district tourism plan ' o s m a n a b a d

80
a’XYKno Capital Services Ltd. April, 2013 DISTRICT TOURISM PLAN O S M A N A B A D

Upload: truongmien

Post on 04-Jan-2017

222 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno Capital Services Ltd. April, 2013

D I S T R I C T T O U R I S M P L A N ‘ O S M A N A B A D ’

Page 2: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

About Osmanabad

Tourism in Osmanabad

Vision and Objectives

Proposals

Tourism Circuit Development

Destination Development Plans

Circuit Designing

Funding Mechanism

Destination Marketing Plan

Outline of the Presentation

Page 3: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Objective of District Tourism Plan

Understanding the potential for tourism in the district, envisioning the

overall tourism development strategy, assessing the infrastructure requirements, zoning of important tourist circuits, and preparation of

individual destination development, marketing and management plans

for major tourist places.

Page 4: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Methodology

List of spots Shorlisting the spots

Categorization of sites

Spoting on map

Site Visit Data

Collection

Preparation Of District Tourism

Plan

Page 5: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Population – 16.60 lakh (Census 2011)

Geographical Area - 7569 sq. km spread in 8Tehsils

Literacy rate – 76.33 % (Census 2011)

Sex Ratio – 920 per 1000 Males

Population Density – 219 per Sq. mt

• Located in western part of

Maharashtra state in west-

central India

• Surrounded by Solapur to

southwest, Ahmednagar to

North west, Beed to north,

Latur to East, and the district

of Bidder and Gulbarga of

state Karnataka to the south

LOCATION

Page 6: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

DISTRICT CONNECTIVITY

NH-09 connecting Pune, Solapur and Karnataka passes through the district

Osmanabad Railway station has connections to Pune, Mumbai, Kolhapur, Miraj, Sangli, Pandharpur, Nagpur, Parbhani, Latur, Nanded, Parali Vaijnath, Hyderabad, and Nizamabad

S. No. Typology Length (in km)

1 Railway 50

2 National Highway (NH) 203

3 State Highway (SH) 837

4 Major District Road (MDR) 1259

5 Nearest airport at Solapur 70

Osmanabad Osmanabad

Page 7: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

TOURISM IN OSMANABAD DISTRICT

TULJA BHAWANI TEMPLE KHANDOBA TEMPLE MAHADEV TEMPLE

DHARASHIV CAVES GOROBA KAKA TEMPLE & MUSEUM

SHIV TEMPLE

Page 8: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

TOURISM IN OSMANABAD DISTRICT

NALDURG FORT,NALDURG RAMTIRTH TEMPLE RAMLING MANDIR, YEDSHI

Page 9: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

DUTTA TEMPLE, MALKAPUR

TOURISM IN OSMANABAD DISTRICT

YEDESHWAR TEMPLE, YERMALA KALYANSWAMI SAMADHIPEETH

BHAIRAVNATH TEMPLE DARGAH, JAVLA KUNTALGIRI

Page 10: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

BHAGWATI DEVASTHAN JAVALGA BET HAZRAT KHWAJA DARGAH

ACHALBET DEVASTHAN SHRI KSHETRA, ACHLER AALAM PRABHU

TOURISM IN OSMANABAD DISTRICT

Page 11: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

TOURISM IN OSMANABAD DISTRICT

• Rich in temples, historic places and natural beauty with religious & archaeological significance

• Most of the sites are important as local tourist destinations

• Attracts local and outsiders visits on specific days of religious importance

• Presently setup lack the potential to attract tourists at the national and international level

Tourism in Osmanabad has not yet realized its full potential

The absence of an integrated effort to promote the many facets of Osmanabad seems to be

the major stumbling block

HITALADEVI TEMPLE PARANDA FORT TULJABHAWANI KHANDOBA TEMPLE MAHADEV TEMPLE

Page 12: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Age Group 16-65 years

Group Vs FITs Mostly religious groups, families, group of friends

Income Group Lower Middle Income Group

Category Families, only Osmanabad and Umarga being major towns get local business

travellers, otherwise mostly religious/leisure travellers

Attraction Points During Festivals, 60% visitors from neighbouring districts in Maharashtra, 30% from

Karnataka and 10% Andhra Pradesh.

Circuit Vs Same Day visitors Mostly local tourists from within the Osmanabad districts are same day visitors

Tourist Profile

Tourist Profile

60% Tourists

are from

neighbouring

districts of

Maharashtra, 30%

Karnataka and 10%

Andhra Pradesh

Page 13: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Ter

Tulja Bhavani

Nagoba Tirth Bhagat Wadi

Javalga bet

Achler

Ramtirth Andur

Vadgaon

Garhdev Dhari

Yedshi

Dhoki

Malkahpur

Yermala

Massa

Lohta Naigaon

Diksal

Malkapur

Mugav

Sonari Domgaon

Javla

Mankeshwar

Pakhrud

Kunthalgiri

Paranda Fort

Naldurg Fort

Hatla Devi Dharashiv

Hz.Khoja Ghazi Dargah

Dharasur Mardini Temple

Wagoli

Selected tourist Spots

Page 14: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

SELECTED TOURIST DESTINATION

Taluka Speciality

Grand Total Heritage

Heritage/ Nature

Religious Religious/Heritage Religious/Nature

Osmanabad 5 2 4 11

Tuljapur 1 2 2 5

Paranda 1 5 1 7

Bhum 4 4

Kalamb 6 1 7

Umarga 3 3

Lohara 1 1

Grand Total 1 1 26 2 8 38

Page 15: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PRESENT TOURIST VISITATION

Tourist Visitation

Local Visitation

Fair/Festival Visitation

Outside Visitation

=

+

+

Taluka Tourist spot Tourists

during fairs (in Lakh)

Local Tourists (in Lakh)

Out side Tourists (in Lakh)

Total Tourists Per Year (In Lakh)

Osmanabad Hatladevi Mandir 0.2 0.15 1.37 1.72

Osmanabad Siddheshwar Dev stahan,Vadgav 3.5 0.09 0.80 4.39

Osmanabad Dharashiv Lenya 0.75 0.02 0.33 1.10

Osmanabad Ramling temple,Yedshi 12 0.08 1.52 13.60

Osmanabad Sant.Goraba Kaka Temple and Museum 0.25 0.15 0.58 0.98

Osmanabad Shree Mahadev Temple,Dhoki 0.2 0.03 0.12 0.35

Osmanabad Hazrat Khojashamsudin Ghazi Dargah 0.35 0.25 1.40 2.00

Osmanabad Shree kshetra Dharashur mardini Temple 0.2 0.05 0.26 0.50

Osmanabad Rammandir Bahetulla sahe mandir 0.25 0.14 0.21 0.60

Osmanabad Hemadpanthi Mandir,Vagoli 0 0.02 0.14 0.15

Osmanabad Garhdev dhari 0.25 0.05 0.47 0.78

Sub total of Taluka 17.95 1.01 7.20 26.16 Tuljapur Ramtirth Temple,Naldurg 0.15 0.02 0.20 0.38 Tuljapur Naldurg Fort 0 0.03 0.52 0.55

Tuljapur Shree Nagoba Temple,Sangvi mardi 20 0.01 0.46 20.47

Tuljapur Khandoba Temple,Aandur/Mailarpur 3 0.20 1.82 5.02

Tuljapur Ambabhavani Temple 25 2.76 273.49 301.25 Sub total of Taluka 48.15 3.02 276.49 327.67

Page 16: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PRESENT TOURIST VISITATION

Tourist Visitation

Local Visitation

Fair/Festival Visitation

Outside Visitation

=

+

+

Taluka Tourist spot Tourists

during fairs (in lakh)

Local Tourists (in Lakh)

Out side Tourists (in Lakh)

Total Tourists Per Year (in Lakh)

Kalamb Gururamchandra Boghle sansthan, Diksal 0.25 0.04 0.34 0.63 Kalamb Shree dutt Temple, Malakapur 0.12 0.11 1.02 1.25 Kalamb Yedeshwari Temple,Yermala 0.6 0.46 4.10 5.16 Kalamb Khandeshwar Temple, Massa Khandeshwari 0.15 0.02 0.16 0.33 Kalamb Mahadev Mandir, Lohta 0.25 0.04 0.34 0.63 Kalamb Mahadev Mandir, Chorvale 0.35 0.06 0.57 0.98 Kalamb Mahadev Mandir, Naigaon- Padoli 0.35 0.07 0.63 1.05

Sub total of Taluka 2.07 0.80 7.16 10.02 Paranda Kalyanswami Samadhipith, Domgav 0.05 0.05 0.41 0.50 Paranda Paranda fort 0 0.01 0.17 0.18 Paranda Shree Bhairavnath temple Sonari 0.18 0.18 1.02 1.38 Paranda Nagoba Temple, Mugav 0.25 0.05 0.31 0.61 Paranda Shree Bhairoba Temple, Khandari 5 0.08 0.48 5.56 Paranda Hazrat Mo. Saheb avaliya sarif dargah,Javla 0.05 0.01 0.06 0.12 Paranda Hazrat Khwaja badrudin Sahid 0.5 0.11 0.61 1.22

Sub total of Taluka 6.03 0.49 3.05 9.57 Umarga Javalga Bet 0.5 0.18 1.02 1.70 Umarga Bhagatvadi Devsthan 0.35 0.12 0.69 1.16 Umarga Achalbet Devsthan,Turori 0.3 0.09 0.81 1.20

Sub total of Taluka 1.15 0.39 2.52 4.06 Lohara Shree Kshetra, Achler 0.3 0.04 0.36 0.70

Sub total of Taluka 0.30 0.04 0.36 0.70 Bhum Aalam prabhu devsthan 3 0.05 0.46 3.51 Bhum Satvai Temple, Mankeshwar 0 0.37 3.35 3.72 Bhum Shree Beleshwar Tirthvikas, Pakhrud 2 0.03 0.27 2.30 Bhum Shree kshetra kuntalgiri 0.25 0.04 0.32 0.60

Sub total of Taluka 5.25 0.49 4.39 10.13 Total (in Lakh) 80.90 6.24 301.17 388.31

Page 17: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

• Lack of domestic tourist arrivals – high local

• Tourists restricted to Tuljabhavani, Nagoba and Ramling Temple

• Need to explore unexplored places for cultural and archaeological

heritage

• High seasonal variations in tourist traffic making it difficult to propose

sustainable infrastructure

Issues

Page 18: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

1.Projected Tourist Visitation

2.Concentutal Designs

Page 19: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

TOURIST POPULATION PROJECTION

Future Tourist Visitation

Projected Local Visitation

Projected Fair/Festival Visitation

Projected Outside Visitation = + +

Growth rate considered is equal to the

growth rate of the town/village

in which the spot is located

Growth rate considered is equal to the

growth rate of the Maharashtra

State

Growth rate considered are:

1) India’s GDP growth rate

2) Maharashtra's GDP growth rate

3) Annual domestic tourist growth rate as envisaged by GoI

• Tourist population projections is undertaken for all 7 Talukas • Projection period considered is next 20 years • 3 different scenario’s were considered Optimistic Pessimistic Most Likely

Page 20: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PROJECTED TOURIST POPULATION

Estimated Local Visiting Population till 2032 (in lakh)

•Estimated Fair/Festival Visiting Population till 2032 (in lakh) •Estimated Fair/Festival Visiting Population till 2032 (in lakh)

Estimated Fair/Festival Visiting Population till 2032 (in lakh)

Taluka 2012 2017 2022 2027 2032 Osmanabad 1.01 1.34 1.76 2.33 3.07 Tuljapur 3.02 3.62 4.34 5.20 6.23 Kalamb 0.80 1.06 1.41 1.88 2.50 Paranda 0.49 0.54 0.59 0.64 0.70 Umarga 0.39 0.45 0.52 0.60 0.69 Lohara 0.04 0.04 0.05 0.05 0.05 Bhum 0.49 0.57 0.66 0.77 0.90

Total Visitation 6.24 7.62 9.33 11.47 14.15

Taluka 2012 2017 2022 2027 2032 Osmanabad 17.95 22.91 29.24 37.32 47.63 Tuljapur 48.15 61.45 78.43 100.10 127.76 Kalamb 2.07 2.64 3.37 4.30 5.49 Paranda 6.03 7.70 9.82 12.54 16.00 Umarga 1.15 1.47 1.87 2.39 3.05 Lohara 0.30 0.38 0.49 0.62 0.80 Bhum 5.25 6.70 8.55 10.91 13.93

Total Visitation 80.90 103.25 131.78 168.19 214.65

0.00

50.00

100.00

150.00

200.00

250.00

2012 2017 2022 2027 2032

Fair

/festi

val V

isit

ing

po

pu

lati

on

in

L

akh

Osmanabad

Tuljapur

Kalamb

Paranda

Umarga

Lohara

Bhum

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

2012 2017 2022 2027 2032

Lo

cal V

isit

ing

Po

pu

lati

on

in

Lakh

Osmanabad

Tuljapur

Kalamb

Paranda

Umarga

Lohara

Bhum

Page 21: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PROJECTED TOURIST POPULATION

Scenario 3 GR – 12.36%

Scenario 1 GR - 7.89%

Scenario 2 GR – 10.37%

Taluka 2012 2017 2022 2027 2032 Osmanabad 7.20 10.52 15.38 22.48 32.87 Tuljapur 276.49 404.17 590.82 863.65 1262.49 Kalamb 7.16 10.46 15.29 22.35 32.68 Paranda 3.05 4.46 6.52 9.53 13.93 Umarga 2.52 3.68 5.39 7.87 11.51 Lohara 0.36 0.53 0.78 1.14 1.66 Bhum 4.39 6.42 9.38 13.71 20.05

Total Visitation

301.17 440.25 643.55 940.74 1375.17

Taluka 2012 2017 2022 2027 2032 Osmanabad 7.20 11.79 19.32 31.64 51.83 Tuljapur 276.49 452.92 741.93 1215.34 1990.85 Kalamb 7.16 11.72 19.20 31.46 51.53 Paranda 3.05 5.00 8.18 13.41 21.96 Umarga 2.52 4.13 6.76 11.08 18.15 Lohara 0.36 0.60 0.98 1.60 2.62 Bhum 4.39 7.19 11.78 19.30 31.61

Total Visitation

301.17 493.35 808.15 1323.82 2168.55

Taluka 2012 2017 2022 2027 2032 Osmanabad 7.20 12.78 22.68 40.25 71.45 Tuljapur 276.49 490.76 871.09 1546.15 2744.36 Kalamb 7.16 12.70 22.55 40.02 71.03 Paranda 3.05 5.41 9.61 17.05 30.27 Umarga 2.52 4.47 7.94 14.10 25.02 Lohara 0.36 0.65 1.15 2.03 3.61 Bhum 4.39 7.79 13.83 24.55 43.58

Total Visitation

301.17 534.57 948.84 1684.15 2989.31

Page 22: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PROJECTED TOURIST POPULATION

Scenario Year

2012 2017 2022 2027 2032 Optimistic Growth Scenario(12.36% - Domestic Tourism Growth rate as envisaged by GoI)

301.17 534.57 948.84 1684.15 2989.31

Moderate Growth Scenario (10.37% - GDP Growth rate of Maharashtra)

301.17 493.345 808.147 1323.82 2168.55

Pessimistic Growth Scenario (7.89% - GDP Growth rate of India)

301.17 440.248 643.552 940.741 1375.17

301

535

949

1,684

2,989

301 493

808

1,324

2,169

301 440

644

941

1,375

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

2012 2017 2022 2027 2032

Optimistic Growth Scenario Moderate Growth Scenario Pessimistic Growth Scenario

Page 23: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

To induce tourism activity enhancing the tourism potential of the district

for increasing the number of domestic tourist arrivals from different parts

of the country in turn providing livelihood and economic opportunities for

its native population.

Vision

Page 24: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

2.Conceptual proposals

Page 25: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

RAMLINGA TEMPLE ,YEDSHI

Page 26: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

IDENTIFIED PROJECTS -RAMLING TEMPLE,YEDSHI

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Ramling Temple, Yedshi

Maintenance of Approach Road 2 km 2 km 100 100 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 30 30

Temple Trust/PWD Govt.

Construction of Parking for 200 cars and 50 buses (5000 sq.mt) 250 62.5 62.5

Temple Trust/PWD PPP

Restoration of Gaumukh 150 150

Temple Trust/PWD PPP

Construction of Bhakt nivas (20 rooms with attach Bath) 20 200 200

Temple Trust/PWD Govt.

Restoration of temple structure 150 150

Temple Trust/PWD Govt.

Construction of Water tank (1,00.000 ltr) 100000 ltr 20 20 PWD Govt.

Landscaping of Temple Campus (3000 sq.mt) 3000 sqmt 75 75

Temple Trust/PWD Govt.

Installation of CCTV camera with Surveillance room 25 25

Temple Trust/PWD Govt.

Construction of Children's play garden 15 15

Temple Trust/PWD Govt.

Installation of solar street lights (50 nos.) 50 12.5 12.5

Temple Trust/PWD Govt.

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 847 832 15

Page 27: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

NAGOBA TIRTH,SANGVI MARDI

Location map

Page 28: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

1 Existing Temple

2 Kund

3 Public Convenience Complex

4 Bhakt Nivas

5 Parking

6 Landscaping and Seating

NAGOBA TIRTH, SANGVI MARDI

Conceptual plan

Page 29: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

IDENTIFIED PROJECTS –NAGOBA TIRTH

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Nagoba Mandir, Tirth

Renovation of Temple structure 100 100 Temple Trust/PWD Govt. Landscaping in temple surrounding 2000 sqmt 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Restoration of Kund 25 25 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 2 40 40 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 Temple Trust/PWD Govt. Subtotal 357 257 100

Page 30: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

YEDESHWARI TEMPLE ,YERMALA

Location map

Page 31: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

1 Existing Temple

2 Public Convenience Complex

3 Parking

4 Community Hall

5 Bhakt Nivas

6 Pagoda

YEDESHWARI TEMPLE ,YERMALA

Conceptual plan

Page 32: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

IDENTIFIED PROJECTS –YEDESHWARI DEVI ,YERMALA

Tourist Place

New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing Implementing

Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Yedeshwari Temple, Yermala

Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Reconstruction and Widening of Approach Steps 150 150 PWD Govt. Landscaping in temple surrounding 2000 50 50 PWD Govt. Construction of Public Convenience Complex with Drinking water facility

1 20 20 Temple Trust/PWD Govt.

Construction of Yatri nivas (10 rooms with attach Bath)

10 100 100 Temple Trust/PWD Govt.

Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt)

50 20 20 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 630.75 480.75 150

Page 33: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

NALDURG FORT

Location map

Page 34: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

1 Existing fort 2 Public Convenience complex

3 Heritage Gallery

4 Landscaping and Seating

5 Pagoda

6 Parking

NALDURG FORT

Conceptual plan

Page 35: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

IDENTIFIED PROJECTS –NALDURG FORT

Tourist Place New proposals Tentative Area / No.

Indicative Cost(in lakhs)

Phasing Implementing

Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Naldurg Fort

Restoration of Fort wall and conservation of fort

500 500 ASI Govt.

Landscaping inside Fort structure 3000 sqmt

75 75 ASI Govt.

Construction of Heritage Gallery 1 100 100 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos.

2 40 40 ASI Govt.

Installation of Solar Penal (10 kv) 10 KV 30 30 ASI Govt. Installation of solar street lights (50 nos.) 50 6.25 6.25 ASI Govt. Construction of Parking for 100 cars and 10 buses (2000 sq.mt)

100 25 25 ASI Govt.

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt.

Subtotal 783.25 683.25 100

Page 36: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

DHARASHIV LENYA

Page 37: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

1 Existing Temple

2 Ropeway Platform

3 Public Convenience Complex

4 Parking

5 Landscaping and seating

6 Accommodation

DHARASHIV LENYA

Page 38: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

IDENTIFIED PROJECTS –DHARASHIV CAVES

Tourist Place New proposals Tentative

Area / No.

Indicative Cost

(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I

Phase II

(2012-22)

(2022-32)

Dharashiv Lenya

Maintenance of Approach Road 3 km 3 km 150 150 PWD Govt. Installation of Ropeway service between Hatladevi temple and Dharashiv (2 km ) 2500 2500 ASI PPP

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 ASI PPP

Conservation and restoration of Caves 500 500 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 ASI Govt. Landscaping of Temple Campus 2000 sqmt 30 30 ASI Govt. Solid waste Management 5 5 ASI Govt. Directional Signage 2 2 PWD Govt. Subtotal 3219.5 719.5 2500

Page 39: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Proposed Projects & Costing

Page 40: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PROJECT COSTING & FUNDING MECHANISM

28%

15%

10%

14%

4% 2%

8%

18%

Osmanabad

Tuljapur

Kalamb

Paranda

Umarga

Lohara

Bhum

District Level Projects

S. No. Taluka

PPP Funded Project Cost

(in lakhs)

Govt.Funded Project Cost

(in lakhs) Total Project cost(in lakhs)

1 Osmanabad 2850 5522.25 8372.25 2 Tuljapur 200 4161 4361 3 Kalamb 110 2927 3037 4 Paranda 87.5 4165.75 4253.25 5 Umarga 37.5 1282.25 1319.75 6 Lohara 12.5 470.75 483.25 7 Bhum 37.5 2389.75 2427.25 8 District Level Projects 5500 5500

Total Cost 8835 20918.75 29753.75 % of Total Cost 30% 70%

32.26%

2.26%

1.25%

0.99%

0.42%

0.14% 0.42%

62.25%

Osmanabad

Tuljapur

Kalamb

Paranda

Umarga

Lohara

Bhum

District Level Projects

Taluka Wise Project Cost

Taluka Wise PPP Funded Project Cost

S. No. Taluka

Cost in Lakh INR

Phase I Phase II Total for Taluka (2012-22) (2022-32)

1 Osmanabad 4875.75 3496.5 8372.25

2 Tuljapur 3799 562 4361

3 Kalamb 2249 788 3037

4 Paranda 3328.25 925 4253.25

5 Umarga 969.75 350 1319.75

6 Lohara 333.25 150 483.25

7 Bhum 1727.25 700 2427.25

8 District Level Project 3500 2000 5500

Total (Phase wise) 20782.25 8971.5 29753.75

% of Total Cost 69.8% 30.2%

Page 41: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

District level tourism projects

Page 42: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Osmanabad Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in

lakhs)

Phasing Implementing

Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Hatladevi Temple

Maintenance of Approach Road 3 km 3 km 150 150 PWD Govt. Construction of Public Convenience Complex with Drinking water facility

1 20 20 Temple Trust/PWD Govt.

Construction of Parking for 100 cars and 10 buses (2000 sq.mt) 100 car 25 25 Temple Trust/PWD PPP

Construction of Shops for ritual offerings (5 nos.) 5 25 25 Temple Trust/PWD PPP

Construction of Bhakt nivas (10 rooms with attach Bath) 10 100 100 PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Solid waste Management 5 5 Temple Trust/PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 357 257 100

Siddheshwar Devsthan,Vadgaon

Widening of Approach Road(1.5 km ) 3 km 75 75 PWD Govt. Construction of Public Convenience Complex with Drinking water facility

1 20 20 Temple Trust/PWD Govt.

Construction of Parking for 100 cars and 10 buses (2000 sq.mt) 100 car 25 25 Temple Trust/PWD PPP

Construction of R.C.C Compound wall 400 mt. 24 24 PWD Govt. Construction of Darshan Mandap 1 25 25 PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (25 nos.) 25 6.25 6.25 PWD Govt. Landscaping of Temple Campus 10 10 Temple Trust/PWD Govt. Solid waste Management 5 5 Temple Trust/PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 222.25 173.25 49

Dharashiv Lenya

Maintenance of Approach Road 3 km 3 km 150 150 PWD Govt. Installation of Ropeway service between Hatladevi temple and Dharashiv (2 km )

2500 2500 ASI PPP

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 ASI PPP

Conservation and restoration of Caves 500 500 ASI Govt. Construction of Public Convenience Complex with Drinking water facility

1 20 20 ASI Govt.

Landscaping of Temple Campus 2000 sqmt 30 30 ASI Govt. Solid waste Management 5 5 ASI Govt. Directional Signage 2 2 PWD Govt. Subtotal 3219.5 719.5 2500

Page 43: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Osmanabad Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in

lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Ramling Temple, Yedshi

Maintenance of Approach Road 2 km 2 km 100 100 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 30 30 Temple Trust/PWD Govt. Construction of Parking for 200 cars and 50 buses (5000 sq.mt) 250 62.5 62.5 Temple Trust/PWD PPP

Restoration of Gaumukh 150 150 Temple Trust/PWD PPP

Construction of Bhakt nivas (20 rooms with attach Bath) 20 200 200 Temple Trust/PWD Govt. Restoration of temple structure 150 150 Temple Trust/PWD Govt. Construction of Water tank (1,00.000 ltr) 100000 ltr 20 20 PWD Govt. Landscaping of Temple Campus (3000 sq.mt) 3000 sqmt 75 75 Temple Trust/PWD Govt. Installation of CCTV camera with Surveillance room 25 25 Temple Trust/PWD Govt. Construction of Children's play garden 15 15 Temple Trust/PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 847 832 15

Sant Gorobakaka Temple & Ramling

Appa Lamture Museum, Ter

Maintenance of Approach Road (3 km) 3 km 150 150 PWD Govt. Construction of Bhakt nivas (10 rooms with attach Bath) 10 75 75 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility (1) temple (2) Museum 2 40 40 PWD Govt. Constriction of Open air theater and Garden 1 100 100 PWD Govt. Construction of ticketing window at museum 1 5 5 PWD Govt. Construction of Accommodation and restaurant facility at museum (10 rooms with attach bath) 10 100 100 PWD Govt. Installation of water supply system (3 km) 100 100 PWD Govt. Construction of Library building 50 50 PWD Govt. Renovation of Ter Railway station 100 100 Central Railway Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 PWD Govt. Extension of Museum building 100 100 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 839.5 539.5 300

Page 44: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Osmanabad Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in

lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Mahadev Mandir.Dhoki

Maintenance of Approach road( 5 km) 5 km 250 250 PWD Govt. Renovation of Temple Building 50 50 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 343.25 310.75 32.5

Hzt.Khoja Samsodin Dargah

Maintenance of Approach Road (3 km) 3 km 150 150 PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Wakaf Board Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board PPP

Islam Interpretation Center 1 100 100 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Wakaf Board Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Renovation of step well 50 50 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 463.25 363.25 100

Shree Kshetra Dharasur Mardini Mandir

Maintenance of Approach Road (2 km) 2 km 100 100 PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Land scaping of Surround Campus (2000 sqmt) 2000 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 293.25 193.25 100

Page 45: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Osmanabad Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in

lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Rammandir Bahetulla Sahe Mandir

Maintenance of Approach Road (5 km) 5 km 250 250 PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 400.75 300.75 100

Hemadpanthi Temple, Vagoli

Construction of Approach road (5 km) 5 km 250 250 PWD Govt. Restoration of Temple structure 500 500 PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 PWD PPP

Construction of Bhakt nivas (10 rooms with attach Bath) 10 100 100 PWD Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 893.25 793.25 100

Gadhdev Dhari

Maintenance of Approach Road (5 km) 5 km 250 250 PWD Govt. Maintenance of Approach Steps 100 100 PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Wakaf Board Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 493.25 393.25 100

Total 8372.25 4875.75 3496.5

Page 46: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Tuljapur Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II (2012-22) (2022-32)

Ramtirth Mandir,Naldurg

Renovation of Temple structure 100 100 PWD Govt. Landscaping in temple surrounding 1000 sqmt 25 25 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Construction of Public Convenience Complex with Drinking water facility 20 20 Temple Trust/PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 268.25 168.25 100

Naldurg Fort

Restoration of Fort wall and conservation of fort 500 500 ASI Govt. Landscaping inside Fort structure 3000 sqmt 75 75 ASI Govt. Construction of Heritage Gallery 1 100 100 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 2 40 40 ASI Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 ASI Govt. Installation of solar street lights (50 nos.) 50 6.25 6.25 ASI Govt. Construction of Parking for 100 cars and 10 buses (2000 sq.mt) 100 25 25 ASI Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 783.25 683.25 100

Nagoba Mandir, Tirth

Renovation of Temple structure 100 100 Temple Trust/PWD Govt. Landscaping in temple surrounding 2000 sqmt 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Restoration of Kund 25 25 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 2 40 40 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 Temple Trust/PWD Govt. Subtotal 357 257 100

Page 47: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Tuljapur Taluka

Tourist Place New proposals

Tentative Area /

No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Khandoba Mandir, Andur & Mailarpur

Maintenance of Approach road(5 km) 5 km 250 250 PWD Govt. Construction of Compound wall at Mailarpur temple 200 12 12 Temple Trust/PWD Govt. Renovation of Temple structure at Mailarpur and Andur 100 100 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 1 40 40 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Construction of Cafeteria 1 15 15 Temple Trust/PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 Temple Trust/PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 549 537 12

Amba Bhavani temple Tuljapur

Implementation of proposed Tuljapur development Plan projects in (2011-12) 1841 1841

Tuljapur Development Authority Govt.

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 5 nos. 250 cars 62.5 62.5

Tuljapur Development Authority PPP

Electric car for internal movement of temple campus 10 nos. 10 50 50

Tuljapur Development Authority PPP

Installation of Elevator facility for disabled 200 200

Tuljapur Development Authority Govt.

Construction of Jetty at lake 1 200 200 Tuljapur Development Authority Govt.

Padel boats (15 nos.) 15 50 50 Tuljapur Development Authority PPP

Subtotal 2403.5 2153.5 250 Total 4361 3799 562

Page 48: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Kalamb Taluka

Tourist Place New proposals Tentative Area

/ No. Indicative

Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Guru Ramchandra Bogle Maharaj Sansthan, Diksal

Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Landscaping in temple surrounding 2000 sqmt 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Restoration of well 25 25 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 487 387 100

Shree Dutt Mandir Sansthan, Malkapur

Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt. Construction of Compound wall surrounding 18 18 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 20 20 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 348.75 230.75 118

Page 49: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Kalamb Taluka

Tourist Place New proposals Tentative Area /

No. Indicative

Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II (2012-22) (2022-32)

Yedeshwari Temple, Yermala

Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Reconstruction and Widening of Approach Steps 150 150 PWD Govt. Landscaping in temple surrounding 2000 50 50 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 20 20 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 630.75 480.75 150

Khandeshwar Mandir, Massa

Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 20 20 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 360.75 240.75 120

Mahadev Mandir, Lohata

Maintenance of Approach road (4 km) 4 km 200 200 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 403.25 303.25 100

Page 50: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Kalamb Taluka

Tourist Place New proposals Tentative Area

/ No. Indicative

Cost(in lakhs)

Phasing

Implementing Agency Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Mahadev Mandir,Chorvale

Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 353.25 253.25 100

Mahadev Mandir, Naigaon

Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 453.25 353.25 100

Total 3037 2249 788

Page 51: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Paranda Taluka

Tourist Place New proposals Tentative Area /

No. Indicative

Cost(in lakhs)

Phasing

Implementing Agency Mode of Funding

Phase I Phase II (2012-22) (2022-32)

Kalyanswami Samadhi

Peeth,Domgaon

Widening of Road (2 km) 2 km 100 100 PWD Govt. Renovation of Temple structure 50 50 Temple Trust/PWD Govt. Construction of Water front 500 500 PWD Govt. Repairing of Bus stop 100 100 MSRTC Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 923.25 823.25 100

Paranda Fort

Restoration of Fort structure 500 500 ASI Govt. Construction of Cafeteria 1 25 25 ASI Govt. Construction of Heritage Gallery 1 200 200 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 ASI Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 ASI Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 ASI Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 ASI PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 798.25 598.25 200

Shree Bhaironath Mandir, Sonari

Construction of temple administration office 1 20 20 Temple Trust/PWD Govt. Maintenance of Approach road (2 km) 2 km 100 100 PWD Govt. Construction of Yatri nivas (20 rooms with attach Bath) 10 200 200 Temple Trust/PWD Govt. Installation of CCTV camera with Surveillance room 5 5 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 398.25 198.25 200

Page 52: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Paranda Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II (2012-22) (2022-32)

Nagoba Tample,Mugav

Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 453.25 353.25 100

Shree Bhairoba Temple,Khanderi

Widening and resurfacing of approach road (4 km) 4 km 200 200 PWD Govt. Construction of water tank (100000 ltr.) 100000 ltr. 20 20 PWD Govt. Construction of Mangal Karayalaya 150 150 Temple Trust/PWD Govt. Maintenance of Temple 50 50 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Groundwater rig bore 1 3 3 Temple Trust/PWD Govt. Construction of Compound wall 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (25 rooms with attach Bath) 25 250 250 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 766.25 616.25 150

Page 53: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Paranda Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II (2012-22) (2022-32)

Hazrat Mo. Saheb avaliya sarif dargah,Javla

Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Renovation of Dargah 75 75 Wakaf Board Govt. Landscaping in surround campus 1500 22.5 22.5 Wakaf Board Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Wakaf Board Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Wakaf Board Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 420.75 408.25 12.5

Hazrat Khwaja badrudin Sahid

Maintenance of Approach road ( 2 km) 2 km 100 100 PWD Govt. Construction of Compound wall (4 km) 150 150 Wakaf Board Govt. Construction of RCC elevated water tank (100000 ltr.) 100000 ltr. 20 20 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Wakaf Board Govt. Construction of Cultural Hall 1 150 150 PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Wakaf Board Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 493.25 330.75 162.5

Total 4253.25 3328.25 925

Page 54: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Umarga Taluka

Tourist Place New proposals Tentative Area

/ No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Kesar Javalga

Construction of Approach road( 3 km) 3 km 150 150 PWD Govt.

Construction of Yatri nivas (15 rooms with attach Bath) 15 150 150 Temple Trust/PWD Govt.

Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.

Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 373.25 223.25 150

Bhagatwadi Devsthan

Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt.

Renovation of Temple 100 100 Temple Trust/PWD Govt. Construction of Entry gate 1 50 50 PWD Govt. Upgradation of Approach steps 1 100 50 50 PWD Govt. Construction of RCC elevated water tank (100000 ltr.) 100000 ltr. 20 20 PWD Govt.

Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.

Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 493.25 443.25 50

Achalbet

Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt.

Landscaping in temple surrounding 2000 30 30 Temple Trust/PWD Govt. Construction of Entry gate 1 50 50 PWD Govt.

Construction of Yatri nivas (15 rooms with attach Bath) 15 150 150 Temple Trust/PWD Govt.

Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.

Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 453.25 303.25 150

Total 1319.75 969.75 350

Page 55: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Lohara Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Shree Kshetra,Achler

Construction of Approach road(2 km) 2 km 100 100 PWD Govt. Construction of Mangal Karayalaya 150 150 Temple Trust/PWD Govt. Renovation of Approach steps 10 10 Temple Trust/PWD Govt. Construction of Yatri nivas (15 rooms with attach Bath) 15 150 150 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 483.25 333.25 150

Total 483.25 333.25 150

Page 56: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Bhum Taluka

Tourist Place New proposals Tentative Area /

No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Shree Kshetra Alamprabhu devsthan

Maintenance of Approach Road (3 km) 2 km 100 100 PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100

Temple Trust/PWD Govt.

Landscaping in temple sorrounding 1500 22.5 22.5 Temple Trust/PWD Govt.

Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.

Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5

Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 275.75 175.75 100

Shree Satvai devi mandir,Mankeshwar

Maintenance of Approach road (4 km) 4 km 200 200 PWD Govt.

Construction of Dining Hall with Kitchen facility 75 75 Temple Trust/PWD Govt.

Construction of Yatri nivas (100 rooms with attach Bath) 100 1000 500 500 PWD Govt. Construction of Public Convenience Complex with Drinking water facility (2 nos.) 2 40 40

Temple Trust/PWD Govt.

Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.

Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.

Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5

Temple Trust/PWD PPP

Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 1368.25 868.25 500

Page 57: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Bhum Taluka

Tourist Place New proposals Tentative

Area / No.

Indicative Cost(in lakhs)

Phasing

Implementing Agency

Mode of Funding

Phase I Phase II

(2012-22) (2022-32)

Shree Beleshwar Tirthvikas,Pakhrud

Maintenance of Approach road (10 km) 10 km 500 500 PWD Govt.

Maintenance of Temple structure 50 50 Temple Trust/PWD Govt. Landscaping in surrounding campus 3000 50 50 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 783.25 683.25 100

Total 2427.25 1727.25 700

Page 58: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Circuit Designing

Page 59: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

CIRCUIT DESIGNING

Need for Circuit Provide a varied experience to the tourist

Aid to the decision making of tourists

Facilitate visit to the maximum possible destinations in limited time

Aid economic development of the region by facilitating the movement of tourists to more sites (ripple effect)

Parameters adopted for formation of Circuit • Variety of tourism attractions in the circuit i.e. the varied (complete) experience that can be given to the

tourist in the circuit • Length of visit of tourist, since this affects the distance to which the tourist is prepared to travel

Type of Circuits • One Day & Two Day circuits • Interest Based circuits.

Page 60: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

One Day & Two Day Circuits

Page 61: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

ONE DAY CIRCUIT

Option-(A) Osmanabad (1) Hatladevi Temple (2) Dharashiv Lenya (3) Hemadpanthi Temple (4) Garhdev Dhari (5 ) Yedshi and back to Osmanabad One can visit Hz. Khojasamsodin Dargah, or Shree Dharasur Mardini Temple as replacement of any of above destination as Osmanabad has only religious spots all spots nearby is not covered as part of one circuit.

Page 62: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

TWO DAY CIRCUIT

Option 2(A)

Day 1 – Osmanabad (1), Vadgaon (2),

Tuljapur (3), Nagoba Temple (4) Andur back

to Tuljapur

Day 2 – Tuljapur (5) Naldurg Fort (6)

Ramtirth (7) Achler

One can visit temple of Tuljapur, Vadgaon

and Nagoba Temple and can customize in to

one day circuit or any option among spots can

be chosen.

Page 63: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

TWO DAY CIRCUIT

Option (B)

Day 1 – Osmanabad (1) Ter (2) Naigaon (3)

Lohata (4) Diksal and Halt at Osmanabad

Day 2 - From Osmanabad (5),Malkapur (6)

Yermala (7) Massa and back to Osmanabad

Page 64: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

TWO DAY CIRCUIT

Option (C)

Day 1 – Paranda (1) Paranda Fort (2) Domgaon

(3) Sonari (4) Mugav (5) Malkapur and Halt at

Paranda

Day 2 - From Paranda (5) Mankeshwar

(6) Kunthalgiri (7) Pakhrud and back to Osmanabad

Page 65: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Interest Type Circuits

Page 66: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

HERITAGE CIRCUIT

Day 1: Osmanabad (1), Naldurg Fort (2), Dharashiv Caves (3), Ter and halt at Osmanabad

Day 2: From Osmanabad to (4), Paranda Fort (5), and Mankeshwar and Back to Osmanabad

Page 67: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

FUNDING MECHANISM

Source Schemes

Central

Government

1. Product/Infrastructure Development for Destinations and Circuits” (PIDDC)

A. Major destinations and circuits development

B. Rural Tourism infrastructure development

2. Scheme for organizing fair & festival and tourism related events (DPPH)

3. Assistance to Central Agencies for tourism infrastructure development

4. Assistance for Large Revenue Generating Projects (LRG)

5. Financial assistance for ‘Setting up, Promotion and Strengthening of Regional and Local

Museums

Maharashtra State

Government

1. TirthKshetra Vikas Yojana

2. Tourism Incentives Scheme under the Maharashtra Tourism Policy, 2006

Institutional Finances Financial assistance to enterprises for setting up and/or development of tourism-related

projects: by Tourism Finance Corporation of India Ltd (TFCI)

Page 68: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PIDDC - Major destinations and circuits development

Focus Improvement of existing product and developing new tourism products to the world standard and focus on Integrated Infrastructure Development of the tourist sites.

Permissible Activities

Landscaping, parks, fencing, compound wall etc Illumination of the tourist destination and the area around and SEL Shows etc

Solid waste management and sewerage management, Public Conveniences, etc Improvement of road connectivity leading to tourist sites, especially from the NH/SH and other entry points Wayside Public Conveniences Equipments related to tourism like water sports, adventure sports, eco-friendly modes of transport Refurbishment of the Monuments Signages and display boards Documentation on places of interest at the locations

Tourist Arrival Centres, Reception Centres, Interpretation Centres Improvement of municipal services directly related to Tourism Other work/activities directly related to tourism

Eligibility Destination must be among the most visited sites in the State, or a recognized Heritage monument. A group of tourist attractions located in the same village, town or city would also qualify

Funding

Financial assistance up to Rs 5.0 crore is provided for the development of destinations and Rs. 8.00 crore for development of Circuits

The MoT would bear 100% of the project cost based on the project plan and estimates submitted, excluding the items which are the exclusive responsibility of the State Governments

Page 69: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PIDDC - Rural Tourism infrastructure development

Focus

Thrust is on promotion of village tourism as the primary tourism product. Tourism form that showcases the rural life, art, culture and heritage at rural locations. It can include farm/agricultural tourism, cultural tourism, nature tourism, adventure tourism and eco - tourism. Tourism which meshes with seasonality and local events and is based on preservation of culture, heritage and traditions.

Permissible Activities

Landscaping, development of parks, fencing, compound wall etc Improvements to roads within the Panchayat limits. This shall not include any major road which connects the

village Illumination in the village Providing for improvement in solid waste management and sewerage management Construction of wayside amenities Procurement of equipments directly related to tourism, like water sports, adventure sports, eco-friendly modes

of transport for moving within the tourism zone Refurbishment of the Monuments Signages, Reception Centres Other work/activities directly related to tourism Tourist Accommodation

Funding A maximum of Rs 50.0 lakh is sanctioned for each project under this scheme for development of tourism related infrastructure

Page 70: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Scheme for organizing fair & festival and tourism related events

Focus The Department of Tourism shall provide financial assistance to State Governments for organizing fairs/festivals and tourism related events such as seminars, conclaves, conventions etc. for the promotion of tourism

Permissible Activities

Creation of semi permanent structures Production of posters, pamphlets, advertisement in news-paper and production of film Remuneration of artists Sitting arrangements, lighting, sound, lodging &boarding, transportation, hiring of space and other similar

activities

Funding

Ministry of Tourism, Government of India would provide maximum financial assistance of Rs. 25.00 Lakh per fair /festival / event in the case of States. The State Government organizing the event would contribute atleast 50 % of the total expenditure involved on the fair / festival or event.

Page 71: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Large Revenue Generating Projects (LRG)

Focus

A project, which is a tourist attraction, or used by tourists and generates large revenue through a levy of fee or user charges on the visitors. The projects promoted by Public Sector Undertakings, Agencies, or Autonomous Bodies of Central/State Governments as well as projects promoted by private sector / PPP Projects recommended by the State Governments/UT Administrations will be eligible for assistance.

Permissible Activities

Tourist trains Cruise vessels Cruise Terminals Convention Centres Golf Courses open for both domestic and international tourists, Health and Rejuvenation facilities and Last mile connectivity to tourist destinations (air and cruise including heli tourism) etc would qualify for

assistance However Hotel & Restaurant component will not be eligible for assistance. Procurement of vehicles and sports

facilities like stadiums will also not be eligible for assistance under the scheme

Funding

The subsidy under the scheme will have a cap of Rs 50 Cr subject to a maximum of 25% of total project cost or 50% of equity contribution of the promoters, whichever is Lower There should be a minimum loan component of 25% in the case of private sector/ PPP projects.

Page 72: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Setting up, Promotion and Strengthening of Regional and Local Museum

Focus Development of both new museums and existing museums

Permissible Activities

Financial assistance is provided for professional development of museums, managed by voluntary organizations, institutions, societies, trusts, local bodies, etc. including universities & colleges registered under the Registration of Societies Act of 1860 (XXI) or those managed by the State Government. The broad range includes museums for promotion of:

a) Antiquities b) Numismatics c) Paintings d) Ethnological collection e) Folk art f) Others including Art & Crafts, Textiles, Stamps, etc.

Funding

Maximum financial assistance admissible (Rs. in Lakhs)

Category 1 Category 2 Setting up of New Museum 600 300 Development of Infrastructure of Existing Museum 500 250 Category I : State museums and renowned museums with exquisite collections Category II : Other museums For all purposes grant would be in the ratio of 80:20. A maximum of and up to 80% of the estimated cost would be provided by the Central Government and a minimum of 20% and balance, if any, will be met by the State Government/Institution, as the case may be.

Scheme by Ministry of Culture, Govt. of India

Page 73: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Tourism Incentive scheme under Maharashtra Tourism Policy 2006

Focus Incentives to encourage private partnership in tourism related activities and infrastructure development

Permissible Activities

Hotels, Heritage Hotels, Resorts and Health Farms, Health & Wellness spa units registered under the Bed and Breakfast scheme of MTDC.

Motels and wayside amenities Apartment Hotels/Service Apartments Water Sports and Amusement Parks Arts and Crafts Villages Golf Courses Camping, Caravanning and Tent Facilities Arial Ropeways Convention Centres Development of Hill Stations Adventure Tourism Projects Houseboats Eco-Tourism Projects. Museums and Aquariums

Zones for tourism

Zone A Mumbai, Mumbai Suburban District, Navi Mumbai, Thane and Pune Municipal Corporation and Pimpri Chinchwad Municipal Corporation areas.

Zone B All Municipal Corporations (except areas in Zone A) and A Class Municipalities. Zone C All districts of Maharashtra except areas in Zone A and B

Page 74: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Tourism Incentive scheme under Maharashtra Tourism Policy 2006

Eligibility criteria for units

Eligible units (project approved) should have a minimum fixed capital investment of Rs. 100 lakhs or more, Rs. 50 lakhs, and Rs. 25 lakhs in A, B and C zone respectively which should be made within 3 years, 2 years and 18 months respectively from the date of registration.

Land Policy

If an investor approaches the MTDC with a viable project on a particular plot of land and undertakes to bear the cost of acquisition and escalation thereof, the MTDC will acquire such land through the Collector and lease the same to the private investor on stipulated terms and conditions in accordance with the government rules and regulations.

Incentives

Fiscal incentives

Total exemption from Luxury Tax (as applicable to Hotels) for a period of 7 & 10 years in the B and C zones respectively & 50% exemption for a period of 5 years in A zone.

Total exemption from Entertainment Tax/Amusement Tax for a period of 5, 7 and 10 years in the A, B, and C zones respectively

Total exemption from Stamp Duty for the projects located in B and C zones and 50% exemption from stamp duty for projects located in A zone.

Electricity concessions Electricity duty will be levied at industrial rates for the respective period

Renewal of Licenses Various licenses and clearances necessary in tourism projects are required to be renewed every year. By this Policy 2006, these licenses/permissions will require renewal every 5 years.

Page 75: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

MARKETING STRATEGY

Negligible marketing efforts for promotion of

tourism in Osmanabad.

Currently, MTDC does not have any office

setup in Osmanabad and hence does not arrange

for travel tours.

• Create a positive image

• Increase awareness for tourist attractions

• Use optimal mix of media vehicles

Attract tourists

• Enhance tourist satisfaction

• Provide total experience in the region Encourage higher

spending by tourists

Page 76: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

PROMOTIONAL BUDGET

S. No. Promotional Expenditure Cost

(in lakhs)

Phasing

Phase I

(2012-15)

Phase II

(2015-18)

1 Graphic Design & Corporate Identity Programme by Ad Agency 10.00 5.00 5.00

2 FAM Tours (Familiarization tour for tour operators) 60.00 30.00 30.00

3 Direct Mailers (A6 size) 25.00 12.50 12.50

4 Printed Tissues / Folder (B/W) 20.00 10.00 10.00

5 Information broachers 52.00 26.00 26.00

6 Advertisement (Hoardings, web based, mobile based etc) 22.00 11.00 11.00

7 Separate website showcasing Osmanabad tourism 5.00 5.00

8 Organising competitions for promotion of Osmanabad tourism 6.00 3.00 3.00

9 Capacity building programme 10.00 5.00 5.00

Total 210.00 107.50 102.50

• A Grapic design and Corporate Identity programme will be developed by a professional ad agency

• Total 250 FAM tours will be organized in two phases with a cost of Rs. 20000 per operator

• 1 lakh direct mailers will posted in the next six years period

• Approx. 1000 paper printed tissues/ folders will be distributed in trains per day

• Approx. 10000 broachers of individual tourist spots & 10000 broachers of the circuits will be printed

• A capacity building programme has been planned for training of guides, hotel operators etc

• Other expenses include organizing competitions, public relations measures etc

Page 77: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

About Project Management Consultant

Page 78: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

About áXYKno

Investment Banking

áXYKno Group

Natural Resources & Energy Railways Infrastructure Clean Energy

Advising and implementing 30 coal blocks amounting to 7 billion tonnes of coal resources and 10,000 MW of Power Plant.

Advising and Implementing Large Infrastructure Projects of various state development and transport authorities in India.

Advising more than 1,000 MW Clean Energy: Hydro, Wind, Solar, Biomass.

Turn Key solutions for Rail & Railway sidings through expert team headed by Mr.K.C.Jena Ex-Chairman Railway Board.

Successfully concluded Debt and Equity syndication and M&A Transaction across sectors.

áXYKno is a ISO 9000:2008 company having 100+ professionals working across sectors and currently advising and implementing PPP’s for Government aggregating to ` 1 Lac Crores.

Page 79: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Presenting áXYKno

a’XYKno

PPP’s for Government aggregating ` 1,00,000 Crores

Implementing more than 10,000 MW Power Plants as

Project Management Consultants through PPP

Implementing robust bidding process and PPP framework

involving more than 30+ coal blocks first time in India

Debt & Equity syndication of

over ` 8000 Crores

Expertise for advising 50+ M&A transactions across

sectors

Advising and Implementing large Infrastructure projects

Advising and implementing 8 billion tonnes of coal reserves

under PPP

Implementing Unique mHealth innovation to

reduce mortality

Infrastructure

NR

E

Page 80: DISTRICT TOURISM PLAN ' O S M A N A B A D

a’XYKno

Co-ordinates

Nagpur

a’XYKno Capital Services Limited a’XYKno Financial Centre, Level 3, Leela Vista, Bajaj Nagar Square, WHC Road, Nagpur – 440010, Phone No.: +91 0712 6467968 to 78,

6467980 to 88 Fax : 0712 2245338

Mumbai

Level 1, Donald House, Opp. Electric House, Colaba Causeway Mumbai – 440 001, Phone No – 022 22822683, 22822684 Fax : 022 22822684

New Delhi

51 , Babar Road Bengali Mar ket New Delhi 110001 +91 9503005233

Thiruvananthapuram

Block No. 5D SFS Palace Court Kowdiar, Thiruvananthapuram, Kerala India - 695003

Pune B-3, Level 2, 'Shree Dwarka', Adjacent to CENTRAL MALL, Ganeshkhind Road PUNE 411 016 Maharashtra, India Call : +91-20-25666511, 512, 513 Fax : +91-20-25666514

Jabalpur

D-5, Deep Tower Kachiyana Road, Golbazar, Jabalpur India - 482002

Reach Us:

www.axykno.com, [email protected]