status of the fair project boris sharkov fair scientific director (des.) @ gsi 12.04.2010...
TRANSCRIPT
![Page 1: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/1.jpg)
Status of the FAIR Project
Boris SharkovFAIR Scientific Director (des.)
@ GSI 12.04.2010
Austria IndiaChina Finland France Germany Greece U KItaly Poland Slovakia Slovenia Spain SwedenRomania Russia Saudi Arabia
![Page 2: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/2.jpg)
B. Sharkov 2
Research Communities at FAIR
100 m
Nuclear Structure & Astrophysicswith rare isotope beams, x10 000and excellent cooling
High EM Field (HI) _Fundamental Studies (HI & p)Applications (HI)
Plasma Physics: x600 higher target energy density 600kJ/g
Nuclear Matter Physics with35-45 GeV/u HI beams, x1000
Hadron Physicswith antiprotons of 0 - 15 GeV
Special Features:• 50ns Bunched beams• Electron cooling of secondary
beams• SC magnets fast ramping• Parallel operation
SIS 100/300
HESR
SuperFRS
NESR
CBMHADES
FLAIRCR- RESR
Rare Isotope Production Target
AntiprotonProduction Target
![Page 3: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/3.jpg)
B. Sharkov 3
Rationale for new Modularized Start Version (WP) in 2009
a detailed cost estimate for CC presented by architectsa new cost estimate in 2009 for the accelerator complexDetailed list of site related construction
costs was worked outfirm commitments of FAIR Member States
Germany and State of Hesse announced to cover "site-dependent" construction costs outside FAIR project budget + 110 M€ !
![Page 4: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/4.jpg)
B. Sharkov 4
Development of Project Staging
2003 Recommendation by WissenschaftsRat – FAIR Realisation in three stages
2005Entire Facility
Baseline Technical Report
2007Phase A
Phase BSIS300
2009
Module 0SIS100
Module 1expt areas CBM/HADES and APPA
Module 2Super-FRSfixed target areaNuSTAR
Module 3pbar facility, incl. CR forPANDA,options for NuSTAR
Module 4 LEB for NuSTAR, NESR for NuSTAR and APPA,FLAIR for APPA
Module 5RESRnominal intensity for PANDA & parallel operation with NuSTAR and APPASIS18 Proton Beamline
Module 6SIS300HESR CoolerER
Modularized Start Version
![Page 5: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/5.jpg)
Basic Criteria :
Outstanding research opportunities should be offered to all four scientific pillars of FAIR by the Modularized Start
Version
B. Sharkov 5
![Page 6: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/6.jpg)
B. Sharkov 6
Module 0:SIS100 and connection to existing GSI accel.
![Page 7: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/7.jpg)
B. Sharkov 7
Module 1:Experimental areas
Module 0:SIS100 and connection to existing GSI accel.
![Page 8: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/8.jpg)
B. Sharkov 8
Module 2:Super-FRS
Module 1:Experimental areas
Module 0:SIS100 and connection to existing GSI accel.
![Page 9: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/9.jpg)
B. Sharkov 9
Module 3:High-energy antiprotons(p-linac, pbar-target, CR,HESR)
Module 2:Super-FRS
Module 1:Experimental areas
Module 0:SIS100 and connection to existing GSI accel.
![Page 10: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/10.jpg)
B. Sharkov 10
Module 3:High-energy antiprotons(p-linac, pbar-target, CR,HESR)
Module 2:Super-FRS
Module 1:Experimental areas
Module 0:SIS100 and connection to existing GSI accel.Module 4:
low energy RIB andlow energy antiprotons
![Page 11: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/11.jpg)
B. Sharkov 11
Module 3:High-energy antiprotons(p-linac, pbar-target, CR,HESR)
Module 2:Super-FRS
Module 1:Experimental areas
Module 0:SIS100 and connection to existing GSI accel.Module 4:
low energy RIB andlow energy antiprotons
Module 5:RESR storage ringP+ beamlineABM Hall
![Page 12: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/12.jpg)
B. Sharkov 12
Module 3:High-energy antiprotons(p-linac, pbar-target, CR,HESR)
Module 2:Super-FRS
Module 1:Experimental areas
Module 0:SIS100 and connection to existing GSI accel.Module 4:
low energy RIB andlow energy antiprotons
Module 5:RESR storage ring
Modularized Start Version
![Page 13: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/13.jpg)
B. Sharkov 13
PANDA
Science with the Modularized Start Version
CBM/HADES
NuSTAR
APPA
![Page 14: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/14.jpg)
14
Experimental equipment (FAIR Modules 0,1)
Cave with HADES and a CBM start version• e+e- measurement (HADES-RICH)• Hadron/Multistrange states CBM magnet +STS• μ+μ-: Muon chambers
Cave with CBM full versionOpen charm: MVDDilepton study: MuCh/RICHHadrons: STS/TOFCentrality selection: PSD
• HADES: existing setup at SIS18• CBM: New instrument with ultra radiation-hard and
high-rate detectors, free-streaming electronics, online event selection
![Page 15: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/15.jpg)
B. Sharkov 15
FAIR Work Packages
![Page 16: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/16.jpg)
International Partner 1WP 1
International Partner 3WP 3
International Partner 2WP 2
International Partner nWP n
• • •
Consortium(represented by
Consortium Leader)
form
FAIR GmbH
![Page 17: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/17.jpg)
B. Sharkov 18
Cost Estimate Modules 0-3 (Price Basis 2005)
Total accelerator and personnel Modules 0 - 3 502
Total civil construction Modules 0 - 3 400
Experiment funding 78
FAIR GmbH personnel and running costs 47
Grand Total Modules 0 - 3 1027
all values in M€
![Page 18: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/18.jpg)
B. Sharkov 19
Firm Commitments
FAIR Countries Total declared Contribution (k€)
Austria 5.000
China 12.000
Finland 5.000
France 27.000
Germany 705.000
Great Britain 8.000
Greece 4.000
India 36.000
Italy 42.000
Poland 23.740
Romania 11.870
Russia 178.050
Slovenia 12.000
Slovakia 6.000
Spain 19.000
Sweden 10.000
Total 1.104.660
Firm Commitments 1.038.660
not firm for the first batch
Kingdom of Saudi-Arabia signed the Declaration to contribute at least 1 %
Primeminister Putinsigned. Officially publicized last week.
![Page 19: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/19.jpg)
B. Sharkov 20
Finance Summary
Cost of Modularized Start Version = 1027 M€
Firm funding commitments of FAIR Partners = 1039 M€
Modularized Start Version secures a swift start within the current funding commitments
![Page 20: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/20.jpg)
B. Sharkov 21
Evaluation Board 16 October 2009
1. The Modularized Start Version is the right way to proceed.
2. The project is more focussed and is in even better shape.
3. We should now start as soon as possible!
The Green Paper outlines the path to achieve this goal
![Page 21: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/21.jpg)
B. Sharkov 22
Roadmap
Start of construction activities 2010/11 +1 year Schedule is driven by civil construction Aim for earliest commissioning of accelerators and respective experiments
Module Construction time (months)
Ready for installation
0 72 2015 / 16 1 28 2015 / 16 2 60 2016 3 60 2016
+1 year+1 year
+1 year
![Page 22: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/22.jpg)
Road Map FAIR Site & Buildings
2009 201220112010 2013 201620152014
1 2 3 45
6
Handing in of preplanning documents to hbm
Clarification of user requirements Modularized Start Version (MSV)
Start revised preplanning for MSV
Expected approval of revised planning for MSV
Preparation of documents for building permit
Expected approval for (partial) building permit
Start site preparation (clearing trees)
Award contracts on civil construction work lot 1 … 4
Completion of civil construction work lot 1 … 4
Start installation of accelerators and detectors
1
2
3
4
5
6
7
7
9
8
10
9
10
8
2017
![Page 23: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/23.jpg)
SIS18upgrade Program
h=2 acceleration cavity for faster ramping
Scrapers and NEG coating for pressure stabilization
Injection system for low charged state heavy ions
Charge separator for higher intensity and high quality beams
The SIS18upgrade program: Booster operation with low charge state heavy ions
Power grid connection
![Page 24: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/24.jpg)
B. Sharkov 26
Conclusions
Based on recent cost estimates and firm commitments of FAIR Member States the Modularized Start Version is elaborated
Modules 0-3 ensure a physics programme that is unique, competitive with great discovery potential
All FAIR science communities can perform excellent physics from early on
The facility can be smoothly upgraded towards the full version of FAIR (modules 4,5,6)
Setup of the international FAIR company proceeds in parallel
![Page 25: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/25.jpg)
B. Sharkov 27
Zeitplan für die Gründung der FAIR GmbH
01 02 03 04 05 06 07 08 09 10 11 12
2010 2011
1 2 3 4 5 6 7 8
1
2
3
4
5
6
8
7
KW1: Fertigstellung der Rechtsdokumente
KW8: Dokumente von Auswärtiges Amt an andere Außenministerien versandt
KW13: Alle Übersetzungen zurück beim Auswärtigen Amt
KW19: Alle offenen Fragen der Übersetzungen bilateral gelöst
KW22: Alle Rechtsdokumente in den fünf Vertragssprachen verfügbar
KW32: Formale Zustimmung aller Partnerländer
KW33: Übersetzerkonferenz
KW37: Formelle Unterzeichnung der Konvention
KW38: Gründung der FAIR GmbH
![Page 26: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/26.jpg)
SIS-300 Progress
Continuing efforts for R&D
19.3.2010 Meeting in Genova
INFN + GSI + FAIR
about prototype curved dipole magnet
April 2010 SIS-300 Pre-consortium meeting in GSI
IHEP + GSI + INFN
Discorap-Project by INFN
Magnet finished in 2010
![Page 27: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/27.jpg)
Board of FAIR Collaborations founded
• APPA, CBM, NuSTAR, PANDA: two representatives each
• discuss common issues (e.g. research and funding)
• initiate joint activities
Contact your funding agencies!
Raise more money for your experiment !
![Page 28: Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) @ GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia](https://reader035.vdocuments.site/reader035/viewer/2022062423/56649e365503460f94b262a5/html5/thumbnails/28.jpg)
B. Sharkov 31