Page 1: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

DJIBOUTI

Djibouti Strategic Location

Page 2: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

1. Existing Infrastructures

2. Infrastructures Expansions

3. Future Infrastructures

4. Summary of Development Projects

Page 3: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Djibouti Macroeconomic Indicators

Page 4: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

8 Coastal Countries

Map of the Coastal & Landlocked African Countries

20 Coastal Countries

9 East Africans landlock countries of which 6 countries are in Djibouti Corridor HinterlandArea: 16,374,944 Km²Population: 238,134,156

Page 5: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

The hinterlandThe hinterland

PortMombasa

Djibouti’s Ports

Port Sudan

Wau

Juba

MalakalAddis Abeba

Page 6: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Existing Existing InfrastructuresInfrastructures

Page 7: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

PORT OF DJIBOUTI SA

DFZNo corporate Tax; One Stop Shop; Open a company within 48 hours163 Free Zone companies registered with DPFZA; 39 Nationalities ; 68% from overseas;Office space, warehouses, Light Industrial Units ,hangar and serviced land.

DCTWorld Class Productivity: 34m/hr/crane average1050m of berth, 18m berth depth.

HDTL Pumping capacity : 2000 T/hour/line Operation : 24 hours Depth : 20m Berths: Two.

Port of Djibouti SA (4100 m of berth) (4100 m of berth)Multi Purpose Port: 3200m of berthMulti Purpose Port: 3200m of berthBulk Terminal: 500m of berthBulk Terminal: 500m of berthContainer Terminal :400m of berthContainer Terminal :400m of berthwith RoRo berth ,with RoRo berth , 12m berth depth.

Page 8: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

InfrastructureInfrastructureExpansionsExpansions

Page 9: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Phase II 2013-2015 950m quay length to reach a total of 2000m 3 million TEU capacity

Phase I

Phase I 1050m quay length 18m draught 6 Super Post Panamax quay cranes (+2 in September 2013) 16RTG(+8 in September 2013) 1.5 million TEU capacity

Phase II

DCT:Phase II

Page 10: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Oil Terminal: second phase of the Oil Terminal Constructionphase will start in 4th quarter 2013; Traffic: increase of 30% of the actual capacity

LPG Expansion

Storage Tanks Expansion

: Phase II: Phase II

Page 11: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Future Future InfrastructuresInfrastructures

Page 12: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Future Mega-Projects 1

2

3

45

7

6

9

1211

10

13

8

Page 13: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Crude Oil: 6.7 billion barrels Melut-Djibouti: 1672Km

Pipelines Projects

LNG: 7.5 Trillion m3

Djibouti-Gallup: 805Km

Page 14: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Trans-African Railways

Far East/Europe Route:20.1 M TEU

Far East /West Africa route:5.4M TEU

Far East /East Coast of South America Route: 4.6 M TEU

Far East/East Coast of USA Route:12 M TEU

Djibouti-Lagos: 4870kmDjibouti-Dakar: 6959 km

Page 15: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

2 Billion Tons of Potash

Railway Projects

Galafi

Tadjourah-Galafi : 124Km ;Total Investment of 600 Million USD

Djibouti-Galilleh: 98Km; Total Investment of 500 Million USD

Galilleh

Page 16: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Jeddah

Aqaba

Durban

Port Sudan

Dar Es Salam

Monbassa

Aden

Jebel Ali

Salalah

Beira

Ain Sukhna

Maputo

DJIBOUTI

Four container carriersCarrying capacity: 3000 TEUS

Djibouti Shipping Company

Mumbai

Page 17: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Projects Cost of Studies Start of studies Start of Project Total Cost of Project Finance

Ship Repair & Drydocks 350 000 USD 2013 2013-2015 400 millions USD Not yet Secured

Development activities  of the fishing port

200 000 USD 2013 2013-2015 20 millions USD Secured

Chebelleh Airport & Cargo Village (Phase I)

700 000 USD  1st quarter 2013 2013-2016 320 millions USD Secured

JABANAS Free Zone in PK12

600 000 USD 2012-2013 2013 50 millions USD Secured

Doraleh Container Terminal

       

Phase I b Internal study Completed 2013 30 millions USD Secured

Phase II 1 000 000 USD In progress 2013-2014 300 millions USD Secured

marine Services-tug boats Internal study 1th quarter 2013 2013 300 000 USD Secured

New Multi-Purpose Port

( Port of Djibouti)1 000 000 USD 3rd quarter 2013 2014-2015 300 million USD Secured

Business District Under study Under study Under study Under study Under study

Djibouti-Galilleh Railway 2 000 000 USD Completed 2013 500 million USD Secured

Tadjourah-Galafi Railway 2 000 000 USD 4th quarter 2012 2013 600 million USD Secured

Summary of Development Projects in Djibouti ports, free zones and maritime related business activities

Page 18: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

Projects Cost of Studies Start of studies Start of Project Total Cost of Project Finance

Livestock Port of 

Damerjog 700 000 USD 3rd quarter 2013 2013-2014 70 millions USD Not yet Secured

Port of Ghoubet

Export of salt from

Lake Assal

250 000 USD Completed 1th quarter 2013-2015 64 millions USD Secured

Port of Tadjoura 

(Potash / Mineral)820 000 USD Completed

 

Phase I 2012-2014 80 millions USD Secured

Phase II 2015-2016 80 millions USD Not yet Secured

Oil Port        

Secured

Secured

Storage tanks / Refined

products500 000 USD 2nd quarter 2012 4 th quarter 2013 60 millions USD

  LPG 300 000 USD 1st quarter 2012 3rd quarter 2013 7 millions USD

LNG 1 500 000 USD End of 2013 2014 2.6 billion USD Not yet Secured

Crude Oil Terminal 1 000 000 USD End of 2013 4th quarter 2013 200 million USD Secured

Khor Ambado Free Zone 1 000 000 USD End of 2013 To be determinedTo be developed in

several phasesNot yet Secured

Djibouti Shipping

Company1 000 000 USD 4th quarter 2012 2nd quarter 2013 200 million USD Not yet Secured

TOTAL PROJECT 5 881 300 000 USD  43.03 % of the total amount are already been secured

Summary of Development Projects in Djibouti ports and free zones maritime related business activities

Page 19: DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects

The coming 3 years, we are going to invest over 5.881 Billion USD on the development of ports and maritime related business activities.

Total Investments

43.03% of the total amount of 5.881 Billion USD are already been secured.