Generated by Jive on 2015-08-08+02:00 1 Public Holiday Calendar and Work Schedule Rules Introduction This knowledge artifact is an attempt from my side to share my learnings on Public Holiday Calendar and Work Schedule Rules. I was fortunate to have worked in a SAP HR Support project for a leading mining company based out of Australia. And while supporting the solution and resolving tickets there, I learned quite a few things about time management. The good part of the solution implemented there was that it had used every bit of standard functionality available to fulfill customer requirements. I should have ideally written this knowledge artifact at least a couple of year back. However, it’s better late than never! And yes, my artifact will be limited to things I know and have expertise about. Public Holiday Calendar A Public Holiday Calendar is a collection of public holidays valid for a location (Personnel Area and Personnel Subarea). Hence, a company having operations from Hyderabad and Chandigarh will ideally have two different public holiday calendars. Because some public holidays valid for Hyderabad employees won’t be applicable for Chandigarh employees. The transaction code to access Public Holiday Calendar in SAP is SCAL. The below screen comes up when we execute TCode SCAL.

Upload: amyousef

Post on 15-Dec-2015

30 views

Category:

Documents


6 download

DESCRIPTION

Public Holiday Calendar and Work Schedule Rules

TRANSCRIPT

Page 1: DOC-52366

Generated by Jive on 2015-08-08+02:001

Public Holiday Calendar and Work ScheduleRules

Introduction

This knowledge artifact is an attempt from my side to share my learnings on Public Holiday Calendar and Work

Schedule Rules. I was fortunate to have worked in a SAP HR Support project for a leading mining company

based out of Australia. And while supporting the solution and resolving tickets there, I learned quite a few

things about time management.

The good part of the solution implemented there was that it had used every bit of standard functionality

available to fulfill customer requirements.

I should have ideally written this knowledge artifact at least a couple of year back. However, it’sbetter late than never!  And yes, my artifact will be limited to things I know and have expertiseabout.

Public Holiday Calendar

A Public Holiday Calendar is a collection of public holidays valid for a location (Personnel Areaand Personnel Subarea). Hence, a company having operations from Hyderabad and Chandigarhwill ideally have two different public holiday calendars. Because some public holidays valid forHyderabad employees won’t be applicable for Chandigarh employees.

The transaction code to access Public Holiday Calendar in SAP is SCAL. The below screen comes up when

we execute TCode SCAL.

Page 2: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:002

We first create a list of public holidays valid for a country and then assign all these publicholidays to public holiday calendars for various locations within the country. What this meansis that we can definitely re-use common public holidays in multiple public holiday calendarsfor different locations within the same country. Hence, if public holiday “New Year” is valid forChandigarh and Hyderabad locations, we just need to create one public holiday “New Year” andassign it to the public holiday calendars for Hyderabad and Chandigarh.

Let us select the radio button for Public Holidays shown in the previous screenshot and then click on change

icon. You will be brought to the below screen.

Page 3: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:003

Below are the key columns shown in the screenshot above:

• Public Holiday - Displays the long text of the Public Holiday

• Short Text - Displays the short text of the Public Holiday

• Use in Holiday Cal.    -        Helps us know if the public holiday is being used in any public

holiday calendar or not. You can’t edit a public holiday if it is being used in any publicholiday calendar. You need to first remove it from all public holiday calendars where it isbeing used and then make the necessary changes and again re-assign the public holidayto the relevant public holiday calendars.

• Sort Key - Helps to group together all public holidays valid for a country. It is a 3

character key and I recommend its naming convention to be Znn where nn stands for country

Page 4: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:004

grouping. Hence, the sort keys for public holidays for Australia, India, New Zealand will be as shownbelow:

• • • Australia - Z13

• India - Z40• New Zealand - Z43

Let me try to change public holiday “Deepavali” which is currently being used in some publicholiday calendar. If you see the below screenshot, it appears in display mode only.

If you click on the “Where-Used List” icon, you will come to know the holiday calendars wherethis public holiday is being used. Hence, the public holiday “Deepavali” is being used in the belowholiday calendars:

Page 5: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:005

If you try to edit a public holiday which is not being used in any holiday calendar, it will open in editable mode

as shown in the screenshot below:

Page 6: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:006

Please refer the above screenshot. There are 5 types of public holidays:

• With Fixed Date - It is always going to fall on a fixed date like New Year on 01-Jan.

• With a fixed day from date - If there is a requirement that 1st Monday from 01-Nov will be

declared as Family Day, then we should select this option.

• Distance to Easter - To specify a public holiday with no. of days before or after Easter.

• Easter Sunday - Meant only for Easter Sunday

• Floating Public Holiday - It is meant for public holidays for which dates vary with every year

like Diwali, Id, Holi etc.

Page 7: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:007

With Fixed Date

Let us study the configuration details of public holiday with fixed date.

• Day - Specify the fixed date of the public holiday

• Month - Specify the month of the public holiday

• Guaranteed    -        A public holiday with a fixed date can be guaranteed or not

guaranteed. If a public holiday is not guaranteed and it falls on an OFF day, then theemployee can’t avail its benefit. Some countries have a policy where if the publicholiday falls on an OFF day (Sat/Sun), then it is moved to a working day (Fri/Mon) sothat the employee still gets the benefit of the public holiday. Hence, the public holiday isguaranteed.

Page 8: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:008

Below is the screenshot for guaranteed rule – Saturday/Sunday:

• Sort Criterion - It is the Sort Key as discussed above.

• Religious Denomination - You can capture if this public holiday is applicable for any

particular religion.

• Public Holiday Class             -        A Public Holiday Class is used to identify whether

a particular day is a public holiday or not. However, it doesn’t specify whether anemployee is eligible for this public holiday or not. There are 4 possible options:

• Blank - Not a Public Holiday• 3 - 9 - Customer specific public holiday classes

• Short Holiday Name - It stores the short text of the holiday and allows up to 10 characters.

• Long Holiday Name - It stores the long text of the holiday and allows up to 30 characters.

Page 9: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:009

With a Fixed Day from Date

Let us look into the configuration details of public holiday with fixed day from date.

• Weekday - Specify the weekday (example Monday)

• Day - Specify the date (example 01)

• Month - Specify the month (example 11)

Hence, it means that the first Monday from 01-Nov will be treated as a public holiday. In the year 2014, the first

Monday from 01-Nov-14 will be 03-Nov-14.

Page 10: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0010

The remaining attributes are similar to fixed date public holiday.

Distance to Easter

Let us look into the configuration details of public holiday with distance to Easter.

• No. of Days Before Easter - Can specify the no. of days before Easter this public holiday has to

fall.

• No. of Days After Easter - Can specify the no. of days after Easter this public holiday has to

fall.

The remaining attributes are similar to fixed date public holiday.

Easter Sunday

Let us look into the configuration details of public holiday – Easter Sunday.

Page 11: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0011

You don’t have anything to configure here. The remaining attributes are similar to fixed datepublic holiday.

Floating Public Holiday

A floating public holiday is one which occurs on a different date each year. It can also not occur in a particular

year. Examples of floating holidays are holidays based on lunar calendar like Holi, Diwali, Id and so on.

Let us look into the configuration details of Floating Public Holiday.

Page 12: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0012

Year - Specify the year in which this public holiday falls.

Month - Specify the month in which this public holiday falls.

Date - Specify the date on which this public holiday falls.

The remaining attributes are similar to fixed date public holiday.

Once the public holidays are created, we need to assign them to a public holiday calendar. Forthis we have to go back to the initial screen, select the radio button – Holiday Calendar – and clickon change icon as shown in the screenshot below.

Page 13: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0013

The below screen comes up:

Page 14: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0014

Below are the key columns in the above screenshot:

ID - A two character Id for the public holiday calendar

Holiday Calendar - Name of the public holiday calendar

Valid From - Year from which the public holiday calendar is valid

Valid To - Year up to which the public holiday calendar is valid

Used in Factory Calendar - Whether the public holiday calendar is used in factory calendar or not

Let me display the Public Holiday Calendar – Australia by clicking on the change icon.

Page 15: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0015

Each public holiday calendar has a validity period. Hence, Public Holiday Calendar AU is valid from 2000 to

2098.

Please have a look at the public holidays assigned to calendar id AU. These holidays are valid from 2000 to

2050. Hence, the validity of public holidays within public holiday calendar is different from the validity of holiday

calendar, thereby giving a lot of flexibility to configure and delimit public holidays in a calendar.

The buttons “Assign Holiday” and “Delete Assignment” help to assign and delete public holidaysfrom a calendar. This is needed to make changes in public holiday especially floating publicholidays.

Please note that if a floating public holiday is being used in multiple holiday calendars, then you would have

to first delete the floating public holiday from each calendar and then make changes. After the changes have

been made to the floating public holiday, then you need to assign them to all the public holiday calendars

where this was being used.

Page 16: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0016

Once a public holiday has been used in a calendar, it should never be deleted permanently. If the public

holiday is not required from a particular year onwards, we should delimit the validity of the public holiday within

the public holiday calendar but not delete it.

If you would like to display the dates of public holidays in a particular year in a public holiday calendar, please

select the public holiday calendar and click on Calendar display icon.

Let me take you to year 2014 for Holiday Calendar Id – AU.

The below screen comes up. Hence, for the year 2014, there are 10 public holidays for Australia and one

public holiday falls on Saturday and Sunday each.

Page 17: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0017

Let me display the calendar for the year 2014 by clicking on the Year display icon. The below screen comes

up.

You will see that the fixed date public holiday – Australia Day – has been moved from Sunday 26-Jan-14 to Monday 27-Jan-14. Both the dates will have public holiday class 1.

Below is the configuration for Australia Day public holiday for your reference.

Page 18: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0018

So, this is all I have here to share about public holidays, public holiday classes and public holidaycalendar. I am not going into factory calendar as I didn’t get a chance to work on this concept. Letus now move over to Day Types.

Day Types

What is a day type and how is it different from public holiday class?

A day type helps us to determine if an employee is eligible for a public holiday or not and whether he should be

working on a day or not and how should he get paid for the given day.

What should be the public holiday class and day type for a DWS if the employee is supposed towork on public holiday – Independence Day – as per planned work schedule? The employee won’tget paid if he doesn’t work on the public holiday. For such a scenario, the public holiday class willbe 1 to indicate that the day is a public holiday and the day type will be blank to indicate that theemployee has to work on this day.

Page 19: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0019

Below are the possible values of day types (Table V_T553T)• Blank - Work/paid• 1 - Off/paid• 2 - Off/unpaid• 3 - Off/special day• 4-9 - customer specific

Rules for Day Types (Table V_T553A)

The functionality of rules for day types is to assign a day type to a day with a particular public holiday class.

You will find field “Rules for Day Types” in Work Schedule Rule configuration table – V_T508A.

The configuration of rules for day types is done in table V_T553A. Below is a sample screenshot.

Page 20: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0020

So how do we interpret rule 01 in the above screenshot? The three columns specify day type fora weekday, Saturday and Sunday respectively. There are 10 spaces in each box below weekday,Saturday and Sunday – with each space representing the Public Holiday Class from 0 – 9.

Let us understand rule 01 for weekday. It states to assign the following day types to weekday if the weekday

has the given public holiday class.

Public Holiday Class Weekday Day Type Weekday

Blank Blank

1 1

2 Blank

3 3

4 1

5 1

6 1

7 1

8 1

9 1

Similarly, it is for Saturday and Sunday.

How should the rule for day types look like if an employee is not eligible for public holidays? It should be like

rule 02 where a day (weekday, Saturday, Sunday) with any public holiday class will have day type blank always

assigned to it.

Hence, if an employee is not eligible for public holidays, we should assign rule for day type 02 in the WSR (to

be assigned to employee) in Table V_T508A.

Define Special Days (V_T553S)

There can be a business scenario where an employee is eligible for only two public holidays in a year from the

same holiday calendar.

Let us say that an employee works out of location – Hyderabad and his WSR is assigned toHyderabad Public Holiday Calendar. However, this employee is only eligible to two public holidays– Christmas and New Year – and not all the public holidays in Hyderabad Public Holiday Calendar.So what do we do in such a case? Do we create a new public holiday calendar for these set ofemployees?

SAP provides this functionality – Define Special Days – to handle such scenarios. We can assignrule for day type 04 to the WSR of this employee and configure dates – 01-Jan and 25-Dec – inDefine Special Days to make them applicable for these employees.

Page 21: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0021

Please refer the below screenshots. This configuration will ensure that the employee is eligible foronly two public holidays – New Year and Christmas.

I hope the concept of public holiday class and day type is clear now. Let us now move to the next concept of

Work Schedule Rule.

Work Schedule Rule

A work schedule rule specifies the working pattern and rules for an employee. The beauty of work schedule

rule in SAP is that it is highly module in nature. As a result of this, it promotes reusability of the components

involved in the work schedule rule.

Before we move further into this, let us understand few key things like groupings.

Groupings

• Personnel Subarea Grouping for Daily Work Schedule: This is used to group daily work schedulesand then the personnel subarea grouping for daily work schedule is assigned to personnel subareagrouping for work schedules. Let us assume that a company has operations in Hyderabad, Bangaloreand Mangalore.

Let us assume that employees in locations Bangalore and Mangalore have been assigned to personnel

subarea grouping for work schedules 01. Employees in location Hyderabad have been assigned to grouping

Page 22: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0022

02. All three locations are to use the same daily work schedules. Hence, we can assign personnel subarea

grouping for daily work schedules 01 to personnel subarea groupings for work schedules 01 and 02.

I haven’t come across any client where the personnel subarea grouping for daily work schedule isbeing shared across multiple personnel subarea grouping for work schedules. I have always foundone to one mapping in all the clients I have worked for.

Please refer the below screenshot of table V_T508Z. The first column represents the personnel subarea

grouping for work schedule rule and the second column represents the personnel subarea grouping for daily

work schedules.

• Personnel Subarea Grouping for Work Schedule Rule: This is used to group personnel area and

personnel subarea for work schedules. It requires you to specify country grouping. Please refer thebelow screenshot from Table V_001P_All.

Page 23: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0023

The first column represents the personnel area, third column represents the personnel subarea and the last

column represents the personnel subarea grouping for work schedule rules.

• Public Holiday Calendar for Personnel Area and Personnel Subarea: This is used to assign public

holiday calendar to personnel area and personnel subarea in table V_001P_All. It requires you tospecify country grouping. Please refer the below screenshot:

• Employee Subgroup Grouping for Work Schedule Rule: This is used to group employee group and

employee subgroup for work schedule rules. Please refer the below screenshot from table V_503_All.

Page 24: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0024

The first column represents the employee group, third column represents the employee subgroup and the

last column represents the employee subgroup grouping for work schedule rules.

As mentioned earlier, a work schedule rule is highly modular in nature and is comprised of work break

schedule, daily work schedule and period work schedule.

Work Break Schedule

Work Break Schedule (WBS) is maintained in table V_T550P. Please refer the below screenshot:

Page 25: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0025

The different types of breaks are mentioned below:

• Fixed break - Break with fixed timings.• Variable break - A 15 min break between 15:00 and 15:30.• Dynamic break - A 15 min break after the employee has worked for 4 hours.

Let us go through the various columns in the above screenshot.

• Grpg - This represents the personnel subarea grouping for daily work schedules as described

earlier.• Break - Name of the break. It can be of max 4 characters.• No      -        Represents the sequential no. of breaks if there are more than one break

times defined for the same break. A shift may have 2 breaks – one lunch break and onesnack break. In such a scenario, sequence no. will be needed to differentiate both thebreaks.

• Start - Start time of the break.• End - End time of the break.• Unpaid - Specify the duration of unpaid break in hours.• Paid - Specify the duration of paid break in hours.• After - Specify the hours after which the employee can go on a break.

Page 26: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0026

Daily Work Schedule

Daily Work Schedule (DWS) is maintained in Table V_T550A. It is used to represent the daily working hours of

a day. Please refer the below screenshot.

Page 27: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0027

Let us understand the different fields for a DWS from the above screenshot.

DWS Grouping - It represents the personnel subarea grouping for Daily Work Schedules.

Daily Work Schedule - It displays the name (4 characters), variant (1 character) and description of

daily work schedule (15 characters).

Start - It displays the start date of the daily work schedule.

End - It displays the end date of the daily work schedule.

Planned Working Hours - It represents the planned working hours.

No planned working hrs - This checkbox is checked if it is an OFF day.

DWS Selection Rule - It helps to determine the DWS variant. I will talk about it in more detail later

on.

Working times can be fixed working hours and flextime working hours.

Fixed Working Hours – It is applicable if the employee has to work fixed working times.

• Planned Working Time - It represents the start time and end time of the daily work schedule.

Flextime Working Hours – It is applicable if the employee has to work flexible working times.

Page 28: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0028

• Planned Working Time - It represents the limit of normal working hours during the employeeis expected to work. Work outside the planned working hours are treated as overtime.

• Normal Working Time - If an employee is on leave, then the system uses normal workingtime to calculate the absence hours. The planned working hours are defined as normal working timesplus the paid breaks.

Core Times 1 and 2 – If an employee is working flexible working hours, then you can specify thecore times during which he must be at work. Two core times can be defined and they shouldn’toverlap with breaks.

Work Break Schedule - You can assign a break schedule to the daily work schedule here.

Tolerance Time

• Begin Tolerance Time - If an employee comes during this period, it is assumed that theemployee has come at the planned shift start time. If the tolerance is after planned shift start time,it allows an employee to come late without being considered late. If the tolerance is before plannedshift start time, it helps to prevent the system from considering this period as overtime. Tolerancesare processed in the schema by function DPTOL.

• End Tolerance Time - If an employee leaves during this period, it is assumed that the employee

has left at the planned shift end time. If the tolerance is before the planned shift end time, it allows anemployee to leave early without being considered leaving early. If the tolerance is after the plannedshift end time, it helps to prevent the system from considering this period as overtime. Tolerances areprocessed in the schema by function DPTOL.

Minimum Working Time - You can specify the minimum no. of hours an employee is supposed to

work in a day.

Maximum Working Time - You can specify the maximum no. of hours an employee is supposed to

work in a day.

Daily Work Schedule Class - It can be used as a parameter to define overtime rules in table V_T510S,

define rules for quota deduction in Table V_T556C. It can also be referenced in PCR to define various time

related scenarios. The values of DWS Class are from 0 to 9. DWS Class 0 stands for OFF day.

Automatic Overtime - If this checkbox is checked, then any time outside the planned working hours

gets calculated as overtime. This happens in PCR TO15 in time schema TM00.

Let us now go back to DWS Selection rule and DWS variant.

DWS variant is used in two scenarios:

• Scenario 1: When we want another DWS to be called in based on certain conditionsgetting satisfied – If there is a requirement that whenever Friday is a public holiday, thenthe planned working hours for Thursday should get reduced to 4 hours from 8 hours.

Page 29: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0029

• Scenario 2: When we want a different no. of hours getting deducted for absence insteadof the planned working hours specified in the DWS – Suppose an employee works 5 daysa week and 40 hours per week – Mon (10hrs), Tue (10hrs), Wed (10hrs), Thu (5hrs) andFri (5hrs). If an employee applies for leave on any day, it should deduct 8 hours and notthe planned working hours of the day.

Below is the detailed explanation of the two scenarios of variants for DWS.

Scenario 1: Rules to determine variant for monthly WS rule generation (Table V_T550X)

Let us try to understand the rule 01. It has two sub-rules – 01 and 02. The 2nd sub-rule gets

executed only when the first sub-rule fails. If the first sub-rule passes, then 2nd sub-rule is not executed.

Holiday Class     -        It comprises 10 spaces representing the 10 public holiday classes from 0 –9. It represents the holiday class for the current day. X represents the holiday class in scope.

Page 30: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0030

HolClNext Day    -        It comprises 10 spaces representing the 10 public holiday classes from 0 –9. It represents the holiday class for the next day. X represents the holiday class in scope.

Day - It represents the weekday and has seven spaces ranging from Mon to Sun. X represents

the weekday in scope.

Variant - It represents the variant to be called in if the rule is successfully executed.

Rule 01 Sub-rule 01 gets executed and the variant B is called in if the holiday class of the currentday is 2, if the holiday class of the next day is anything from 0 – 9 and the weekday can beanything from Mon – Sun. If the rule 01 sub-rule 01 is successfully executed, then the originalDWS is replaced by its variant B.

If the rule 01 sub-rule 01 fails, then the rule 01 sub-rule 02 gets executed and the variant Bis called in if the holiday class of the current day is anything except 2, if the holiday class ofthe next day is anything from 0 – 9 and the weekday is Friday. If the rule 01 sub-rule 02 issuccessfully executed, then the original DWS is replaced by its variant B. If the rule 01 sub-rule02 fails, then the variant B is not called in and the original DWS is used.

Apart from defining the DWS Selection rule, you also need to create a DWS with the variant B and define the

planned working hours for the DWS with variant B.

Scenario 2: Determine Daily Work Schedule Variants for Absence

Let us try to understand the rule 01. It has only one sub-rule – 01

Holiday Class            -        It comprises 10 spaces representing the 10 public holiday classes from0 – 9. It represents the holiday class for the current day. X represents the holiday class in scope.

HolClNext Day           -        It comprises 10 spaces representing the 10 public holiday classes from0 – 9. It represents the holiday class for the next day. X represents the holiday class in scope.

GrpAtt/Abs              -        It represents the absence grouping of the absence which is defined inTable T554S. It comprises 10 spaces representing absence grouping from 0 – 9. X represents theabsence grouping in scope.

Page 31: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0031

Weekday - It represents the weekday and has seven spaces ranging from Mon to Sun. X

represents the weekday in scope.

Variant - It represents the variant to be called in if the rule is successfully executed.

Rule 01 Sub-rule 01 gets executed and the variant A is called in if the holiday class of the currentday is anything from 0 - 9, if the holiday class of the next day is anything from 0 – 9, if theabsence grouping of the absence applied is 1 and the weekday can be anything from Mon – Sun.If the rule 01 sub-rule 01 is successfully executed, then the original DWS is replaced by its variantA. If the rule fails, then the original DWS is called in for absence hours.

When an absence type with absence grouping 01 is applied, the DWS selection rule 01 assigned to the DWS

will get executed. If the rule execution is successful, the original DWS gets replaced with DWS variant A and

the no. of hours mentioned in the DWS Variant A gets deducted for absences.

Let us now move on to Period Work Schedule.

Period Work Schedule

A period work schedule is a group of daily work schedules which gets repeated to form a working pattern. It is

defined in table V_T551A.

Please refer the below screenshot which has 3 PWS displayed:

Grpg - Personnel Subarea Grouping for Daily Work Schedules.

PWS - Name of Personnel Work Schedule. It can have maximum 4 characters.

Period WS Text - Description of Period Work Schedule. It can have maximum 20 characters.

Week - This is the week number.

Page 32: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0032

01 – 07                  -        This represents the day from Mon – Sun.

PWS 0001 is 5 Days, 2 OFFs pattern.

PWS 0002 is 5 Days, 2 OFFs, 5 Nights, 2 OFFs pattern.

PWS 0003 is 4 Days, 4 OFFs, 4 Nights, 4 OFFs pattern. If you wish a pattern not ending on Sunday to get

repeated, you use * after the pattern for it to get repeated.

After creating the PWS, you must define counting class for Period Work Schedule in Table V_T551C. Please

refer the below screenshot.

Grpg - Personnel Subarea Grouping for Daily Work Schedules

PWS - Name of Personnel Work Schedule. It can have maximum 4 characters.

Start Date - Start date for counting class of PWS.

End Date - End date for counting class of PWS.

Cntg Class - Counting Class is used to count absence and attendance by specifying different methods of

counting according to the period work schedule.

Let us now move over to Work Schedule Rule configuration.

Work Schedule Rule

A work schedule rule specifies the working pattern, public holidays and working hours for an employee.

Configuration of work schedule rule is done in Table V_T508A. Please refer the below screenshot.

Page 33: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0033

ES Grouping - Employee Subgroup grouping for Work Schedule Rule

Holiday Calendar ID - Id of the public holiday calendar applicable to the WSR

PS Grouping - Personnel Subarea grouping for Work Schedule Rule

Work Schedule Rule - It specifies the name (8 characters) and description of WSR (25 characters).

Start - It gives the start date of WSR.

End - It gives the end date of WSR.

Daily Working Hours - It displays the average daily working hours of the WSR.

Weekly Working Hours - It displays the average weekly working hours of the WSR.

Weekly Workdays - It displays the average weekly workdays of the WSR.

Monthly Working Hours - It displays the average monthly working hours of the WSR.

Annual Working Hours - It displays the average annual working hours of the WSR.

Page 34: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0034

Please find below the recommended co-relation between weekly working hours, monthly working hours and

annual working hours.

Annual Working Hours = Weekly Working Hours * 52

Monthly Working Hours = Annual Working Hours / 12

Period Work Schedule - You specify the 4 character PWS here.

Ref Date for PWS - You specify the generation date for PWS.

Start Point in PWS - It represent the start point in PWS.

Rule for Day Types - You can specify the rule for specifying the day types for days.

DWS Grouping - Grouping for Daily Work Schedule

Let me explain you the importance of WSR Start Date and Ref Date for PWS.

WSR start date is the date from which the WSR is created. Ref Date is the date based on whichthe WSR is generated. If the ref date is 11-Mar-14, then the WSR gets generated from Mar’14onwards.

Let me give you a real time situation. A new employee has been hired and he is going to be placed on a new

WSR effective 01-Mar-14.

What should be the WSR start date and ref date in such a case and month of generation?

I recommend the WSR start date to be effective at least 2 years before the month of generation. The month of

generation should be at least a month before the employee needs to work on the WSR. Why is this so?

In our example, since the employee has to start work on 01-Mar-14 on the new WSR, I would generate the

WSR effective 01-Feb-14 and I will create the WSR from 01-Feb-12.

The generation has to be at least one month before the month employee gets placed on theWSR because in case of time evaluation, it checks for the generated DWS on the last day of theprevious time evaluation period. If we generate the WSR from Mar’14, there won’t be any DWSgenerated for 28-Feb-14 and this will give a configuration error during time evaluation run.

Let me give you another scenario. Let us say that there are two shifts in which employees have to work. Group

A employees have to work as per pattern A and Group B employees have to work as per pattern B. Please

refer below patterns A and B.

Pattern A

Week Mon Tue Wed Thu Fri Sat Sun

001 Day Day Day Day Day OFF OFF

002 Night Night Night Night Night OFF OFF

Pattern B

Page 35: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0035

Week Mon Tue Wed Thu Fri Sat Sun

001 Night Night Night Night Night OFF OFF

002 Day Day Day Day Day OFF OFF

So are we going to create two PWS for the above scenario?

No, we actually need to create only 1 PWS and change the reference point in PWS for the two WSRs.

For pattern A, ref point in PWS = 001;

For pattern B, ref point in PWS = 008.

Generation of WSRs

After we have configured the WSR, the next important step is generation of WSR.

Please follow the below path for generation of WSR.

SPRO > Time Management > Work Schedules > Work Schedule Rules and Work Schedule > Generate Work

Schedules in Batch

The below screen comes up.

You can generate more than one WSR at the same time.

Page 36: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0036

Enter the details of the WSR and the period for which you wish to generate the WSR and enter E in field BTCI

and execute. This will do mass generation of WSR for the period requested.

The generated WSR is saved in Table T552A.

Every time that you add, delete, change or update a public holiday in a calendar, you would need to generate

all the impacted WSRs for the given months for which the change has been made.

Sometimes there may be a need to change the generated DWS for a particular day. Let ussay that the employees are working 5 days 2 OFFs in shift 9 am – 6 pm from Mon – Sun on aparticular WSR.

Now, you would like all your employees on this WSR to work only on a particular Thursday from9 am – 1 pm. In such a case, we should substitute the existing DWS with another DWS (havingtimings 9 am – 1 pm) in the generated WSR using TCode PT02. This will ensure that the shift forthat Thursday will change for all employees on this WSR.

However, if there is a request to change the shift timings only for selected employees, then we should do shift

substitution in IT2003 for the selected employees.

Infotype 0007

Infotype 0007 contains the planned working time for an employee. Please refer the below screenshot from

IT0007.

Page 37: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0037

Work Schedule Rule - Specifies the work schedule rule for the employee.

Time Management Status - Specifies the time management status for the employee which goes on to

determine whether time evaluation happens or not and if it is positive or negative time evaluation. You can

default time management status using feature TMSTA.

Working Week - In some clients, the start of week can be different compared to the standard

and the start of week can also be dependent on timings. In such cases, we need this concept of working week

to specify the start and end of the week. Working week concept in standard SAP is used for weekly overtime

calculation in sub schema TW30 in time schema TM04. You can default working week using feature WWEEK.

Part Time Employee - If you check this checkbox, the part time functionality will get enabled.

As per the current full time WSR, an employee has to work for 5 days in a week from Mon – Friwith 8 hours per day and 40 hours per week.

Let us assume that an employee has to work 60% of a full time WSR with reduced working hours each day. In

such a case, we check the part time employee check box and change the employment percentage to 60%.

Please refer the below screenshot.

Page 38: DOC-52366

Public Holiday Calendar and Work Schedule Rules

Generated by Jive on 2015-08-08+02:0038

The system automatically adjusts the daily working hours, weekly working hours, monthly working hours and

annual working hours automatically based on the employment percentage. This was one scenario of part-time

WSR.

What do we do if an employee works 60% by working 8 hours from Mon-Wed and OFF from Thu to Sun?

In such a scenario, we create a part time WSR like a full time WSR and then use capacity utilization field in

IT0008 to capture 60% utilization.

Here I come to the end of this knowledge artifact. I hope you enjoyed reading through this document.

Thanks for your patience and time to go through this document.

Warm regards,

Vivek Barnwal.

**************************************************************************************************