaldy Waste Water Treatment WorksLead Mechanical Engineer in the production of an Energy Study to extract heat from the treated effluent. Project tasks included site surveys and inspection of the water treatment works process to determine the most appropriate and non disruptive method for integration. Investigation into the possible loads and equipment which could be coupled to ensure efficient operation.

Healthcare

Reydon Healthy Living Centre (£2.2m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new healthcare facility. Production of Stage F detailed design documentation and drawings as part of traditional design contract.

Additional roles included the Project Management of the building services team including the management of finances, health and safety. Further role included sustainability where I was required to develop the energy strategy, BREEAM Health and Wellbeing Report and LZC Report. The target was BREEAM Excellent. The building was required to comply with the necessary Health Technical Memorandums (HTMs), Health Building Notes (HBNs) and Building Regulations.

Greyfriars Clinic West Building (£2.2m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new healthcare facility. Production of Stage F detailed design documentation and drawings as part of traditional design contract.

Additional roles included the Project Management of the building services team including the management of finances, health and safety. Further role included sustainability where I was required to develop the energy strategy, BREEAM Health and Wellbeing Report and LZC Report. The target was BREEAM Excellent. The building was required to comply with the necessary Health Technical Memorandums (HTMs), Health Building Notes (HBNs) and Building Regulations.

NCH Stroke Unit (£8m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new healthcare facility. Production of Stage F detailed design documentation and drawings as part of traditional design contract.

NCH was a new build stroke rehabilitation facility to be erected, part in the place of a previously demolished building and part on an existing car park. The building was of modular construction which complied with Norwich City Council’s 10% on site renewable target, Part L2A 2006 carbon dioxide emissions target, Health Technical Memorandums (HTMs), Health Building Notes (HBNs) and Building Regulations.

Moorefield Eye Hospital, London

Page 5: Stuart Kennedy - Linkedin

Lead mechanical engineer in the Conditions Survey and Feasibility assessment of costs needed to bring Moorefield Eye Hospital up to minimal legal standards for all aspects of the building. Role entailed reporting of inspection and assessment of the building fabric, fixtures and fittings, building service plant equipment and end use equipment.

Gorelstone Medical Practice (£3m)Lead Mechanical Engineer delivering the mechanical, public health and energy strategy for the new healthcare facility. Production of Stage F detailed design documentation and drawings as part of traditional design contract.

The building adopted centralised specialist gas systems and warning systems. The building was required to comply with the necessary Health Technical Memorandums (HTMs), Health Building Notes (HBNs) and Building Regulations.

Residential

158 High Street Biggar (£.2m)Lead Mechanical Engineer delivering the mechanical and public health for the Strip out and refurbishment of remodelling of a petrol station upstairs from the new Museum. Production of Stage F detailed documentation and drawings as part of a traditional build contract.

RG Carters, LVMH Potters Bar

Services coordinator engineer, acting for RG Carters’ representative to coordinate between the design team members. Duties include the task of chairing meetings, aiding diplomatic discussions and coordinating the MEP services installations of each sub-contractor.

The LVMH Potters Bar project is a new build 2000m² country home for Louis Vuitton. The building is a high specification fit out of the swimming pool, sauna, steam room, media room, hair salon and commercial kitchen.

Retail

Dalkeith Stables (£1.8m)Lead Mechanical Engineer delivering the mechanical and public health for the Strip out and refurbishment of remodelling of a stable block into a Country Retail Park. Production of Stage F detailed documentation and drawings as part of a traditional build contract.

This project consisted of retail, offices, cookery schools and restaurants. The building services were required to respect the requirements of the Architect and Heritage Scotland in providing an efficient and cost effective servicing strategy.

BEX, LakenheathLead Mechanical Engineer delivering the mechanical and public health for the new build shopping centre. Production of Stage D documentation and drawings.

The unit includes restaurants, hairdressers and many other specialist servicing areas. Other duties include the development of LZC, Part L2A and LCC (lifecycle cost) reports, preparation of specifications and CFD simulation.

Edinburgh St James

Lead Mechanical Engineer in the Stage 3 design of the 9 MW District Heating Scheme which notably included CHP and High Temperature Hot Water Systems. Additional responsibilities included the coordination of the mechanical team reporting to the Associate, the production of the Mechanical and Prelims Specification, the design of the smoke ventilation, overseeing mechanical design and submission.