document resume ed 374 285 ce 067 223 author atkinson, … · 2014. 5. 7. · %me last/wetland mate...

127
DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, Rhonda; And Others TITLE Understanding Sequence: Electrical Instrumentation, Millwright, Pipefitter. INSTITUTION Associated Builders and Contractors, Inc., Baton Rouge, LA. Pelican Chapter.; East Baton Rouge Parish School Board, La.; Greater Baton Rouge Chamber of Commerce, LA. SPONS AGENCY Office of Vocational and Adult Education (ED), Washington, DC. National Workplace Literacy Program. PUB DATE 31 Dec 93 CONTRACT V198A10155 NOTE 127p.; For documents related to this project, see CE 067 219-251. PUB TYPE Guides Classroom Use Instructional Materials (For Learner) (051) --"Tests/Evaluation Instruments (160) EDRS PRICE MF01/PC06 Plus Postage. DESCRIPTORS Adult Basic Education; Behavioral Objectives; Content Area Reading; Electrical Occupations; Instrumentation Technicians; Learning Activities; Learning Modules; *Literacy Education; *Serial Ordering; Trade and Industrial Education IDENTIFIERS *ABCs of Construction Project; Following Directions; Millwrights; Pipe Fitters; *Sequencing Skills; Workplace Literacy ABSTRACT Developed as part of the ABCs of Construction National Workplace Literacy Project, this instructional module contains instructional materials designed to help students understand the concept of sequencing and develop basic sequencing skills. The module begins with a unit in which instructional materials dealing with the construction industry are used to teach the importance of sequencing skills. Presented next are three sections of exercises containing reading materials specific to one of the following occupations/occupational clusters: electrical and instrumentation, pipefitting, and millwright. Each section contains five exercises in which students are presented with a story or some job-related procedure and are then asked either to answer a series of questions about the sequencing involved in the story/procedure or to select the best sequencing sequence from a series of sequencing options. Also included are answer keys for each of the three sections of exercises. (MN) *********************************************************************** Reproductiona supplied by EARS are the best that can be made from the original document. ***********************************************************************

Upload: others

Post on 04-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

DOCUMENT RESUME

ED 374 285 CE 067 223

AUTHOR Atkinson, Rhonda; And Others

TITLE Understanding Sequence: Electrical Instrumentation,Millwright, Pipefitter.

INSTITUTION Associated Builders and Contractors, Inc., BatonRouge, LA. Pelican Chapter.; East Baton Rouge Parish

School Board, La.; Greater Baton Rouge Chamber of

Commerce, LA.

SPONS AGENCY Office of Vocational and Adult Education (ED),

Washington, DC. National Workplace LiteracyProgram.

PUB DATE 31 Dec 93

CONTRACT V198A10155

NOTE 127p.; For documents related to this project, see CE

067 219-251.PUB TYPE Guides Classroom Use Instructional Materials (For

Learner) (051) --"Tests/Evaluation Instruments (160)

EDRS PRICE MF01/PC06 Plus Postage.

DESCRIPTORS Adult Basic Education; Behavioral Objectives; Content

Area Reading; Electrical Occupations; InstrumentationTechnicians; Learning Activities; Learning Modules;*Literacy Education; *Serial Ordering; Trade and

Industrial Education

IDENTIFIERS *ABCs of Construction Project; Following Directions;Millwrights; Pipe Fitters; *Sequencing Skills;Workplace Literacy

ABSTRACTDeveloped as part of the ABCs of Construction

National Workplace Literacy Project, this instructional module

contains instructional materials designed to help students understand

the concept of sequencing and develop basic sequencing skills. The

module begins with a unit in which instructional materials dealing

with the construction industry are used to teach the importance of

sequencing skills. Presented next are three sections of exercises

containing reading materials specific to one of the following

occupations/occupational clusters: electrical and instrumentation,pipefitting, and millwright. Each section contains five exercises in

which students are presented with a story or some job-related

procedure and are then asked either to answer a series of questions

about the sequencing involved in the story/procedure or to select the

best sequencing sequence from a series of sequencing options. Also

included are answer keys for each of the three sections of exercises.

(MN)

***********************************************************************Reproductiona supplied by EARS are the best that can be made

from the original document.***********************************************************************

Page 2: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

r r ' -

St.

o

U S DEPARTMENT OF EDUCATIONOffice Of Eaucational Research and Improverreni

1 UCATIONAL RESOURCES INFORMATIONCENTER (ERIC)

this document has been reproduced asreceived from the person or organizationoriginating it

ID Minor changes have been made toimprove reproduction quality

-Points o iew or opinions slated in thisdocumer r do not necessarily representofficial OERI position or policy

BEST COPY AVAILABLE

. Ir.:11

44.1

v.

Page 3: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

%me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee

Uitekacy gnat dunded tkotough tke U.S. Tepaktment o8 education ikord tfioventbek1, 1992, to cDeeottba 31, 1993, at tke Limning eextek o the Ttitian Chaptet(Associated Tulidexs and Cortbiaetoits Ut Baton 'Rouge, Louisiana. Uke

pubitdpkwate pagnetskip involved in the pko4e6t included tke east Baton 'gouge

%A Selma& (Aduft and Continuing education cDepcuctenent and the gkeiata BatoncRouge Ckarabat Commute. Olte contents do not neeessady kepkeseat tie Naas of

the Tepaktment o8 education, and you shoat( not assume endoksentext by the

%dud govekstritent.

cpko4eet cakeetok: Tame& cWag, Adult and Continuing education

Ctuateufuni ctlikiteks: 42konda (Atkinson, gscu

ta (Debbie Uongmax, Sgqicat Tomei oVaxey, 5,-egcti

%acidity Stall): a Ann cDePultaye

demote Chapman

Blaine cRegnoids

gime ogotetake mos got be gepeodgeed tottilogt matte* pageustog Igo* East c1311(011 cRogge Staked: oe(Ageoeiated q3utideu aid Coataaotom,Teitoaa eiapta

Page 4: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

MODULES OF INSTRUCTION DEVELOPED IN GRANT CYCLE

1. Writing Frames for Construction Workers (10 exercises)

for low-level readers; consists of 10 'paragraphs' with open-ended sentences forworkers to complete and recopy in their notebooks. Topics deal with work and training,

such as "My Job,' 'Classroom Behavior," and "Listening to Myself.'

2. Writing About Your Craft (10 topics)

for all students; list of 10 topics, such as "My Boss," 'The Main Beef About MyJob," and 'How Work Orders Are Delivered.' Used for integrating reading and writing

in a job-specific context.

3. Building Workplace Vocabulary for 13 & I: Structural Analysis (80 pages)Building Workplace Vocabulary for Millwrights: Structural Analysis(79 pages)Building Workplace Vocabulary for Pipefitters: Structural Analysis(79 pages)

5th grade level; teaches word attack skills for technical terms, utilizing word partsand root words; includes hints for retaining meanings by building card file with visualrepresentations of terminology.

4. Building Workplace Vocabulary for E & I: General, Specialized, & TechnicalTerms (58 pages)Building Workplace Vocabulary for Millwrights: General, Specialized & Technical

Terms (29 pages)Building Workplace Vocabulary for Pipefitters: General, Specialized, & Technical

Terms (32 pages)

5th grade level; teaches different kinds of vocabulary words encountered in work-related texts; drills for remembering new words; tips for building vocabulary;some dictionary use.

5. Building Workplace Vocabulary for E & I: Compound Words (28 pages)Building Workplace Vocabulary for Pipefitters: Compound Words (18 pages)Building Workplace 'Vocabulary for Millwrights: Compound Words (22 pages)

5th grade level; strategies for finding the meanings of compound words used intechnical writing; works with words in context

4

Page 5: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

6. Improving Listening Skills: Hazards Communication (18 pages)

Improving Listening Skills: Fire Extinguishers (22 pages)

a viewing, study guide that accompanies a commercial training video used in the

required 8-hour OSHA safety course; learning new words, main ideas, and drawing

conclusions are covered.

7. Measuring Decimals: Millwright (28 pages)

instruction and application problems

8. Improving Study Skills/Test Taking (60 pages)

6th grade level; good study skills arc needed for success in the ABC Training

program; explores strategies for organizing class notes and study time; analysis sheet for

determining weaknesses in test preparation; how to schedule to arrange study time and

work time

Computer Program

"Math for Pipefitters" is an interactive, multi-media program that covers fractions,

decimals, angles, and right triangle geometry in a pipefitting context (88 screens)

Page 6: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

UNDERSTANDING SEQUENCES: FOLLOWING DIRECTIONSIN CONSTUCTION MATERIALS

Objective: To read to follow directions.

It was Ted's first day at work. He had just finished school.He never had a "real" job before. He wasn't sure what to do.He asked his foreman. The foreman said, "Clock in. Unloadthe truck. Sort the pipe by size. Stack it. Then see me.tell you what else to do."

Ted wanted to make a good impression. He beganunloading the truck. He stacked all the pipe. He finished thejob. He looked at the stacks. Something looked wrong. Hethought back. What did the foreman say? Right! He wassupposed to sort the pipe first. Ted quickly sorted the pipe.He then stacked it. It looked much better. Ted had workedhard. He worked hard for the rest of the day. He workedhard all week.

Ted's first week ended. He got his paycheck. He opened it.Wait a minute! Something was wrong. Ted thought hischeck would be bigger. He worked hard. What happened tohis money?

Ted talked to the foreman. The foreman iooked at the check.He was surprised. He knew Ted was a hard worker. He

6

Page 7: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

knew Ted worked all week. Where was Ted's money? Theforeman pulled Ted's tirnesheet.

On Monday, Ted clocked in at 9:15. On Tuesday and

Wednesday, he clocked at 10:00. On Thursday, Ted clocked

in at 10:30. He clocked in Friday after lunch.

The foreman talked to Ted. He said, "Ted, you're a goodworker. You come to work on time. You work hard eachday. You need to change one thing. Think back. Each day, Itold you what to do. Each day, I told ycu to clock in first. Youwanted to get busy. You didn't clock in first. It lust doesn't

work that way. You have to do first things first. When you dothings is often as important as how you do it."

Ted's foreman is talking about following directions. This

means you do things is a certain order. Some things must bedone first. Others must come last. Following directions

means you understand the steps in instructions. These forma sequence --a step-by-step process.

Sometimes you don't have a foreman to tell you what to do.

You must read information for yourself to find what to do.This information directs you. It tells you what to do at eachstep. Followinp directions is itself a process in which you dothings in a ceri4in order.

2

Page 8: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Every sequence has a purpose. This is its point or main idea.The main idea is usually a change or outcome. The steps,Then, lead you to where you need to go. The point could be achange in a raw material. It could be a way to use a tool. itcould be a way to insure safety. Finding the point is animportant part of following directions.

STEPS IN FOLLOWING DIRECTIONS

1. Some directions begin with a heading or label. Read thisfirst. This title often tells you the sequence's main idea.

2. Read the directions through. This reading gives you anoverall sense of what to do. It tells you how many steps todo. You can also get an idea of how hard each step will be.NOTE: The directions may not seem to make sense. Thai'sOK. Many directions seem unclear aftur first reading.

3. Decide what you think the point of the sequence is.

4. Read Step 1. Do what it says.

5. Continue reading. Follow each step until you reach thelast step.

6. Reread the directions to check your work.

3

Page 9: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

How do you know what steps are in a sequence?

Sometimes, finding the steps is easy. Some directions include

words like "STEP 1" "STEP and so on. Other directions areharder to follow. Some directions use words like "ONE" or

"FIRST" to show you where to start. Some use words like

"SECOND," "THIRD," "NEXT," "AND THEN," or "NOW" to

show you what else to do. Words like "LAST" or "FINALLY"

help you find the end of the directions.

4

Page 10: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXAMPLE:

Procedure for Using a Combination Bench and Pipe se

WARNING! Follow all safety precautions!

Step 1 Inspect the vise for any defects that might make it unsafe touse.

Step 2 Turn the handle counterclockwise to open the jaws.

Step 3 Place the workpiece between the jaws.

Step 4 Tighten the jaws by turning the handle clockwise until the workpiece is held between the jaws so that the material does not slip.

WARNING! If the work piece slips in the vise, it can cause damage tothe material or present a safety hazard.

Wheels of learning Trainee Guide. Task Module 12101, Instrumentaton, Hand Too* or ms;rurnentation. p.

1. Some directions begin with a heading or label. Read thisfirst. It often tells you the sequence's main idea. The title ofthe sequence is "PROCEDURE FOR USING A COMBINATION

BENCH AND PIPE VISE."

5

A U

ufle, 1 tonertAr,... wi 41 t tunwVestnel..1_ afe,a,6,1,.

Page 11: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

2. Read the directions through. This reading gives you anoverall sense of what you must do. You can also get an ideaof how hard each step v ill be. NOTE: The directions maynot make sense. That's OK. Many directions seem unclear

after first reading. The procedure has four steps. The stepsdon't appear too hard.

3. Decide what you think the sequence's point is. This

process tells how to open the jaws of a vise and insert a piece of

work securely so that you can work on it.

4. Read Step 1. Do what it says. Step 1 involves safety-- you

check the vise for problems before use.

5. Continue reading. Follow each step until you reach thelast step. Step 2 tells you how to open the jaws of the vise. You

place the work into the jaws of the vise in Step 3. In Step 4, you

tighten the laws of the vise so that the work is secure.

6. Reread the directions to check your work. Check fordefects first. Open the vise. Insert the work. Close the vise

securely.

6

Page 12: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

CCLLI

w EXERCISES

L1J

CIL0

LU Electrical and.1 Instrumentation

LIJ

milminute

00 Associated Builders & Contractors, Inc.EBR Adult & Continuing Education

Page 13: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 1

Jack used an electric percussion hammer to drill throughsome concrete. He reads the following from his CraftTraining Handbook.

PROCEDURE FOR USING AN ELECTRIC PERCUSSION HAMMER

Before using an electric percussion hammer, know itsapplications and limitations. These can be found in the

manufacturer's instructions. Electric percussion hammers canbe used with drill bits, chisels, of other attachments. Thisprocedure uses a drill bit.

WARNING! Follow all safety precautions.Step 1 Select the correct drill bit fot the iob.

Step 2 Insert the drill bit in the chuck.

NOTE: !f using a star drill, insert to chuck and handle assembly,lock it in place, and then insert the bit.

WARNING! Check that the bit is secure in the chuck. A loose bitcan cause personal iniury or damage to the work.

Step 3 Position the hammer at the angle desired for the hold.Position the bit firmly on the center mark.

7

13

Page 14: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

NOTE: Pull the trigger only after the bit is in position and firm

pressure has been applied. The pressure holds the bit in placeand prevents it from wandering. Never allow an electrichammer to idle. If there is no pressure being applied to the bit,the force of the reciprocating action of the bit is absorbed by the

nose bushing. This can seriously damage the nose bushing.

Step 4 Squeeze the trigger, being sure to hold the hammersecurely and straight while drilling to avoid jamming or bindingthe bit.

NOTE: Should the bit seize in the hole, reversing direction of thebit or using a rotating motion may loosen it.

Step 5 When finished drilling the hole, clean chips and debrisout of hole with a squeeze bulb.

Warning: Do not use an air hose to clean out the hole.

Wheels of Looming Tree Guide, Tr-sk Module 12103, Instrumentaticn, Power Tool for Instrumentation. p. 13-14.

8

14

Page 15: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Which of the following best describes what Jack should havedone?

OPTION A

Jack chose a drill bit. He inserted the drill bit in the chuck.

He checked the hole. He cleaned chips and debris from thehole with an air hose. He squeezed the trigger. He held the

hammer securely and straight. This kept the drill from

jamming or binding the/bit. He positioned the hammer at theangle desired for the hare. He positioned the bit firmly on thecenter mark.

OPTION B

Jack chose the right drill bit for the job. He put the drill bit inthe chuck. Jack held the hammer at the angle he needed.He carefully positioned the bit on the center mark. Hesqueezed the trigger. He kept the hammer from jamming byholding the hammer securely. He drilled the hole and cleanedit with a squeeze bulb.

OPTION C

Jack chose a drill bit. He inserted the drill bit in the chuck. Hesqueezed the trigger. He checked the hole. He cleanedchips and debris from the hole with an air hose Hepositioned the hammer at the angle desired for the hole. Hepositioned the bit firmly on the center mark. He held thehammer securely and straight. This kept the drill fromjamming or binding the bit.

9

[ldifitiVilitiliAlltsialiitalkifiliiiiilltifrae

15

Page 16: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 2

Jan is installing threaded fasteners. She is using a torquewrench to tighten the nuts. She reads the following in herABC Craft Training handbook.

INSTALLING THREADED FASTENERS

The following general procedure can be used to install threadedfasteners in a variety of applications:

NOTE: When installing threaded fasteners for a specific job,make sure to check all installation requirements.

WARNING: Follow all safety precautions.

Step 1 Select the proper bolts or screws for the job.

Step 2 Check for damaged or dirty internal and external threads.

Step 3 Clean the bolt or screw threads. Do not lubricate thethreads if a torque wrench is to be used to tighten the nuts.

Step 4 Insert the bolts through the pre-drilled holes and tightenthe nuts by hand. Or, insert the screws through the holes andstart the threads by hand.

NOTE: Turn the nuts or screws several turns by hand and checkfor cross threading.10

Page 17: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 5 Following the proper tightening sequence, tighten thebolts or screws snug.

Step 6 Check the torque specification. Following the propertightening sequence, tighten each bolt, nut, or screw severaltimes approaching the specified torque. Tighten to the finaltorque specification.

Step 7 If required to keep the bolts or nuts from working loose,install lam nuts, cotter pins, or safety wire.

Meets of '_ecming Iccinee Guide, Task Module 12106, Instrumentation, Inszumentolion Fosteners p 34.

Which of the following best describes what Jan should do?

OPTION A

Jan should choose the bolts she needs. She should thenclean each one. She must check for damaged internal andexternal threads. She needs to carefully lubricate thethreads. She should install jam nuts to keep the bolts fromworking loose. She will then insert the bolts through the pre-drilled holes. She should tighten the nuts by hand. She willlighten the bolts snug by following the proper tightening

sequence. She will then check the torque specification. She

must lighten each bolt several limes to approach the desiredtorque. Lastly, she will tighten the bolts to the final torquespecifications.

11

Page 18: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Jan should choose the bolts she needs. She must check fordamaged internal and external threads. She should thenclean each one. She needs to carefully lubricate the threads.She will then insert the bolts through the pre-drilled holes.She should install jam nuts to keep the bolts from workingloose. She should tighten the nuts by hand. She will lightenthe bolts snug by following the proper tightening sequence.She will the check the torque specification. She musttighten each bolt several times to approach the desiredtorque. Lastly, she will tighten the bolts to the final torquespecifications.

OPTION C

Jan should choose the bolts she needs. She must check tordamaged internal and external threads. She should thenclean each one. She should not lubricate the threadsbecause she is using a torque wrench. She will then insert thebolts through the pre-drilled holes. She should tighten thenuts by hand. She will lighten the bolts snug by following theproper lightening sequence. She will then check the torque

specification. She must tighten each bolt several times toapproach the desired torque. Lastly, she will tighten the boltsto the final torque specifications. She should install jam nutsto keep the bolts from working loose.

12

Page 19: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 3

Vu is going to install blind rivets through drilled holes with a

pop rivet tool. He reads the following inforrn4tion in his ABCCraft Training handbook.

INSTALLING BLIND RIVETS

Blind rivets are installed through drilled or punched holes with aspecial blind (pop) rivet tool. Use the following general

procedure to install blind rivets:

WARNING: Follow all safety precautions.

WARNING: Make sure to wear proper eye and face protectionwhen riveting.

Step 1 Select the correct length and diameter of blind rivet to beused.

Step 2 Select the appropriate drill bit for the size of rivet beingused.

Step 3 Drill a hole through both parts being connected.

Step 4 Inspect the rivet gun for any defects that might make itunsafe for use.

Step 5 Place the rivet mandrel into the proper sized setting tool.

13

1.1

Page 20: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Insert the rivet end into the pre-drilled hole.

Step 7 Install the rivet by squeezing the handle of the rivet gun

causing the laws in the setting tool to grip the mandrel. The

mandrel is pulled up, expanding the rivet until it breaks at the

shear point.

Step 8 Inspect the rivet to make sure the pieces are firmly riveted

together and that the rivet is properly installed.

Wheels of _coming Trciree Guide, Telsk Module 12106, Instrument=s, Fos:eners . p 35-36.

Which of the following best describes what Vu did?

OPTION A

First, Vu put on a protective face mask. He then selected the

correct length and diameter of the blind rivet he needed. He

chose the appropriate drill bit for the size of rivet being used.

He drilled a hole through both parts being connected. He

placed the rivet mandrel into the proper-sized setting tool.

He inspected the rivet gun for defects. He inserted the rivet

end into the pre-drilled hole. He installed the rivet by

squeezing the handle of the rivet gun. Vu inspected the rivet

to be sure the pieces were firmly riveted together.

14

20

Page 21: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

First, Vu put on a protective face mask. He then selected the

correct length and diameter of the blind rivet he needed. He

chose the appropriate drill bit for the size of rivet being used.

He drilled a hole through both parts being connected. He

inspected the rivet gun for defects. He placed the rivet

mandrel into the proper-sized setting tool. He inserted the

rivet end into the pre-drilled hole. He installed the rivet bysqueezing the handle of the rivet gun. Vu inspected the rivetto be sure the pieces were .firmly riveted together.

OPTION C

First, Vu put on a protective face mask. He chose the

appropriate drill bit for the size of rivet being used. He drilled

a hole through both parts being connected. He then selected

the correct length and diameter of the blind rivet he needed.

He placed the rivet mandrel into the proper-sized setting tool.

He inspected the rivet gun for defects. He inserted the rivet

end into the pre-drilled hole He installed the rivet bysqueezing the handle of the rivet gun. Vu inspected the rivetto be sure the pieces were firmly riveted together.

15

2i

Page 22: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 4

G.J. is using toggle bolts to fasten a mount to wallboard. Hereviews the following information from his ABC manual.

INSTALLING TOGGLE BOLTS

Toggle bolts are used to fasten a part to hollow biock, wallboard,plaster, panel, or tile. The following general procedure can beused to install toggle bolts.

WARNING! Follow all safety precautions.

Step 1 Select the proper size of drill bit or punch and toggle boltfor the job.

Step 2 Check the toggle bolt for damaged or dirty threads or amalfunctioning wing mechanism.

Step 3 Clean and lightly lubricate the threads of the bolt.

Step 4 Using the correct size of drill bit, drill a hole completelythrough the surface to which the part is to be fastened.

Step 5 Inscit the toggle bolt through the opening in the item tobe fastened.

16

22

Page 23: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Screw the toggle wing onto the end of the toggle bolt,ensuring that the flat size of the toggle wing is facing the bolthead.

Step 7 Fold the wings completely back and push them throughthe drilled hole until the wings spring open.

Step 8 Tighten the toggle bolt with a screwdriver until it is snug.

Wheels of Leaning Trcinecl Guide, Task Module 12106, Instrumentatcri, Invu,-nentction Fasteners p 37

Which of the following best describes what G.J. should hovedone?

OPTION A

G.J. looked at the mount. He chose a toggle bolt that wasthe proper size for the job. He picked o drill bit to match it.He checked the bolt to make sure it was clean. He looked tosee that the wing mechanism was working. He cleaned thethreads on the bolt. He oiled them. He drilled a hole throughthe wallboard. He put the bolt through the hole in the mount.He screwed the toggle wing on the end of the toggle bolt.I le made sure that the flat side of the w41g faced the bolthead. He folded the wings back. He pushed the wingsthrough the hole. He let the wings spring open. He pulledthe mount back to hold the wings against the inside of thewallboard. He tightened the toggle with a screwdriver untilsnug.

17

23

Page 24: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

G.J. looked at the mount. He drilled a hole through thewallboard. He chose a toggle bolt that was the proper sizefor the job. He cleaned the threads on the bolt. He oiledthem. He picked a drill bit to match it. He checked the bolt tomake sure it was clean. He looked to see that the wingmechanism was working. He put the bolt through the holein the mount. He screwed the Joggle wing on the end of thetog& bolt. He made sure that the flat side of the wing faced

the bolt head. He folded the wings back. He pushed the

wings through the hole. He let the wings spring open. Hepulled the mount back to hold the wings against the inside of

the wallboard. He tightened the toggle with a screwdriveruntil snug.

18

2 ti

Page 25: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

G.J. looked at the mount. He drilled a hole through the

wallboard. He put the bolt through the hole in the mount.He chose a toggle bolt that was the proper size for the job.He picked a drill bit to match it. He checked the bolt to makesure it was clean. He looked to see that the wing mechanism

was working. He cleaned the threads on the bolt. He oiledthem. He screwed the toggle wing on the end of the toggle

bolt. He made sure that the flat side of the wing faced thebolt head. He folded the wings back. He pushed the wingsthrough the hole. He let the wings spring open. He pulledthe mount back to hold the wings against the inside of thewallboard. He tightened the toggle with a screwdriver untilsnug.

1C

Page 26: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 5

Loyd replaced a gasket on a flange. He had to layout a newone. He used the following information from his ABC trainingguide:

LAYING OUT NEW GASKET

The following procedure descri)z,s how to lay out and cut a newgasket for a pipe flange.

WARNING! Follow all safety precautions.

Step select the proper gasket material for the conditions andprocess.

Step 2 Take three measurements (draw each as concentriccircles):

* diameter of pipe opening,

* outside diameter of flange, and

diameter of the bolt hole circle.

The diameter of the bolt circle is found by measuring from thebottom (or top) of opposite holes.

Step 3 Find the radius of the bolt circle. The radius of the boltcircle is equal to half of the diameter.

Step 4 Draw a line through the circle's center for opposite holes.

20

G

11

Page 27: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 5 nn a 6-hole flange, the radius is equal to the distancebetween bolt holes.

Step 6 To check the distance, walk the dividers around the circle.

NOTE: Lay out holes a little larger than their actual size. Gasketswith an even number of holes (i.e., 4, 8, 16) can also be laid outusing the "swing arc" method. This method uses the divider tobisect distances. Flanges with an odd number of holes can belaid out using a protractor (simply divide 360 degrees by thenumber of holes) or by using the mathematical method.

Step 7 Cut out the gasket using a gasket cutter.

NOTE: The blade should not protrude more than 1/32" morethan the thickness of the casket material. Never hammer thegasket, as hammering may cause lumps in the gasket.

Step 8 Place the gasket material on hard wood to protect thepunch edge. Then, punch out the holes using a holy -, punch.

Wheels of learning, Instrumentation Module 12108 Gaskets and Packing, p 10-12,

21

2'r

Page 28: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Loyd's foreman is checking his work. Which of the followingwill get an "OK" from the foreman?

OPTION A

Loyd chose a material suitable for the conditions and process.He drew a line through the center of circle for oppositeholes. Since he was culling a 6-hole flange, he found theradius was equal to the distance between the bolt holes. Hewalked the dividers around the hole to check his work. Hemeasured the diameter of the pipe opening. He measuredthe outside diameter of the flange. He measured thediameter of the bolt hole circle. He figured the radius of thebolt circle. He used a gasket cutter to cut the gasket. Heplaced the gasket material on hard wood to protect thepunch edge. He punched out the holes.

22

2 o

Page 29: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Loyd chose a material suitable for the conditions and process.He measured the diameter of the pipe opening. He

measured the outside diameter of the flange. He measuredthe diameter of the bolt hole circle. He figured the radius ofthe bolt circle. Since he was cutting a 6-hole flange, he foundthe radius was equal to the distance between the bolt holes.He walked the dividers around the hole to check his work.He used a gasket cutter to cut the gasket. He drew a linethrough the center of the circle for opposite holes. He

punched out the holes. He placed the gasket material onhard wood to protect the punch ecge.

OPTION C

Loyd chose a material suitable for the conditions and process.He measured the diameter of the pipe opening. Hemeasured the outside diameter of the flange. He measuredthe diameter of the bolt hole circle. He figured the radius ofthe bolt circle. He drew a line through the center of the circlefor opposite holes. Since he was cutting a 6-hole flange, hefound the radius was equal to the distance between the boltholes. He walked the dividers around the hole to check hiswork. He used a gasket cutter to cut the gasket. He placedthe a asket material on hard wood to protect the punch edge.He punched out the holes.

23

Page 30: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

CCL1JF-Z EXERCISESLli

Lii

0ILI

Lli

Pipefitting

1.1.1

0 Associated Builders & Contractors, Inc.EBR Adult & Continuing Education

Page 31: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 1

Carl used a manual bendera hickey--to bend pipe beforeinstalling. He was supposed to use the following steps fromhis ABC Craft Handbook:

Step 1 Determine the size of the pipe to be bent.

3iep 2 Select the proper size of bender.

Step 3 Mark the pipe at the beginning of the bend.

Step 4 Lay the pipe on the floor.

Step 5 Slide the bender onto the pipe at the start of the bend.

Step 6 Grip the handle, and pull the bender down toward thefloor to make the bend.

NOTE: The thin-wall conduit bender will make a smooth bendwith one long pull of the handle; it has a heel that you can presswith your foot to assist in bending the pipe. The pipe and heavy-wall conduit bender requires you to make o small bend, slidethe bender along the pipe a short distance, arid make anotherbend until the proper bend in achieved.

Step 7 Stop the bend when the required bend angle is achieved.

24

31

Page 32: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

CAUTION Be careful not to bend the pipe past the requiredangle. It is difficult to straighten pipe without damaging it.

Step 8 Remove the bender from the pipe.

Step 9 Check the pipe for cracking or kinking.

Step 10 Store the bender it its proper place.

Wheels of Learnirg Trainee Gt.:ice, Task Module 08101, Pipefirter Hand Tools, p 68-69

Using this process, Carl correctly bent the pipe. Which of thefollowing did Carl probably do?

OPTION A

Carl measured the pipe. It was 1/2 inch pipe. He chose theright bender size. He found where the beginning of the pipeshould be and marked the pipe. He put the pipe on the floor.He slid the bender on the pipe at the start of the bend. Carlcarefully gripped the handle. ; ie pulled the bender downtoward the floor to make the bend. He stopped when thebend reached the correct angle. He removed the hickey. Helooked at the pipe to see if it was cracked or kinked. He putthe bender away.

25

Page 33: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Cad chose the right bender size and measured thr; pipe. Itwas 1/2 inch pipe. He found where she beginning of the pipe

should be and marked the pipe. He put the pipe on the floor.He slid the bender on the pipe at the start of the bend. Carlcarefully gripped the handle. He pulled the bender up awayfrom the floor to make the bend. He stopped when the bend

reached the correct angle. He looked at the pipe to see if itwas cracked or kinked. He removed the hickey. He put thebender away.

OPTION C

Carl chose the right bender size and measured the pipe. Itwas 1/2 inch pipe. He marked the pipe. He found where thebeginning of the pipe should be. He put the pipe on thefloor. Carl carefully gripped the handle of the hickey. He slid

the bender on the pipe at the start of the bend. He pulledthe bender up away from the floor to make the bend. Hestopped when the bend reached the correct angle. Helooked at the pipe to see if it was cricked or kinked. Heremoved the hickey. He put the bender away.

26

3 3

Page 34: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 2

Jay has been cutting steel pipe with a portable band saw.The blade has become worn. He needs to replace it. Heknows that this requires the following method:

WARNING! Make sure the portable band saw is unpluggedbefore replacing the blade.

Step 1 Rotate the blade adjust knob 180 degrees to release thetension on the blade.

Step 2 Turn the saw upside down on your work table.

Step 3 Remove the blade from the blade pulleys underneath thesaw.

WARNING! Be careful when removing the blade, because theblade-has a tendency to spring out when you take it off the bladepulleys.

Step 4 Slip a new blade around the blade pulleys.

Step 5 Slip the new blade into the blade guide and the backstop.

Step 6 Turn the saw over, and rotate the blade adjust knob toput tension on the blade.V.1-eels of Lecrr:rg Trainee Cvi le, Task Module 081C2. Pov.er 7:: ' 9.10

27

Page 35: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Jay had some problems changing the blade in the saw.

What should Jay do to correctly replace the saw blade?

OPTION A

Jay should should rotate the blade adjust knob a quarter-

turn. This will increase tension on the blade. He should hold

the saw rightside up. He should take the blade from the

blade pulleys on the top of the saw. He should then slip theblade around the blade pulleys. He should then slip the new

blade into the blade guide. The new blade should slip into

the back stop. Jay should turn the saw over and rotate the

blade adjust knob to release tension on the blade.

OPTION B

Jay should unplug the saw first. He should rotate the blade

adjust knob a full turn. This will increase tension on the

blade. He should hold the saw upside down. He should take

the blade from the blade pulleys underneath the saw. He

should then slip the blade over the blade pulleys. He should

then slip the new blade into the blade guide. The new blade

should slip into the back stop. Jay should turn the saw over

and rotate the blade adjust knob to release tension on the

blade.

28

3

Page 36: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

Jay should unplug the saw first. He should rotate the blade

adjust knob a half-turn. This will release tension on theblade. He should hold the saw upside down. He should takethe blade from the blade pulleys underneath the saw. Heshould then slip the blade around the blade pulleys. He

should then slip the new blade into the blade guide. The new

blade should slip into the back stop. Jay should turn the saw

over and rotate the blade adjust knob to regain tension onthe blade.

29

3G

1

Page 37: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 3

Vic is a new employee. He will be using a portaFepneumatic grinder. His supervisor gives him the followinginformation so Vic can inspect the grinder before use.

Step 1 Inspect the air inlet and the air line of a pheumatic grinderto ensure there are no signs of damage that could cause a badconnection or loss of air.

Step 2 Inspect the power cord and plug in electric models toensure there are no signs of damage.

Step 3 Inspect the handle to make sure it is not loose, whichcould cause a loss of control.

Step 4 Inspect the grinder housing and body for defects.

Step 5 Ensure that the trigger switch works properly and doesnot stick in the ON position.

Step 6 Ensure that the safety guard is in good cond.:ion andsecurely attached to the grinder.

Step 7 Check the oil level in pneumatic grinders.

Step 8 Ensure that the maximum rotating speed of the grindingwheel is higher than the maximum rotating speed of the grinder.30

3"r

Page 38: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 9 Start the grinder, and allow it to run for 1 to 2 minutes

while checking for visual abnormalities, excessive vibration,

extreme temperature changes, or noisy operation.

Step 10 Inspect the work area to ensure the safety of yourself

and others and to make sure that the heat and sparks

generated by the grinder cannot start any fires.

W'eel..s of Leamir.g Trainee Guide. Task Module 08102. Pir.-z-27ter Power Tccls, p 9-10

Which of the following will get an OK from Vic's supervisor?

OPTION A

Vic checked the air intake and air line. He checked for other

signs of damage that would result in a loss of air. He

checked the grinder's handle, housing, and body. He made

sure that the trigger was working properly. He examined thesafety guard and made sure it was attached to the grinder.He checked the oil level. He made sure that the maximumrotating speed of the grinding wheel was higher that themaximum rotating speed of the grinder. He started thegrinder. He let it run for a couple of minutes. He looked atthe grinder to see if he saw anything wrong. He felt to see ifit vibrated too much or got too hot. He listened to see if the

grinder ran more loudly than usual. Vic checked the work

area. He saw some papers that could catch on fire. He putthe papers away.

31

3 0

Page 39: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Vic checked the grinder's handlc, housing, and body. Hemade sure that the trigger was working properly. Heexamined the safety guard and made sure it was attached tothe grinder. Vic checked the air intake and air line. Hechecked for other signs of damage that would result in a loss

of air. He checked the oil level. He made sure that the

maximum rotating speed of the grinding wheel was higher

that the maximum rotating speed of the grinder. He startedthe grinder. He let it run for a couple of minutes. He lookedat the grinder to see if he saw anything wrong. He felt to seeif it vibrated too much or got too hot. He listened to see if thegrinder ran more loudly than usual. Vic checked the work

area. He saw some papers that could catch on fire. He putthe papers away.

32

Page 40: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

Vic started the grinder. He let it run for a couple of minutes.He looked at the grinder to see if he saw anything wrong. Hefelt to see if it vibrated to much or got too hot. He listenedto see if the grinder ran more loudly than usual. Vic checked

the air intake and air line. He checked for other signs ofdamage that would result in a loss of air. He checked the

grinder's handle, housing, and body. He made sure that thetrigger was working properly. He examined the safety guardand made sure it was attached to the grinder. He checkedthe oil level. He made sure that the maximum rotating speedof the grinding wheel was higher that the maximum rotafingspeed of the grinder. Vic checked the work area. He sawsome papers that could catch on fire. He put the papersaway.

33

Page 41: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 4

4och must make sure a joint in 5/8 inch pipe is leakproof. Hewill be using Teflon tape. He reviews the folk: wing from hisABC craft training manual:

Warning! Never use Teflon tape on pipe that is to be welded orpipe that carries steam or other high-temperature service. WhenTeflon tape is heated, it emits a highly toxic gas that could befatal.

Step 1 Remove all excess cutting oil from the threads to improvethe grip of the tape on the threads.

NOTE: Use 1/2 inch wide Teflon tape for pipe that is 3/4 inchnominal size and smaller. Use 3/4 inch wide tape for pipe thatis 1-inch nominal size or larger.

Step 2 Start the tape from the end of the pipe, leaving the first fullthread bare to prevent the tape from bunching up at thebeginning of the thread.

Step 3 Wrap the tape around the pipe in the direction that thepint is to be assembled.

NOTE: Tape should be wrapped around right-hand threads in aclockwise direction and around left-hand threads in a

counterclockwise direction.

34

Page 42: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 4 Continue to wrap the tape around the joint, overlappingthe edges of each wrap until all remaining threads have beencovered.

Step 5 Press the tape against the threads to seal it to the threads

and prevent the tape from slipping off the threads once you startto make up the joint.

What is the proper way for each to wrap the pipe with Teflontape?

OPTION A

Zach used a cloth to remove the cutting oil from the threadsof the pipe. He got a roll of 1 inch Teflon tape. He startedtaping from the middle of the pipe. He left the first full threadbare. He didn't want it to bunch in the middle of the pipe.He wrapped it clockwise because he used right-handthreads. He wrapped the pipe. He overlapped the edgesuntil he could no longer see any threads. He smoothed the

tape against the threads to seal it. He knew this would alsoprevent it from slipping when he made up the joint.

42

Page 43: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Zach used a cloth to remove the cutting oil from the threadsof the pipe. He got a roll of 1/2 inch Teflon tape. He startedtaping from the end of the pipe. He left the first full thread

bare. He didn't want it to bunch at the end of the thread. Hewrapped it clockwise because he used right-hand threads.He wrapped the pipe. He overlapped the edges until hecould no longer see any threads. He smoothed the tapeagainst the threads to seal it. He knew this would alsoprevent it from slipping when he made up the ioint.

OPTION C

Zach used a cloth to remove the cutting oil from the threadsof the pipe. He got a roll of 1 inch Teflon tape. He startedtaping from the end of the pipe. He didn't want it to bunch atthe end of the thread. He wrapped it counterclockwisebecause he used right-hand threads. He wrapped the pipe.He overlapped the edges until he could no longer see anythreads. He smoothed the tape against the threads to seal it.He knew this would also prevent it from slipping when hemade up the joint.

36

Page 44: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 5

Lee's company got a contract to replace a piping system.She will be fitting screwed pipe and fittings. Lee knows shemust use the following procedure:

Step 1 Determine the type, size, and schedule of pipe beingused in the system.

Step 2 Determine the length of pipe needed.

Step 3 Cut the pipe to the desired length.

Step 4 Ream the pipe to remove all internal burrs.

Step 5 Thread the pipe, taking caution not to cut the threads toodeep.

Step 6 Select the proper size, shape, and type of fittings needed.

Step 7 Clean the pipe and fittings thoroughly inside and out.

NOTE: All sand, dirt, and oil must be removed from the inside ofthe pipe and fittings to avoid contaminating the system orclogging the line. The fittings and pipe ends may be cleanedwith a clean rag soaked in nonflammable solvent.

37

4 4

Page 45: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 8 Check the threads on the pipe and the fitting to ensure

that they are properly cut and not damaged.

Step 9 Apply joint compound or Teflon tape to the pipe threads.

Step 10. Start the fitting on the pipe by hand.

Step 11. Tighten the fitting slowly, using a pipe wrench.

CAUTION: Tightening the fitting quickly causes excessive heatdue to friction, which could cause the threads or the fitting to

expand. Do not allow the threads to bottom out into the fitting.

This can damage the threads and the fitting.

Wheels of Leering Trainee Guide, Task Module 06103, Pipefirting, Threaded Pipe Fabrication p 45 -46.

33

4 5

Page 46: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

If Lee did the lob correctly, what did she do?

OPTION A

Lee checked the system. She measured the section thatneeded replacing. It was 24 inches long. She cut a newpiece of schedule 40 carbon steel 2 inch pipe. She needed toremove some external burrs, so she reamed it. She carefullythreaded the pipe. She selected a fitting based on the size,shape, and type. She got a rag and some flammable solvent.She cleaned the pipe and the fitting inside and outside. Leechecked the pipe's threads to make sure she had cut themaccurately. She put joint compound on the threads. Shestarted fitting the pipe by hand. Lee used a pipe wrench toslowly tighten the fitting. She made sure that the threads didnot bottom out into the fitting.

39

4

Page 47: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Lee checked the system. She noted that the pipes wereschedule 40 carbon steel 2 inch pipe. She measured thesection that needed replacing. It was 24 inches long. Shecut a new piece of schedule 40 carbon steel 2 inch pipe. Sheneeded to remove some internal burrs, so she reamed it. Shecarefully threaded the pipe. She selected a fitting based onthe size, shape, and type. She got a rag and somenonflammable solvent. She cleaned the pipe and the fittinginside and outside. Lee checked the pipe's threads to makesure she had cut Them accurately. She put joint compoundon the threads. She started fitting the pipe by hand. Lee

used a pipe wrench to slowly tighten the fitting. She madesure that the threads did not bottom out into the fitting.

4 (

Page 48: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

Lee checked the system. She measured the section thatneeded replacing. It was 24 inches long. She selected afitting based on the size, shape, and type she needed. Shenoted that the pipes were schedule 40 carbon steel 2 inchpipe. She cut a new piece of schedule 40 carbon steel 2 inchpipe. She needed to remove some internal burrs, so she

reamed it. She carefully threaded the pipe. She got a ragand some nonflammable solvent. She cleaned the pipe andthe fitting inside and outside. Lee checked the pipe's threadsto make sure she had cut them accurately. She put jointcompound on the pipe being careful not to get any on thethreads. Lee used a pipe wrench to slowly begin fitting the

pipe. She made sure that the threads did not bottom out intothe fitting. She tightened the fittings by hand.

41

48

Page 49: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

FIII

L1EXERCISES

L

C.)

F-zLLI

11.1

uJ

Millwrightz

F--

ATX)Associated Builders & Contractors, Inc:Him!:

EBR Adult & Continuing Education

4

Page 50: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 1

Gabe is installing gaskets. He uses a putty knife to scrape offthe old gaskets. He used the following steps to select,inspect, use and maintain the putty knife.

Step 1 Select a putty knife of the proper length and width to dothe lob.

WARNING! Do not choose a knife that is larger than needed andcannot be handled safely.

Step 2 Inspect the putty knife to ensure that the blade is not bentor dull and that the handle is in good condition and firmlyattached to the blade.

Step 3 Hold the knife in one hand at an angle to the work, andscrape the gasket off using smooth, even strokes.

WARNING! Do not try to chip the gasket with the putty knife. Thiscould nick the surface being scraped and dull the knife. Keepthe knife blade flat on the surface. Do not try to scrape the sideedge of the blade. Keep your hands away from the cutting edgeof the blade, and work away from your body to prevent personalinjury.

Step 4 Continue to scrape the surface until all the gasket isremoved.42

5 i)

Page 51: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 5 Clean the knife thoroughly with a rag, using solvent if

needed.

Step 6 Oil the knife lightly to prefent rust.

Step 7 Store the knife in its proper place.

Wheels of Learning, Millwright Moaule 15101, Miilwr.ght Ficr.d Tools. p 17,

What is the proper procedure for Gabe to use?

OPTION A

Gabe checked the gasket. He chose a putty knife that was

appropriate in length and width. He looked at the blade to

be sure it wasn't bent or dull. He looked at the handle to be

sure it was in good condition and firmly attached to the

blade. He held the knife in both hands. He made sure that

he never held it at an angle to the gasket. He used short,

choppy strokGs"to remove the gasket. He kept the blade flat

on the :surface. He made sure that he did not use the blade

edge as a scraper. He kept his hands away from the cuffing

edge. He was careful to cut toward his body. Gabe keptscraping until all the gasket was removed. He carefully

cleaned the knife and oiled it. He put the putty knife away.

43

51

a=s6e..risoaLaaeb:aisal..- ," gudosaagius'

Page 52: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Gabe checked the gasket. He chose a putty knife that was

appropriate in weight. He looked at the blade to be sure it

wasn't too sharp for the gasket. He looked at the handle to

be sure it was in good condition and firmly attached to the

blade. He held the knife in one hand. He made sure that he

held it at an angle to the gasket. He used smooth, evenstrokes to remove the gasket. He kept the blade vertical on

the surface. He made sure that he did not use the side edge

as a scraper. He kept his hands away from the cutting edge.

He was careful to cut away from his body. Gabe kept

scraping until all the gasket was removed. He carefully oiled

the knife. He put the putty knife away.

OPTION C

Gabe checked the gasket. He chose a putty knife that was

appropriate in length and width. He looked at the blade to

be sure it wasn't bent or dull. He looked at the handle to be

sure it was in good condition and firmly attached to the

blade. He held the knife in one hand. He made sure that he

held it at an angle to the gasket. He used smooth, even

strokes to remove the gasket. He kept the blade flat on the

surface. He made sure that he did not use the side edge as

a scraper. He kept his hands away from the cutting edge.

He was careful to cut away from his body. Gabe kept

44

Page 53: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

scraping until all the gasket was removed. He carefullycleaned the knife and oiled it. He put the putty knife away.

45

Page 54: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 2

!Carl is connecting flanges and structural steel. He aligns boltholes with drift pins. He uses the following steps to select,inspect, use, and maintain the pins.

Step 1 Select a pin of the proper size for the holes being aligned..

NOTE: The proper size drift pin will fit all the way through bothholes being aligned and still be large enough and strongenough to pull the mating pieces together.

Step 2 Inspect the pin to ensure that it is not bent and that it

does not have burrs that could cut your hands.

Step 3 Insert the pin into the holes of the mating pieces, and

use it to pull the holes into alignment.

Step 4 Clamp the mating pieces together using a C-clamp, if

possible, to hold the parts in alignment while the pin is removed

and a bolt installed in its place.

NOTE: On pieces with more than one hole, the drift pin can beleft in until bolts can be installed in the other holes. Then the drift

pin is removed, and a bolt is installed in its place.

Step 5 Clean the pin, using a rag and solvent if needed.

46

Page 55: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Cover the pin with a light coat of oil to prevent rust.

Step 7 Store the pin in its proper place.

Wheels of Lecming, MtIlvinght ,Vodute 15101, Millvinght Hand Tools o la,

What would have been the best way for Karl to use a driftpin?

OPTION A

Kart measured the size of the holes he needed to align. Hechose a pin to match. He checked the pin To see that it wasnot bent. He made sure there was nothing sharp that mightcut his hands. He put the pin into the holes of the mating

piece. He used that to pull the holes into the correct position.

He got a C-clamp. He used that to put the mating pieces

together. He removed the pin and installed a bolt in its place.Some dirt got on the pin. He cleaned it with a rag and

solvent. He coated with pin with oil. He put the pin back.

47

r;

Page 56: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Karl measured the size of the holes he needed to align. Hechose a pin to match. He checked the pin tc see that it wasnot bent. He made sure there was nothing sharp that mightcut his hands. He made sure that he did not put tfie pin intothe holes of the mating piece. He pulled the holes into thecorrect position. He got a C-clamp. He used that to put themating pieces together. He removed the pin and installed abolt in its place. Some dirt got on the pin. He cleaned it witha rag and oil. He coated with pin with solvent to prevent rust.He put the pin back.

OPTION C

Karl chose a pin. He got a C-clamp. He checked the pin tosee that it was not bent. He made sure there was nothing

sharp that might cut his hands. Karl measured the size of theholes he needed to align. He used the pin to pull the holes

into the correct position. He used the C-clamp to put themating pieces together. He removed the pin and installed abolt in its place. Some dirt got an the pin. He cleaned it witha rag and solvent. He coated with pin with cll. He put the pinback.

48

Page 57: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 3

Jon must install some new gears. The gears he is replacing

are precision gears which were press-fitted in place. vie finds

a couple of them particularly difficult to remove. Jon doesn't

want to damage the gear, so he decided to get a gear puller.He uses the following process to select, inspect, use, and

maintain a gear puller.

Step 1 Select a gear puller with the correct jaw length and

spread width for the gear or bearing being pulled.

Step 2 Inspect the puller to ensure that the jaws are not bent or

excessively worn and that the pressure bolt threads are notstripped.

Step 3 Ensure that all set screws or locking screws have been

loosened or removed from the gear or bearing.

Step 4 Inspect the shaft lo ensure that there are no nicks, burrs,

or foreign objects that would interfere with the gear or bearing

sliding off the shaft.

Step 5 Position the puller on the gear or bearing, and screw the

pressure screw in until it presses against the shaft

49

Page 58: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Check the puller to ensure that the jaws are properlypositioned on the gear or bearing.

CAUTION: The puller jaws must be positioned so that they willprovide a straight, even pull on the gear or bearing and notdamage it.

Step 7 Turn the pressure bolt slowly clockwise to begin applyingpressure to the gear or bearing.

WARNING! Always wear eye protection when using a puller,because particles could break off and injure your eyes.

Step 8 Continue to tighten the pressure bolts until the gear orbearing is removed from the shaft.

Step 9 Clean the puller thoroughly.

Step 10 Coat the puller lightly with oil to prevent rust.

Step 11 Store the puller in its proper place.

Wheels of Learning, Millwright Mcc:..ie 15101, MtirAnght Hand Toots, p. 34 -35.

What is NOT the correct way for Jon to use the gear puller?

50

Page 59: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION A

Jon looked at the gear he needed to pull. He chose a gearpuller with the correct jaw length and spread width. Hechecked the puller. He wanted to see if it was bent or worn.He needed to know if the bolt threads were stripped. Hemade sure that the set screw was loosened and removedfrom the gear. He checked the shaft. He made sure there

were no foreign objects that would keep the gear from slidingoff the shaft. He put the puller on the gear. He screwed thepressure screw in place until it touched the shaft. He

checked the puller again to be sure it was properly

positioned. He knew he needed to be able to evenly pull thegear straight out. He turned the pressure bolt slowlyclockwise. This applied pressure to the gear. He put goggleson. He continued to tighten the pressure bolt until he

removed the gear from the shaft. He cleaned the puller,oiled it, and put it away.

51

5 '3

Page 60: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Jon looked at the gear he needed to pull. He chose a gearpuller with the correct jaw length and spread width. Hechecked the puller. He wanted to see if there was anything

wrong with it. He needed to know if the bolt threads werestripped. He put goggles on. He loosened the set screw and

removed it from the gear. He checked the shaft. He made

sure there were no nicks or burrs that would keep the gearfrom sliding off the shaft. He put the puller on the gear. Hescrewed the pressure screw in place until it touched the shaft.

He checked the puller again to be sure it was properly

positioned. He knew he needed to be able to evenly pull the

gear straight out. He turned the pressure bolt slowlyclockwise. This applied pressure to the gear. He continuedto tighten the pressure bolt until he removed the gear from

the shaft. He cleaned the puller. He oiled it. He put it away.

52

Page 61: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

Jon looked at the gear he needed to pull. He chose a gear

puller with the correct law width and spread length. He

checked the puller. He wanted to see if it was bent or worn.He needed to know if the bolt threads were stripped. He

made sure that the set screw was light secured in the gear.

He checked the shaft. He made sure there were foreign

objects that would keep the gear from sliding off the shaft.He put the puller on the gear. He screwed the pressurescrew in ' ace until it touched the shaft. He checked the

puller again to be sure it was properly positioned. He knew

he needed to be able to pull the gear out at an angle. Heturned the pressure bolt slowly counter lockwise. This

applied pressure to the gear. He removed the goggles so he

could see better. He continued to tighten the pressure bolt

until he removed the gear from the shaft. He cleaned the

puller, oiled it, and put it away.

53

6i

Page 62: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 4

Bob is replacing a valve. He must remove the packing

material from around it. He uses a packing puller to do thelob. He follows the process below to select, inspect, use, andmaintain the packing puller.

Step 1 Select a corkscrew-type puller of the proper size andlength for the job.

Step 2 Inspect the puller to ensure that it is sharp and not bent

out of shape.

Step 3 Insert the puller into the stuffing box, turning it one or two

turns clockwise to screw it into the packing.

Step 4 Pull on the puller carefully to remove the packing from thebox.

NOTE: Usually the packing will break up into small pieces whenit is removed.

Step 5 Repeci step 4 until all the packing has been removed

from the stuffing box.

NOTE: After the packing has been removed, there will usually be

some packing pieces left that the corkscrew puller cannot pick

54

Page 63: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

up. Choose a pick type puller and remove the packing pieces.

Choose a pick type puller and remove the packing pieces.

Step 6 Clean the pullers thoroughly.

Step 7 Coat the pullers lightly with oil to prevent rust.

Step 8 Store the pullers in their proper places.

Wheels of lecming, Miliwnght Module 15101, Millwright Tools, p. 35-36.

Which job will Bob's supervisor most likely approve?

OPTION A

Bob measured the valve. He chose a corkscrew -type puller

that was the right size and length. He checked the puller.

He wanted to make sure it was still sharp. He needed to

know that it had not been bent out of shape. He put the

puller into the stuffing box. He turned it one or two turns

clockwise to screw it into the pocking. He pulled on the

puller. This removed the packing from the box. The packing

began to break into pieces. He continued to remove the

packing until all large pieces were gone. He used a pick

puller to remove the smaller pieces. He cleaned both pullers.

He coated them with oil. He put the pullers away.

55

6 ,i

Page 64: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Bob measured the valve. He chose a corkscrew-type pullerthat was the right weight. He checked the puller. He wantedto make sure it wasn't too sharp. He needed to know that ithad not been bent out of shape. He put the puller into thestuffing box. He turned it one or two turns counterclockwiseto screw it into the packing. He pulled on the puller. Thisremoved the packing from the box. The packing began tobreak into pieces. He continued to remove the packing untilall large pieces were gone. He used a pick puller to removethe smaller pieces. He cleaned both pullers. He coated themwith oil. He put the pullers away.

OPTION C

Bob measured the valve. He chose a pick puller that was theright size and length. He checked the puller. He wanted tomake sure it was still sharp. He needed to know that it hadnot been bent out of shape. He put the puller into thestuffing box. He turned it one or two turns counterclockwiseto screw it if o the packing. He pulled on the puller. Thisremoved the packing from the box. The packing began tobreak into p aces. He continued to remove the packing untilall large pieces were gone. He used a corkscrew-type pullerto remove tt 3 smaller pieces. He cleaned both pullers. Hecoated therr with oil. He put the pullers away.

56

G4

Page 65: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 5

Rick uses a diagonal cutter to snip wire. He uses thefollowing steps to select, inspect, use, and maintain adiagonal cutter:

Step Select a diagonal cutter of the proper size for the materialto be cut.

Step 2 Inspect the cutter to ensure that the cutting edges are notnicked or dull.

Step 3 Position the cutter to cut the material in the desiredlocation.

Step 4 Squeeze the handles of the cuffer to cut the material.

Step 5 Clean the cutter.

Step 6 Store the cutter in its proper place.

Wheels of Lec.m;rg, Miilwr'ght Module 15101, Millwrigh:1-icnd Tools. 19.

57

Page 66: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

What's the best way for Rick to use the cutter?

OPTION A

Rick checked the wire. He wanted to be sure he chose a

cutter that was the right size. He chose a cutter. He looked

at it to be sure the the cutting edges were net nicked or dull.

le placed the cutter at the place he needed to cut. He

squeezed the handles of the cutter. He cut the wire. He

deaned the cutter. Rick put it away.

OPTION B

Rick checked the wire. He wanted to be sure he chose a

cutter that was the right size. He chose a cutter. He looked

at it to be sure the the cutting edges were nicked and dull.

He placed the cutter at the place he needed to cut. He

squeezed the handles of the cutter. He cut the wire. He

cleaned the cutter. Rick put it away.

OPTION C

Rick chose a cutter. He looked at it to be sure the the cutting

edges were not too sharp. He checked the wire. He wanted

to be sure he chose a cutter that was the right size. He

placed the cutter at the place he needed to cut. He

squeezed the handles of the cutter. He cut the wire. He

deaned the cutter. Rick put it away.

58

Page 67: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

UNDERSTANDING SEQUENCES: FOLLOWING DIRECTIONS

IN CONSTUCTION MATERIALS (*Answer Key Version)

Objective: To read to follow directions.

It was Ted's first day at work. He had just finished school.

He never had a "real" job before. He wasn't sure what to do.

He asked his foreman. The foreman said, "Clock in. Unload

the truck. Sort the pipe by size. Stack it. Then see me. Hi

tell you what else to do."

Ted wanted to make a good impression. He began

unloading the truck. He stacked all the pipe. He finished the

job. He looked at the stacks. Something looked wrong. Hethought back. What did the foreman say? Right! He was

supposed to sort the pipe first. Ted quickly sorted the pipe.

He then stacked it. tt looked much better. Ted had worked

hard. He worked hard for the rest of the day. He worked

hard all week.

Ted's first week ended. He got his paycheck. He opened it.

Wait a minute! Something was wrong. Ted thought his

check would be bigger. He worked hard. What happened to

his money?

Ted talked to the foreman. The foreman looked at the check.

He was surprised. He knew Ted was a hard worker. He

Page 68: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

knew Ted worked all week. Where was red's money? The

foreman pulled Ted's timesheet.

On Monday, Ted clocked in at 9:15. On Tuesday and

Wednesday, he clocked at10:00. On Thursday, Ted docked

in at10:30. He clocked in Friday after lunch.

The foreman talked to Ted. He said, "Ted, you're a good

worker. You come to work on lime. You work hard each

day. You need to change one thing. Think back. Each day, I

told you what to do. Each day, I told you to clock in first. You

wanted to get busy. You didn't clock in first. it lust doesn't

work that way. You have to do first things first. When you do

things is often as important as how you do it."

Ted's foreman is talking about following directions. This

means you do things is a certain order. Some things must be

done first. Others must come last. Following directions

means you understand the steps in instructions. These form

a sequencea step-by-step process.

Somefimes you don't have a foreman to tell you what to do.

You must read information for yourself to find what to do.

This information directs you. It tells you what to do at each

step. Following directions is itself a process in which you do

things in a certain order.

2

6 0

Page 69: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Every .sequence has a purpose. This is its point or main idea.

The main idea is usually a change or outcome. The steps,

then, lead you to where you need to go. Ti---e point could be a

change in a raw material. It could be a way to use a tool. It

could be a way to insure safety. Finding the point is an

important part of following directions.

STEPS IN FOLLOWING DIRECTIONS

1. Some directions begin with a heading or label. Read this

first. This title often tells you the sequence's main idea.

2. Read the directions through. This reading gives you an

overall sense of what to do. It tells you how many steps to

do. You can also get an idea of how hard each step will be.

NOTE: The directions may not seem to make sense. That's

OK. Many directions seem unclear after first reading.

3. Decide what you think the point of the sequence is.

4. Read Step 1. Do what it says.

5. Continue reading. Follow each step unt1 you reach fie

last step.

6. Reread the directions to check your work.

3

Page 70: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

How do you know what steps are in a sequence?

Sometimes, finding the steps is easy. Some directions include

words like "STEP 111 "STEP 2" and so on. Other directions are

harder to follow. Some directions use words like "ONE" or

"FIRST" to show you where to start. Some use words like

"SECOND," "THIRD," "NEXT," "AND THEN," or "NOW" to

show you what else to do. Words like "LAST" or "FINALLY"

help you find the end of the directions.

4

Page 71: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXAMPLE:

Procedure for Using a Combination Bench and Pipe Vise

WARNING! Follow all safety precautions!

Step 1 Inspect the vise for any defects that might make it unsafe touse.

Step 2 Turn the handle counterclockwise to open the jaws.

Step 3 Place the workpiece between the jaws.

Step 4 Tighten the jaws by turning the handle clockwise until the workpiece is held between the jaws so that the material does not slip.

WARNING! If the work piece slips in the vise, it can cause damage tothe material or present a safety hazard.

Wheels of Leaning Trcir.ee 3uide, Task Module 12101, Insfairr,entcton, Hcnd Tools for insfrurnen=ion. p. 15.

1. Some directions begin with a heading or label. Read this

first. It often tells you the sequence's main idea. The title of

the sequence is "PROCEDURE FOR USING A COMBINATION

BENCH AND PIPE VISE."

5

7i

Page 72: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

2. Read the directions through. This reading gives you an

overall sense of what you must do. You can also get an idea

of how hard each step will be. NOTE: The directions may

not make sense. That's OK. Many directions seem unclear

after first reading. The procedure has four steps. The steps

don't appear too hard.

3. Decide what you think the sequence's point is. This

process tells how to open the jaws of a vise and insert a piece of

work securely so that you can work on it.

4. Read Step 1. Do what it says. Step 1 involves safety-- you

check the vise for problems before use.

5. Continue reading. Follow each step until you reach the

last step. Step 2 tells you how to open the jaws of the vise. You

place the work into the jaws of the vise in Step 3. In Step 4, you

tighten the jaws of the vise so that the work is secure.

6. Reread the directions to check your work. Check for

defects first. Open the vise. Insert the work. Close the vise

securely.

6

7

Page 73: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

ccLui---z ANSWER KEY11.10i-ZLLI

0...0.11.1.1>Lil0.1 Electrical andU Instrumentation2m0LUI-

Associated Builders & Contractors, Inc.EBR Adult & Continuing Education

7:3

Page 74: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 1

Jack used an electric percussion hammer to drill throughsome concrete. He reads the following from his CraftTraining Handbook.

PROCEDURE FOR USING AN ELECTRIC PERCUSSION HAMMER

Before using an electric percussion hammer, know itsapplications and limitations. These can be found in the

manufacturer's instructions. Electric percussion hammers canbe used with drill bits, chisels, or other attachments. Thisprocedure uses a drill bit.

WARNING! Follow all safety precautions.

Step 1 Select the correct drill bit for the job.

Step 2 Insert the drill bit in the chuck.

NOTE: If using a star drill, insert the chuck and handle assembly,lock it in place, and then insert the bit.

WARNING! Check that the bit is secure in the chuck. A loose bit

can cause personal injury or damage to the work.

Step 3 Position the hammer at the angle desired for the hold.Position the bit firmly on the center mark.

7

74

Page 75: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

NOTE: Pull the trigger only after the bit is in position and firm

pressure has been applied. The pressure holds the bit in place

and prevents it from wandering. Never allow an electric

hammer to idle. If there is no pressure being applied to the bit,

the force of the reciprocating action of the bit is absorbed by the

nose bushing. This can seriously damage the nose bushing.

Step 4 Squeeze the trigger, being sure to hold the hammer

securely and straight while drilling to avoid jamming or bindingthe bit.

NOTE: Should the bit seize in the hole, reversing direction of the

bit or using a rotating motion may loosen it.

Step 5 When finished drilling the hole, clean chips and debris

out of hole with a squeeze bulb.

Warning: Do not use an air hose to clean out the hole.

Wheeis :f Leaning Trainee Gu:de, Task Module 12103, Instrumentation, Power Tool for Instrumentation p. 1314.

3

Page 76: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Which of the following best describes what Jack should have

done?

OPTION A

Jack chose a drill bit. He inserted the drill bit in the chuck.

He checked the hole. He cleaned chips and debris from the

hole with an air hose. He squeezed the trigger. He held thehammer securely and straight. This kept the drill from

jamming or binding the bit. He positioned the hammer at the

angle desired for the hole. He positioned the bit firmly on the

center mark.

*OPTION B

Jack chose the right drill bit for the job. He put the drill bit in

the chuck. Jack held the hammer at the angle he needed.

He carefully positioned the bit on the center mark. He

squeezed the trigger. He kept the hammer from lamming by

holding the hammer securely. He drilled the hole and cleaned

it with a squeeze bulb.

OPTION C

Jack chose a drill bit. He inserted the drill bit in the chuck. He

squeezed the trigger. He checked the hole. He cleaned

chips and debris from the hole with an air hose. He

positioned the hammer at the angle desired for the hole. He

positioned the bit firmly on the center mark. He held thehammer securely and straight. This kept the drill from

jamming or binding the bit.

Page 77: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 2

Jan is installing threaded fasteners. She is using a torque

wrench to tighten the nuts. She reads the following in her

ABC Craft Training handbook.

INSTALLING THREADED FASTENERS

The following general procedure can be used to install threaded

fasteners in a variety of applications:

NOTE: When installing threaded fasteners for a specific job,

make sure to check all installation requirements.

WARNING: Follow all safety precautions.

Step 1 Select the proper bolts or screws for the job.

Step 2 Check for damaged or dirty internal and external threads.

Step 3 Clean the bolt or screw threads. Do not lubricate the

threads. if a torque wrench is to be used to tighten the nuts.

Step 4 Insert the bolts through the pre-drilled holes and tighten

the nuts by hand. Or, insert the screws through the holes and

start the threads by hand.

NOTE: Turn the nuts or screws several turns by hand and check

for cross threading.10

7 i

Page 78: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 5 Following the proper tightening sequence, tighten thebolts or screws snug.

6 Check the torque specification. Following the proper

tightening sequence, tighten each bolt, nut, or screw severaltimes approaching the specified torque. Tighten to the finaltorque specification.

Step 7 If required to keep the bolts or nuts from working loose,install jam nuts, cotter pins, or safety wire.

'Wheels of Learning Trainee Guide. Task Module 12106, lnstrumentation. Instrumentation Fasteners p. 34.

Which of the following best describes what Jan should do?

OPTION A

Jan should choose the bolts she needs. She should thendean each one. She must check for damaged internal andexternal threads. She needs to carefully lubricate thethreads. She should install jam nuts to keep the bolts fromworking loose. She will then insert the bolts Through the pre-drilled holes. She should tighten the nuts by hand. She willtighten the bolts snug by following the proper tighteningsequence. She will then check the torque specification. She

must tighten each bolt several times to approach the desiredtorque. Lastly, she will lighten the bolts to the final torquespecifications.

11

76

Page 79: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Jan should choose the bolts she needs. She must check fordamaged internal and external threads. She should thendean each one. She needs to carefully lubricate the threads.She will then insert the bolts through the pre-drilled holes.She should install jam nuts to keep the bolts from workingloose. She should tighten the nuts by hand. She will tightenthe bolts snug by following the proper tightening sequence.She will then check the torque specification. She mustlighten each bolt several times to approach the desiredtorque. Lastly, she will tighten the bolts to the final torquespecifications.

*OF770N C

Jan should choose the bolls she needs. She must check fordamaged infernal and external threads. She should thendean each one. She should not lubricate the threadsbecause she is using a torque wrench. She will then insert thebolts through the pre-drilled holes. She shouk/tigLiten thenuts by hand. She will tighten the bolts snug by following theproper tightening sequence, She will then check the torquespecification, She must tighten each bolt several limes toapproach the desired torque. Lastly, she will tighten the boltsto the final torque specificailons. She should install jot nutsto keep the bolts from working loose.

12

I J

Page 80: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 3

Vu is going to install blind rivets through drilled holes with a

pop rivet tool. He reads the following information in his ABCCraft Training handbook.

INSTALLING BLIND RIVETS

Blind rivets are installed through drilled or punched holes with aspecial blind (pop) rivet tool. Use the following generalprocedure to install blind rivets:

WARNING: Follow all safety precautions.

WARNING: Make sure to wear proper eye and face protectionwhen riveting.

Step 1 Select the correct length and diameter of blind rivet to beused.

Step 2 Select the appropriate drill bit for the size of rivet beingused.

Step 3 Drill a hole through both parts being connected.

Step 4 inspect the rivet gun for any defects that might make itunsafe for use.

Step 5 Place the rivet mandrel into the proper sized setting tool.

13

31)

Page 81: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Insert the rivet end into the pre-drilled hole.

Step 7 Install the rivet by squeezing the handle of the rivet gun

causing the jaws in the setting tool to grip the mandrel. The

mandrel is pulled up, expanding the rivet until it breaks at the

shear point.

Step 8 Inspect the rivet to make sure the pieces are firmly riveted

together and that the rivet is properly installed.

Kteels of Learning Trainee Guide, Tcsk Module 12:06. Ins.. TL:rnentation, Insrumentation :csteners . p 35 -36.

Which of the following best describes what Vu did?

OPTION A

First, Vu put on 'a protective face mask. He then selected the

correct length and diameter of the blind rivet he needed. He

chose the appropriate drill bit for the size of rivet being used.

He drilled a hole through both parts being connected. He

placed the rivet mandrel into the proper-sized setting tool.

He inspected the rivet gun for defects. He inserted the rivet

end into the pre-drilled hole. He installed the rivet by

squeezing the handle of the rivet gun. Vu inspected the rivetto be sure the pieces were firmly riveted together.

14

6i

Page 82: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

*OPTION B

First, Vu put on a protective face mask. He then selected the

correct length and diameter of the blind rivet he needed. He

chose the appropriate drill bit for the size of rivet being used

He drilled a hole through both parts being connected. He

inspected fhe rivet gun for defects. He placed the rivet

mandrel into the proper-sized setting tool. He inserted the

rivet end into the pre-drilled hole. He installed the rivet by

squeezing the handle of the rivet gun. Vu inspected the rivet

to be sure the pieces were firmly riveted together.

OPTION C

First, Vu put on a protective face mask. He chose the

appropriate drill bit for the size of rivet being used. He drilled

a hole through both parts being connected. He then selected

the correct length and diameter of the blind rivet he needed.

He placed the rivet mandrel into the proper-sized setting tool.

He inspected the rivet gun for defects. He inserted the rivet

end into the pre-drilled hole. He installed tie rivet bysqueezing the handle of the rivet gun. Vu Lispected the rivet

to be sure the pieces were firmly riveted tociether.

Page 83: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 4

G.J. is using toggle bolts to fasten a mount to wallboard. Hereviews the following information from his ABC manual.

INSTALLING TOGGLE BOLTS

Toggle bolts are used to fasten a part to hollow block, wallboard,plaster, panel, or tile. The following general procedure can beused to install toggle bolts.

WARNING! Follow all safety precautions.

Step 1 Select the proper size of drill bit or punch and toggle boltfor the job.

Step 2 Check the toggle bolt for damaged or dirty threads or amalfunctioning wing mechanism.

Step 3 Clean and lightly lubricate the threads of the bolt.

Step 4 Using the correct size of drill bit, drill a hole completelythrough the surface to which the part is to be fastened.

Step 5 Insert the toggle bolt through the opening in the item tobe fastened.

16

83

Page 84: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Screw the toggle wing onto the end of the toggle bolt,

ensuring that the flat size of the toggle wing is facing the bolt

head.

Step 7 Fold the wings completely back and push them through

the drilled hole until the wings spring open.

Step 8 Tighten the toggle bolt with a screwdriver until it is snug.

WrIGEiS of Le-cming Trainee Guide, Task Module 12106, Instrumentation, instrumentation Fasteners p 37.

Which of the following best describes what G.J. should hove

done?

*OPTION A

G.J. looked at the mount. He chose a toggle bolt that was

the proper size for the job. He picked a drill bit to match it.

He checked the bolt to make sure it was clean. He looked to

see that the wing mechanism was working. He cleaned the

threads on the bolt. He oiled them. He drilled a hole through

the wallboard. He put the bolt through the hole in the mount.

He screwed the toggle wing on the end of the toggle bolt.

He made sure that the fiat side of the win faced the bolt

head. He folded the wings back. He pushed the wings

through the hole. He let the wings spring open. He pull ad

the mount back to hold the wings against the iaside of the

wallboard. He lightened the toggle with a screwdriver until

snug.

17

84

Page 85: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

G.J. looked at +9. mount. He drilled a hole through thewallboard. He chose a toggle bolt that was the proper sizefor the lob. He cleaned the threads on the bolt. He oiledthem. He picked a drill bit to match it. He checked the bolt tomake sure it was dean. He looked to see that the wing

mechanism was working. He put the bolt through the holein the mount. He screwed the toggle wing on the end of thetoggle bolt. He made sure that the flat side of the wing facedthe bolt head. He folded the wings back. He pushed thewings through the hole. He let the wings spring open. Hepulled the mount back to hold the wings against the inside of

the wallboard. He tightened the toggle with a screwdriveruntil snug.

18

85

Page 86: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

looked at the mount. He drilled a hole through the

wallboard. He put the bolt through the hole in tie mount.He chose a toggle bolt that 'vas the proper size for the job.

He picked a drill bit to match it. He checked the bolt to make

sure it was dean. He looked to see that the wing mechanism

was working. He cleaned tie threads on the bolt. He oiledthem. He screwed the toggle wing on the end of the togglebolt. He made sure that the flat side of the wing faced the

bolt head. He folded the wings back. He pushed the wings

through the hole. He let the wings spring open. He pulledthe mount back to hold the wings against the inside of the

wallboard. He tightened the toggle with a screwdriver untilsnug.

19

8 6

Page 87: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

EXERCISE 5

Loyd replaced a gasket on a flange. He had to layout a new

one. He used the following information from his ABC trainingguide:

LAYING OUT NEW GASKET

The following procedure describes how to lay out and cut a newgasket for a pipe flange.

WARNING! Follow all safety precautions.

Step 1 Select the proper gasket material for the conditions andprocess.

Step 2 Take three measurements (draw each as concentriccircles):

* diameter of pipe opening,

* outside diameter of flange, and

* diameter of the bolt h le circle.

The diameter of the bolt circle is found by measuring from thebottom (or top) of opposite holes.

Step 3 Find the radius of the bolt circle. The radius of the bolt

circle is equal to half of the diameter.

Step 4 Draw a line through the circle's center for opposite holes.

2C

87

Page 88: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 5 On a 6-hole flange, the radius is equal to the distance

between bolt holes.

Step 6 To check the distance, walk the dividers around the circle.

NOTE: Lay out holes a little larger than their actual size. Gaskets

with an even number of holes (i.e., 4, 8, 16) can also be laid out

using the "swing arc" method. This method uses the divider to

bisect distances. Flanges with an odd number of holes can be

laid out using a protractor (simply divide 360 degrees by the

number of holes) or by using the mathematical method.

Step 7 Cut out the gasket using a gasket cutter.

NOTE: The blade should not protrude more than 1/32" more

than the thickness of the gasket material. Never hammer the

gasket, as hammering may cause lumps in the gasket.

Step 8 Place the gasket material on hard wood to protect the

DL inch edge. Then, punch out the holes using a hole punch

Wheels of Looming, Instrumentclion121CC Gcskets pod 7-'ock;rig, p 10-12.

21

80

Page 89: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Loyd's foreman is checking his work. Which of the following

will get an "OK" from the foreman?

OPTION A

Loyd chose a material suitable for the conditions and process.

He drew a line through the center of the circle for opposite

holes. Since he was cutting a 6-hole flange, he found the

radius was equal to the distance between the bolt holes. He

walked the dividers around the hole to check his work. He

measured the diameter of the pipe opening. He measured

the outside diameter of the flange. He measured the

diameter of the bolt hole circle. He figured the radius of the

bolt circle. He used a gasket cutter to cut the gasket. He

placed the gasket material on hard wood to protect thepunch edge. He punched out the holes.

of

22

Page 90: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION

Loyd chose a material suitable for the conditions and process.

He measured the diameter of the pipe opening. He

mecsured the outside diameter of the flange. He measured

the diameter of the bolt hole circle. He figured the radius ofthe bolt circle. Since he was cutting a 6-hole flange, he foundthe radius was equal to the distance between the bolt holes.

He walked the dividers around the hole to check his work.

He used a gasket cutter to cut the aasket. He drew a line

through the center of the circle for opposite holes. He

punched out the holes. He placed fne gasket material on

hard wood to pi otect the punch edge.

4t0F770N C

Loyd chose a material suitable for the conditions and proC6.;S.

He measured the diameter of the pipe opening. He

measured the outside diameter of the flange. He measured

the diameter of the bolt hole circle. He figured the radius cifthe bolt circle. He drew a line through the center of the circlefor opposite holes. Since he was cutting a 6-hole flange, hefound the radius was equal to the distance between the bolt

holes. He walked the dividers around the hole to check his

work. He used a gasket cutter to cut the gasket He placedthe_gasket material on hard wood to protect the punch edge.He punched out the holes.

23

J

Page 91: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

CCL1J

ANSWER KEY

1----Z

d.

iJJ

0

LLI

Pipefitting

Ul

rJ Associated Builders & Contractors, Inc.EBR Adult & Continuing Education

Page 92: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 1

Cad used a manual bender--a hickey--to bend pipe before

installing. He was supposed to use the following steps from

his ABC Craft Handbook:

Step 1 Determine the size of the pipe to be bent.

Step 2 Select the proper size of bender.

Step 3 Mark the pipe at the beginning of the bend.

Step 4 Lay the pipe on the floor.

Step 5 Slide the bender onto the pipe at the start of the bend.

Step 6 Grip the handle, and pull the bender down toward the

floor to make the bend.

NOTE: The thin-wall conduit bender will make a sm .oth bend

with one long pull of the handle; it has a heel that y ,u can press

with your foot to assist in bending the pipe. The pip, and heavy-

wall conduit bender requires you to make a small bend, slide

the bender along the pipe a short distance, and ma.. e another

bend until the proper bend in achieved.

Step 7 Stop the bend when the required bend anglE is achieved.

24

Page 93: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

CAUTION Be careful not to bend the pipe past the requiredangle. It is difficult to straighten pipe without damaging it.

Step 8 Remove the bender from the pipe.

Step 9 Check the pipe for cracking or kinking.

Step 10 Store the bender it its proper place.

'M -eels of Learning Trainee Guide, Task Module 08101, Pipefltter Hand Tools. p 66-69

Using this process, Carl correctly bent the pipe. Which of thefollowing did Carl probably do?

*OPTION A

Carl measured the pipe. It was 1/2 inch pipe. He chose theright bender size. He foundwhere the beginning of the pipeshould be and marked the pipe. He put the pipe on the floor.He slid the bender on the pipe at the start of the bend, Carlcarefully gripped the handle. He pulled the bender downtoward the floor to make the bend He stopped when thebend reached the corm&angle. He removed the hickey. He10.1ked at the pipe to see if it wos cracked or kinked. He putthe bender away

25

9 ;

Page 94: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Can chose the right bender size and measured the pipe. It

wr6 1/2 inch pipe. He found where the beginning of the pipe

should be and marked the pipe. He put the pipe on the floor.

He slid the bender on tie pipe at the start of the bend. Carl

carefully gripped the handle. He pulled the bender up awayfrom the floor to make the bend. He stopped when the bendreached the correct angle. He looked at the pipe to see if it

was cracked or kinked. He removed the hickey. He put thebender away.

OPTION C

Carl chose the right bender size and measured the pipe. It

was 1/2 inch pipe. He marked the pipe. He found where the

beginning of the pipe should be. He put the pipe on the

floor. Carl carefully gripped the handle of the hickey. He slid

the bender on the pipe at the start of the bend. He pulled

the bender up away from the floor to make the bend. He

stooped when the bend reached the correct angle. Helocked at the pipe to see if it was cracked or kinked. He

removed the hickey. He put the bender away.

2b

9

Page 95: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 2

Jay has been cutting steel pipe with a portable band saw.The blade has become worn. He needs to replace it. Heknows that this requires the following method:

WARNING! Make sure the portable band saw is unpluggedbefore replacing the blade.

Step 1 Rotate the blade adjust knob 180 degrees to release thetension on the blade.

Step 2 Turn the saw upside down on your work table.

Step 3 Remove the blade from the blade pulleys underneath thesaw.

WARNING! Be careful when removing the blade, because theblade has a tendency to spring out when you take it off the bladepulleys.

Step 4 Slip a new blade around the blade pulleys.

Step 5 Slip the new blade into the blade guide and the backstop.

Step 6 Turn the saw over, and rotate the blade adjust knob toput tension on the blade.ihheeis of lecrning "since Guice "ask Module :5'.02. Pip&Iner Pov.er 'cc ;10

27

95

Page 96: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Jay had some problems changing the blade in the saw.

What should Jay do to correctly replace the saw blade?

OPTION A

Jay should should rotate the blade adjust knob a qucrter-tum. This will increase tension or the blade. He should holdthe saw rightside up. He should take the blade from theblade pulleys on the top of the saw. He should then slip theblade around the blade pulleys. He should then slip the newblade into the blade guide. The new blade should slip intothe back stop. Jay should turn the saw over and rotate theblade adjust knob to release tension on the blade.

OPTION B

Jay should unplug the saw first. He should rotate the bladeadjust knob a full turn. This will increase tension en theblade. He should hold the saw upside down. He should takethe blade from the blade pulleys underneath the saw. Heshould then slip the blade over the blade pulleys. He si .ouldthen slip the new blade into the blade guide. The new )ladeshould slip into the back stop. Jay should turn the saw )verand rotate the blade adjust knob to release tension on theblade.

28

9 t)

Page 97: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

*OPTION C

Jay should unplug the saw first. He should rotate the bladeadjust knob a haft turn. This will release tension on theblade. He should hold the saw upside down. He should takethe blade from the blade pulleys underneath the saw. Heshould then slip the blade around the blade pulleys. He

should then slip the new blade into the blade guide. The newblade should slip into /ha back stop. Jay should turn the sawover and rotate the blade adjust knob to regain tension onthe blade.

29

9

Page 98: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 3

Vic is d new employee. He will be using a portablepneumatic grinder. His supervisor gives him the followinginformation so Vic can inspect the grinder before use.

Step 1 Inspect the air inlet and the air line of a pheumatic grinderto ensure there are no signs of damage that could cause a badconnection or loss of air.

Step 2 Inspect the power cord and plug in electric models toensure there are no signs of damage.

Step 3 Inspect the handle to make sure it is not loose, whichcould cause a loss of control.

Step 4 Inspect the grinder housing and body for defects.

Step 5 Ensure that the trigger switch works properly and does

not sttck in the ON position.

Step 6 Ensure that the safety guard is in good condition andsecurely attached to the grinder.

Step 7 Check the oil level in pneumatic grinders.

Step 8 Ensure that the maximum rotating speed of the grindingwheel is higher than the maximum rotating speed of the grinder.30

9u

Page 99: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 9 Start the grinder, and allow it to run for 1 to 2 minutes

while checking for visual abnormalities, excessive vibration,

extreme temperature changes, or noisy operation.

Step 10 Inspect the work area to ensure the safety of yourself

and others and to make sure that the heat and sparks

generated by the grinder cannot start any fires.

Wheels of Leaning Trainee C-dae, Task Module 08102, Pipefitter Power Tccls. p. 9-10

Which of the following will get on OK from Vic's supervisor?

*OPTION A

Vic checked the air intake and air line. He checked for othersigns of damage that would result in a loss of air. Hechecked the grinder's handle, housing, and body. He made

sure that the bigger was working property. He examined thesafety guard and made sure it was attached to the grinder.He checked the oil level, He made sure that the maximumrotating speed of the grinding wheel was higher that the

maximum rotating speed of the grinder. He started thegrinder. He let it run for a couple of minutes. He looked atthe grinder to see if he saw anything wrong. He felt to see ifit vibrated too much or got too hot. He listened to see if the

grinder ran more loudly than usual. Vic checked the work

area. He saw some papers that could catch on fire. He putthe papers away.

31

9J

Page 100: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Vic checked the grinder's handle, housing, and body. Hemade sure that the trigger was working properly. Heexamined the safety guard and made sure it was attached to

the grinder. Vic checked the air intake and air line. He

checked for other signs of damage that would result in a loss

of air. He checked the oil level. He made sure that themaximum rotating speed of the grinding wheel was higherthat the maximum rotating speed of the grinder. He startedthe grinder. He let it run for a couple of minutes. He lookedat the grinder to see if he saw anything wrong. He felt to seeif it vibrated too much or got too hot. He listened to see if the

grinder ran more loudly than usual. Vic checked the work

area. He saw some papers that could catch on fire. He putthe papers away.

32

1o)

Page 101: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

Vic started the grinder. He let it Ain for a couple of minutes.

He looked at the grinder to see if he saw anything wrong. He

felt to see if it vibrated too much or got too hot. He listened

to see if the grinder ran more loudly than usual. Vic checked

the air intake and air line. He checked for other signs of

damage that would result in a loss of air. He checked the

grinder's handle, housing, and body. He made sure that the

trigger was working properly. He examined the safety guard

and made sure it was attached to the grinder. He checked

the oil level. He made sure that the maximum rotating speed

of the grinding wheel was higher that the maximum rotating

speed of the grimier. Vie checked the work ow. He sawsome papers that could catch on fire. He put the papers

away.

33

10

Page 102: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 4

Zach mus: make sure a joint in 5/8 inch pipe is leakproof. Hewill be using Teflon tape. He reviews the following from hisABC craft training manual:

Warning! Never use Teflon tape on pipe that is to be welded orpipe that carries steam or other high-temperature service. When

Teflon tape is heated, it emits a highly toxic gas that could befatal.

Step 1 Remove all excess cutting oil from the threads to improvethe grip of the tape on the threads.

NOTE: Use 1/2 inch wide Teflon tape for pipe that is 3/4 inch

nominal size and smaller. Use 3/4 inch wide tape for pipe thatis 1-inch nominal size or larger.

Step 2 Start the tape from the end of the pipe, leaving the first full

thread bare to prevent the tape from bunching up at the

beginning of the thread.

Step 3 Wrap the tape around the pipe in the direction that thejoint is to be assembled.

NOTE: Tape should be wrapped around right-hand threads in a

clockwise direction and around left-hand threads in a

counterclockwise direction.

34

10;2

Page 103: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 4 Continue to wrap the tape around the joint, overlapping

the edges of each wrap until all remaining threads have beencovered.

Step 5 Press the tape against the threads to seal it to the threads

and prevent the tape from slipping off the threads once you startto make up the joint.

What is the proper way for Zach to wrap the pipe with Teflontape?

OPTION A

Zach used a cloth to remove the cutting oil from the threadsof the pipe. He got a roll of 1 inch Teflon tape. He started

taping from the middle of the pipe. He left the first full threadbare. He didn't want it to bunch in the middle of the pipe.

He wrapped it clockwise because he used right-hand

threads. He wrapped the pipe. He overlapped the edgesuntil he could no longer see any threads. He smoothed the

tape against the threads to seal it. He knew this would alsoprevent it from slipping when he made up the joint.

35

103

Page 104: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

*OPTION B

Zach used a cloth to remove the cutting oil from the threadsof the pipe. He got a roll of 1/2 inch Teflon tape. He skeet:

taping frorr, the end of th pipe. He left the first full thread

bare. He didn't want it to bunch at the end of the thread. Hewrapped it clockwise because he used right -hand threads.

He wrapped the pipe. He overlapped the edges until hecould no longer see any threads. He smoothed the topeagainst the threads to seal it. He knew this would alsoprevent it from slipping when he made up the Point.

OPTION C

Zach used a cloth to remove the cutting oil from the threadsof the pipe. He got a roll of 1 inch Teflon tape. He started

taping from the end of the pipe. He didn't want it to bunch atthe end of the thread. He wrapped it counterclockwise

because he used right-hand threads. He wrapped the pipe.He overlapped the edges until he could no longer see any

Threads. He smoothed the tape against the threads to seal it.He knew this would also prevent it from slipping when hemade up the joint.

36

10 4

Page 105: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 5

Lee's company got a contract to replace. a piping system.She will be fitting screwed pipe and fittings. Lee knows shemust use the following procedure:

Step 1 Determine the type, size, and schedule of pipe beingused in the system.

Step 2 Determine the length of pipe needed.

Step 3 Cut the pipe to the desired length.

Step 4 Ream the pipe to remove all internal burrs.

Step 5 Thread the pipe, taking caution not to cut the threads toodeep.

Step 6 Select the proper size, shape, and type of fittings needed.

Step 7 Clean the pipe and fittings thoroughly inside and out.

NOTE: All sand, dirt, and oil must be removed from the inside ofthe pipe and fittings to avoid contaminating the system orclogging the line. The fittings and pipe ends may be cleanedwith a clean rag soaked in nonflammable solvent.

37

10 ;5

Page 106: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 8 Check the threads on the pipe and the fitting to ensure

that they are properly cut and not damaged.

Step 9 Apply joint compound or Teflon tape to the pipe threads.

Step 10. Start the fitting on the pipe by hand.

Step 11. Tighten the fitting slowly, using a pipe wrench.

CAUTION: Tightening the fitting quickly causes excessive heat

due to friction, which could cause the threads or the fitting to

expand. Do not allow the threads to bottom out into the fitting.

This can damage the threads and the fitting.

terming Trainee :1;ide, Task Mcduie C8:03, Pipe8tting, Threaded Pipe Fabriccion. p.

Page 107: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

ti Lee did the job correctly, what did she do?

OPTION A

Lee checked the system. She measured the section thatneeded replacing. It was 24 inches long. She cut a newpiece of schedule 40 carbon steel 2 inch pipe. She needed toremove some external burrs, so she reamed it. She carefullythreaded the pipe. She selected a filling based on the size,shape, and type. She got a rag and some flammable solvent.She cleaned the pipe and the fitting inside and outside. Leechecked the pipe's threads to make sure she had cut themaccurately. She put joint compound on the threads. Shestarted fitting the pipe by hand. Lee used a pipe wrench toslowly tighten the fitting. She made sure that the threads didnot bottom out into the fitting.

39

107

Page 108: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

itoProm B

Lee checked the system. She noted that the pipes wereschedule 40 carbon steel 2 inch pipe. She measured thesection that needed replacing. It was 24 inches long. She

cur a new piece of schedule 40 carbon steel 2 inch pipe. Sheneeded to remove some internal burrs, so she reamed it. Shecarefully threaded the pipe. She selecteda fitting based onthe size, shape, and frpe. She got a rag and somenonflammable so /vent. She cleaned the pipe and the Mktginside and outside. Lee checked the pipe's threads to makesure she had cut them accurately. She put foint compound

on the threads. She started fitting the pipe by hand. Leeused a pipe wrench to slowly tighten the fitting. She madesure that the threads did not bottom out into the fitting.

40

11W

Page 109: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION C

Lee checked the system. She measured the section thatneeded replacing. It was 24 inches long. She s elected afitting based on the size, shape, and type she needed. Shenoted that the pipes were schedule 40 carbon steel 2 inchpipe. She cut a new piece of schedule 40 carbon steel 2 inchpipe. She needed to remove some internal burrs, so shereamed it. She carefully threaded the pipe. She got a ragand some nonflammable solvent. She cleaned the pipe andthe fitting inside and outside. Lee checked the pipe's threads

to make sure she had cut them accurately. She put jointcompound on the pipe being careful not to get any on thethreads. Lee used a pipe wrench to slowly begin fitting thepipe. She made sure that the threads did not bottom out intothe fitting. She tightened the fittings by hand.

41

10`

Page 110: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

cr

ANSWER KEY

F---

LLI

z

0

Millwright

LIJ

Associated Builders & Contractors, Inc.EBR Adult & Continuing Education

1] tl

Page 111: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 1

Gabe is installing gaskets. He uses a putty knife to scrape offthe old gaskets. He used the following steps to select,inspect, use and maintain the putty knife.

Step 1 Select a putty knife of the proper length and width to dothe lob.

WARNING! Do not choose a knife that is larger than needed andcannot be handled safely.

Step 2 Inspect the putty knife to ensure that the blade is not bentor dull and that the handle is in good condition and firmlyattached to the blade.

Step 3 Hold the knife in one hand at an angle to the work, andscrape the gasket off using smooth, even strokes.

WARNING! Do not try to chip the gasket with the putty knife. Thiscould nick the surface being scraped and dull the knife. Keepthe knife blade flat on the surface. Do not try to scrape the sideedge of the blade. Keep your hands away from the cutting edgeof the blade, and work away from your body to prevent personaliniury.

Step 4 Continue to scrape the surface until all the gasket isremoved.42

Page 112: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 5 Clean the knife thoroughly with a rag, using solvent ifii ceded.

Step 6 Oil the knife lightly to prefent rust.

Step 7 Store the knife in its proper place.

Wheels o.f Learr;rg, Millwright Module 15101, Millwright Hand Toys, p 17,

What is the proper procedure for Gabe to use?

OPTION A

Gabe checked the gasket. He chose a putty knife that wasappropriate in length and width. He looked at the blade tobe sure it wasn't bent or dull. He looked at the handle to besure it was in good condition and firmly attached to theblade. He held the knife in both hands. He made sure thathe never held it at an angle to the gasket. He used short,

choppy strokes to remove the gasket. He kept the blade flat

on the surface. He made sure that he did not use the bladeedge as a scraper. He kept his hands away from the cuttingedge. He was careful to cut toward his body. Gabe keptscraping until a'! the gasket was removed. He carefullycleaned the knife and oiled it. He put the putty knife away.

1

112

Page 113: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPT1ON B

Gabe checked the gasket. He chose a putty knife that wasappropriate in weight. He looked at the blade to be sure itwasn't too sharp for the gasket. He looked at the handle tobe sure it was in good condition and firmly attached to theblade. He held the knife in one hand. He made sure that heheld it at an angle to the gasket. He used smooth, evenstrokes to remove the gasket. He kept the blade vertical onthe surface. He made sure that he did not use the side edge

as a scraper. He kept his honds away from the cutting edge.He was careful to cut away from his body. Gabe keptscraping until all the gasket was removed. He carefully oiledthe knife. He put the putty knife away.

*OPTION C

Gabe checked the gasket. He chose a putty knife that wasappropriate in length and width. He looked at the blade tobe sure it wasn't bentor dull. He looked at the handle to besure it was in good condition and firmly attached to theblade. He held the knife in one hand. He made sure that heheld it at an angle to the gasket. He used smooth, evenstrokes to remove the gasket. He kept the blade flat on thesurface. He made sure that he did not use the side edge asa scraper. He kept his hands away from the cutting edge.He was careful to cut away from his body. Gabe kept

44

11:3

Page 114: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

scraping until all thegasket was removed. He carefullycleaned the knife and oiled it. He put the putty knife away.

11 4

Page 115: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 2

Karl is connecting flans es and structural steel. He aligns boltholes with drift pins. He uses the ft 'lowing steps to select,inspect, use, and maintain the pins.

Step 1 Select a pin of the proper size for the holes being aligned.

NOTE: The proper size drift pin will fit all the way through bothholes being aligned and still be large enough and strongenough to pull the mating pieces together.

Step 2 Inspect the pin to ensure that it is not bent and that itdoes not have burrs that could cut your hands.

Step 3 Insert the pin into the holes of the mating pieces, anduse it to ptjll the holes into alignment.

Step 4 Clamp the mating pieces together using a C-clamp, ifpossible, to hold the parts in alignment while the pin is removedand a bolt installed in its place.

NOTE: On pieces with more than one hole, the drift pin can beleft in until bolts can be installed in the other holes. Then the driftpin is removed, and a bolt is installed in its place.

Step 5 Clean the pin, using a rag and solvent if needed.

46

Page 116: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Cover the pin with a light coat of oil to prevent rust.

Step 7 Store the pin in its proper place.

Wheels of Lecmirg, ,Millwright Module 15;01, Miliwnght Hcr.c %cis o IC.

What would have been the best way for Karl to use a driftpin?

*OPTION A

Karl measured the size of the holes he needed to align. Hechose a pin to match. He checked the pin to see that it wasnot bent. He made sure there was nothing sharp that mightcut his hands. He put the pin into the holes of the matingpiece. He used that to pull the holes into the correctposition.He got a C-clamp. He used that to put the mating piecestogether. He removed the pin and installed a bolt in its place.Some dirt goton the pin. He cleaned it with a rag andso /vent. He coated with pin with oil. He put the pin back.

47

Page 117: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Karl measured the size of the holes he needed to align. Hechose a pin to match. He checked the pin to see that it wasnot bent. He made sure there was nothing sharp that mightcut his hands. He made sure that he did not put the pin intothe holes of the mating piece. He pulled the holes into thecorrect position. He got a C-clamp. He used that to put the

mating pieces together. He removed the pin and installed a

bolt in its place. Some dirt got on the pin. He cleaned it witha rag and oil. He coated with pin with solvent to prevent rust.He put the pin back.

OPTION C

Karl chose a pin. He got a C-clamp. He checked the pin tosee that it was not bent. He made sure there was nothing

sharp that might cut his hands. Kari measured the size of the

holes he needed to align. He used the pin to pull the holesinto the correct position. He used the C-clamp to put themating pieces together. He removed the pin and installed a

bolt in its place. Some dirt got on the pin. He cleaned it witha rag and solvent. He coated with pin with oil. He put the pinback.

48

11 7

Page 118: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 3

Jon must install some new gears. The gears he is replacing

are precision gears which were press-fitted in place. He finds

a couple of them particularly difficult to remove. Jon doesn'twant to damage the gear, so he decided to get a gear puller.

He uses the following process to select, inspect, use, andmaintain a gear puller.

Step 1 Select a gear puller with the correct jaw length and

spread width for the gear or bearing being pulled.

Step 2 Inspect the puller to ensure that the jaws are not bent or

excessively worn and that the pressure bolt threads are notstripped.

Step 3 Ensure that all set screws or locking screws have beenloosened or removed from the gear or bearirry.

Step 4 Inspect the shaft to ensure that there are no nicks, burrs,

or foreign objects that would interfere with the gear or bearing

sliding off the shaft.

Step 5 Position the puller on the gear or bearing, and screw the

pressure screw in until it presses against the shaft.

49

Page 119: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Step 6 Check the puller to ensure that the jaws are properlypositioned on the gear or bearing.

CAUTION: The puller jaws must be positioned so that they willprovide a straight, even pull on the gear or bearing and notdamage it.

Step 7 Turn the pressure bolt slowly clockwise to begin applying

pressure to the gear or bearing.

WARNING! Always wear eye protection when using a puller,

because particles could break off and injure your eyes.

Step 8 Continue to tighten the pressure bolts until the gear orbearing is removed from the shaft.

Step 9 Clean the puller thoroughly.

Step 10 Coat the puller lightly with oil to prevent rust.

Step 11 Store the puller in its proper place.

Wheels of Lecming, Millwright Module 15101, Mill.r.c =cnd Tools, p 34.35,

What is NOT the correct w ]y for Jon to use the gear puller?

50

1.1J

Page 120: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION A

Jon looked at the gear he needed to pull. He chose a gearpuller with the correct jaw length and spread width. Hechecked the puller. He wanted to see if it was bent or worn.He needed to know if the bolt threads were stripped. Hemade sure that the set screw was loosened and removed

from the gear. He checked the shaft. He made sure there

were no foreign objects that would keep the gear from sliding

cff the shaft. He put the puller on the gear. He screwed thepressure screw in place until it touched the shaft. He

checked fne puller again to be sure it was properly

posiiioned. He knew he needed to be able to evenly pull thegear straight out. He turned the pressure bolt slowlyclockwise. This applied pressure to the gear. He put goggleson. He continued to tighter] the pressure bolt until he

removed the gear from the shaft. He cleaned the puller,oiled it, and put it away.

120

Page 121: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Jon looked at the gear he needed to pull. He chose a gear

puller with the correct jaw length and spread width. Hechecked the puller. He wanted to see if there was anythingwrong with it. He needed to know if the bolt threads werestripped. He put goggles on. He loosened the set screw and

removed it from the gear. He checked the shaft. He made

sure there were no nicks or burrs that would keep the gear

from sliding off the shaft. He put the puller on the gear. He

screwed the pressure screw in place until it touched the shaft.

He checked the puller again to be sure it was properly

positioned. He knew he needed to be able to evenly pull the

gear straight out. He turned the pressure bolt slowly

clockwise. This applied pressure to the gear. He continuedto tighten the pressure bolt until he removed the gear from

the shaft. He cleaned the puller. He oiled it. He put it away.

52

12i

Page 122: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

*OPTION C

Jon looked at the ear he needed to ull.. He chose a earpuller with the correct jaw width and spread length. Hechecked the puller. He wanted to see if it was bent or worn.He needed to know if the bolt threads were stripped: Hemade sure that the setscrew was tight secured in the gear.He checked the shaft. He made sure there were foreignobjects that would keep the gear from sliding off the shaft.He put the puller on the gear. He screwed the pressurescrew in place until it touched the shaft. He checked the

puller again to be sure it was properly positioned. He knewhe needed to be able to pull the gear out at an angle. Heturned the pressure bolt slowly counter lockwise. Thisapp Ilea' ressutoe ear. He removed the o les so hecould see better. He continued to tighten thepressure boltuntil he removed the gear from the shaft. He cleaned thepuller, oiled it and put itaway.

53

Page 123: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 4

Bob is replacing a valve. He must remove the packingmaterial from around it. He uses a packing puller to do thejob. He follows the process below to select, inspect, use, andmaintain the packing puller.

Step 1 Select a corkscrew-type puller of the proper size andlength for the lob.

Step 2 Inspect the puller to ensure that it is sharp and not bentout of shape.

Step 3 Insert the puller into the stuffing box, turning it one or twoturns clockwise to screw it into the packing.

Step 4 Pull on the puller carefully to remove the packing from thebox.

NOTE: Usually the packing will break up into small pieces whenit is removed.

Step 5 Repeat step 4 until all fhe packing has been removedfrom the stuffing box.

NOTE: After the packing has been removed, there will usually besome packing pieces left that the corkscrew puller cannot pick

54

123

Page 124: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

up. Choose a pick type puller and remove the packing pieces.Choc se a pick type puller and remove the packing piec/es.

Step 6 Clean the pullers thoroughly.

Step 7 Coat the pullers lightly with oil to prevent rust.

Step 8 Store the pullers in their proper places.

Whets or Learning, Millwright Module 15101, Millwright Hcrd Tools.p 35-36.

Which lob will Bob's supervisor most likely approve?

* OPTION A

Bob measured the valve. He chose a corkscrew-type pullerthat was the ri ht size and lenth. He checked the uller.He wanted to make sure it was still sharp. He needed toknow that it had not been bentout of shape. He put thepuller into the stuffing box. He turned it one or two turnsclockwise to screw it into the packing. He pulled on thepuller. This removed the packing from the box. The packingbegan to break into pieces. He continued to remove thepacking until all large pieces were gone. He used a pickpuller to remove the smallerpieces. He cleaned both pullers.He coated them with a He put the pullers away.

55

12 4

Page 125: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

OPTION B

Bob measured the valve. He chose a corkscrew-type pullerthat was the right weight. He checked the puller. He wantedto make sure it wasn't too sharp. He needed to know that ithad not been bent out of shape. He puttfie puller into thestuffing box. He turned it one or two turns counterclockwiseto screw it into the packing. He pulled on the puller. Thisremoved the packing from the Lox. The packing began tobreak into pieces. He continued to remove the packing untilall large pieces were gone. He used a pick puller to removethe smaller pieces. He cleaned both pullers. He coated themwith oil. He put the pullers away.

OPTION C

Bob measured tfie valve. He chose a pick puller that was theright size and length. He checked the puller. He wanted tomake sure it was still sharp. He needed to know that it hadnot been bent out of shape. He put the puller into thestuffing box. He turned it one or two turns counterclockwiseto screw it into the packing. He pulled on the puller. Thisremoved the packing from the box. The packing began tobreak into pieces. He continued to remove the packing untilall large pieces were gone. He used a corkscrew-type pullerto remove the smaller pieces. He cleaned both pullers. Hecoated them with oil. He put the pullers away.

56

125

Page 126: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

Exercise 5

Rick uses a diagonal cutter to snip wire. He uses thefollowing steps to select, inspect, use, and maintain adiagonal cutter:

Step 1 Select a diagonal cutter of the proper size for the materialto be cut.

Step 2 Inspect the cutter to ensure that the cutting edges are notnicked or dull.

Step 3 Position the cutter to cut the material in the desiredlocation.

Step 4 Squeeze the handles of the cutter to cut the material.

Step 5 Clean the cutter.

Step 6 Store the cutter in its proper place.

Wheels of Learning, Millwright Module 15101, Ma.voght Hcr.d Tools, p.19,

57

126

Page 127: DOCUMENT RESUME ED 374 285 CE 067 223 AUTHOR Atkinson, … · 2014. 5. 7. · %me last/wetland mate a& were made possible tin ugh a otiationd ctVokkpPaee Uitekacy gnat dunded tkotough

What's the best way for Rick to use the cutter?

*OPT7ON A

Rick checked the wire. He wanted to be sure he chose acutter that was the right size. He chose a cutter. He lookedat it to be sure the the cutting edges were not nicked or dull.He placed the cutter at the place he needed to cut. Hesqueezed the handles of the cutter. He cut the wire. Hecleaned the cutter. Rick put itaway.

OPTION B

Rick checked the wire. He wanted to be sure he chose acutter that was the right size. He chose a cutter. He lookedat it to be sure the the cutting edges were nicked and dull.He placed the cutter at the place he needed to cut. Hesqueezed the handles of the cutter. He cut the wire. Hecleaned the cutter. Rick put it away.

OPTION C

Rick chose a cutter. He looked c.: it to be sure the the cutting

edges were not too sharp. He checked the wire. He wantedto be sure he chose a cutter that was the right size. Heplaced the cutter at the place he needed to cut. Hesqueezed the handles of the curar. He cut the wire. Hecleaned the cutter. Rick put it away.

58

127