Diyarbakır Batman Siirt Development Project
IFAD Loan No 718 –TR
2011
6 MONTH PROGRESS REPORT
JULY 2011
T.C. FOOD, AGRICULTURE AND LIVESTOCK MINISTRY
TABLE OF CONTENTS
SECTION 1 ............................................................................................................................................. 4
1.1 GENERAL INFORMATION ............................................................................................................ 4
1.1.1. Project Area ................................................................................................................................... 4
1.1.2. Project Target Group ..................................................................................................................... 5
1.1.3. Objectives of the Project ................................................................................................................ 5
1.1.4. Components of the Project ............................................................................................................ 6
1.1.4.1. Component A – Village Improvement Program ......................................................................... 6
1.1.4.2. Component B – Rural Economic Growth ................................................................................... 7
1.1.4.3. Component C – Capacity Building for Employment .................................................................. 8
SECTION 2 ............................................................................................................................................. 8
2.1. Activities Realized in 2011 by Components..................................................................................... 8
2.1.1. Component A – Village Improvement Program ............................................................................ 8
2.1.1.1. Component A1: Awareness Raising ........................................................................................... 8
2.1.1.2. Component A2: Farmer Education and Training ....................................................................... 9
2.1.1.3. Component A3: Village Improvement Infrastructure ................................................................. 3
2.1.2. Component B – Rural Economic Growth ................................................................................... 5
2.1.2.1 Component B2: Contributory Grants ........................................................................................... 5
2.1.3. Component C – Capacity Building for Employment................................................................... 11
2.1.4.Component D – Project Organization and Management .............................................................. 13
2.1.4.1. Treasury Audit Report ............................................................................................................. 14
SECTION 3 ........................................................................................................................................... 15
3.1. FINANCING, COST AND EXPENDITURES OF THE PROJECT ............................................. 15
ANNEXES ............................................................................................................................................ 17
ANNEX 1: PROJECT ACTIVITIES SCHEDULE BY COMPONENTS– 2011 ................................. 18
ANNEX.2: PHYSICAL DEVELOPMENT TABLE ............................................................................ 24
TABLE INDEX
Table 1. 2011 January –June Farmer Training Activities …………………………………………………................................……………10
Table 2. 2011 Provincial Distribution of Farmers Participating in Farmer Education and Training Activities.….......…… 11
Table 3. 2011 DBSDP FARMER TRAININGS AND COURSES (GENERAL)………………………………………………………..…….…...... 11
Table 4. 2011 DBSDP DEMONSTRATIONS (GENERAL).................................................................................................... 12
Table 5. Procurement of Agricultural Tools and Equipment for 2010 Demonstration Activities ………………....……..........12
Table 6. Procurement of Agricultural Tools and Equipment for 2011 Demonstration Activities (GENERAL) ..…….........13
Table 7. 2011 DBSKP HİS Pond Investments ………………………………………………………………………………………..…………….…......14
Table 8. 2011 DBSDP Closed System Irrigation Canal Investments.…………………………………..…….………..…………..……........14
Table 9. 2010 Diyarbakır Individual Grant Scheme.…………………………………………………………………………………..…….............16
Table 10. 2010 Batman Individual Grant Scheme (Approved Applications).……………..…………………………………………….....16
Table 11. 2010 Batman Individual Grant Scheme ……………………………………………..……………………….……………..……...........18
Table12. 2010 Siirt Individual Grant Scheme (Approved Applications)………………….……………………………………….….……...18
Table 13. 2010 Siirt Individual Grant Scheme ……………………………………………………………………………….……………....….........18
Table 14. 2010 Individual Grant Scheme (OVERALL)…………………………………………………………………….…………………..……....19
Table 15. Disbursed Grants by Amount under 2010 Individual Grant Scheme ……………………………………..……..…...........19
Table 16. 2009 Diyarbakır Economic Investment Grant Scheme .……………………………………………………………………...........19
Table 17. Ongoing Economic Investments ………………………………………………………………………………………………...……..........20
Table 18. Technical Personnel Training Activities in 2011……………………………………..………………………………..……..……......21
Table 19. 2011 DBSDP TRAINING OF TECHNICAL PERSONNEL .…………………………………………………………..……..………….....22
Table 20. Capacity Building for Employment Activities Realized in 2011………………………………………….………………....…...23
Table 21. Capacity Building for Employment Activities Realized in 2011…………………………………………………………..…......24
Table 22. 2010 DBSDP PMU Office IT Equipment and Material Procurement List……………………………………………………..24
Table 23. Financing Sources and Investment Amount of the Project ………………………………………………………………..........29
Table 24 A. Table A: Summary of Expenditures by Loan Categories and by Financiers ( 2011 First 6 Months)............29
Table 24 B. Table B: Summary of Expenditure Categories by Financiers for the First 6 Months of 2011 (USD)………..30
Table 25 C. Summary of Expenditures by Components and by Loan Categories for the First 6 Months of 2011 (USD)..30
ABBREVIATIONS RA Regional Administrator DBSDP Diyarbakır Batman Siirt Development Project DSI State Hydraulic Works F/PO Finance/Procurement Officer IFAD International Fund for Agricultural Development HİS Animal Drinking Water (Ponds) SPA Special Provincial Administration PFE Provincial Field Engineer PDA Provincial Directorate (Director) of Agriculture BDS Business Development Specialist M&E Monitoring and Evaluation CPMU/MARA Central Project Management Unit/MARA PA Program Administrator PAU Project Administration Unit PMU Project Management Unit SIP Strategic Investment Programme SCM Supply Chain Management UNDP United Nations Development Program UNDP/CO UNDP/Turkey Country Office (Ankara) AWPB Annual Work Plan and Budget
SECTION 1
1.1 GENERAL INFORMATION
1. The Project is being implemented by the Ministry of Agriculture and Rural Affairs, General
Directorate of Agricultural Production and Development. UNDP assists the programme
administration for project implementation in the scope of flow of funds, accounting and supply
of goods and services, and also will provide 752.000 USD financing as a grant for the 5 year
implementation of the Project.
2. Project was included in 2006 investment program with the decision of the Higher Planning
Council dated 22.11.2006 and numbered 2006/87. “Loan Agreement” was signed on 5 March
2007 between the financing institution IFAD and the Undersecretariat of Treasury on behalf of
GoT and adopted by the Cabinet on 14 May 2007.
3. “Grant Agreement” was signed on 19 June 2007 between the Undersecretariat of Treasury
and UNDP.
4. “Service Agreement” has been signed on 6 September 2007 between our Ministry, Ministry of
Foreign Affairs and UNDP.
5. The Project was put into force on 19 December 2007 after all necessary conditions were
fulfilled, and the closing date was identified by IFAD to be 30 June 2013 and completion date
to be 31 December 2012.
1.1.1. Project Area
6. The Project area covers Diyarbakır, Batman and Siirt Provincial borders of South-eastern
Anatolia.
7. The climate is harsh with severely cold winters and hot dry summers. Precipitation ranges from
about 200-700 mm. In Diyarbakır the average January temperature at nights is -24°C and
maximum temperature in July and August can reach 46°C. The growing season is short.
8. Total agricultural land of three provinces in the Project area is 994,869 ha, forest area is
473,376 ha and pastureland is 451,764 ha. Total land is 2,430,362 ha.
9. The most important potential natural resource in the Project provinces in GAP region is water
potential of watershed of Euphrates and Tigris Rivers. Also, natural resources such as
petroleum, copper, marble seam with colored streak, forest, pastures and culture and tourism
resources exist in the region. Rich and high quality marble reserves in Diyarbakır are attractive
commercially.
1.1.2. Project Target Group
10. Primary target group is poorer rural men, women and young people living in the project
provinces. Secondary target group is new or established businesses with sustainable profit.
1.1.3. Objectives of the Project
11. Main objective of the Project is to improve economic and social status of the poor people living
in rural areas in accordance with Turkey’s National Rural Development strategies, plans and
programs.
12. Project’s primary objectives are to;
a) improve the quality of life of population and economic efficiencies of agricultural
enterprises being poor due to current production and employment patterns in poor
rural villages in the Project area,
b) develop both on- and off-farm income sources and establish new businesses
through developing Supply Chain Management and increase employment through
the establishment of new and expansion of existing profitable businesses,
c) Optimize employability of members of the target groups through enhancement of
individual and organizational skills necessary to achieve objectives (a) and (b).
1.1.4. Components of the Project
13. Investment activities of the project are implemented under three main components;
a) Village Improvement Program,
b) Rural Economic Growth, and
c) Capacity Building for Employment.
On the other hand, the following component was designed as a fourth component for
sound and effective implementation of the Project and realization of necessary planning
and budget control activities:
d) Project Coordination and Management Component.
1.1.4.1. Component A – Village Improvement Program
14. Selected economic and social investments will be supported under this component to improve
the living standards of poor villages. This component comprises three sub-components;
a) Awareness raising,
b) Farmer Education and Training,
c) Infrastructure Investments for Village Improvement.
15. Awareness Raising sub-component comprises the activities for raising awareness of rural
population about existing financial and social development support types and resources that
are necessary for determining investment opportunities at village level and facilitating these
kinds of investments.
16. With Farmer education and training sub-component, firstly it is targeted to determine cost
effective and sustainable earnings in subsistence and semi-subsistence farming systems in
Project villages. Secondly, it is targeted to develop related training curriculum, materials and a
training menu. Lastly, by using the training menu, it is aimed to ensure that farmers demand
special trainings on their needs, to be provided by PDAs through increasing demonstrations
and technological transfer programs.
17. Under the Infrastructure Investments for Village Improvement sub-component, investments
are provided for the benefit of the village population and to increase quality of life in villages
within the Project Area meeting the criteria for public infrastructure implementations.
1.1.4.2. Component B – Rural Economic Growth
18. This Component includes measures for diversification of rural income resources and increasing
employment in Project provinces. Rural Economic Growth Component is composed of three
main sub-components:
a) Rural Supply Chain Management,
b) Contributory Grants,
c) P/DDA Staff Capacity Building,
19. Investment needs and opportunities determined by Supply Chain Management Sub-
Component will form a basis for investments to be supported by the Project.
20. Under the Contributory Grant Sub-component, it is targeted to provide contributory co-
financing and also leverage fund by loans that investors provide from their own resources or
financial institutions in order to improve facilities determined under SIP ‘Strategic Investment
Plan’ to accelerate the economic growth in the Project area.
21. Under the P/DDA Staff Capacity Building sub-component, it is targeted to develop institutional
capacity by improving knowledge and skills of technical staff in Provincial and District
Directorates of Agriculture on Strategic Investment Plans.
1.1.4.3. Component C – Capacity Building for Employment
22. This component seeks to enhance access of surplus labour in the participatory Project villages
to employment with better salaries in rural economy.
23. Targets of the component and approaches to realize these targets are (i) to determine
knowledge and skills that employers need potentially, information on number of persons to be
employed and whether or not there are staff having right knowledge and skills via a study in
the overall Project area; (ii) to analyze trends, opportunities and problems of labor market in
the region; (iii) to develop appropriate training program to increase employability in the target
groups; (iv) to improve support activities necessary to develop productivity structure of labor
market and (v) to provide training for persons who are interested in obtaining necessary skills
and knowledge for fitting potential vacant positions.
SECTION 2
2.1. Activities Realized in 2011 by Components
2.1.1. Component A – Village Improvement Program
2.1.1.1. Component A1: Awareness Raising
24. 2000 brochures were printed summarizing the overall progression of Diyarbakır Batman Siirt
Development Project, project budget and the scope of project activities.
25. A cine-vision show was prepared covering overall project activities being implemented since
the beginning of the Project such as Infrastructure and Sewer Works, Farmer Education and
Training, Demonstration, Contributory Grant Scheme etc., in order to promote the Project.
26. 1000 catalogues were printed covering information about the completed activities in each
Project province.
27. A widely participated “Project Activities Evaluation Meeting” was held on 26.04.2011 with the
attendance of Mehdi EKER, Minister of Food, Agriculture and Livestock.
28. www.dbskp.org Internet page started broadcasting where Project activities implemented in
Diyarbakır, Batman and Siirt Provinces are promoted and current information and photographs
are uploaded.
2.1.1.2. Component A2: Farmer Education and Training
29. “Modern Viniculture Training” was provided for producers on 27.02.2011 in Batman Province
Gercüş District Vineyard Demonstration area and in Beşiri District Vineyards established in the
scope of 50% Grant Scheme. In the training, practical trainings were provided on adaptation to
Wired Training System and Pruning techniques in accordance with Wired Training System. At
the end of the training with 60 participants, all participants received Pruning Scissors, Pruning
Saws and Gloves as promotion.
30. “On-site Training for Producers” was provided on 16-17.03.2011 in Diyarbakır for 62 project
beneficiaries in two Almond Demonstration areas established in the scope of 2010
Demonstration activities. In the training, on-site practices were carried out regarding
maintenance and pruning in fruit production. Moreover, all participants received Pruning
Scissors, Pruning Saws and Gloves as promotion.
31. Grant beneficiaries, Demonstration owners and other producers in Siirt province received 3
days “Fruit Production Training” in Yalova Atatürk Horticulture Central Research Institute. 20
Farmers participated in the training organized between 13-15.04.2011.
32. In the scope of 2011 training programme, 2 days “Sapling Production Training” was provided
in Mersin Province, Erdemli District, ALATA Horticulture Research Institute on 19-20 April 2011.
21 people participated in the Training including 20 women farmers and 1 Technical Staff from
Batman province and its districts. During the training programme modern greenhouses and
greenhouse sapling production areas, and also leaf, plant and water analysis laboratories were
visited. Moreover, seed, seedling, cut rooting areas and practices in these fields were reviewed
and information was received from technical staff of the Institute. As well as increasing
technical knowledge of the participants regarding sapling production, it was also an
opportunity to see sapling production practices on site.
33. With the participation of grant beneficiaries and producers benefiting from any of the DBSKP
activities in Diyarbakır province, 3 days “Fruit Production Training” was held in Yalova Atatürk
Horticulture Central Research Institute. 24 Farmes participated in the training organized
between 19-21.05.2011.
34. In SÜTAŞ Training Centre, farmers from Batman province received theoretical and practical
training on “Dairy Cow Breeding”. During the 3-day training, producers received practical
trainings on subjects that the famers generally need such as feeding and care for the animals,
and milking, keeping milk in under hygienic conditions and processing. 26 farmers participated
in the training held on 25-28.04.2011.
35. Technical Staff working in Diyarbakır P/DDAs received “Fruit Production Training” on 16-
18.05.2011 in Yalova Atatürk Horticulture Central Research Institute. 29 Technical Staff of
P/DDAs participated in the training.
36. “Milk and Dairy Products Technologies” training was held in SÜTAŞ Karacabey/Bursa on 16-
19.05.2011. Profitable Dairy Livestock Production, Feeding of Dairy Cattle, Planning of Dairy
Cattle Stables, Important Dairy Cattle Diseases and Ways to Prevent Them, Selection for
Breeding, Preparing Ratios, Organization, Selection and Use of Milking Machines were included
in the Training Programme. 20 producers from Siirt province participated in the training.
37. “Greenhouse Production” Training was provided for women farmers on 10-12.05.2011 in
Antalya BATEM. Theoretical and practical training on Ornamental Plant Production was
received. 3 Technical Staff and 15 Women Farmers from Diyarbakır province participated in
the training. Out of 15 Women Farmers participating in the training, greenhouses in
accordance with modern systems to be fully financed by the Project will be established for 3
Women Farmers with the potential of carrying out Ornamental Plant Production.
38. 2-day practical “Grafting Master Training” was held with the participation of farmers from
Batman province on 7-8.06.2011 in Antep Pistachio Research Institute / Gaziantep. 25 people
including 23 Farmers and 2 Technical Staff participated in the training. Practical training was
provided on grafting on Wild Varieties of Pistachio and Vineyards.
Table.1. 2011 January –June Farmer Training Activities
Subject Location of the Training No of
trainings
No of Participants Duration (days)
Cost of training
Female Male Total
Dairy Cattle Training Sütaş Training Centre / Aksaray 1 26 26 4 20.105,60 TL
Milk and Dairy Products Technologies Training
Sütaş Training Centre / Bursa 1 20 20 4 18.848,22 TL
Fruit Production Training Atatürk Horticulture Central Research Institute / Yalova
3 2 71 73 12 59.977,75 TL
Viniculture Training Gercüş (vineyard demonstration area) Beşiri (vineyard established with grant support)
2 60 60 1 2.430,00 TL
Greenhouse Production Training Western Mediterranean Research Institute / Antalya
1 1 17 18 3 14.054,50 TL
On-site Training for Producers Almond Demonstration Areas / Diyarbakır 2 62 62 2 2.400,00 TL
Project Publicity Forum South-eastern Anatolia Agricultural Research Institute / Diyarbakır
1 200 1 73.224,00 TL
Pistachio Grafting Training Pistachio Research Institute / Gaziantep 1 25 25 2 9.725,00 TL
Sapling Production Training Alata Horticulture Research Institute / Mersin
1 20 1 21 2 11.556,40 TL
TOTAL 13 23 282 505 31 212.321,47 TL
Table.2. 2011 Provincial Distribution of Farmers Participating in Farmer Education and Training Activities
Subject of the Training
Diyarbakır Batman Siirt General
Total No of Trainings
Female Male Total No of
Trainings Female Male Total
No of Trainings
Female Male Total
Dairy Cattle Training 1 26 26 26
Milk and Dairy Products Technologies Training
1 20 20 20
Fruit Production Training 2 2 51 53 1 20 20 73
Viniculture Training 2 60 60 60
Greenhouse Production Training 1 17 1 18 18
On-site Training for Producers 2 62 62 62
Project Publicity Forum 1 200 200
Pistachio Grafting Training 1 25 25 25
Sapling Production Training 1 20 1 21 21
Total 6 19 114 333 5 20 112 132 2 40 40 505
Table.3. 2011 DBSDP FARMER TRAININGS AND COURSES (GENERAL)
2011 JANUARY-DECEMBER PLANNED 2011 JANUARY-JUNE REALIZED 2011 JULY-DECEMBER TO BE
REALIZED
Subject
No. of Trainings
Total No. of
Trainings
Total No. of Participants
No. of Trainings
Total No. of
Trainings
Realization Rate of
Trainings %
Total No. of
Trainings
Realization Rate in terms of Total No.
of participants
%
No. of Trainings
Total No. of
Trainings
Total No. of Participants
Diy
arb
akı
r
Ba
tma
n
Siir
t
Diy
arb
akı
r
Ba
tma
n
Siir
t
Diy
arb
akı
r
Ba
tma
n
Siir
t
Dairy Cattle Training 1 2 3 80 1 1 33% 26 32,50% 1 1 2 54
Sheep Breeding Training
1 1 20 0 0% 0% 1 1 20
Milk and Dairy Products Technologies Training
1 1 20 1 1 100% 20 100% 0 0
Fruit Production Training
2 1 3 80 2 1 3 100% 73 91,25% 0 0
Viniculture Training 2 2 4 110 2 2 50% 60 54% 2 2 50
Greenhouse Production Training
1 1 25 1 1 100% 18 72% 0 0
Training for Cooperative Members
2 2 50 0 0 0 0% 2 2 50
On-site Training for Producers
2 2 50 2 2 100% 62 124 0 0
Practical Training for Producers in Model Orchards and Demonstration Areas
3 3 75 0 0 0 0% 3 3 75
Practical Training for Producers on Wired Training System in Demonstration Areas
1 1 50 0 0 0 0% 1 1 50
Technical Visit on Marketing
1 1 30 0 0 0 0% 1 1 30
Technical Visit to Fair 1 1 30 0 0 0 0% 1 1 30
Project Publicity Forum 1 1 200 1 1 100% 200 100% 0 0
Pistachio Grafting Training
1 1 25 1 1 100% 25 100% 0 0
Siirt Pistachio Promotion (Fair)
1 1 0 0 0 0% 1 1 0
Sapling Production Training
2 2 50 1 1 50% 21 42% 1 1 29
TOTAL 17 7 4 28 895 6 5 2 13 46% 505 56% 11 2 2 15 388
39. In Diyarbakır, Batman and Siirt provinces, modern orchards are being established by planting
Certified Saplings and installing Fencing Systems, Drip Irrigation Systems and Wired Training
Systems in order to widespread intensified orchard culture. When establishing the orchards,
products that can highly adapt to the region (specific to the region or depending on climate
and other variables) are chosen. Moreover, when selecting the products, it is also considered
to choose products that were not subject to any scientific studies in the region. Establishment
of Demonstration orchards was competed in Diyarbakır and Siirt provinces as of end of June.
Table.4. 2011 DBSDP DEMONSTRATIONS (GENERAL)
Type
Area (da)
Total Planned Area (da)
2011 Jan-June Established Area (da)
Total No. of Farmers
To Be Established area (da) 2011 July-December
Diy
arb
akır
Bat
man
Siir
t
Apricot Orchard 26,5 26,5 24 3 -
Plum Orchard 24,2 24,2 23,7 3 -
Apple Orchard 30 30 29,5 3 -
Vineyard with Wired Training System 22,7 11,5 34,2 32,2 5 -
Walnut Orchard 23 23 0 - 23
Pomegranate Orchard 18,6 22,3 40,9 22,3 3 18,6
TOTAL 103,4 41,6 33,8 178,8 131,7 17 41,6
40. In Batman province, since the selected varieties for Walnut Orchard Demonstrations planned
to be established in 2011 could not be supplied under existing conditions, only the activities
regarding installation of fencing system has started. Sapling planting and Drip irrigation system
installation will be finalized in Fall.
41. For the Project provinces, as stated in 2010 AWPB, procurement of Wimble (for sapling),
Almond Shelling Machine and Stone Picker could not be realized in 2010, but preparations
regarding procurement proceedings were finalized and as of February 2011 tender
announcement was made and procurement processes were completed. Tendering process for
the procurement of Agricultural Machinery and Equipment stated in 2011 AWPB was finalized.
42. Preparation of the Technical Specifications for the procurement of Solar Power System and
installation on Demonstration fields is continuing.
43. Activities for finalizing the procurement process for signs to promote demonstration
areas are continuing.
Table.5. Procurement of Agricultural Tools and Equipment for 2010 Demonstration Activities
Type
Planned (according to 2010 AWPB) Realized
Diyarbakır Batman Siirt Total Diyarbakır Batman Siirt Total
Almond Crusher 2 - - 2 2 - - 2
Stone Picking - - 1 1 - - 1 1
TOPLAM 12 3 7 22 12 2 1 15 Procurement of 2 Almond Crusher and Peelers and 1 Stone Picking Machine stated in 2010 AWPB was realized in 2011.
Table.6. Procurement of Agricultural Tools and Equipment for 2011 Demonstration Activities (GENERAL)
Type
Number
Total Procured
Diy
arb
akı
r
Ba
tma
n
Siir
t
Grape Squeezer 10 10 **
Stalk Cutter 3 3 **
Wimble (for sapling) 5 6 11 22*
Branch Grinding Machine 2 2 **
TOTAL 10 8 8 26 22 * Procurement of 11 Wimbles (for saplings) stated in 2010 AWPB was realized in 2011.
**Grape Squeezer, Stalk Cutter and Branch Grinding Machine procurement processes are continuing.
2.1.1.3. Component A3: Village Improvement Infrastructure
44. Tender preparations for the implementation of Closed System Irrigation Canal and HİS
(animal drinking water pond) projects were completed. For the HİS ponds, construction
works tender announcement was made, and for the irrigation canals, prequalification
announcement was made and tenders were carried out. For HİS Ponds Construction
Works, contract was signed with the contractor on 02.06.2011 and construction works
started. For the irrigation canals, prequalified companies were invited to the
construction tender and construction works tender was finalized. The contract will be
signed with the winning company in July and construction works will start within the
same month.
45. Detailed information regarding 2011 DBSDP HİS Pond investments are stated in Table 7,
and detailed information regarding 2011 DBSDP Closed System Irrigation Canal
investments are stated in Table 8.
Table.7. 2011 DBSKP HİS Pond Investments
NO Province District Village Population No. of
Households
Useful Storing Volume
(m3)
Number of Large Livestock
Number of Small
Livestock
1 Diyarbakır Centre Baroğlu 310 30 6277 100 500
2 Diyarbakır Centre Ekinci 984 147 58046 1200 2400
3 Diyarbakır Ergani Alitaş 546 86 18398 500 2000
4 Diyarbakır Eğil Gürünlü 519 74 100 1800 10000
5 Siirt Kurtalan Uluköy 522 83 33974 400 1400
TOTAL 2.881 420 116.795 4.000 16.300
Table.8. 2011 DBSDP Closed System Irrigation Canal Investments
NO Province District Village Population No. of
Households
Irrigated area (da)
Length of irrigation canal
(m.)
1 Diyarbakır Hani Centre 3480 580 5700 20378
2 Diyarbakır Kulp İslamköy 2500 169 852 3620
3 Diyarbakır Çermik Karakaya 150 22 307 1884
4 Diyarbakır Çermik Artuk 400 53 108 469
5 Batman Kozluk Tosunpınar 500 70 300 3272
TOTAL 7.030 894 7.267 29.623
46. In Diyarbakır and Siirt provinces, protocols were signed between the PDAs and SPAs
regarding the construction Field Roads identified by the PAUs. With the signed protocols,
approximately 6 km field road construction was completed in Siirt province. Construction
cost for field roads is 30.000 TL.
47. Survey for the cost of 19 km Field Road with Diyarbakır SPA was completed. Ministry
approval for fund allocation is awaited.
48. For the wastewater quality analysis, 2 water samples were taken from each constructed
Sewer and Natural Treatment Systems in Diyarbakır province Güleçoba and Gözalan
villages, Batman province Ünsaldı village and Siirt province İkizbağlar village. One of
these two samples was taken from the septic inlet and the other was taken from the
natural treatment outlet. After these samples are analysed, wastewater quality analysis
report will be prepared in July.
2.1.2. Component B – Rural Economic Growth
2.1.2.1 Component B2: Contributory Grants
49. Out of 67 Individual Investors who applied to benefit from 2010 Diyarbakır individual
investments grant scheme, 23 investors completed the establishment of their orchards
and the grant payments to individual investors who have completed their orchards have
been realized.
Table.9. 2010 Diyarbakır Individual Grant Scheme
Investment Type Number of Investors
Total Cost of Investment
Amount of Disbursed Grant
The Ratio of Grant Disbursed to the
Total Grant Disbursed ( % )
Almond Orchard 23 479.397,37 TL 239.698,69 TL 36*
TOTAL 23 479.397,37 TL 239.698,69 TL 36*
*Ratio of total disbursed grant amount to total requested grant amount.
50. In order to support the development of “Viticulture” sector in Batman, grants were
advertised on 11.08.2010 for Individual Grant Scheme. The deadline for applications was
on 03.09.2010 and a total of 45 Individual applications were received. The application
files were evaluated by Batman PAU. As a result of evaluations, grant applications of 39
individual investors were considered as appropriate.
Table.10. 2010 Batman Individual Grant Scheme (Approved Applications)
Investment Type
Name of Investment
Number of Investments
Total Project Amount basis for
Grant ( TL )
Total Amount of Requested Grant
( TL )
Area ( da )
Individual Investments
Viniculture (Vineyard
Establishment) 39 1.521.198,48 760.599,24 301
TOTAL 39 1.521.198,48 760.599,24 301
51. Out of 39 investors, grant payments have been realized to 7 Individual Investors who
have signed Grant Contracts under 2010 Batman Individual Grant Scheme and completed
establishment of vineyards and/or completed purchase of agricultural goods.
Table.11. 2010 Batman Individual Grant Scheme
Investment Type Number of Investors
Total Cost of Investment ( TL )
Amount of Disbursed Grant (
TL )
The Ratio of Grant Disbursed to the
Total Grant Disbursed ( % )
Viniculture 5 221.295,47 TL 110.647,74 TL 15*
Viniculture Agricultural Machinery-Equipment
2 21.600,00 TL 10.800,00 TL 1,5*
TOTAL 7 242.895,47 TL 121.447,74 TL 16,5*
*Ratio of total disbursed grant amount to total requested grant amount.
52. Grants were advertised on 13.12.2010 to support the development of “Zivzik
Pomegranate Growing” sector in Siirt for Individual Grant Scheme. The deadline for
applications was on 14.01.2011 and a total of 32 Individual applications were received.
As a result of evaluations, grant applications of 16 individual investors were considered
as appropriate.
Table.12. 2010 Siirt Individual Grant Scheme (Approved Applications)
Investment Type
Name of Investment
Number of Investments
Total Project Amount basis for
Grant ( TL )
Total Amount of Requested Grant
( TL )
Area ( da )
Individual Investments
Zivzik Pomegranate
(Establishment of
Pomegranate Orchard)
16 374.796,70 191.395,85 213,7
TOTAL 16 374.796,70 191.395,85 213,7
53. Out of 16 investors who have signed Grant Contracts under 2010 Siirt Individual Grant
Scheme, 5 investors completed establishment of Pomegranate Orchards and grant
payments have been realized to 5 Individual Investors.
Table.13. 2010 Siirt Individual Grant Scheme
Investment Type Number of Investors
Total Cost of Investment ( TL )
Amount of Disbursed Grant ( TL )
The Ratio of Grant Disbursed to the Total Grant Disbursed ( % )
Pomegranate Orchard
5 128.863,55 TL 64.431,78 TL 34*
TOTAL 5 128.863,55 TL 64.431,78 TL 34*
*Ratio of total disbursed grant amount to total requested grant amount.
54. In the provinces of Diyarbakır, Batman and Siirt, a total of 35 Individual Investors have
completed their investments and grant payments have been made to investors who have
completed their investments.
Table.14. 2010 Individual Grant Scheme (OVERALL)
Investment Type Number of Investors
Total Cost of Investment
Amount of Disbursed Grant
Ratio of Total Disbursed Grant
Amount ( % ) Area (da)
Almond Orchard 23 479.397,37 TL 239.698,69 TL 56 466,8
Viticulture 5 221.295,47 TL 110.647,74 TL 26 40
Pomegranate Orchard
5 128.863,56 TL 64.431,77 TL 15
85,45
Viticulture Tools-Equipment
2 21.600,00 TL 10.800,00 TL 3
TOTAL 35 851.156,40 TL 425.578,20 TL 100 592,25
Table.15. Disbursed Grants by Amount under 2010 Individual Grant Scheme
Disbursement Amount Number of Investors
Total Cost of Investment
Amount of Disbursed Grant
Ratio of Disbursed to Total Grant Amount
( % )
<= 4 500 3 25.268,00 TL 12.634,00 TL 3
4 501-9 000 14 173.831,66 TL 86.915,83 TL 20,4
9 001-13 500 7 162.932,76 TL 81.466,38 TL 19,2
13 501-18 000 1 27.198,74 TL 13.599,37 TL 3,2
18 001-22 500 7 307.330,26 TL 153.665,13 TL 36,1
22 501 > 3 154.594,98 TL 77.297,49 TL 18,1
TOTAL 35 851.156,40 TL 425.578,20 TL 100
55. Within the framework of Economic Investment Grant Scheme in Diyarbakır, 5 Economic
Investment Projects have partially completed their investments and the grant payments
for the completed parts of investments have been realized.
Table.16. 2009 Diyarbakır Economic Investment Grant Scheme
Disbursement Amount Number of Investors Total Cost of Investment Amount of Disbursed
Grant
Dairy Sector 5 607.294,24 TL 303.647,12 TL
TOTAL 5 607.294,24 TL 303.647,12 TL
56. As regards the dairy sector, the establishment activities are ongoing for 6 economic
investment projects in Diyarbakır and 1 economic investment project in Batman.
Furthermore, the establishment activities are ongoing for 2 economic investment
projects on Zivzik Pomegranate in Siirt and 1 economic investment project on Viticulture
Sector in Batman.
Table.17. Ongoing Economic Investments
Investment Type Province Number of
Investments Total Project
Amount
Total Amount of Requested
Grant
Realized Grant
Disbursement Amount
Remaining Grant
Disbursement Amount
Dairy Sector (Barn Construction, Procurement of Machinery and Equipment and Milk Collection Network)
Diyarbakır 6 1.841.700,00
TL 920.850,00 TL 374.682,66 TL 546.167,34 TL
Batman 1 434.500,00 TL 190.000,00 TL 0,00 TL 190.000,00 TL
Pomegranate Growing (Construction of Cold Storage House)
Siirt 2 778.013,43 TL 340.000,00 TL 0,00 TL 340.000,00 TL
Viticulture (50 da Vineyard Establishment) (Fence System, Sapling, Irrigation and procurement of machinery and
equipment)
Batman 1 230.300,00 TL 115.150,00 TL 0,00 TL 115.150,00 TL
TOTAL 10 3.284.513,43
TL 1.566.000,00
TL 374.682,66 TL 1.191.317,34 TL
57. Upon the decision made, Batman PAU started SIP preparations on Strawberry Growing
Sector.
2.1.2.1 Component B3 : Capacity Building for PDA Staff
58. Under the sub-component of capacity building for Provincial/District Directorate of
Agriculture staff, in order to increase the occupational knowledge of Technical
Personnel, practical trainings are provided so that new production models will be
learned by doing in connection with the advancement of techniques in line with modern
production models in Agriculture and Animal Husbandry.
59. The training which was included in AWPB as "Economic and Financial Analysis” Training
took place on 09.06.2011 in the training room of FTE (Farmer Training and Extension)
Section of Siirt PDA. Training was delivered by Hürriyet KEÇELİ from Project Central Unit.
Training focused on topics related to economic profitability and calculation of connected
economic parameters in preparing and assessing projects. 20 technical staff from Project
Central Unit and from Diyarbakır, Batman and Siirt PAUs participated.
60. Technical personnel of Siirt Provincial and District Directorate of Agriculture participated
in “Fruit Growing Training” held on 13-15.04.2011 in Yalova Atatürk Horticulture Central
Research Institute and in “Milk and Dairy Products Technologies” training held on 16-
19.05.2011 in SÜTAŞ Karacabey/Bursa.
61. The tendering process has been completed for the provision of Foreign Language
Courses (English) to Diyarbakır, Batman and Siirt PAU staff. The procurement process for
foreign language courses, for which the tendering process has been completed, is
ongoing.
Table.18. Technical Personnel Training Activities in 2011
Subject of Training Place of Training Number
of Trainings
Number of Participants Duration
of Training ( day )
Cost of Training
Female Male Total
Economic and Financial Analysis Training
Siirt PDA, Farmer Training and Extension Building
1 3 17 20 1 -
Milk and Dairy Products Technologies Training
Sütaş Training Centre/ Bursa 1 7 7 4 6.596,88 TL
Fruit Growing Training Yalova Atatürk Horticulture Central Research Institute
1 2 7 9 3 6.964,00 TL
TOTAL 3 5 31 36 8 13.560,88 TL
Table.19. 2011 DBSDP TRAINING OF TECHNICAL PERSONNEL
2011 JANUARY-DECEMBER PLANNED 2011 JANUARY-JUNE REALIZED 2011 TO BE REALIZED IN JULY-AUGUST
Training
Number of
Trainings
Number of Trainings
Number of
Trainings
Diy
arb
akı
r
Ba
tma
n
Siir
t Total No. of
Trainings
Total No. of Participants D
iya
rba
kır
Ba
tma
n
Siir
t Total No. of
Trainings
Total Realization
Rate of Trainings
%%
Total No. of Participants
Realization rate as per
Total Number of
Participants %
Diy
arb
akı
r
Ba
tma
n
Siir
t Total No. of
Trainings
Percentage of Trainings
to be Realized
Total No. of
Participants
Percentage of Trainings
to be realized as per No. of Participants
Economic and Financial Analysis
1 1 25 1 100% 20 80% 0%
Technical Visit on Marketing
1 1 5 0% 0 0% 1 100% 5 100%
Technical Visit to Fair
1 1 5 0% 0 0% 1 1 100% 5 100%
Sheep Breeding Training
1 1 10 0% 0 0% 1 1 100% 10 100%
Milk and Dairy Product Technologies Training
1 1 10 1 1 100% 7 70% 0
Yalova Atatürk Horticulture Central Research Institute, Fruit Growing Training
1 1 2 15 1 1 50% 9 60% 1 1 50% 6 40%
TOTAL 3 1 3 7 70 1 1 3 43% 36 52% 1 1 2 5 57% 26 48%
2.1.3. Component C – Capacity Building for Employment
62. In a 10-day training programme which took place between 18-28.04.2011, 16 female
farmers were trained on “Growing Ornamental Plants” on a theoretical basis in the
training room of Diyarbakır FTE Section and on a practical basis in the application fields
of Southeast Anatolia Agricultural Research Institute and Diyarbakır Directorate of
Environment and Forestry. 16 female farmers who participated in the trained have been
provided with certificates approved by Public Training Centre.
Table.20. Capacity Building for Employment Activities Realized in 2011
Subject of Training
Place of Training Number
of Trainings
Number of Participants Duration
of Training (days) Female Male Total
Ornamental Plant Production
Diyarbakır PDA, FTE Building 1 16 16 10
Grafting Master Training
Gercüş Public Training Centre / Batman
1 16 2 18 5
Sapling Production
Gercüş Public Training Centre / Batman
1 16 16 5
TOTAL 3 48 0 50 20
63. All participants who have participated in the Grafting Master and Sapling Production
training courses organized via Gercüş Public Training Centre received approved
certificates.
64. Although not included in 2011 AWPB, based on the IFAD no-objection;
16 individuals participated in Sapling Production course from Batman (no-objection for:20
persons) whereas 33 individuals participated in Grafting Master Training from Batman
(Batman; No-objection 2x20).
Table.21. Capacity Building for Employment Activities Realized in 2011
Subject of Training
Place of Training Number
of Trainings
Number of Participants Duration of
Training (days)
Female Male Total
Grafting Master Training
Gercüş Public Training Centre / Batman
2 35 35 10
Sapling Production
Gercüş Public Training Centre / Batman
1 16 16 5
TOTAL 3 16 35 51 15
65. The training programme for the Grafting Master course (Diyarbakır; No-objection 25) for
which no-objection was obtained for Diyarbakır is due to start on 26 July. The course
programme will last a total of 30 hours.
2.1.4.Component D – Project Organization and Management
66. Selim DÖĞER took office on 18.02.2011 to work as Business Development Expert in
Batman.
67. Project is managed by “Central Project Unit” established under General Directorate of
Agricultural Production and Development (GDAPD) of the Ministry of Agriculture and
Rural Affairs in Ankara and “Project Management Units” established under Diyarbakır,
Batman, Siirt Provincial Directorates of Agriculture. Staff of Project Management Units in
Center and Project provinces is listed in Table 22.
68. In 2010, IT equipment and material procurement process for DBSDP PMU has been
completed and is now in contracting phase. Details are set out in Table 22.
Table22. 2010 DBSDP PMU Office IT Equipment and Material Procurement List
Item No of items
Laptop Computer 6
Notebook 1
Scanner 1
External Hard Disk 4
TOTAL 12
2.1.4.1. Treasury Audit Report
69. The compliance of financial statements and project expenditures of Diyarbakır Batman
Siirt Development Project in period 01.01.2010–31.12.2010 to 718-TR Loan Agreement
has been audited. Independent Auditors of the Undersecretariat of Treasury expressed
their observations and recommendations about the audit in their Result Report as
follows.
1- It has been observed that in project contracts, the chairman and/or some members
were the same persons in both Procurement and Examination and Acceptance
Commissions. Since this would be in contradiction to the principle of segregation of
duties and might lead to conflict of interest, it is recommended that Procurement
and Examination and Acceptance Commissions are composed of different persons.
2- Although included in UNDP standard procurement procedures, it has been observed
that bidders are not present during the opening and evaluation of bids. Since this
would be an obstacle in the formation of a complete conviction in terms of fair and
just tender evaluation, it is suggested that bidders are encouraged to participate in
the opening and evaluation of bids.
70. Following the audit, the remarks of the relevant institution as regards the
recommendations presented to the institution by Treasury Auditors are as follows.
1- In the forthcoming tenders of the project, special care will be attached to
ensuring the composition of the Procurement and Examination and Acceptance
Commission with different members.
2- In the forthcoming tenders of the project, bidders will be encouraged to
participate in the opening and evaluation of bids.
SECTION 3
3.1. FINANCING, COST AND EXPENDITURES OF THE PROJECT
71. The Project is financed by the Government of the Republic of Turkey, International
Fund for Agricultural Development (IFAD), United Nations Development Program
(UNDP) and Project Beneficiaries. Implementation period is 5 years and its budget is
approximately 37 million USD. Distribution of financing sources is indicated in Table
23.
Table 23: Financing Sources and Investment Amount of the Project
Financing Source Amount
( Million USD)
Government Budget 4,454
External (IFAD Loan) 24,104
UNDP Grant 0,752
Beneficiary Contribution 7,607
Total 36,919
Table 24 A: Summary of Expenditures by Loan Categories and by Financiers ( 2011 First 6 Months January-June)
Expenditure Category Total IFAD Government
Budget UNDP Grant
Beneficiaries
I. Investment Costs A. Civil Works - - - - - B. Equipment and Material 5.737,19 5.737,19 - - - C. Trainings, Workshops and Studies 188.145,79 64.461,34 - 123.684,45 - D. Technical Assistance 8.185,81 - - 8.185,81 - E. Contributory Grants 393.639,36 170.923,72 - - 222.715,64
Total Investment Costs 595.708,15 241.122,25 - 131.870,26 222.715,64
II. Recurrent Costs - - - - - A. UNDP/CO Administration Support - - - - - B. UNDP/CO Administration Fee - - - - - C. Project Staff Salaries and Allowances 93.868,49 93.868,49 - - - D. Operation and Maintenance 466,96 466,96 - - -
Total Recurrent Costs 94.335,45 94.335,45 - - -
TOTAL COSTS 690.043,60 333.457,70 - 131.870,26 222.715,64
Table 25 B: Summary of Expenditure Categories by Financiers for the First 6 Months of 2011 (USD)
CATEGORY TOTAL External ( IFAD )
Government Budget
UNDP Grant Beneficiaries
I Civil Works - - - - -
II Equipment and Material
5.737,19 5.737,19 - - -
III - i Training 139.325,70 64.461,34 - 74.864,36 -
III - ii National Workshop 48.820,09 - - 48.820,09 -
IV Technical Assistance 8.185,81 - - 8.185,81 -
V Contributory Grant 393.639,36 170.923,72 - - 222.715,64
VI - i Wages and DSA 93.868,49 93.868,49 - - -
VI - ii Operating and Maintenance
466,96 466,96 - - -
VI - iii Implementation Support
- - - - -
TOTAL 690.043,60 333.457,70 - 131.870,26 222.715,64
Table 25 C: Summary of Expenditures by Components and by Loan Categories for the First 6 Months of 2011 (USD)
Loan Category Village
Improvement Programme
Rural Economic Growth
Capacity Building for
Employment
Project Organization
and Administration
TOTAL
I. Civil Works - - - - -
II. Equipment and Material - - - 5.737,19 5.737,19
III. Trainings, Workshops and Studies 139.325,70 - - 48.820,09 188.145,79
IV. Technical Assistance - - - 8.185,81 8.185,81
V. Contributory Grants - 393.639,36 - - 393.639,36
VI. Recurrent Costs - - - 94.335,45 94.335,45
Total 139.325,70 393.639,36 - 157.078,54 690.043,60
ANNEXES
ANNEX 1: PROJECT ACTIVITIES SCHEDULE BY COMPONENTS– 2011
Component A: Village Improvement Programme
USD Activities J F M A M J J A S O N D Details/Milestones
A 1. Awareness Raising
Village meetings and needs assessment
Collecting the data necessary for Sub-component A1 and A2
Existing information on selected villages are collected by PMU.
DBSDP Website
Opening the DBSDP website to use and ensuring data sharing and presentation by continuous updates
A website including all information contained in the brochure to be printed and distributed as well as information and photographs on the project will be opened for use and continuously updated
Project Publicity Brochure 6,500 Determining the content of the brochure, printing and distribution
A publicity brochure covering information on activities, financial support under DBSDP and other rural development projects will be printed and will be distributed through field visits and village meetings.
Component A: Village Improvement Programme
USD Activities J F M A M J J A S O N D Details/Milestones
A 2. Farmer Education and Training
Farmer Training 241,500 Identification of training content, procurement and realization of training activities
To be performed by PMU and PAUs.
Demonstrations 333,000 Identification of demonstration areas, procurement and establishment of orchards
To be performed by PMU and PAUs.
Purchase of Tools and Equipment for PDA 174,000 Preparation of technical specifications for tools and equipment, procurement and hand-over to PDAs
Purchase of Office IT Equipment and Furniture for Diyarbakır for Farmer Training Purposes
26,750 Preparation of technical specifications for IT equipment and office furniture, procurement and hand-over to PDA
Office furniture and IT equipment and material will be purchased for a farmer training room to be allocated for use by also PDA in a cooperative building pre-determined by PDA in Diyarbakır under DBSDP.
A 3. Infrastructure for Village Improvement
Civil Works for HİS Ponds and Closed System Irrigation Canals
3,705,000 Tender announcement for civil works, evaluation of tenders, signing contract with the firm, commencement of work, completion of work and provisional acceptance
Procurement of Consultancy Services for Civil Works
167,000 Tender announcement for consultancy services, evaluation of tenders, signing contract with the firm and realization of controller services
Provincial Field Engineer (2 persons,12 months, full-time)
60,000 Execution of field activities by Provincial Field Engineers
Waste Water Quality Analyses 3,000 Procurement for waste water quality analysis work and publication of report
Total Component A 4,716,750
Component B: Rural Economic Growth
USD Activities J F M A M J J A S O N D Details/Milestones
B 1. Rural Supply Chain Management
Study on marketing and analysis with SCM
Provision of training to PMU-BDE personnel and relevant PDA staff on marketing and analysis with SCM and conduct of a primary agricultural marketing analysis following detailed value chain analysis for selected priority agricultural product/sub-sector(s) for each province.
B 2. Contributory Grants
Providing contributory grants to individual and institutional applicants and beneficiary contribution
4,319,346 A new grant announcement for 2011, assessment and contracting
Identification of new SIPs for 2012
Identification and preparation of new SIPs following SCM
B3: Capacity Building for PDA Personnel
Training activities and technical visits for technical staff
Determination of contents for training and technical visits, procurement and realization of training activities
Total Component B 4,319,346
Component C: Capacity Building for Employment
USD Activities J F M A M J J A S O N D Details/Milestones
Vocational Training 35,000 Preparation of training programme based on regional needs, execution and support of the training through demonstrations
Training to 25 women farmers in Diyarbakır on ornamental plants, training to 20 persons in Batman on grafting master, training to 20 women in Siirt on sapling production.
Needs assessment and labour market analysis
Analysis of the structural efficiency of labour market within the project area including the conduct of a study to identify knowledge and skills as requested by employers and a needs assessment for the training of trainers, execution of necessary activities as a result of the analysis
Total Component C 35,000
Component D: Project Organization and Management
USD Activities J F M A M J J A S O N D Details/Milestones
Studies and Workshops
Annual Planning Workshop 20,250 Organization of annual working plan and budget workshop to which all project staff will participate
Monitoring and Evaluation Updating of database, baseline studies and survey studies to measure impact assessment
English language course 20,250 English language course for PAU staff in Diyarbakır and Batman
Project staff
Project Regional Administrator (1) 42,000 Contract Management Upon the approval of MARA and UNDP
Business Development Specialist (2)
60,000 Contract Management, recruitment of 1 Business Development Specialist for Batman
Upon the approval of MARA and UNDP
Finance/Procurement Officer (1) 30,000 Contract Management Upon the approval of MARA and UNDP
Monitoring /Evaluation Expert (1)
30,000 Contract Management Upon the approval of MARA and UNDP
Component D: Project Organization and Management
USD Activities J F M A M J J A S O N D Details/Milestones
Wages
DSA for PMU staff 2,250 Work outside Project Area
Airfare – national travel 2,250 Travels outside Project Area
Office Management Costs
Translation Services 2,250
UNDP/CO Management
UNDP/CO ISS 128,601
UNDP/CO GMS 40,000
Government Contribution
Vehicles ( MIDIBUS x 1 ) * 53,000
Taxes, travel allowances, etc. 253,000
Paper, fuel for heating, fuel, travel allowances, etc. 180,000 Field roads protocol allowance is not included in this part.
Total Component D and Government Contribution 863,851
OVERALL TOTAL 9,934,947
ANNEX.2: PHYSICAL DEVELOPMENT TABLE
Unit
Planned (according to AWPB 2011) Realized (according to AWPB 2011) Cumulative
Realization
as of end-
JUNE 2011 Activities
Diy
arb
ak
ı
r Ba
tma
n
Sii
rt
To
tal
Diy
arb
ak
ı
r Ba
tma
n
Sii
rt
To
tal
A. Village Improvement Programme
A1.Awareness Raising
Publicity Brochure piece 2000 13037
Publicity Catalogue piece 1000 1000
Cinevision show piece 1 1
A2.Farmer Education and Training1
Farmer Training (Number of Trainings) piece 17 7 4 28 6 5 2 13 29
Farmer Training (Number of Participants) person 660 175 60 895 333 132 40 505 955
Demonstration2
Demonstration Area piece 103,4 41,6 33,8 97,9 33,8 293,22
Number of Demonstration person 12 4 5 12 5 58
Agricultural tool and equipment 3
Pneumatic Drill piece 1 1 2
Silage Machine piece 2
Stalk Cutter piece 3 3 3 3 3
Grape Squeezer Machine piece 10 10 10 10 10
Branch Grinding Machine piece 2 2 2 2 2
Stubble Drill Machine piece 1 1
Wimble (for sapling) piece 5 6 11 10 6 6 22 27
Almond Shelling Machine piece 2 2 2 2 2
Garden Tractor and Equipment piece 1 1
Stone Picker piece 1 1 1 1 1
A3. Infrastructure for Village Improvement
Sewerage and Natural Treatment piece 13
Drinking Water Tank piece 1 1 2 1 1 2 2
Stream Improvement piece 1 1 1 1 1
Culvert piece 2 2 2 2 2
Pipe Laying for Road Crossing piece 7 7 7 7 7
HİS Pond piece
Water Storage Tank for HİS piece
Closed System Irrigation Channel piece
Sewage Quality Analysis Report piece 4 2 2 8
B. Rural Economic Growth
B1.Rural Supply Chain Management
Strategic Investment Plan4 piece 1 1 6
B3.Contributory Grants5
Individual piece 23 7 5 158
Economic piece 6
B4.D/DDA Staff Capacity Building
International Training piece 1 2
National Training piece 2
Workshop piece 1 1 2
English Language Training person
C. Capacity Building for
Employment
Sapling Growing (Number of Trainings) piece 2 2 2
Sapling Growing (Number of Participants) person 50 50 50
Ornamental Plant Growing (Number of
Trainings) piece
Ornamental Plant Growing (Number of
Participants) person
Grafting Master Training (Number of
Trainings) piece
Grafting Master Training (Number of
Participants) person
D. Project Organization and
Management
Technical Assistance
Regional Administrator person 1 1 1
Business Development Specialist person
Civil Engineer person 2
Procurement and Financial Officer person 1
Monitoring and Evaluation Expert person 1 1 1
Vehicles
Pick up piece 4
Minibus piece 1
Midi bus piece
Equipment and Office Supplies
GPS Tool piece 2 1 1 4 5
Computer6 piece 1 1 17
Laptop7 piece 6 1 7 11
Netbook piece 1 1
Projector piece 1 1 5
Projection Screen piece 3
Projection Apparatus piece 1 1 1
Modem piece 4 4 11
Power Supply piece 10
Flash Kart piece 8
Air conditioner piece 1 1 7
Multi-purpose printer piece 1 1 4
Fixed Telephone piece 19
Continuous Motion Camera piece 3
Digital Camera piece 4
Refrigerator piece 1 1 1
Oven piece 1 1 1
Aspirator piece 1 1 1
Water Dispenser piece 1 1 1
Tea Machine piece 1 1 1
Meeting Table piece 1 1 1
Chair piece 9 9 10
Officer Seat piece 1 1 1
Conference Seat piece 24 24 74
Lectern piece 1 1 1
White Board piece 1 1 1
Table piece 6 6 7
Chair piece 24 24 24
Computer Table piece 3 3 3
Computer Chair piece 3 3 3
Pair Chair piece 1 1 1
Single Waiting Chair piece 2 2 2
Coffee Table piece 6 6 7
Bookcase piece 1 1 19
Computer Table piece 3 3 3
Kitchen Cabinet piece 1 1 1
Pedestal Ashtray piece 6 6 6
Anti-Virus Program piece 2 2 2
42" LCD TV piece 1 1 1
Cinema System piece 1 1 1
Security System piece 1 1 1
Working Tables ( Set ) piece 14
Drawer Moving Caisson piece 14
Visitors Chair piece 3
Conference/Seminar Chair piece 14
Scanner piece 1 1
External Hard Disk piece 4 4
Digital Camera piece 4
Conference Chair as per piece 10 10 10
Speaker Chair (a) piece 1 1 1
Speaker Chair (b) piece 2 2 2
Speaker Table piece 1 1 1
Table Set piece 1 1 1