doc.: ieee 802.11-11/0813r0 report may 2011 alex ashley, nds ltdslide 1 802.11 may 2011 closing...
TRANSCRIPT
doc.: IEEE 802.11-11/0813r0
Report
May 2011
Alex Ashley, NDS LtdSlide 1
802.11 May 2011 Closing Plenary Reports
Date: 2011-05-12
Name Company Address Phone email Adrian Stephens Intel
Corporation +44 792 008
4900 (mobile)
Alex Ashley NDS Ltd +44 792 021 1351
Authors:
doc.: IEEE 802.11-11/0813r0
Report
Abstract
• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the January 2011 closing plenary meeting.
May 2011
Alex Ashley, NDS LtdSlide 2
doc.: IEEE 802.11-11/0813r0
Report Slide 3
802.11 WG Editor’s Meeting (May ‘11)
Date: 2011-05-08
Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,
MS SJ-14-4, San Jose, CA 95134-1706
+1-408-527-0815 [email protected]
Authors:
Alex Ashley, NDS Ltdfrom slide 1/7 of 11/0497r2 by Peter Ecclesine (Cisco Systems)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Slide 4
Roll Call – 2011-05-10• 802.11 Editor’s Present
• P802.11s Amendment (MESH) –Kazuyuki Sakoda• P802.11aa Amendment (VTS) – Alex Ashley• P802.11ac Amendment (VHT L6) – Robert Stacey• P802.11ad Amendment (VHT60) – Carlos Cordeiro• P802.11ae Amendment (QosMan) – Henry Ptasinski• P802.11af Amendment (TVWS) – Peter Ecclesine• P802.11ah Amendment (S1G) – Minyoung Park• P802.11ai Amendment (FILS) – Tom Siep
• 802.11 Editor’s Not Present
• P802.11mb Amendment (REVmb) – Adrian Stephens
• Also present:
– Clint Chaplin– Mike Montemurro– Jon Rosedahl
• IEEE Staff present and always welcome!
• IEEE Staff not present and always welcome!
– Kim Breitfelder – manager publishing, [email protected]– Tricia Gerdon – our staff liaison, [email protected] – Michelle Turner – staff editor for 802, [email protected]
• Note: editors request that an IEEE staff member should be present at least during Plenary meetingsAlex Ashley, NDS Ltd
from slide 2/7 of 11/0497r2 by Peter Ecclesine (Cisco Systems)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
ANA Report
• Recent allocations to TGad (1 item) and TGs (9 items)
• Two Behavior Limits released (reserved) by TGmb
• Two “temporary” values used by TGmb replaced by allocated values
• Reallocation of two values used by TGmb to avoid collision with published .11v
• Tentative allocations to TGad (12 items) and TGae (9 items)
Alex Ashley, NDS LtdSlide 5from slide 3/7 of 11/0497r2 by Peter Ecclesine (Cisco Systems)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
MEC Status• P802.11s D7.0 has gone through IEEE-SA Mandatory
Editorial Coordination in October 2010See next three slides
• 802.11 Working Group MEC11-11/615r0 documents the process
Suggest that TG identify what it expects to be the last WG ballot that will make changes. In parallel with ballot, a team of two editors will review the draft and work with the TG editor to make changes to address: numbering, ANA allocations, adherence to WG802.11 style.
• P802.11ae D4.0 and P802.11aa D5.0 will go through Working Group Mandatory Editorial Coordination before July 2011
See next three slidesSlide 6 Alex Ashley, NDS Ltd
from slide 4/7 of 11/0497r2 by Peter Ecclesine (Cisco Systems)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
802.11 Style Guide
• See 11-09-1034-01-0000-wg11-style-guide.doc
• Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts.
• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual
Slide 7 Alex Ashley, NDS Ltdfrom slide 5/7 of 11/0497r2 by Peter Ecclesine (Cisco Systems)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Slide 8
Editor Amendment Ordering
Amendment Number Task Group REVCOM Date802.11 Amendment 8 TGv Feb 2011
802.11 Amendment 9 TGu Feb 2011
802.11 Amendment 10 TGs Sept 2011
802.11 Revision 802.11mb Mar 2012*est.
802.11-2011 Amendment 1 TGae Jun 2012
802.11-2011 Amendment 2 TGaa Jun 2012
802.11-2011 Amendment 3 TGaf Sept 2012
802.11-2011 Amendment 4 TGad Dec 2012
802.11-2011 Amendment 5 TGac Dec 2013
802.11-2011 Amendment 6 TGah July 2013
802.11-2011 Amendment 7 TGai Sept 2013
• Data as of May 2011• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm
Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!
Alex Ashley, NDS Ltdfrom slide 6/7 of 11/0497r2 by Peter Ecclesine (Cisco Systems)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Most current doc shaded
green.TG Published or Draft Baseline DocumentsSource MEC
Style Guide Editor
Snapshot Date
Published
s mb ae aa af ad aa ad ac ah
s Y 10.0 Frame 8.0 Yes 2009 Kazuyuki Sakoda 15-Mar
mb Y 8.0 Frame 9.0 Yes 2009 Adrian Stephens 15-Mar
ae 6.0 2.0 OpenOffice 3.2
No 2009 Henry Ptasinski 19-Jan
aa 7.0 7.0 1.0 4.0 Word No 2009 Alex Ashley 16-Mar
af 8.0 3.0 4.0 1.01
Frame 9.0 No 2009 Peter Ecclesine 12-May
ad 8.0 2.1 Word 2007
No 2009 Carlos Cordero 8-May
ac 7.0 0.2 Frame 9.0 No 2009 Robert Stacey 15-Mar
ah Minyoung Park
ai Tom Siep
Changes from last report shown in red.
Slide 9
May 2011 Draft Development Snapshot
Slide 9 Alex Ashley, NDS Ltdfrom slide 7/7 of 11/0497r2 by Peter Ecclesine (Cisco Systems)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 10
Closing ReportDate: 2011-05-13
Name Company Address Phone email
Clint Chaplin Samsung Electronics 75 W. Plumeria Drive San Jose, Ca 95134
+1 408 544 5815 [email protected]
Authors:
from slide 1/3 of 11/0814r0 by Clint Chaplin, Chair (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 11
Abstract
Closing report for WNG SC for May 2011, Indian Wells, CA, USA
from slide 2/3 of 11/0814r0 by Clint Chaplin, Chair (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 12
• Presentations at March 2011 meeting– 802.11 WNG Presentation: 6-9GHz extensions to 802.11 (11-11-0743-00-
0wng-6-9ghz-extensions-to-802-11.ppt) – Jim Lansford
– DSA system for 2.4GHz ISM Band (11-11-0591-00-0wng-dsa-system-for-2-4ghz-ism-band.pptx) – Shoichi Kitazawa
• Minutes
– 11-11-0751-00-0wng-may-2011-meeting-minutes.doc
• Plans for July 2011
– 1 2 hour session
from slide 3/3 of 11/0814r0 by Clint Chaplin, Chair (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 13
May 2011 Closing Report -TGmbDate: 2011-05-12
Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave
Sunnyvale, CA 94089
+1 630-363-1389
Authors:
from slide 1/6 of 11/0818r0 by Dorothy Stanley (Aruba Networks)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 14
Abstract
This document contains the TGmb closing report for May 2011.
from slide 2/6 of 11/0818r0 by Dorothy Stanley (Aruba Networks)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 15Slide 15
Accomplishments
• Completed Second Recirculation SB Comment Resolution (D8.0)– 863 comments
– Third Recirculation SB (20 day) to start shortly
• Scheduled Teleconference calls on – June 24, July 8, 15
– 10am Eastern (7am Pacific)
• Timeline Analysis– No change from plan that 11mb will incorporate 11s
– Revisit in July
from slide 3/6 of 11/0818r0 by Dorothy Stanley (Aruba Networks)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 16Slide 16
Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion• Jan 2011 – Sponsor Recirc. Start• Nov 2011 – WG/EC Final Approval• March 2012 – RevCom/SASB Approval
from slide 4/6 of 11/0818r0 by Dorothy Stanley (Aruba Networks)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 17Slide 17
Goals for July 2011
• Recirculation Sponsor Ballot comment resolution (D9.0)
from slide 5/6 of 11/0818r0 by Dorothy Stanley (Aruba Networks)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 18
TGs LA Closing ReportDate: 2011-05-12
Author:
Name Address Affiliation Phone Email
Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands
Philips +31 40 2749743
from slide 1/6 of 11/0822r0 by Dee Denteneer (Philips)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 19
Abstract
TGs closing report for the May 2011 meeting.
Resolved all comments received during the fourth Recirculation Sponsor Ballot on Draft 11.0 plus a
number of late comments plus a number of comments received via JTC1 from the NB of China.
Approved a motion to produce Draft 12.0 and go for a fifth Sponsor recirculation.
from slide 2/6 of 11/0822r0 by Dee Denteneer (Philips)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 20
Status• Before meeting
• TGs passed its fourth Sponsor Ballot based Draft 11.0 with 96.7% approval rate (closed: May 7 2011).
• We received 119 comments
• There were an additional 177 late comments received
• We received an additional 5 comments via JTC1 from the NB of China
• During meeting
• Resolved all these comments: kudos to the CRC
• Got great help from David Hunter
• Approved a motion to recirculate
from slide 3/6 of 11/0822r0 by Dee Denteneer (Philips)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 21
Comment resolution• During meeting, we resolved all comments, see 11-11/0703r9.
editorial technical
received open received open
Part of no vote 0 0 18 0
Not part of no vote 54 0 47 0
Late comments 120 0 57 0
JTC1 comments 5 0
from slide 4/6 of 11/0822r0 by Dee Denteneer (Philips)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 22
Timeline review• During the LA meeting, we established the timeline, joint with a
REVmb and in the editors’ meeting; see 11-11/107r1.
Currently envisaged scenario date
Recirculations February-June, 2011
Request EC Unconditional Approval to go to Revcom July 2011
Get on September Revcom agenda Before 29 July 2011
Revcom approval September 2011
Publication September 2011
from slide 5/6 of 11/0822r0 by Dee Denteneer (Philips)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 23
Plan
• A fifth reciculation from May 20-June 4
• Professional editing starting June 4
• A clean recirculation from June 17-July 2
• Request for unconditional approval in San Francisco meeting
from slide 6/6 of 11/0822r0 by Dee Denteneer (Philips)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
802.11aa – Robust Audio Video Transport Streaming Indian Wells Closing Report
Date: 2011-05-11
Authors:
Name Affiliation Address Phone email Ganesh Venkatesan Intel Corporation JF3-336 2111NE 25th Ave +1 503 334 6720 Ganesh.Venkatesan@intel
.com Alex Ashley NDS Ltd One London Road, Staines,
Middlesex, TW18 4EX, England
+44 1784 848770 [email protected]
Alex Ashley, NDS LtdSlide 24from slide 1/5 of 11/0799r0 by Ganesh Venkatesan, Intel Corporation et al
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Technical Presentations
Slide 25 Alex Ashley, NDS LtdSlide 25
Document number Title Author(s)
1 11/549r1 HCCA TxOP Re-Org Alex Ashley
2 11/675r0 SCS Comment Resolutions Alex Ashley
3 11/620r0 GCR Comment Resolutions Alex Ashley
4 11/768r0 11aa MIB Compilation Fixes Alex Ashley
5 11/0771r2 Block ACK Setup for GCR Naveen Kakani
6 11/0759r4 Proposed Solution to CID 3065 Graham Smith
7 11/741r4Resolutions for CIDs 3038, 3039, 3040
and 3066Graham Smith
8 11/764r3 Request for ANA assignments Ganesh Venkatesan
from slide 2/5 of 11/0799r0 by Ganesh Venkatesan, Intel Corporation et al
May 2011
doc.: IEEE 802.11-11/0813r0
Report
LB175 Comment Resolution Status
Alex Ashley, NDS LtdSlide 26
Blank Accept PrincipleDeclined Total
Editor 18 2 20GCR 11 14 3 28
General 4 4OBSS 7 25 32
SCS 4 3 2 9Total 40 48 5 93
100% Resolved
from slide 3/5 of 11/0799r0 by Ganesh Venkatesan, Intel Corporation et al
May 2011
doc.: IEEE 802.11-11/0813r0
Report Slide 27
Teleconferences
Weekly Monday 1130-1230 Hrs ET
June 13, 20, 27; July 11 2011
Alex Ashley, NDS LtdSlide 27from slide 4/5 of 11/0799r0 by Ganesh Venkatesan, Intel Corporation et al
May 2011
doc.: IEEE 802.11-11/0813r0
Report Slide 28
Plans
• After the May 2011 meeting– Kick off Recirculation 4 on D5.0– Kick off MEC
• July 2011– Resolve Recirculation 4 LB Comments– Complete Draft6.0 and start recirculation– Joint Meeting with 802.1AVB
Alex Ashley, NDS LtdSlide 28from slide 5/5 of 11/0799r0 by Ganesh Venkatesan, Intel Corporation et al
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 29
TGac May 2011 Closing ReportDate: 2011-05-12
Name Affiliations Address Phone email Osama Aboul-Magd Samsung Electronics 75 W. Plumeria Drive
San Jose, CA 95134 408-544-5870 [email protected]
om
Authors:
from slide 1/5 of 11/0817r0 by Osama Aboul-Magd (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 30
Abstract
This document is the closing report for the TGac for the May 2011 session.
from slide 2/5 of 11/0817r0 by Osama Aboul-Magd (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Work Completed
• Comment resolution completed on D0.1, 11/0276r16• TG approved Coexistence Assurance document, 11/0493r0• TG approved motion for Letter Ballot on D1.0• Minutes are available in 11-11-816r0
Alex Ashley, NDS LtdSlide 31from slide 3/5 of 11/0817r0 by Osama Aboul-Magd (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 32
July 2011 Goals
• Comment resolution on D1.0.
from slide 4/5 of 11/0817r0 by Osama Aboul-Magd (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 33
Conference Call Times
• Thursday June 30, 10:00 – 12:00 ET
• Thursday July 7, 20:00 – 22:00 ET
• Thursday July 14, 10:00 -12:00
• Thursday July 28 20:00 -22:00
• Thursday August 4 10:00 -12:00
from slide 5/5 of 11/0817r0 by Osama Aboul-Magd (Samsung)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 34
TGad May 2011 Closing ReportDate: 2011-05-13
Name Company Address Phone email Eldad Perahia Intel
Corporation
2111 NE 25th Ave Hillsboro, OR 97124
503-712-8081 [email protected]
Authors:
from slide 1/5 of 11/0697r0 by Eldad Perahia, Intel Corporation
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 35
Abstract
This document is the closing report for TGad for the May 2011 session.
from slide 2/5 of 11/0697r0 by Eldad Perahia, Intel Corporation
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Work Completed
• Resolved all comments on LB 174 this week
• TG and WG approved motion for recirculation letter ballot on D3.0
• Chris Hansen replaces Vinko Erceg as Vice Chair
Alex Ashley, NDS LtdSlide 36from slide 3/5 of 11/0697r0 by Eldad Perahia, Intel Corporation
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Goals for July 2011
• Comment resolution on D3.0
Alex Ashley, NDS LtdSlide 37from slide 4/5 of 11/0697r0 by Eldad Perahia, Intel Corporation
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Conference call times
• Previously approved conference calls– May 26, Jun 9
• 10:00 – 12:00 ET
– May 19, Jun 2, Jun 16• 20:00-22:00 ET
• New conference calls– Not overlap with TGac
– Jun 23, July 7, July 28, Aug 11• 10:00 – 12:00 ET
– Jun 30, July 14, Aug 4• 20:00-22:00 ET
Alex Ashley, NDS LtdSlide 38from slide 5/5 of 11/0697r0 by Eldad Perahia, Intel Corporation
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 39
TGae Closing Report – May 2011Date: 2011-05-12
Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd.
Mississauga, ON. Canada. L4W 0B4
+1-905-629-4746 [email protected]
Authors:
from slide 1/6 of 11/0806r0 by Michael Montemurro, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 40
Abstract
This document is the closing report for the TGae Task Group for the May 2011 session.
from slide 2/6 of 11/0806r0 by Michael Montemurro, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 41
Work Completed• Completed Comment Resolution for LB 176
– https://mentor.ieee.org/802.11/dcn/11/11-11-0598-07-00ae-tgae-lb-176-comment-resolutions.xls
• Motion to approve recirculation LB on Draft 4.0• ANA request• Voted to request formation of Sponsor Ballot Pool• Voted to submit Draft 4.0 for MEC • Teleconferences:
– Weekly teleconferences beginning Wednesday Jun 22 at 11am ET for 1 hour until the July Plenary meeting.
from slide 3/6 of 11/0806r0 by Michael Montemurro, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 42
TGae Timeline – March 2011
• Initial Working Group Letter Ballot: September ‘10
• Re-circulation Working Group Letter Ballot: January ‘11
• Form Sponsor Ballot Pool: May ’11
• Mandatory Editorial Check: May ’11
• Initial Sponsor Ballot: July ’11
• Sponsor Ballot Recirculation: Sep ‘11
• Final WG/EC Approval: Nov ‘11
• RevCom/Standards Board Approval: March ‘12
from slide 4/6 of 11/0806r0 by Michael Montemurro, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 43
July 2011 Goals• Resolve comments from recirculation LB on D4.0• Request conditional approval for Sponsor Ballot• Prepare for recirculation letter ballot
from slide 5/6 of 11/0806r0 by Michael Montemurro, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
TGae Motion
• Having approved comment resolutions for all of the comments received from LB176 on P802.11ae Draft 3.0 as contained in document 11-11/0598r7, instruct the editor to prepare P802.11ae Draft 4.0 incorporating those resolutions and approve a 15-day Working Group Recirculation Ballot asking the question “Should P802.11ae Draft 4.0 be forwarded to Sponsor Ballot?”
• Moved by Michael Montemurro on behalf of TGae
• TGae vote:
• Moved: Santosh Pandey, Seconded: Matthew Fischer, Result: 8/0/0.
• Moved by:• Seconded:• Result: (for-against-abstain: 0/0/0) Motion
Alex Ashley, NDS LtdSlide 44from slide 6/6 of 11/0806r0 by Michael Montemurro, RIM
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 45
IEEE 802.11 TGafPalm Springs Closing Report
Date: 2011-05-13
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Peter Ecclesine Cisco Systems 170 W. Tasman Dr., San Jose, CA 95134
+1-408-527-0815 [email protected]
Authors:
from slide 1/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 46
AbstractThis presentation is the closing report for the tenth face-
to-face meeting of IEEE 802.11 TGaf taking place the week of May 11, 2011 at the IEEE 802 Wireless Interim in Palm Springs.
from slide 2/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Agenda
• Approve meeting, ad hoc meeting and teleconference minutes
• Review the results of LB171
• Approve the LB171 comment spreadsheet in 11-11/277r11
• Approve draft P802.11af D1.01 as the working draft
• Review of the progress since March, including the May ad hoc meeting
• Comment resolution
• Plan for July meeting and teleconferences
Alex Ashley, NDS LtdSlide 47from slide 3/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
TGaf Accomplishments • Settled on architecture and security modifications to
track regulatory changes
• Selected P802.11ac as PHY focus – Adjusted timeline accordingly
• Resolved 481 comment– 408 of 410 Editorial (accepted into draft 1.01)
– 73 of 892 Technical (voted Thursday AM2)
• Revised the P802.11af timeline
• Planned for July ad hoc, and weekly teleconferences– Still begin Tuesdays at 22:00 ET
Alex Ashley, NDS LtdSlide 48from slide 4/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Plans for July
• Ad hoc July 14 - 15 in the Bay Area
• Continue comment resolution
Alex Ashley, NDS LtdSlide 49from slide 5/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion
• Move to approve an ad hoc meeting of TGaf in the Bay Area, California on July 14-15, 2011 to advance the TGaf draft prior to the July IEEE 802 Plenary in San Francisco.
• Moved: Richard Kennedy
• Second
• Result: x/x/x
Alex Ashley, NDS LtdSlide 50from slide 6/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 51
TGaf Timeline – Updated March 2011
• New
• Initial Working Group Letter Ballot: January 2011
• Second Working Group Letter Ballot: September 2011
• Recirculation Letter Ballot: November 2011
• Form Sponsor Ballot Pool: February 2012
• Initial Sponsor Ballot: March 2012
• Recirculate Sponsor Ballot: May 2012
• Final WG/EC Approval: July 2012
• RevCom/Standards Board Approval: September 2012
from slide 7/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Teleconferences
• Weekly on Tuesdays:
• Time: 22:00 ET for 120 minutes
Alex Ashley, NDS LtdSlide 52from slide 8/8 of 11/0801r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 53
IEEE 802.11ah Closing Report forMay 2011Date: 2011-5-11
Name Affiliations Address Phone email David Halasz Aclara 2315 W. 9th Street
Austin, TX 78703 330-283-2715 dave.halasz@oaktreewirel
ess.com
Authors:
from slide 1/5 of 11/0809r0 by David Halasz, OakTree Wireless
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Activity in TGah
• Worked on Channel model document– General agreement on outdoor channel model
– Discussions on indoor channel
• Requirements and evaluation methodology started
• Change of leadership roles– Yongho Seok Vice Chair
– Minyoung Park Editor
– Secretary is open
Alex Ashley, NDS LtdSlide 54from slide 2/5 of 11/0809r0 by David Halasz, OakTree Wireless
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Going forward
•Get agreement on channel models and approve channel model document
•Make progress on Requirements and Evaluation Methodology
•Continue to receive submissions on Specification framework and general submissions
Alex Ashley, NDS LtdSlide 55from slide 3/5 of 11/0809r0 by David Halasz, OakTree Wireless
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Teleconferences
• June 20th 6:30 PM ET 1.5 hours Channel model
• June 27th 6:30 PM ET 1.5 hours Requirements
• July 11th 6:30 PM ET 1.5 hours Requirements
Alex Ashley, NDS LtdSlide 56from slide 4/5 of 11/0809r0 by David Halasz, OakTree Wireless
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Timeline
• No adjustment to timeline
• If lack of progress on channel model in July then timeline will be impacted
Alex Ashley, NDS LtdSlide 57from slide 5/5 of 11/0809r0 by David Halasz, OakTree Wireless
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 58
IEEE 802.11TGaiClosing Report
Date: 2011-05-13
Authors:
Name Company Address Phone email
Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN
+81-3-5719-7630 [email protected]
Marc Emmelmann Fraunhofer FOKUS
Fraunhofer FOKUSKaiserin-Augusta-Alle 3110589 BerlinGermany
+49-30-3463 7268
from slide 1/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 59
AbstractThis presentation is the closing report for the Palm Springs
meeting of the IEEE 802.11 TGai.
from slide 2/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Agenda for this weekPalm Springs, May 2011
• Official time slot – Monday PM2,EVE
– Tuesday AM1, EVE
– Thursday AM1,PM2
• Goals for the Meeting:– Review and Approve the Singapore and Teleconference meeting
minutes
– Presentation of submissions
• Approve a use case scenario documentation
• Approve a functional requirement documentation– TIME line of task group
– Plan for July & TeleconferenceAlex Ashley, NDS LtdSlide 60
from slide 3/15 of 11/0805r0 by Bruce Kraemer (Marvell)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Accomplishments TGai 1/2• Reviewed and Approved the Singapore and
Teleconference meeting minutes
• Approved Use Case Scenario documentation
• Approved TGai requirement documentation
• Approved Process for creating TGai draft
• Approved Weekly Teleconference schedule
• Approved Plan for July
• Discussion and approve Evaluation methodology
• Submission of Initial technical contribution
• General submission
Alex Ashley, NDS LtdSlide 61from slide 4/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Accomplishments TGai 2/2• Submission of Presentation
– 0619/00 Use case: network mobility / Jihyun Lee (LG Electronics)
– 0746/00 Discussion on How Many APs to Cover/ Dwight Smith (Motorola Mobility)
– 0238/17 Use-Case-Reference-List-for-TGai / Tom Siep (CSR)
– 0750/01 Use-Case-Document-Definitions /Tom Siep (CSR)
– 0739/01 HIP DEX for Fast Initial Authentication in 802.11 /Konstantinos Georgantas, (Helsinki Institute for Information Technology)
– 0756/00 IP address assignment in FIA/ Robert Moskowitz (Verizon)
– 0797/00 Use Case: Mobile hotspot / Jhyun Lee (LG)
– 0745/05 TGai Functional Requirements / Marc Emmelmann (Fraunhofer FOKUS & Root )
– 0748/04 process-for-Creating-TGai-Draft / Tom Siep (CSR)
May 2011
Alex Ashley, NDS LtdSlide 62from slide 5/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Approve TGai meeting minutes of Singapore face-to-face meeting.
• Motion:
• Approve TGai Meeting Minutes for the IEEE 802.11 March 2011 Plenary : – March 2011 Singapore session minutes, 11/11-11-0477-00-00ai-
march-2011-singapore-session-minutes.doc
• Approved
May 2011
Alex Ashley, NDS LtdSlide 63from slide 6/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Approve TGai teleconference meeting minutes of Singapore to Palm Springs meeting.
• Motion:
• Approve TGai teleconference meeting minutes of Singapore to Palm Springs meeting.: – March-May Teleconference Minutes, 11/11-11-0490-05-00ai-
march-may-teleconference-minutes.doc
• Approved
May 2011
Alex Ashley, NDS LtdSlide 64from slide 7/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion to approve use case reference
• Move to accept all changes in 11-11-0238-17 and upload the revised document as rev 18 to the server , accept 11-11-0238-18 use case reference list .
• Mover : Tom Siep (CSR)
• Second : Dwight Smith (Motorola Mobility)
• Result 12-0-4 passed
May 2011
Alex Ashley, NDS LtdSlide 65from slide 8/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion
• Move to add an additional “Mobile Hotspot Use Case” as per slide 3 and 4 of 11-11-797r0 to the TGai Use Case Document (11-11-238r18)
• Moved: Eunsun Kim
• Seconded: Lee Armstrong
• Y-N-A: 15-0-5 motion passes
from slide 9/15 of 11/0805r0
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion to approve requirement document
• Move to accept all changes in 11-11-0745-04 and upload the revised document as rev 05 to the server , accept 11-11-0745-05 as TGai requirement document.
• Mover : Lee Armstrong (DoT)
• Second :Dwight Smith (Motorola Mobility)
• Result 10 -0 -1 passed
May 2011
Alex Ashley, NDS LtdSlide 67from slide 10/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion to approve Process for creating TGai draft
• Move to accept all changes in 11-11-0748-02 and upload the revised document as rev 03 to the server , accept 11-11-0748-03 Process for creating TGai draft.
• Mover : Lee Armstrong (DoT)
• Second : Tom Siep (CSR)
• Result : 6-1-2 passed
May 2011
Alex Ashley, NDS LtdSlide 68from slide 11/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Time line of TGai
PAR Approved, Modified, or Extended [Expires] 2010-12-08
– WG Letter Ballots Initial / Recirc Mar 12 / Jul 12
– Form Sponsor Ballot Pool / Reform Jan 13
– MEC Done Jan13
– IEEE-SA Sponsor Ballots Initial / Recirc Mar13/ Jun13
– Final 802.11 WG Approval Jan 14
– final or Conditional 802 EC Approval Jan 14
– RevCom & Standards Board Final or Continuous Process Approval Mar14
– ANSI Approved N/A
Alex Ashley, NDS LtdSlide 69from slide 12/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Teleconference Schedule
• Motion: – Approve the following schedule of weekly teleconferences. – Tuesdays 09:00 EDT (NY Time) continue from 17th May.– Duration 1Hour– Using WEB-EX that will be provided by Task Group Chair
• Moved:Tom Siep(CSR) , Seconded:Lee Armstrong (DoT)• Result:7 -0 -0 passed
May 2011
Alex Ashley, NDS LtdSlide 70from slide 13/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Documents
• Approved Minutes– March 2011 Singapore session minutes, 11/11-11-0477-00-00ai-
march-2011-singapore-session-minutes.doc– March-May Teleconference Minutes, 11/11-11-0490-05-00ai-
march-may-teleconference-minutes.doc
• Approved Use Case Reference List– use case reference list, 11/11-11-0238-18-00ai-use-case-reference-
list-for-tgai.docx – requirement documentation, 11/11-11-0745-05-00ai-tgai-
functional-requirements.docx– process for creating tgai draft, /11/11-11-0748-03-00ai-process-
for-creating-tgai-draft.pptx
Alex Ashley, NDS LtdSlide 71from slide 14/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Thanks to all who participated!
Alex Ashley, NDS LtdSlide 72from slide 15/15 of 11/0805r0 by Hiroshi Mano (Root Inc.)
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 73
JTC1 ad hoc closing report (May11)Date: 2011-5-13
Name Company Address Phone email
Andrew Myles Cisco [email protected]
Authors:
from slide 1/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 74
Abstract
Closing report for JTC1 ad hocfor May 2011, Palm Springs
from slide 2/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 75
JTC1 ad hoc focused on prep for upcoming SC6 meeting
• Progress in Palm Springs (March 2011)– Reviewed extended goals
• The ad hoc is now responsible for 802 matters– Reviewed status of liaisons previously sent to SC6
• Comments received from China NB related to 802.11s ; passed to TGs
• There is a motion to approve liaison– Reviewed presentations for SC6 meeting ; mostly based on previous
liaisons related to
• Liaison relations questions
• 802.11 security
• Identifier conflict issue
• 802.1X/AE misunderstandings
from slide 3/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 76
JTC1 ad hoc focused on prep for upcoming SC6 meeting
• Progress in Palm Springs (March 2011)– Discussed UK NB proposal to obsolete 8802 series
• No position yet; will wait for discussions at SC6 meeting– Discussed possibility of becoming Category A liaison
• No position yet; more information required– Appointed delegation (HoD delegation action)
• Likely to include 9 people; including an IEEE staff member– Approved mechanism for approving presentations to SC6
• Presentations still being refined/revised
• Plan is for Bruce Kraemer to have authority to approve– Bruce Kraemer will take over formal 802 Liaison position to SC6
from slide 4/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report
JTC1 ad hoc will review results of SC6 meeting during the San Francisco plenary
• Plans for San Francisco (July 2011)– Review results of SC6 meeting in June in San Diego
Alex Ashley, NDS LtdSlide 77from slide 5/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion to authorise HoD to approve presentation
• The JTC1 ad hoc approved a motion to authorise the HoD to SC6 meeting to approve presentations– The JTC1 ad hoc recommends to the IEEE 802.11 WG that Bruce
Kraemer be empowered to approve any presentations to ISO/IEC JTC1/SC6 during the ISO/IEC JTC1/SC6 face to face meeting in San Diego in June 2011
• IEEE 802.11 WG should consider an equivalent motion– IEEE 802.11 WG authorises Bruce Kraemer (HoD) to approve
any presentations to ISO/IEC JTC1/SC6 during the ISO/IEC JTC1/SC6 face to face meeting in San Diego in June 2011
Alex Ashley, NDS LtdSlide 78from slide 6/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion to authorise HoD to approve presentation
• The JTC1 ad hoc approved a motion to authorise the HoD to SC6 meeting to approve presentations– The JTC1 ad hoc recommends to the IEEE 802.11 WG that Bruce
Kraemer be empowered to approve any presentations to ISO/IEC JTC1/SC6 during the ISO/IEC JTC1/SC6 face to face meeting in San Diego in June 2011
• IEEE 802.11 WG should consider an equivalent motion– IEEE 802.11 WG authorises Bruce Kraemer (HoD) to approve
any presentations to ISO/IEC JTC1/SC6 during the ISO/IEC JTC1/SC6 face to face meeting in San Diego in June 2011
Alex Ashley, NDS LtdSlide 79from slide 7/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Motion to authorise liaison related to TGs comments
• IEEE 802.11 WG should consider a motion to authorise a liaison to SC6 related to 802.11s comments– The IEEE 802.11 WG authorises Bruce Kraemer to approve a
liaison to SC6 that
• Thanks the China NB for their comments on the 802.11s draft
• Notifies SC6 that TGs has considered and resolved the comments
• Provides a copy of the comment resolutions
• Invites the all SC6 NBs to provide further comments
Alex Ashley, NDS LtdSlide 80from slide 8/8 of 11/0823r0 by Andrew Myles, Cisco
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 81
IEEE 802.11Regulatory Ad Hoc Committee
Closing ReportDate: 2011-05-13
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1/4 of 11/0803r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 82
AbstractThis presentation is the closing report for the Palm
Springs 2011 meeting of the IEEE 802.11 Regulatory Ad Hoc Committee.
from slide 2/4 of 11/0803r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Agenda
• The regulatory summaries
• Regulatory issues status– FCC open issues
• Test plan for TVDBs– EN 300 328 revision update
– FCC 5 GHz rules changes update
• Critical issues actions– 802.18 document for ITU-R on TV White Spaces projects in 802
– FCC specified measurement method for TVBD transmit power
Slide 83 Alex Ashley, NDS Ltdfrom slide 3/4 of 11/0803r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Regulatory AHC Activities
• Discussed regulatory summaries from North America, the EU and Asia– FCC TVBD test plan issues
– Update on 5 GHz TDWR activities
– Received Draft Spectrum Allocation plan from India
• Generated input on P802.11af for 802.18 information document to ITU-R
Alex Ashley, NDS LtdSlide 84from slide 4/4 of 11/0803r0 by Rich Kennedy, Research In Motion
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 85
Smart Grid ad hoc Closing Report – May 2011
Date: 12 May 2011
Primary Meeting Document : 11-11-0720r2
Abstract:
1 – SGIP NIST PAP22 - EPRI FAN Field Area Network concepts & plans 11-11-802
Name Company Address Phone emailBruce Kraemer Marvell 5488 Marvell Lane,
Santa Clara, CA, 95054
+1-321-751-3988 [email protected]
from slide 1/6 of 11/0815r0 by Bruce Kraemer, Marvell
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 86
• Propagation loss models– Terrain & Clutter
– Characterization of deployment categories
– Household densities
• Framework for Guideline completion
• Review / Questions / Proposals generated for discussion in PAP2
• 802 Proposed Revision of Section 4 “Wireless Technology”
• Review of EPRI Field Area Network concepts & plans
from slide 2/6 of 11/0815r0 by Bruce Kraemer, Marvell
May 2011
doc.: IEEE 802.11-11/0813r0
Report
2011 NIST PAP2 Meeting History
Alex Ashley, NDS LtdSlide 87
Date & Time Agenda & Slides Presented Approved Meeting Minutes 4/26/11 2:00PM ET Download Download (Unapproved) 4/12/11 2:30PM ET Download Download 3/29/11 6:00PM ET Download, Rural Area
Propagation Analysis, Spreadsheet
Download
3/10/11 8:00AM PT Download Download 2/25/11 3:00PM ET Download, PAP02 Proposed
Operating Procedures Download
2/11/11 1:00PM ET Download Download
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP02Wireless
from slide 3/6 of 11/0815r0 by Bruce Kraemer, Marvell
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Models vs. Smart Grid Requirements
88
Frequency Range of interest
BS Antenna Height
SS Antenna Height
Special
Situations1
Rural (1) Rural (2) Suburban Urban Dense Urban
700 MHz to 6000 MHz 7 to 100 m Exterior 2 m, Interior 1.5 to
6.5 m
Meter vaults, below grade,
basements, etc
Rolling Hills, Mountains, Valleys, w & w/o foliage
Flat Open Area - Farm-
like
1-3 Story residential -
some commercial
Commercial Industrial, 1-4 story bldgs
High Rise Bldgs:
Residential + Enterprise
1800 to 2700 MHz & with modification: 1000 to 4000 MHz
10 to 80 m (useable 7 to
80 m)
2 to 8 m Type A, B Type C Yes Type A3 Type A3
Hata-Okumura150 to 1500 MHz (usaeble to 2000 MHz)
30 to 200 m 1 to 10 m No2 Question accuracy
Yes? Too optimistic?
Yes Yes
COST2311500 to 2000 MHz 30 to 200 m 1 to 10 m No2 ?? Yes Yes Yes
ITU-R M.12252000 +/- MHz 0 to 50 m
>avg rooftop height
Yes Yes Yes
802.11ah Model Pending< 1000 MHz
Smart Grid Requirements for communications network (WAN or FAN) per Utilities
Commonly available Path Loss Models for PMP coverage analysisErceg-SUI and Modified Erceg-SUI
from slide 4/6 of 11/0815r0
May 2011
doc.: IEEE 802.11-11/0813r0
Report
Extended Work Plan Proposal
Alex Ashley, NDS LtdSlide 89from slide 5/6 of 11/0815r0 by Bruce Kraemer, Marvell
May 2011
doc.: IEEE 802.11-11/0813r0
Report Alex Ashley, NDS LtdSlide 90
References
• Previous major submission package to NIST
• Doc 1396
• https://mentor.ieee.org/802.11/dcn/10/11-10-1396-03-0000-smart-grid-summary-input-to-pap-2-report-nov-2010.ppt
• And therein:
V6-r1
from slide 6/6 of 11/0815r0 by Bruce Kraemer, Marvell
May 2011