Operations Name: Pennit Number: Commonwealth of Virginia Department of Mines, Minerals and Energy Division of Gas and Oil P.O. Box 1416; Abingdon, VA 242 12 Telephone: (540) 676-5423 CBM-PGP-S36 3636 DRILLING REPORT ATTACH A FINAL LOCATION PLAT AS REQUIRED BY 4 VAC 25-150-360.C. DRILLING DATA RECEIVED I 4 1999 DEQ-Swao Date drilling commenced: _ -" D ,.., e", c", em "-'.b ",e ,,- r..,, 0 -,- 7, .... ,.., 19 '-'0 9 -,, 8 __ Drilling Contractor: Noah Horn Well Drilling, Inc . Date drilling completed : December II, 1 998 Rig Type : X Rotary Cable Tool Total Depth of Well : 252 1.5 ft GEOLOGICAL DATA - no data available Fresh Water at ___ Feet ____ GPMlInch Stream _____ FeeL ___ GPMlInch Stream ___ Feet GPMlInch Stream _ __ Feet ______ GPMlInch Stream Salt Water at ___ Feet GPMlInch Stream _ _ _ F eeL _ __ . __ . __ . .. _ ..... ___ GPMlInch Stream _____ Feet __ . ___ GP/v[f[nch Stream _. __ FeeL ___ .. _. ___ . __ GPMlInch Stream Coal Seams MINING IN AREA MINED NAME TOP BOTTOM THICKNESS YES NO OUT See DGO-GO-14, Exhibit A F onn DGO-GO- 14 Rev. 10/96 I Pogo lo i3

Upload: others

Post on 16-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

Operations Name: Pennit Number:

Commonwealth of Virginia Department of Mines, Minerals and Energy Division of Gas and Oil P.O. Box 1416; Abingdon, VA 24212 Telephone: (540) 676-5423

CBM-PGP-S36 3636

DRILLING REPORT

ATTACH A FINAL LOCATION PLAT AS REQUIRED BY 4 VAC 25-150-360.C.

DRILLING DATA

RECEIVED

V~!y I 4 1999

DEQ-Swao

Date drilling commenced: _ -"D,..,e",c",em"-'.b",e,,-r..,,0-,-7,....,..,19'-'09-,,8 __ Drilling Contractor: Noah Horn Well Drilling, Inc. Date drilling completed: December II, 1998 Rig Type: X Rotary Cable Tool Total Depth of Well: 252 1.5 ft

GEOLOGICAL DATA - no data available

Fresh Water at ___ Feet ____ GPMlInch Stream _____ FeeL ___ GPMlInch Stream ___ Feet GPMlInch Stream _ __ Feet ______ GPMlInch Stream

Salt Water at ___ Feet GPMlInch Stream _ _ _ F eeL ___ . __ . __ ... _ ..... ___ GPMlInch Stream _____ Feet __ . ___ GP/v[f[nch Stream _. __ FeeL ___ .. _. ___ . __ GPMlInch Stream

Coal Seams

MINING IN AREA MINED NAME TOP BOTTOM THICKNESS YES NO OUT

See DGO-GO-14, Exhibit A

F onn DGO-GO-14 Rev. 10/96

I

Pogo loi 3

Page 2: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

Gas and Oil Shows

FORMATION TOP BOTTOM Pocahontas 628.3' 2521.5 '

Cuttings or samples: __ _ are X

Cuttings or samples: ___ have X

ELECTIUCLOGSANDSURVEYS

IPF HOURS THICKNESS (MCFDIBOPD) PRESSURE TESTED 1893.2'

are not available for examination by a member of the Virginia Division of Mineral Resources have not been furnished to the Virginia Division of Mineral Resources

List logs ran on wellbore: _Garnma,....CaliperTDe\".iatioll--_. _________________ _

Did logs disclose vertical location of a coal seam? -A-X _ _

SURVEY RESULTS

DirectionIDistancei Depth Of Survey Deo;rees From True Vertical

See Deviation Survey

Use additional sheets as necessary

f onn IXiO-GO-l4 Rev. 10/96

Page 2 013

Yes __ No

DirectionIDistance Degrees From True

Depth Of Survey Vertical

Page 3: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

CASING AND TIJBING PROGRAM

Cement Cemented Casing Hole Used In To SuIface

Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface 12 3/4" 0-22.4' 15" Water Protection 4 V:" 0-2505.32' 6 Yz" 165 X Coal Protection 4 ~" 0-2505.32' 6 Yz" 165 X Other Casing And Tubing Left In Well Liners 7" 0-870.15' 8 li4" 145 X

REMARKS : Shut down fishing jobs, depths and dates, caving, lost circulation, etc.: Basket set at 96' ----- '-"-"'---_._---------_._--_ ... _----

Form DGO-GO-14 Rev. 10/96

Page 3 of3

Packers Or Date Bridge Plugs

Cemented Kind/Size/Set

12-10-98 12-10-98

12~8-98 Basket at 96'

Page 4: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

1 I . ,

II II \\ \~ I.

\

00

N 332.422 . 95 1 . 009 . 72 3 . 29

{f E 80 ACRE U 17 11

6220 '

37"12' 30 "

-----t+ o \J .. ~ ~ <\/28

1

" ~

..

WELL LOCAT ION PLAT ~ . "t. - .. ' ;~ ., ~.,.. .. . . : ... ~ ~ .

~ . . ~ ~~ . . ~ ~.- .. ,; ~ .. -

_ :~c 0_

Page 5: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

Exhibit A

Well Name: 98-PGP-S-36 SURFACE ELEV: 2426.82 EASTING: 1010920.36 NORTHING: 331194.55

SEAM DEPTH DEPTH ELEVATION THK. REMARKS FROM TO (TOSE) (FT) (FT) (FT)

-----------------------------------------------------------------*COAL 33.00 34.00 2393.82 1. 00

34.00 102.00 2392.82 68.00 *KN1 102.00 105.00 2324.82 3.00

105.00 116.80 2321. 82 11 .80 *KN2 116.80 118.20 2310.02 1. 40

118.20 230.00 2308.62 111. 80 *AL2 230.00 231. 20 2196.82 1. 20

231. 20 325 . 40 2195.62 94.20 *RA1 325. 40 327.10 2101. 42 1. 70

327.10 364.00 2099.72 36.90 *RA2 364.00 366.90 2062.82 2.90

366.90 381.00 2059.92 14.10 *RA3 381.00 384.00 2045.82 3.00

384.00 390.00 2042.82 6 .00 *RA3 390.00 391.00 2036.82 1. 00

391. 00 484.00 2035.82 93.00 *JB1 484.00 486.10 1942.82 2.10

486 . 10 530.00 1940.72 43.90 *JB3 530.00 533.90 1896.82 3.90

533.90 618.20 1892.92 84.30 *T1 618.20 621. 20 1808.62 3.00

621.20 627.10 1805 . 62 5.90 *TI 627.10 628.30 1799.72 1. 20

628.30 1000.00 1798.52 371. 70 *SE1 1000.00 1001. 00 1426.82 1. 00

1001. 0 0 1035.30 1425.82 34.30 *SE2 1035.30 1037.30 1391. 52 2.00

1037.30 1076.70 1389.52 39.40 *LS1 1076 .70 1078.50 1350.12 1. 80

1078.50 1092.50 1348.32 14.00 *LS2 1092.50 1093.50 1334.32 1. 00

1093.50 1140.90 1333 . 32 47.40 *UH1 1140.90 1142.30 1285.92 1. 40

1142.30 1189.10 1284.52 46 . 80 *UH2 1189.10 1190.60 1237.72 1. 50

1190.60 1195.50 1236.22 4 .90 *UH3 1195.50 1198.10 1231. 32 2 . 60

1198.10 1250.10 1228.72 52.00 *MH1 1250.10 1252.90 1176.72 2.80

1252.90 1315.10 1173.92 62.20 *MH2 1315.10 1316.70 1111. 72 1. 60

1316.70 1360.10 1110.12 43.40 *P11 1360.10 1363.10 1066.72 3.00

1363.10 1385.50 1063.72 22.40 *P10 1385 . 50 1387.00 1041.32 1. 50

1387. 0 0 1448.40 1039.82 61.4 0 *LH2 1448.40 1449.90 978 .42 1. 5 0

144 9. 90 1533.00 976.92 83. 10 *P91 1533. 00 1534 . 90 893 . 8 2 1. 90

Page 6: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

1534.90 1536.00 891. 92 1.10 *P92 1536.00 1537.00 890 . 82 1.00

1537.00 1537.60 889.82 0.60 *P92 1537.60 1539.00 889.22 1.40

1539.00 1730.80 887.82 191.80 *COAL 1730.80 1732 . 00 696.02 1.20

1732.00 1737.00 694 . 82 5.00 *P61 1737.00 1740.00 689.82 3.00

1740.00 1804.20 686.82 64.20 *P51 1804.20 1806 . 20 622.62 2.00

1806.20 1898.00 620.62 91.80 *P41 1898.00 1899.80 528.82 1. 80

1899.80 1975.60 527.02 75.80 *P3 1975.60 1981. 20 451. 22 5 .. 60

1981. 20 2016 . 90 445.62 35.70 *P21 2016.90 2018.00 409.92 1.10

2018.00 2103.00 408 . 82 85.00 *P01 2103.00 2104.00 323.82 1.00

2104.00 2521. 80 322.82 417.80

NOTE: FOOTAGE NOT ADJUSTED FOR DEVIATION FILE: C:\GAS\S36.CMP DATE: 12/16/98

Page 7: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

DRILL DATA HOLE -- NOAH HORN WELL DRILLING, INC.

COMPANY: PGP HOLE NO.: S-36

LOCATION: Osborne Mtn. DRILL: #23

DATE STARTED: 12-07-98 ELECTRIC LOGGED: Yes

DATE COMPLETED: 12-11-98 GROUTED: Yes

DEPTH THICK.!'IESS STRATA REMARKS

FROM TO FT. DESCRIPTION VOIDS, ETC.

0.00 22.00 22.00 OVERBURDEN 22" WII 2 " ... CASrNG 22.00 25 .00 3.00 SANDY SHALE 2' OF 22" PIPE 25 .00 56.00 31.00 SAND 56.00 87.00 31.00 SAND 87.00 118.00 31.00 SANDY SHALE 118.00 149.00 31.00 SANDY SHALE 149.00 180.00 31.00 SAND 180.00 211.00 31.00 SAND 211.00 242.00 31.00 SANDY SHALE 242.00 272.00 30.00 SANDY SHALE 272.00 302.00 30.00 SAND 302.00 332.00 30.00 SANDY SHALE 332.00 362.00 30.00 SANDY SHALE 362.00 392.00 30.00 SANDY SHALE 392.00 422.00 30.00 SAND 422.00 452.00 30.00 SAND 452.00 482.00 30.00 SAND 482.00 512.00 30.00 SANDY SHALE 512 .00 542.00 30.00 SANDY SHALE 542.00 572.00 30.00 SAND 572.00 602.00 30.00 SAND 602.00 632.00 30.00 SANDY SHALE I COAL 632.00 662.00 30.00 SANDY SHALE 662.00 692.00 30.00 SAND 692.00 722.00 30.00 SAND 722.00 752 .00 30.00 SANDY SHALE 752.00 782.00 30.00 SAN D 782.00 812.00 30.00 SAN DY SHALE 8 12.00 842.00 30.00 SANDY SHALE 842 .00 872.00 30.00 SAND 870.15' W T' CASrNG 872.00 902.00 30.00 SAND 902.00 927.00 25 .00 SAND

Page 8: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

FROM TO FT. DESCRIPTION

927.00 957.00 30.00 SAND 957.00 987.00 30.00 SANDY SHALE 987.00 1017.00 30.00 SANDY SHALE 1017.00 10H.00 30.00 SAND 1047.00 1077.00 30.00 SANDY SHALE: COAL 1077.00 1107.00 30.00 SANDY SHALE 1107.00 1137.00 30.00 SANDY SHALE 1137.00 1167.00 30.00 SAND 1167.00 1197.00 30.00 SANDY SHALE 1197.00 1227.00 30.00 SANDSTONE 1227.00 1257.00 30.00 SANDY SHALE 1257.00 1:87.00 30.00 SANDY SHALE 1287.00 1:17.00 30.00 SHALE 1317.00 I'H.OO 30.00 SANDSTONE 1347.00 1,77.00 30.00 SANDSTONE ' COAL 1377.00 1.107.00 30.00 SANDSTONE 1407.00 1137.00 30.00 SA:--IDSTONE 1437.00 1"67.00 30.00 SANDY SHALE I COAL 1467.00 1.97.00 30.00 SANDSTONE : SHALE 1497.00 1527.00 30.00 SHALE I SAND I COAL 1527.00 1557.00 30.00 SHALE I COAL / SAND 1557.00 1587.00 30.00 SANDY SHALE 1587.00 1617.00 30.00 SANDY SHALE 16 17.00 16-17.00 30.00 SANDY SHALE 1647.00 i677.00 30.00 SANDSTONE 1677.00 1-07.00 30.00 SA!\DSTONE 1707.00 1-}7.00 30.00 SANDSTONE COAL/S HALE 1737.00 1767.00 30.00 SANDY SHALE 1767.00 1~97.06 30.00 SANDY SHALE / COAL 1797.00 1817.00 30.00 SANDSTONE 1827.00 1857.00 30.00 SANDSTONE 1857.00 1887.00 30.00 SAND 1887.00 1917.00 30.00 SAND 1917.00 1947.00 30.00 SAND 1947.00 1967.00 20.00 SANDY SHALE 1967.00 1971.00 4.00 COAL 1971.00 1977.00 6.00 SANDY SHALE 1977.00 2007.00 30.00 SANDY SHALE 2007.00 2037.00 30.00 SAND 2037.00 2067.00 30.00 SANDY SHALE 2067.00 2097.00 30.00 SANDY SHALE 2097.00 2127.00 30.00 SANDY SHALE 2127.00 2157.00 30.00 SHALE 2157.00 2187.00 30.00 RED SHALE

2187.00 2217.00 30.00 RED SHALE / SANDY SHALE

2217.00 22-17.00 30.00 SAND 2247.00 ::77.00 30.00 SAND 2277.00 ::07.00 30.00 SANDSTONE 2307.00 ::37.00 30.00 SANDSTONE FROM TO FT. DESCRIPTION

Page 9: Division of Gas Oil Box 1999 V~!y 4CASING AND TIJBING PROGRAM Cement Cemented Casing Hole Used In To SuIface Casing Interval Size CufFt Yes No Conductor 12 3/4" 0-22.4' 15" Surface

2337.00 2367.00 2367.00 2397.00 2397.00 2427.00 2427.00 2457.00 2457.00 2487.00 2487.00 2517.00

2157.00 FT. TOTAL DEPTH 22.40 FT. 12 'I." CASrNG

870.15 FT. T' CASrNG 2505.32 FT. 4 y," CASrNG

30.00 30.00 30.00 30.00 30.00 30.00

SANDY SHALE I RED AND GREY SANDY SHALE SANDY SHALE SANDSTONE SANDSTONE SANDSTONE I SHALE 2505.32 ' W/ 4 Y," Casing