Marine Planning in Pentland Firth and Orkney Waters
James Green
Development and Marine Planning
Orkney Islands Council
SuperGen Doctoral Training Programme
Getting to Grips with the Marine Environment ‐ II Heriot‐Watt University
June 2014
![Page 2: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/2.jpg)
Content
• Brief introduction to marine planning
• Pilot Pentland Firth and Orkney Waters
Marine Spatial Plan
• Land use planning and marine
infrastructure
![Page 3: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/3.jpg)
What is marine spatial planning?
‘Marine spatial planning is a public process of analysing and allocating
the spatial and temporal distribution of human activities in marine
areas to achieve ecological, economic, and social objectives that
usually have been specified through a political process’ (UNESCO).
![Page 4: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/4.jpg)
Why develop a plan? • Sustainable development
• Strategic vision and spatial strategy
• Promote efficient use of space
• Stakeholder knowledge and buy-in
• Engage local communities
• Build consensus and find common ground
• Provide greater certainty for developers
• Reduce risk in the licensing process
• Monitoring and adaption
![Page 5: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/5.jpg)
Marine Planning in Scotland
• Marine (Scotland) Act 2010
- National marine plan and atlas
- Regional marine plans
- Provision for Marine Planning
Partnerships
- Licensing
- Marine Protected Areas
‘A public authority must take any authorisation
or enforcement decision in accordance with the
appropriate marine plans, unless relevant
considerations indicate otherwise’ Section 15(1).
![Page 6: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/6.jpg)
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
www.scotland.gov.uk/Topics/marine/seamanagement/regional/pentlandorkney
![Page 7: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/7.jpg)
The plan area
The plan area
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
![Page 8: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/8.jpg)
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
Working Group
• Marine Scotland (Lead)
• Highland Council
• Orkney Islands Council
Advisory Group
• Scottish Natural Heritage
• Scottish Environment Protection
Agency
• Historic Scotland
• Highlands and Islands Enterprise
• Orkney Harbour Authority
• Scrabster Harbour Trust
• Royal Yachting Association
Stakeholders For example:
• Local communities;
• Commercial fisheries;
• Marine renewables;
• Aquaculture; and
• Recreational interests.
How is the plan being
delivered?
![Page 9: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/9.jpg)
Working
Group
Advisory
Group
Stakeholders
Stakeholders
Stakeholders
Orkney
Local
Communities
Caithness
and
Sutherland
Local
Communities
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
![Page 10: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/10.jpg)
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan • Set out the plan making process for consultation,
November 2012 Plan Scheme
• Stakeholder Events in July 2013
• Included draft Environmental Report
Planning Issues and Options
• Responded to stakeholder contributions
• Outlines Working Group actions for drafting the plan
Consultation Analysis and Report
• Structured discussion to develop policies
• Will take place from July to the end of 2014
Stakeholder Focus Groups
• Formal 12 week consultation (Start 2015) Draft Marine Spatial
Plan
• Will include Post Adoption Statement and HRA, 2015 Final Plan and
associated documents
• Lessons learned
• Review of pilot process Review
![Page 11: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/11.jpg)
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
![Page 12: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/12.jpg)
The PFOW marine spatial plan is non statutory and, if approved by
Scottish Ministers, will be:
• A material consideration in the determination of marine
licensing, works licenses and Section 36 applications
• Can be adopted as Planning Policy Advice
or as Supplementary Guidance to the appropriate Local
Development Plan
Pilot Pentland Firth and Orkney Waters
Marine Spatial Plan
The status of the plan
![Page 13: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/13.jpg)
• Local Development Plans and planning guidance
• Masterplanning and Development Briefs
• Investment in port and harbour infrastructure
Land use planning and marine infrastructure
![Page 14: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/14.jpg)
Land use planning
• Overlap with marine plans across the
intertidal zone
• Local Development Plans and the
coastal zone
• Integrating land based and marine
development
• The aquaculture anomaly
![Page 15: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/15.jpg)
Masterplanning and Development Briefs
• Coordinate development and
infrastructure
• Engage businesses and end users
• Identifies environmental constraints /
sensitivities
• Developer contributions and funding
![Page 16: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/16.jpg)
Hatston
Stromness
Lyness
Port and harbour investment
![Page 17: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/17.jpg)
Lyness Hoy
![Page 18: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/18.jpg)
Lyness
• Marine renewables (O&M), aquaculture, heritage
• Land in Council ownership
• Enterprise Area
• £2.97m investment to upgrade the wharf (OIC and ERDF)
• Over 300,000 sq.m. of lay down areas available adjacent to quay edge
• Sheltered deep water anchorage within Scapa Flow
• HIE Engineering hubs in planning
• Regular connectivity to Orkney Mainland
![Page 19: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/19.jpg)
Hatston Pier, Kirkwall
![Page 20: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/20.jpg)
• Ferry terminal, cruise ships, marine renewables
• Council owned land and Enterprise Area
• £8 million to extend the pier (OIC and ERDF)
• Accommodate vessels up to 385 meters LOA and 10.5
meter drafts
• Support marine renewables in the North Isles
• Regular connectivity to Aberdeen (Sea) and UK (Air)
Hatston, Kirkwall
![Page 21: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/21.jpg)
Copland's Dock Stromness
![Page 22: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/22.jpg)
Copland's Dock Stromness
• Council land
• Ten hectares of laydown land
• Total quay edge of 337 meters
• £10.6m jointly funded by OIC, ERDF and Scottish
Government
• Renewables support vessels, aquaculture, fishing vessels
and freight
• Access to sheltered waters in Scapa Flow
![Page 23: Doctoral Training Heriot Watt University FINAL](https://reader031.vdocuments.site/reader031/viewer/2022021813/587820021a28aba12d8b64cb/html5/thumbnails/23.jpg)
Marine Planning – A Council Perspective
James Green
Development and Marine Planning
Orkney Islands Council