Page 1: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

DK1-DE/LUMinimum capacities from Joint Declaration

1

Linette Linnemann Nielsen, Senior Economist

Page 2: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

EXPORT CAPACITY FROM DK1 TO DE

2

0

10

20

30

40

50

60

70

jan-

2014

mar

-201

4

maj

-201

4

jul-

2014

sep-

2014

nov-

2014

jan-

2015

mar

-201

5

maj

-201

5

jul-

2015

sep-

2015

nov-

2015

jan-

2016

mar

-201

6

maj

-201

6

jul-

2016

sep-

2016

nov-

2016

jan-

2017

mar

-201

7

maj

-201

7

jul-

2017

sep-

2017

nov-

2017

jan-

2018

mar

-201

8

maj

-201

8

jul-

2018

% o

f N

TC

Export capacity

Joint Declaration is implemented

Page 3: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

TSO WORKPLAN

Common Energinet and TenneT workplan is presented in 2015

The plan is continouslyupdated.

DG ENERGY DEVELOPMENT

As a response to NordEnergi’s letter, DG

Energy invited all involvedparties to a meeting in the

spring of 2016.

A follow-up meeting wasarranged in the fall of 2016.

POLITICALNEGOTAITION

The Danish Ministry of Energy, Utilities and Climate

and German Federal Ministry for Economic

Affairs and Energy negotiates a political agreement in 2017

Page 4: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

Joint DeclarationIS A POLITICAL AGREEMENTWhich will secure more capacity for the electricitymarket

Page 5: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

THE MINIMUM CAPACITY INCREASES OVER TIME

5

0

200

400

600

800

1000

1200

jul-17 aug-17 sep-17 okt-17 nov-17 2018 Q1 +Q2 2019

Q3 +Q4 2019

2020M

W in

eve

ry h

our

Minimum capacity

The capacity has to be secured in both import and export direction for every hour.

Page 6: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

THE AMOUNT OF COUNTERTRADE

3/4/2017Aktørmøde DK1-DE, Erritsø 6

MWh

Day-ahead NTC

Minimum capacity

Time

Mwh for countertrade

If day-ahead prices are higher in Germany, and a full export flow from DK1. If flow decreases, the MWh for countertrade decreases.

MWh for countertrade

Page 7: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

PHYSICAL CONGESTIONSARE COUNTERTRADED

7

7

Depending on the flow, Energinet and TenneT increase and decrease the power on either side of the congestion after the day-ahead market.

Energinet uses “special regulation” in DK1 and DK2.

TenneT uses the German intraday market.

Page 8: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

REQUESTED COUNTERTRADED IN DK1

8

-

50 000

100 000

150 000

200 000

250 000

300 000

350 000

MW

h

Joint Declaration countertrade Regular countertrade

Regular countertrade is countertrade requested from TenneT, which is not related to the minimum capacities.

Energinet ensures transparency towards the market by publishing:

The amount of countertrade requested:https://energinet.dk/El/Nyheder-som-systemydelser/Data-for-specialregulering

Monthly average prices for countertrade:https://energinet.dk/El/Indkoeb-og-udbud-af-systemydelser/Pris-paa-reserver

The final impact assessment prepared by Energinet and TenneT:https://en.energinet.dk/About-our-news/News/2017/12/01/Energinet-and-TenneT-publish-final-impact-assessment-of-different-countertrade-models-for-DK1-DE

Page 9: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

The solutionis a stronger gridAnd the short term solutions shallnever hinder this development

Page 10: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

10

West coast lineUnder Planning

Expected in operation 2022East coast lineUnder constructionIn operation in 2020

Kriegers FlakUnder constructionIn operation in 2019

PLANNED GRID EXPANSIONS

Page 11: DK1-DE/LU - Nordic energy regulators · 2018-11-07 · Aktørmøde DK1 -DE, Erritsø 3/4/2017 6. MWh Day-aheadNTC Minimum capacity Time. Mwh for countertrade. If day-ahead prices

LATEST DEVELOPMENTSIn the spring of 2018, the EU Commission Directorate General for Competition opened an investigation into German grid operator TenneT for limiting cross-border electricity capacity with Denmark.

At the same time the Commission invited comments on TenneT’s proposed commitments to increase cross-border capacity with Denmark.

The result form the consultation is still unknown.