    SUMMER INTERNSHIP REPORTCOVER BLOCK

    Cover blocks are placed to prevent the steel rods from touching the shutteringplates and there by providing a minimum cover and fix the reinforcements as per

    the design drawings . Sometimes it is commonly

    Larsen & Toubro Construction

    (8 June 3 July !"#$

    APURVA NAIK

    REG NO. - 120904666

  • 7/26/2019 DLF The Crest L&T

    2/110

    MANIPAL INSTITUTE OF TECHNOLOGY,

    MANIPAL UNIVERSITY, KARNATAKA

  • 7/26/2019 DLF The Crest L&T

    3/110

    ACKNOWLEDGEMENT

    I. I would like to extend my gratitude to Larsen &Toubro

    Construction Management for providing the excellentopportunityto have exposure of the project !L" The Crest#

    II. I am grateful to Mr# $%%' ()%*M%#+ Mr# %(L%M+ ,,(!ept#+ Mr# '%*-()+ (tructure#+ !ept#+ Mr# %nuj(aini and Mr# %jay (harma+ .uality !ept#+ Mr# /aushikin the $lant & Machinery !ept#+ Mr#M0(I' /)%'#+ Mr#

    1%2 /3M%*#+ Mr# (3!-() /r#+ Mr# %(I"#+ & Mr#M%'4I'!-*#+ "inishing !ept#+ who guided andencouraged me through the summer training andimparted in depth knowledge of the project#

    AMRESH TIWARI

    (CIVIL ENGINEERING

  • 7/26/2019 DLF The Crest L&T

    4/110

  • 7/26/2019 DLF The Crest L&T

    5/110

    INDEX

    (#'0# TITL- $%5-'0#

    6 I'T*0!3CTI0'

    7 $*01-CT )I5)LI5)T &

    I'"0*M%TI0'

    8 (%"-T2

    9 M%T-*I%L Cement

    (and

    %ggregate

    (teel

    ,lock

    Marble

    Tile 5ypsum

    "lyash

    ,ond

    Curing Compound

    : .3%LIT2 C0'T*0L & MI; !-(I5'

    < $L%'T & M%C)I'-*2

    = ,%* ,-'!I'5 (C)-!3L-

    > ()3TT-*I'5 & "0*M0*/

    ? (T*3CT3*-

    "ooting

    Column

  • 7/26/2019 DLF The Crest L&T

    6/110

    ,eam

    (lab

    (taircase

    (hear all

    6@ "I'I()I'5

    Layout of ,lockwork & Ledge

    wall

    I$( "looring

    Marble "looring

    5ypsum $laster (unken %rea water prooAng &

    Alling

    Tile work

    "all Celling

    $aint

    66 C0'(T*3CTI0' $L%''I'5

    67 ,ILLI'5

    68 C0'CL3(I0'

  • 7/26/2019 DLF The Crest L&T

    7/110

    CHAPTER 1 : INTRODUCTION

    ABOUT THE ORGANISATIONLarsen & Toubro Limited+ also known as L&T+ was founded

    by !anish engineers B(oren /ristian Toubro & )enning

    )olckLarsenD+ is an Indian multinational conglomerate

    headEuartered in Mumbai+ India# The company has

    business interests in engineering+ construction+

    manufacturing goods+ information technology and

    Anancial services+ and also has an oFce in the Middle-ast#

    Larsen & Toubro Construction is IndiaGs largest

    construction organiHation# Many of the countrys priHed

    landmarks its exEuisite buildings+ tallest structures+

    largest industrial projects+ longest Jyover+ and highest

    viaducts have been built by it# Leadingedge capabilities

    cover every discipline of constructionK civil+ mechanical+

    electrical and instrumentation#

    BUILDING & FACTORIES

    The ,uildings & "actories Independent Company is

    eEuipped with the domain knowledge+ structures# $rojects

    are executed using the cutting edge technology+sophisticated construction eEuipment and projectmanagement tools for Euality+ safety and speed#

  • 7/26/2019 DLF The Crest L&T

    8/110

    9

  • 7/26/2019 DLF The Crest L&T

    9/110

    QUALITY POLICY

    %t L&T+ -nvironment+ )ealth & (afety B-)(D is given the

    highest priority# The -)( policy enunciated by theCorporate Management lays emphasis on -nvironment+)ealth and (afety through a structured approach and

    well deAned practices# (ystems and procedures have

    been established for implementing the reEuisites atall stages of Construction and they are accredited to the

    International standards of I(0 ?@@6K7@@>+ I(0 69@@6K7@@9

    and 0)(%( 6>@@6K7@@=#

  • 7/26/2019 DLF The Crest L&T

    10/110

    :

  • 7/26/2019 DLF The Crest L&T

    11/110

    VISION & MISSION

    VISION

    L&T shall be professionally managed Indian multinationalcommitted to total customer satisfaction and enhancingshareholder value# L&T shall be an innovativeentrepreneurial and empowered team constantly

    creating value and attaining global benchmarks# L&Tshall foster a culture of caring trust and continuouslearning while meeting expectations of employees+stakeholders and society#

    MISSION

    To achieve excellence in the Aeld of -ngineering+$rocurement and Construction through world class

    practice and standards in Euality+ (afety and $rojectManagement#

  • 7/26/2019 DLF The Crest L&T

    12/110

  • 7/26/2019 DLF The Crest L&T

    13/110

    CHAPTER 2 : PROJECT

    HIGHLIGHTS

    Clie! DLF Li"i!e#

    P$%e'! N("e T)e C$e*!

    P$%e'! M((+e$ MACE G$%,-

    L!#.

    A$')i!e'!,$(l C%*,l!(! A$')i!e'! H(/ee0

    C%!$('!%$S!$,'!,$(l C%*,l!(! M(i*)

    Q,(!i! S,$e%$ L(+#(

    L(#*'(-e Gee$ C%3,$

    MEPF & T$(4'C%*,l!(!

    5SP

    C%!$('!%$ L&T

    L%'(!i% PAR6 DRIVE7 DLF 87

    =

  • 7/26/2019 DLF The Crest L&T

    14/110

    There are many consultants involved in this project as shown

    belowK

    ? P$%e'! M((+e$:9 MACE C%*! (# P$%e'!

    M((+e"e! P!. L!#.

    They are assigned to the $roject by the 0wner and

    charged

    with overall management of the project and

    associated cost and programme issues#

    ? A$')i!e'!,$(l '%*,l!(!: 9A$')i!e'! H(/ee0

    C%!$('!%$ #

    Their role is to plan creative and innovative

    building design solutions for the clients#

    ? S!$,'!,$(l '%*,l!(!: M(i*) C%*,l!(!*

    Their role in the project is to work out complete

    *CC design of the columns+ beams+ slabs and

    the retaining wall and is done on the base of the

    %rchitectural drawing#

    ? MEPF '%*,l!(!: 9 5SP

    Their role is to consult the clients in the Aeld of

    %ir Conditioning+ 4entilating+ -lectrical $ower

    and Lighting+ "ire %larm+ "ire $rotection and

    $lumbing#

  • 7/26/2019 DLF The Crest L&T

    15/110

    ? L(#*'(-e '%*,l!(!: 9Gee$ C%3,$ H,!')i*

    They are involved in the planning+ design and

    direction of a landscape+ garden or distinct

    space#

    >

  • 7/26/2019 DLF The Crest L&T

    16/110

    PROJECT INFROMATION

    The Crest is a part of -lite housing (ystem# It is located at

    $ark !rive+ !L" :+ (ector :9 5urgaon+ )aryana (tate+India# It is within the premium !L" $hase 4 community on

    the 5olf Course *oad#

  • 7/26/2019 DLF The Crest L&T

    17/110

    The project is close to 5urgaon "aridabad *oad#

    The recently commissioned Indira 5andhi International

    BI5ID %irport+ T8+ is approximately 8: minutes from the

    proposed site and 7@ minutes from !L" Cyber City# It is

    approximately 6@ minutes from )3!% City Centre Metro

    (tation providing connectivity further on to !elhi and

    'C* *egion#

    ?

  • 7/26/2019 DLF The Crest L&T

    18/110

    6@

  • 7/26/2019 DLF The Crest L&T

    19/110

    The Main "eatures of $roject are as followsK

    ? )igh *ise *esidential Towers

    ? 8 Towers 5 8> story high Tower %+ ,+ C

    ? 8 Towers 5 7= story high Tower !+ -+ "? 9 Levels of ,asement

    ? =#>77 %cres+ 8:+=@7m7

    ? Clubhouse with community swimming pool + gymnasium+

    etc#

    ? 0verall built up area 8+66 persons

    ? (urface $arking == vehicles

    ? Covered Car $arks 76>=

    ? Car $arks per apartment 7 & 8

    ? ,asement %rea ?8+?=7#?>m7

    ? Total )eight of the Tower%+ , and C above 5L 68@#7m

    ? Total )eight of the Tower!+ - and " above 5L ?8#:>:m

    ? 0verall -lectrical !emand ?+8== /

    ? 0verall $otable ater !emand :68 /L!

    ? 0verall "lushing ater !emand 76@ /L!

    ? Treated aste ater 3se 8=< /L!

    ? 0verall ,ack up $ower < x 7+@@@/4%

    66

  • 7/26/2019 DLF The Crest L&T

    20/110

    2

    The project site is divided into two Hones namely Tower

    None and 'on Tower None# Tower None includes ,lock%+

    ,lock,+ ,lockC+ ,lock!+ ,lock- and ,lock"# 'on TowerNone includes *etaining all and many amenities such as

    ,asketball Court+ (wimming $ool+ 7 Tennis Courts+ Club

    )ouse and 5ymnasium#

    There will be 8 gates for the entry and exit each provided

    with a >m wide driveway# 6 gate is near to ,lock % for

    ,lock %+ ,lock , and ,lock C# 7nd gate is near to ,lock

    " for ,lock !+ ,lock - and ,lock

    F. 8rd gate is provided for the Club )ouse which is provided

    with a :m

    wide driveway# The >m wide driveway is provided for

    transportation

    which includes two 8#:m lanes separated by a median of

    width 6m#

    Towers are facilitated with 8 to 9 ,)/ luxurious Jats and :

    ,)/ $ent )ouse "lats# < lifts are provided in each tower

    and 6 separate service lift is also provided in Tower%+

    Tower, and TowerC respectively# 0n the other hand only

    < lifts are provided in Tower!+ Tower- and Tower"# 7

    staircases are provided in each tower#

    alkways are provided which connect all the blocks witheach other and also to the Club )ouse+ Tennis Courts+

    ,asketball Court+ (wimming $ool etc# The walkways are

    provided at a slope near the entrance of the block and

    these are kept at a higher elevation as compared to the

    other part which can be beneAcial during monsoon as the

  • 7/26/2019 DLF The Crest L&T

    21/110

    problem of water logging near the entrance can be solved

    easily#

    L(i+ %/ T%e$ C$(e* K Tower Cranes are provided one for

    Tower%+ one forTowerC# These 7 tower cranes are shared for the work of Tower,#

    0ne Tower Crane is provided for Tower! and one tower crane

    is provided for Tower"#

    67

  • 7/26/2019 DLF The Crest L&T

    22/110

    These 7 tower cranes are shared for the work of Tower-# Tower Crane

    of %+ C+ !

    are of radius ::m and Tower crane of tower " is of 9:m#

    CHA!TER " # SA$ET%(afety is must prior thing for construction# Labour and

    staO protection is must reEuire for smooth progress of

    work# 'ow a dayGs safety plays major role in construction

    as it contains certain percentage# %ccording to safety+

    construction company get certiAcate from government

    and it contain contains certain percentage which deAne

    companyGs market value# (o safety also plays major role

    for getting project#

    *ole of the safety personal isK

    a. To check whether everyone is having all safety

    eEuipmentGs or notP

    b. To check the scaOolding and approve it for use P

    c. To be at the site of concreting P

    d. To give the Arstaid in case of any minor injuryPe. To give regular Tool ,ox to the laboursP

    SAFETY TRAININGThe Contractor is responsible for conducting allnecessary training including+ Mobile -Euipment+(caOolding erection and use+ safe excavation+ safeelectrical practices+ proper use of lifting eEuipment and

    other related issues# Training is being taken in form ofinduction training for each employee new on the site+speciAc training and tool box meetings Bon the jobtrainingD#

    The Contractors Manager of )(- department and the

    safety personals provides and conducts all induction

    safety training# 'o access to the site is allowed without

    Arst attending and completing this training# The

  • 7/26/2019 DLF The Crest L&T

    23/110

    induction training is encompassing the following itemsK

    a. (peciAcs of the plant industrial haHards

    b. %larm+ site evacuation+ personnel counting+ resumption ofwork

    68

  • 7/26/2019 DLF The Crest L&T

    24/110

    c. (ite safety rules and procedures

    d. Local laws+ rules and regulations

    e. Contractual stipulations

    f. 'ear miss and accidents reporting

    g. "ire protection

    h. )ousekeeping

    i. *ewards and disciplinary action policy

    -)( $olicy !escriptionK L&T strongly emphasiHes on-nvironment+ )ealth and (afety# 0ne of the prime aspects

    of this policy is to ensure that minimum wastage is done+

    and no harm is caused to environment+ along with propersafety and health of the working staO# %ccording to the

    policy+

    Q %ll adverse -nvironment Impacts & accidents arepreventable#

    Q 'o task is so important that risk of injury to people is

    justiAed#

    Q orking safely is a condition of employment#

    Q (afety is a top driven function#

    L&T focuses its work on (afety and .uality# -)(

    policy is very important+ and all the rules pertaining to

    safety on site have to befollowed at all times#

    5i# B($$ie$* K These are provided along the edge of thebuilding for

    the safety of the workers as well as the employees# These

    are very necessary as the height of the construction

    exceeds 7:8@m from the ground#

  • 7/26/2019 DLF The Crest L&T

    25/110

    69

  • 7/26/2019 DLF The Crest L&T

    26/110

    $ressuriHed (taircases+ lifts+ lobbies and lift shafts are

    provided for better Are safety evacuation#

    6:

  • 7/26/2019 DLF The Crest L&T

    27/110

    6

  • 7/26/2019 DLF The Crest L&T

    28/110

    PERSONAL PROTECTION EQUIPMENT

    ? HEAD PROTECTION

    $rotecting employees from potential head injuries is a keyelement of any safety program# % head injury can impair

    an employee for life or it can be fatal# earing a safety

    helmet or hard hat is one of the easiest ways to protect

    an employees head from#injury# -mployers must

    ensure that their employees wear head protection if

    any of the following applyK

    a. 0bjects might fall from above and strike them on the

    headPb. They might bump their heads against Axed objects+

    such as exposed pipes or beamsP or

    c. There is a possibility of accidental head contactwith electrical haHards#

    -'5I'--* -L-CT*ICI%' L%,03* (3$-*4I(0*

    SAFETY HELMETIn general+ protective helmets or hard hats should do thefollowingK

    a. *esist penetration by objects#

    b. %bsorb the shock of a blow#

    c. ,e waterresistant and slow burning

  • 7/26/2019 DLF The Crest L&T

    29/110

    6=

  • 7/26/2019 DLF The Crest L&T

    30/110

    ? REFLECTIVE JAC6ET

    0ne of the biggest dangers on any jobsite is visibility#hether itGs keeping workers safe from traFc or

    helping them stand out to eEuipment drivers onsite+high visibility and reJective clothing is important for

    maintaining the safety of your employees on the job#)igh visibility jackets can be incorporated into

    reEuired

    workwear that promotes

    safety#

    ?

    FOOT AND LEG PROTECTION-mployees who face possible foot or leg injuries from

    falling or rolling objects or from crushing or penetrating

    materials should wear protective footwear# If an

    employees feet may be exposed to electrical haHards+

    nonconductive footwear should be worn# 0n the other

    hand+ workplace exposure to static electricity may

    necessitate the use of conductive footwear#

  • 7/26/2019 DLF The Crest L&T

    31/110

    SAFETY SHOES6>

  • 7/26/2019 DLF The Crest L&T

    32/110

    ? FACE PROTECTION-mployees Bworkers and engineersD can be exposedto a large number of haHards that pose danger totheir eyes and face# -mployees must have

    appropriate eye or face protection if they are exposedto eye or face haHards from Jying particles+ moltenmetal+ liEuid chemicals+ chemical gases or vapours+ orpotentially harmful light radiation#

    SAFETY MAS6

    6?

  • 7/26/2019 DLF The Crest L&T

    33/110

    ? EYE PROTECTION FOR EXPOSED 5OR6ERS

    )(- department suggests that eye protection be

    routinely considered for use by carpenters+

    electricians+ and pipeAtters+ grinding machineoperators+ sawyers+ welders+ labourers+ and timber

    cutting and logging workers# -mployers of workers in

    other job categories should decide whether there is aneed for eye and

    face $$- through a haHard assessment#

    EYEPROTECTION

    -xamples of potential eye or face injuries includeK

    a. !ust+ dirt+ metal or wood chips entering the eye

    from activities such as chipping+ grinding+ sawing+

    hammering+ the use of power tools or even strong windforces#

    b. 0bjects swinging into the eye or face+ such as

    tree limbs+ chains+ tools or ropes#

  • 7/26/2019 DLF The Crest L&T

    34/110

    7@

  • 7/26/2019 DLF The Crest L&T

    35/110

    ? HAND AND ARM PROTECTION

    -mployers should explore all possible engineeringand work practice controls to eliminate haHardsand use $$- to provide additional protection

    against haHards that cannot be completely eliminatedthrough other means#

    TYPES OF PROTECTIVE GLOVES

    There are many types of gloves available today toprotect against a wide variety of haHards# The nature

    of the haHard and the operation involved will aOect

    the selecting the right pair of gloves challenging# Thefollowing are examples of some factors that may

    inJuence the selection of protective gloves for a

    workplace#

    a. Type of chemicals handled#

    b. 'ature of contact Btotal immersion+ splash+ etc#D#

    c. !uration of contact#

    d.

    %rea reEuiring protection Bhand only+ forearm+ armD#e. 5rip reEuirements Bdry+ wet+ oilyD#

    f. %brasionRresistance reEuirements#

    FABRIC AND COATED FABRIC GLOVES

    HAND GLOVE

  • 7/26/2019 DLF The Crest L&T

    36/110

    76

  • 7/26/2019 DLF The Crest L&T

    37/110

    ? 5OR6ING AT HEIGHT

    "alls from heights are a signiAcant problem on

    construction sites+ resulting in serious injury and

    death of workers# "or the victims+ their families andthe community+ each injury is one too many# It is not

    just the young and inexperienced workers that

    may be injured# -xperience is no guarantee ofimmunity from injury#

    a. Temporary work platforms risks must be controlled

    through

    the use of stable and securely fenced work

    platforms Bsuch as scaOolding or other forms ofportable work platformD#

    b. 5uardrails should only be used in situations

    when it is notreasonably practicable to use

    temporary work platforms#

    c. "all arrest systems fall arrest

    systems should only be

    used in situations when itis not reasonably

    practicable to use either

    temporary work platforms orguardrails#

  • 7/26/2019 DLF The Crest L&T

    38/110

    "ull arrest harness is used for working at heights in the

    pipe rack+ as workers have to work at height of :m+ 6@m+

    67m+ 7@m height from the ground level+ (o full arrest

    harness is made compulsory for the workers#

    77

  • 7/26/2019 DLF The Crest L&T

    39/110

    ? HEARING PROTECTION

    !etermining the need to provide hearing

    protection for employees can be challenging#-mployee exposure to excessive noise depends upon

    a number of factors+ includingK

    a. The loudness of the noise as measured in decibelsBd,D#

    b. The duration of each employees exposure to the

    noise#

    c. hether employees move between work areas withdiOerent

    noise levels#

    d. hether noise is generated from one or multiplesources#

  • 7/26/2019 DLF The Crest L&T

    40/110

    78

  • 7/26/2019 DLF The Crest L&T

    41/110

    ? HOUSE6EEPING

    a. )ousekeeping is the act of keeping the working

    environment

    cleared of all unnecessary waste+ therebyproviding a Arstline of defense against accidentsand injuries#

    b. 5eneral housekeeping is done by the contractors atall working

    site+ labor shed+ material shed or at working platform at

    thetop+ oFces# Contractor shall clean the area where

    they have to work at day and at night#c. "ull height barricades are erected around the site in

    order to

    prevent the running plant from any haHard and also

    protect the working area BsiteD from any haHard+ as

    running plant may cause danger to the workers as

    leakage of gas+ Are or any kind of haHard can occur

    any time in a running plant#

    d. %ll surplus earth and debris that are excavated for

    foundation

    construction should be removed from theconstruction area to the oFcial earth storage area

    and the same earth is also used for backAlling#

    e. $roper stacking of materials should be done at site+both at

    height and at ground level+ at yards and at suchlocation where

    material would be unloaded for future use#

  • 7/26/2019 DLF The Crest L&T

    42/110

  • 7/26/2019 DLF The Crest L&T

    43/110

    CHAPTER ; : FLOOR PLANAREAS

    ? T0-* % 9?8@mm ; 8896@mm

    6

  • 7/26/2019 DLF The Crest L&T

    44/110

    CHAPTER 8 : FORM5OR6

    hen concrete is placed+ it is in plastic state# It

    reEuires to be supported by temporary supports andcastings of desired shape till it becomes suFciently strong

    to support its own weight# This temporary

    casing is known as the /%$"%$

  • 7/26/2019 DLF The Crest L&T

    45/110

    7

  • 7/26/2019 DLF The Crest L&T

    46/110

    Al,"ii," F%$"%$< S*!e"

    Comparatively a new technology in India+ saves cost+ time

    and improves the Euality of construction# %luminium

    "ormwork is successfully used in 1apan+ (ingapore+Malaysia and the Middle -ast for the construction of

    apartments and buildings+ both low and high rises# "or

    repetition of building layouts and for abovetheplinth

    work+ %luminium "ormwork system is very cost

    eOective# %luminium "ormwork panels can be designed

    for any conditionRcomponent of building such as bay

    windows+ stairs+ balconies and special architectural

    features# This system is uniEue as all the components in a

    building+ including slabs+ Joors+ walls+ columns+ beams+

    staircases+ balconies and window hood are concrete in a

    single stretch#

    The panels of aluminium formwork are made from high

    strength aluminium alloy+ with the face or contact surfaceof the panel+ made up of 9mm thick plate+ which is

    welded to a formwork of specially

    designed extruded sections+ to form a robust component#

    It

    takes only 6R

  • 7/26/2019 DLF The Crest L&T

    47/110

    other formwork material# It is removable and can be

    reused hundreds of times with little maintenance#

    7=

  • 7/26/2019 DLF The Crest L&T

    48/110

    A**e"3l

    The simplicity of %luminium "ormwork and the repetitive

    nature of the assembly process make it possible to

    accurately programme construction seEuences and thuscycle times well in advance# In addition+ this enables

    the unskilled labour to work with the formwork# %ll panels

    are clearly labelled to ensure that they are easily

    identiAable on site and can be smoothly Atted

    together using the formwork modulation drawings#

    Pi (# 5e#+e S*!e"

    The panels are held in position by a simple pin and wedge

    system that passes through holes in the outside rib of

    each panel# The panels At precisely+ simply and securely#

    They reEuire no bracing# ,uildings can be constructed

    Euickly and easily by unskilled labour with a hammer

    being the only tool reEuired# 0nce the panels have been

    numbered+ measuring is not necessary# %s the erection

    process is manual+ tower cranes are freed up and can

    concentrate on other handling operations# The result is a

    typical 9 to : day cycle for Joor to Joor construction#

  • 7/26/2019 DLF The Crest L&T

    49/110

    7>

  • 7/26/2019 DLF The Crest L&T

    50/110

    A#(!(+e*

    ? The formwork can be handled by unskilled labor#

    ? It increases the speed of construction#

    ? This system has exceptionally good Euality with

    accuratedimensions for all openings to receive windows anddoors right angles at meeting points of wall to wall+wall to Joor+ wall toceiling+ etc#

    ? (ystem components are durable and can be used several

    times

    without sacriAcing the Euality or correctness of

    dimensions and

    surface#

    ? It is environment friendly as there is no use of timber#

  • 7/26/2019 DLF The Crest L&T

    51/110

    7?

  • 7/26/2019 DLF The Crest L&T

    52/110

    CHAPTER > : QUALITY

    ASSURANCE & QUALITY

    CONTROL

    L&T has developed its own Euality system to meet

    reEuired Euality standard and time schedule+ in order

    to adhere uncompromising Euality standards at everystage of construction activities#

    .uality %ssurance plan consists of all the planned

    and systematic actions that are to be undertaken &

    performed in the construction activities# It is imperative

    to ensure that products and services are inspected+

    checked and approved at all stages from commencement

    of work including receipt of material to its completion

    & so far its utiliHation# It is commitment of

    management to arrange .%R.C functions during all

    phases of the contract and also to ensure that at the work

    to be executed is in compliance with the contractual

    terms+ speciAcations+ statutory+ regulatory reEuirements

    and all relevant applicable codes and standards with

    the reEuirements# This department duty at every

    stage of construction phase likeK before construction+

    during execution+ after execution# *eceived material

    testing is also under scope the department# If receiving

    material Euality adherence to I( code then only

    material will use for construction activity otherwise it

    will rejected#

  • 7/26/2019 DLF The Crest L&T

    53/110

    QUALITY ASSURANCE PROCEDURE

    It will consist of following phases#

    ? $reconstruction phase

    ? !uring construction phase

    ? $ost Construction phase

    8@

  • 7/26/2019 DLF The Crest L&T

    54/110

    PRE9CONSTRUCTION PHASE

    !uring this phase various activities are undertaken

    and a system is put in place and activated in order to

    ensure thatK? %ll activities at all locations being planned on time#

    ? The support system is eFcient enough to sustain the

    Euality and

    progress of work as planned#

    ? .uality and progress at all times during construction

    phase

    remain unaOected and unhindered#

    DURING CONSTRUCTION PHASE

    It is the most important phase of Euality control# This

    is ensured by allotting responsibilities to concerned

    engineers with commensurate authority and

    supervisors with commensurate authority at

    execution and closely monitored by execution incharge and .%R.C -ngineer to ensure a total Euality

    product at all times# To achieve this+ scheme forimplementation were devised# -xecution engineers

    and .%R.C -ngineers control special works with close

    coordination# They also have to carry out .uality

    %udit of each construction activities at site to ensure

    that Euality of work is maintained at site#

    POST CONSTRUCTION PHASE

    %fter the construction activities is completed+thorough inspection and testing is carried out to

    ensure that Anished product is conforming to

    speciAed standards# *eEuired Euality records aredocumented in prescribed documents to

  • 7/26/2019 DLF The Crest L&T

    55/110

    demonstrate the achievements of speciAed Eualityand eOectiveness of Euality

    system#

    86

  • 7/26/2019 DLF The Crest L&T

    56/110

    TESTS ON AGGREGATES

    De!e$"i(!i% %/ Siee A(l*i* %/

    A++$e+(!e

    CODE OF PRACTISEK I( 78>< B$art 6D 6??8 Tenth $rint

    OBJECTIVEK To determine the particle siHe distribution ofAne and

    coarse aggregate#

    APPARATUS: ,alance of @#6gm accuracy+ I( sieves

  • 7/26/2019 DLF The Crest L&T

    57/110

    ? Lumps of Ane material present can be broken by gentle

    pressure

    by hand#

    ? "ine camel hairbrush may be used to clean the under side

    of theI( sieve 6:@ & =:microns#

    87

  • 7/26/2019 DLF The Crest L&T

    58/110

    ? eigh the material retained on the each sieve and record

    them#

    ? The cumulative mass of the aggregate fraction shall

    then be

    calculated and percentage of passing on each sieve

    shall then be reported#

    Minimum weights of sample for sieve analysisK

  • 7/26/2019 DLF The Crest L&T

    59/110

    C(*!i+ %/ C%'$e!e C,3e*

    CODE OF PRACTISEK I( :6

  • 7/26/2019 DLF The Crest L&T

    60/110

    ? "ill the mould in layers of :@mm#

    ? -nsure symmetrical distribution of concrete within the

    mould#

    89

  • 7/26/2019 DLF The Crest L&T

    61/110

    Compacting by handK

    ? Compact each layer with tamping rod by giving

    8:strokes for

    6:@mm mould+ 7:strokes for 6@@mm mould+8@strokes for cylindrical mould#

    ? $enetrate the strokes into the underlying layer so that the

    bottom

    layer gets rodded# Tap the sides of the mould to

    remove any voids left over after tamping#

    Compacting by vibratorK

    ? Compact each layer by means of electric or

    pneumatic

    hammerRvibrator of by a suitable vibrating table#

    ? The Euantum vibration to be given for laboratory

    specimen shall

    be nearly same as that may be adopted in

    actual concreting operations#? (tore the specimen at site in a place free from vibrations+

    under

    damp matting#

    ? The specimens are to be kept in moist air of atleast ?@S

    relative

    humidity at a temperature of 7=@ 7@ for 79hours#

    ? %fter the time elapsed the specimens are to be

    marked for

    identiAcation and demoulded without giving any

    jerk+ hammering+ or throwing from height to avoid

    fracture before testing#

    ? (ubmerge the specimens in water immediately after de

    mould#

    ? *enew the water at every seven days#

  • 7/26/2019 DLF The Crest L&T

    62/110

    ? Maintain a temperature of 7=@ 7@ and never allow

    them to

    become dry until they have been tested# *ecord the

    maximum and minimum temperatures during the

    curing period#

    8:

  • 7/26/2019 DLF The Crest L&T

    63/110

    De!e$"i(!i% %/ C%"-$e**ieS!$e+!) %/ C%'$e!e ',3e*

    CODE OF PRACTISEK I( :6days#

    ? These are to be tested immediately after removing

    from the

    water and while they are in wet condition#

    ? ipe oO the surface water and remove the Ans if any#

    ? Check the dimension and noted down the weight#

    ? ipe the bearing platens of the testing machine clean#

    ? $lace the cubes in such a manner that the load shall be

    applied to

    opposite sides of the cube cast+ i#e#+ not to the top and

    bottom#? The faces of the test specimen and the steel platens of the

    testing

    machine shall not be packed#

    ? *otate the movable portion gently by hand+ so that

    uniform

    seating is obtained#

  • 7/26/2019 DLF The Crest L&T

    64/110

    ? %pply the load without any shock continuously at the

    rate of

    69@kgRsEcmRminute until the resistance of

    specimen to the increase of load breaks down

    and no greater load can be sustained#

    8

  • 7/26/2019 DLF The Crest L&T

    65/110

    ? *ecord the maximum load applied to the specimen#

    C%"-$e**ie *!$e+!)BkgRsEcm or 'RsEmmD Maximumload

    applied Bkg or 'D

    Crosssectional area

    BsEcm or sEmmD

    %verage of three specimens shall be taken as sample of

    representative batch provided individual variation is

    not more than 6:S of the average#

    8=

  • 7/26/2019 DLF The Crest L&T

    66/110

    De!e$"i(!i% %/ Fiee** %/Ce"e! 3 e! *iei+

    CODE OF PRACTISEK I( 9@86 B$art 6:D 6??6

    OBJECTIVEK To determine the Aneness of cement by wetsieving by the

    mass of residue left over 9:microns sieve#

    APPARATUS: ,alance of @#6gm accuracyP and 9:micronsieve#

    PROCEDURE:

    ? Take a representative cement sample to be tested with a

    sample

    driver#

    ? Take 6@@@gm of from the sample#

    ? et the sample with a gentle stream of water#

    ? *emove it from the stream and wash for 6minute#? *eturn the sieve to the spray of water through a tap and

    wash it

    for a minute by moving the sieve in circular motion in

    horiHontal plane#

    ? *inse it well and taking care not to loose any of the

    residue over

    the sieve#? ,lot the bottom surface of sieve with a damp cloth#

    ? !ry the sieve and residue in oven or on a hot plate#

    ? Cool the sieve+ brush the residue from the sieve+ and

    weigh#

    ? *esidue percentage 6@@ x residue in gm R weight of

    sample

  • 7/26/2019 DLF The Crest L&T

    67/110

    before sieving#

    8>

  • 7/26/2019 DLF The Crest L&T

    68/110

    CHAPTER ? : CONTRACT

    PROTECTION IN HOT 5EATHER

    hen the air temperature is more than 87@ C during the

    placement of the concrete+ then the reinforcement shall

    be sprayed with water so as to prevent the temperature of

    the concrete alongside the bars rising above 87@ C#

    REMOVAL OF FORM5OR6

    The minimum periods between completion of placing

    concrete and the removal of formwork shall be as followsK

    ? 4ertical sides of beams+ wall and columns 79 hours

    ? (oFts of slabs 9 days

    ? *emoval of props to slabs 66 days

    ?

    (oFts of beams > days? *emoval of props to beams 6: days

    USE OF CAMBER IN SLABS AND BEAMS

    %ll slabs and beams more than : metres in span shall be

    laid to a camber if needed# The following formula may be

    used subject to the contractor verifying its applicabilityK

    8?

  • 7/26/2019 DLF The Crest L&T

    69/110

    COMPACTION OF CONCRETE

    The concrete shall be compacted to produce a dense

    homogeneous mass with the assistance of vibrators# %

    :@mm diameter internal vibrator shall be deemedcapable of compacting 7@m8 Rhr# Internal vibrators shall

    be capable of producing not less than 6@+@@@ cycles per

    minute#

    CURING OF CONCRETE

    Immediately after compaction and for 69 daysthereafter+ concrete shall be protected from the harmful

    eOects of weather+ including rain and rapid temperature

    changes and from drying out# The method of curing will

    minimiHe the loss of moisture from the concrete#

    5ATER FOR CONCRETE

    ? ater shall be clean and free from salt and other

    impurities#

    ? ater used for mixing and curing of concrete shall have a

    p)

    value in the basic range of < to ?#

    ? The soluble solids shall not exceed the following limitsK

    a. Total dissolved solids 7@@@mgRl

    b. Chlorides B'aClD

  • 7/26/2019 DLF The Crest L&T

    70/110

    than :@ C nor more than 7:@ C#

    9@

  • 7/26/2019 DLF The Crest L&T

    71/110

    Q,(li! A**,$('e

    !esign and construction shall be executed and supervised

    by fully

    EualiAed and experienced personnel in similar

    nature of works# Contractor shall assume and take

    upon himself to

    ? !esign+ construct+ erect+ maintain and struck form

    work

    proprietary or custom made#

    ? "orm work shall provide reEuired

    1. (hape+ siHe and Anish

    2. *igidity and durability during placing Blive levelsD

    3. *igidity and durability for receiving freshconcrete

    4. Leak proof water tight jointsRjunctions

    5. -asy removal without disturbing concrete

    6.$rovide easy access for handing and placing

    ? "orm work shall provide safety and shall have adeEuate

    access for

    concreting

    ? orkers shall work with reEuired safety measures such as

    safety

    belts+ helmet+ etc#

    E@-e$ie'e

    ? (ite supervisors and foremen EualiAed and experienced

    atleast

    Ave years on similar nature of form work

    ? (emiskilled labour shall be of minimum experience of Ave

    years

  • 7/26/2019 DLF The Crest L&T

    72/110

    in doing similar nature of form work

    96

  • 7/26/2019 DLF The Crest L&T

    73/110

    M(!e$i(l

    Construction formwork with smooth faced plywood to

    produce smooth straight level and sharp proAles shall be

    used for the works# )oriHontal and vertical straight linesshould follow the approved pattern#

    S'%-e %/ %$

  • 7/26/2019 DLF The Crest L&T

    86/110

    R%(# R%lle$: 9

    It is used to compact soil+ concrete in the

    construction of roads or foundations# It is also used in

    land Alling#

    Types of rollersK

    ? 4ibrating roller for sand#

    ? (heepfoot roller for cohesive soil#

    ? $lain drum roller for normal soil#

    ? $neumatic tyre roller used for clay#

    C$(e*: 9

    % crane is a tower or derrick that is eEuipped with

    cables and pulleys that are used to lift and lower

    materials# They are commonly used in the construction

    industry and in the manufacturing of heavy

    eEuipment# Cranes used in construction are normallytemporary

    structures+ either Axed to ground or mounted on purpose

    built vehicle# !iOerent types of cranes areK

    ? Mobile cranes? Telescopic cranes

    ? Tower cranes

    ? Truck Mounted cranes

    ? *ough Terrain cranes

    ? Loader Cranes

    ? 0verhead cranes

  • 7/26/2019 DLF The Crest L&T

    87/110

    9?

  • 7/26/2019 DLF The Crest L&T

    88/110

    CONCRETE

    Concrete is a composite material composed of water+ Aneaggregates and coarse aggregates embedded in a hard

    matrix of material that Alls the spacing among the

    aggregates particles and gives them together#

    I+$e#ie!* %/ '%'$e!eK

    ? ater

    ? Cement? %ggregates (and+ 'atural gravel+ Crushed stone

    ? Chemical %dmixtures

    ? %ccelerators -g# Calcium chloride

    ? *etarders -g# (ugar+ 5lucose

    ? %ir -ntrainment -g# %luminium oxide

    ? $lasticiHers -g# %cetone formaldehyde

    condensate#? $igments -g# Iron oxide#

    ? Corrosion inhibitors-g# MCI7@77 B mixture of amine

    carboxylates and amino alcohols#D

    ? ,onding agents -g# 'ito bond (,*

    ? $umping aids -g# (lurry

    ? Mineral admixtures

    ?

    "ly ash B6:S to 8:S of weight of cementD? 5round granulated blast furnace B9@S to =@S of

    weight of

    cementD

    ? (ilica fume increases strength and durability#

  • 7/26/2019 DLF The Crest L&T

    89/110

    :@

  • 7/26/2019 DLF The Crest L&T

    90/110

    Me!)%#* %/ '%'$e!i+

    ? $ump and wheel barrow#

    ?

    Tower crane and slip bucket#? $ump and pipeline#

    E=,i-"e!* U*e# K

    ? H%i*!K !evice used for lifting or lowering a load by means

    of a drum

    or left wheel around which rope or chain wraps#

    It may be manually operated+ electrically and may be

    using chain or wire rope as its lifting medium# It is

    attached by means of lifting hook#

    A#(!(+e*

    ? Inexpensive

    ? -asy to use

    Di*(#(!(+e*

    ? Care should be taken while using it+ if it falls+ it could be

    very

    dangerous#

  • 7/26/2019 DLF The Crest L&T

    91/110

    :6

  • 7/26/2019 DLF The Crest L&T

    92/110

    ? C),!eK It allows rapid transport of items from the

    upper Joors

    to a lower Joor or basement#

    They may be sEuare+ round or rectangular at

    the top and bottom#

    A#(!(+e*:

    ? -asy to use#

    ? -asy to erect#

    ? $rovide access in accessible#Di*(#(!(+e*:

    ? *eEuires extra labour and support#

    ? C%e%$ 3el! K It is used to transfer concrete

    horiHontally and

    limited distance vertically#

    A#(!(+e*

    ? Inexpensive as compared to cranes#

    ? 3sed in areas like tunnels due to less space#

    Di*(#(!(+e*

    ? ,elts need initial higher tension#

    ? Loading and transfer points need to be properly

    designed#

    ? Conveying of sticky materials create discharge of

    causing

    and discharge of causing poor conductivity#

  • 7/26/2019 DLF The Crest L&T

    93/110

    :7

  • 7/26/2019 DLF The Crest L&T

    94/110

    ? C%'$e!e -,"- K It is a machine used to transfer

    concrete by

    pumping concrete into pipes#

    A#(!(+e*? It is fast in transporting and saves money as less

    labour is

    reEuired#

    ? Improved concrete#

    Di*(#(!(+e*

    ? Takes time to set and dismental#

    ? -xpensive as compared to conveyor belt#

    ? T$%lle i!) $(il* K It is used to transfer goods from one

    place to

    another by a given path to rail decided from before#

    ? T%e$ '$(e* K It is used to carry from one place to

    another using abucket#

    A#(!(+e*

    ? -asy to maintain#

    ? 'o noise#

    ? )igh performance#

  • 7/26/2019 DLF The Crest L&T

    95/110

    :8

  • 7/26/2019 DLF The Crest L&T

    96/110

    ? -asy installation#

    Di*(#(!(+e*

    ? -xpensive as used in large projects#

    ? 'eeds a wireless communication like walky talky#

    ? $ower supply is reEuired#

    ? Pl('e$ 3%%" K It is mounted on 9 legged chassis has a 8

    section

    hydraulic boom# It is provided with sophisticated

    remote control system#

    A#(!(+e*

    ? "aster pours#

    ? Less manpower#

    ? Less crane usage#

    ? Increased site safety#

    Di*(#(!(+e*

    ? $roper planning is reEuired#

    ? Maintenance is also reEuired Bcleaning after

    every

    operationD#

    :9

  • 7/26/2019 DLF The Crest L&T

    97/110

    CHAPTER 11 : SLABS

    % concrete slab is a common structural element ofmodern building# )oriHontal slabs of steel reinforced

    concrete are most often used to construct Joors and

    ceilings#

    The concrete slabs are built on the building site using

    formworkinto which the concrete when wet is poured# The

    formwork is commonly built from wooden planks and

    boards+ steel or plastic# If the slab is to be reinforced+ the

    reinforced bars are positioned within the formwork before

    the concrete is poured in# $lastic tipped metal or plastic

    bar chairs are used to hold the reinforcing bar away from

    the bottom and sides of the formwork+ so that when the

    concrete sets it completely envelopes the reinforcement#

    ? "or a ground slab+ the formwork may consist of sidewalls

    pushed

    into the ground#

    ? "or a suspended slab+ the formwork is shaped like a

    tray+supported by a temporary scaOold until the concrete sets#

  • 7/26/2019 DLF The Crest L&T

    98/110

    ::

  • 7/26/2019 DLF The Crest L&T

    99/110

    Oe95( Sl(3

    ? % oneway slab is used in a rectangular slab+ supported

    only on

    two opposite edges with long beam spans and shorterslab spans#

    ? hen a rectangular slab is supported on all the four edges

    and

    the length to breadth ratio is eEual to or greater than two#

    ? The slab spans in the direction parallel to the shorter

    edge#? Main reinforcement

    is provided in

    only one direction

    because

    there is huge

    diOerence

    in lengths+

    thus load is nottransferred

    to the shorter

    beams#

  • 7/26/2019 DLF The Crest L&T

    100/110

    :

  • 7/26/2019 DLF The Crest L&T

    101/110

    T% 5( Sl(3

    ? hen a rectangular slab is supported on all the four edges

    andthe length to breadth ratio is less than two+ it isconsidered to be a two way slab#

    ? The slab spans in both the orthogonal directions#

    ? Thus+ main reinforcement is provided in both directions for

    two

    way slabs#

    *ectangular twoway slabs can be divided into the following

    typesK

    ? Fl(! -l(!e* K These slabs do not have beams

    between the

    columns+ drop panels or column capitals#

    ? Fl(! *l(3* K These slabs do not have beams but have

    drop panels

    or column capitals#

    ? T%9( *l(3* i!) 3e("* K There are beams

  • 7/26/2019 DLF The Crest L&T

    102/110

    between the

    columns# If the beams are wide and shallow+ they are

    termedas band beams#

    :=

  • 7/26/2019 DLF The Crest L&T

    103/110

    Fl(! Pl(!e*

    ? % Jat plate Joor is a twoway slab with no supporting

    beams+ onlycolumns#

    ? The slab has smooth under surfaces without column

    capitals or

    drop panels#

    ? It is suitable for light loads associated with apartment

    construction and can be economically used for spans upto

  • 7/26/2019 DLF The Crest L&T

    104/110

    ? "lat slab with column head#

    ? "lat slab with both drop panel and column head#

    :>

  • 7/26/2019 DLF The Crest L&T

    105/110

  • 7/26/2019 DLF The Crest L&T

    106/110

    :?

  • 7/26/2019 DLF The Crest L&T

    107/110

    G$(#e Sl(3

    ? It is a Jat concrete structure built on top of the soil at

    ground

    level#

    ? It doesnGt reEuire support from underground footers and

    acts as

    the foundation for the building and provides a stable

    base for the building#

    ? The perimeter of the grade slab is often slightly thicker

    than the

    rest of the surface# It acts a mini footer and helps todistribute the exterior walls more evenly across the

    soil#

    ? It is poured as a single unit and allowed to dry slowly for

    several

    days to minimiHe cracking and maximiHe strength and

    durability#

  • 7/26/2019 DLF The Crest L&T

    108/110

  • 7/26/2019 DLF The Crest L&T

    109/110

    CONCLUSION

    It was a wonderful learning experience at L&T

    ConstructionGs site of !L" The Crest project for a period

    of 9 weeks in 5urgaon# I was given exposure in almost

    all the departments at the site# Lab experiments

    performed at site also helped me to understand the

    deviation from the standard condition and how to tackle

    with practical situation# It was a nice experience to come

    across the true working atmosphere# I would like to thank

    everyone at the site who shared their knowledge and

    helped me in summer training# I hope this experience will

    surely help me in my future and also in shaping my career#