district tourism plan ' o s m a n a b a d
TRANSCRIPT
a’XYKno Capital Services Ltd. April, 2013
D I S T R I C T T O U R I S M P L A N ‘ O S M A N A B A D ’
a’XYKno
About Osmanabad
Tourism in Osmanabad
Vision and Objectives
Proposals
Tourism Circuit Development
Destination Development Plans
Circuit Designing
Funding Mechanism
Destination Marketing Plan
Outline of the Presentation
a’XYKno
Objective of District Tourism Plan
Understanding the potential for tourism in the district, envisioning the
overall tourism development strategy, assessing the infrastructure requirements, zoning of important tourist circuits, and preparation of
individual destination development, marketing and management plans
for major tourist places.
a’XYKno
Methodology
List of spots Shorlisting the spots
Categorization of sites
Spoting on map
Site Visit Data
Collection
Preparation Of District Tourism
Plan
a’XYKno
Population – 16.60 lakh (Census 2011)
Geographical Area - 7569 sq. km spread in 8Tehsils
Literacy rate – 76.33 % (Census 2011)
Sex Ratio – 920 per 1000 Males
Population Density – 219 per Sq. mt
• Located in western part of
Maharashtra state in west-
central India
• Surrounded by Solapur to
southwest, Ahmednagar to
North west, Beed to north,
Latur to East, and the district
of Bidder and Gulbarga of
state Karnataka to the south
LOCATION
a’XYKno
DISTRICT CONNECTIVITY
NH-09 connecting Pune, Solapur and Karnataka passes through the district
Osmanabad Railway station has connections to Pune, Mumbai, Kolhapur, Miraj, Sangli, Pandharpur, Nagpur, Parbhani, Latur, Nanded, Parali Vaijnath, Hyderabad, and Nizamabad
S. No. Typology Length (in km)
1 Railway 50
2 National Highway (NH) 203
3 State Highway (SH) 837
4 Major District Road (MDR) 1259
5 Nearest airport at Solapur 70
Osmanabad Osmanabad
a’XYKno
TOURISM IN OSMANABAD DISTRICT
TULJA BHAWANI TEMPLE KHANDOBA TEMPLE MAHADEV TEMPLE
DHARASHIV CAVES GOROBA KAKA TEMPLE & MUSEUM
SHIV TEMPLE
a’XYKno
TOURISM IN OSMANABAD DISTRICT
NALDURG FORT,NALDURG RAMTIRTH TEMPLE RAMLING MANDIR, YEDSHI
a’XYKno
DUTTA TEMPLE, MALKAPUR
TOURISM IN OSMANABAD DISTRICT
YEDESHWAR TEMPLE, YERMALA KALYANSWAMI SAMADHIPEETH
BHAIRAVNATH TEMPLE DARGAH, JAVLA KUNTALGIRI
a’XYKno
BHAGWATI DEVASTHAN JAVALGA BET HAZRAT KHWAJA DARGAH
ACHALBET DEVASTHAN SHRI KSHETRA, ACHLER AALAM PRABHU
TOURISM IN OSMANABAD DISTRICT
a’XYKno
TOURISM IN OSMANABAD DISTRICT
• Rich in temples, historic places and natural beauty with religious & archaeological significance
• Most of the sites are important as local tourist destinations
• Attracts local and outsiders visits on specific days of religious importance
• Presently setup lack the potential to attract tourists at the national and international level
Tourism in Osmanabad has not yet realized its full potential
The absence of an integrated effort to promote the many facets of Osmanabad seems to be
the major stumbling block
HITALADEVI TEMPLE PARANDA FORT TULJABHAWANI KHANDOBA TEMPLE MAHADEV TEMPLE
a’XYKno
Age Group 16-65 years
Group Vs FITs Mostly religious groups, families, group of friends
Income Group Lower Middle Income Group
Category Families, only Osmanabad and Umarga being major towns get local business
travellers, otherwise mostly religious/leisure travellers
Attraction Points During Festivals, 60% visitors from neighbouring districts in Maharashtra, 30% from
Karnataka and 10% Andhra Pradesh.
Circuit Vs Same Day visitors Mostly local tourists from within the Osmanabad districts are same day visitors
Tourist Profile
Tourist Profile
60% Tourists
are from
neighbouring
districts of
Maharashtra, 30%
Karnataka and 10%
Andhra Pradesh
a’XYKno
Ter
Tulja Bhavani
Nagoba Tirth Bhagat Wadi
Javalga bet
Achler
Ramtirth Andur
Vadgaon
Garhdev Dhari
Yedshi
Dhoki
Malkahpur
Yermala
Massa
Lohta Naigaon
Diksal
Malkapur
Mugav
Sonari Domgaon
Javla
Mankeshwar
Pakhrud
Kunthalgiri
Paranda Fort
Naldurg Fort
Hatla Devi Dharashiv
Hz.Khoja Ghazi Dargah
Dharasur Mardini Temple
Wagoli
Selected tourist Spots
a’XYKno
SELECTED TOURIST DESTINATION
Taluka Speciality
Grand Total Heritage
Heritage/ Nature
Religious Religious/Heritage Religious/Nature
Osmanabad 5 2 4 11
Tuljapur 1 2 2 5
Paranda 1 5 1 7
Bhum 4 4
Kalamb 6 1 7
Umarga 3 3
Lohara 1 1
Grand Total 1 1 26 2 8 38
a’XYKno
PRESENT TOURIST VISITATION
Tourist Visitation
Local Visitation
Fair/Festival Visitation
Outside Visitation
=
+
+
Taluka Tourist spot Tourists
during fairs (in Lakh)
Local Tourists (in Lakh)
Out side Tourists (in Lakh)
Total Tourists Per Year (In Lakh)
Osmanabad Hatladevi Mandir 0.2 0.15 1.37 1.72
Osmanabad Siddheshwar Dev stahan,Vadgav 3.5 0.09 0.80 4.39
Osmanabad Dharashiv Lenya 0.75 0.02 0.33 1.10
Osmanabad Ramling temple,Yedshi 12 0.08 1.52 13.60
Osmanabad Sant.Goraba Kaka Temple and Museum 0.25 0.15 0.58 0.98
Osmanabad Shree Mahadev Temple,Dhoki 0.2 0.03 0.12 0.35
Osmanabad Hazrat Khojashamsudin Ghazi Dargah 0.35 0.25 1.40 2.00
Osmanabad Shree kshetra Dharashur mardini Temple 0.2 0.05 0.26 0.50
Osmanabad Rammandir Bahetulla sahe mandir 0.25 0.14 0.21 0.60
Osmanabad Hemadpanthi Mandir,Vagoli 0 0.02 0.14 0.15
Osmanabad Garhdev dhari 0.25 0.05 0.47 0.78
Sub total of Taluka 17.95 1.01 7.20 26.16 Tuljapur Ramtirth Temple,Naldurg 0.15 0.02 0.20 0.38 Tuljapur Naldurg Fort 0 0.03 0.52 0.55
Tuljapur Shree Nagoba Temple,Sangvi mardi 20 0.01 0.46 20.47
Tuljapur Khandoba Temple,Aandur/Mailarpur 3 0.20 1.82 5.02
Tuljapur Ambabhavani Temple 25 2.76 273.49 301.25 Sub total of Taluka 48.15 3.02 276.49 327.67
a’XYKno
PRESENT TOURIST VISITATION
Tourist Visitation
Local Visitation
Fair/Festival Visitation
Outside Visitation
=
+
+
Taluka Tourist spot Tourists
during fairs (in lakh)
Local Tourists (in Lakh)
Out side Tourists (in Lakh)
Total Tourists Per Year (in Lakh)
Kalamb Gururamchandra Boghle sansthan, Diksal 0.25 0.04 0.34 0.63 Kalamb Shree dutt Temple, Malakapur 0.12 0.11 1.02 1.25 Kalamb Yedeshwari Temple,Yermala 0.6 0.46 4.10 5.16 Kalamb Khandeshwar Temple, Massa Khandeshwari 0.15 0.02 0.16 0.33 Kalamb Mahadev Mandir, Lohta 0.25 0.04 0.34 0.63 Kalamb Mahadev Mandir, Chorvale 0.35 0.06 0.57 0.98 Kalamb Mahadev Mandir, Naigaon- Padoli 0.35 0.07 0.63 1.05
Sub total of Taluka 2.07 0.80 7.16 10.02 Paranda Kalyanswami Samadhipith, Domgav 0.05 0.05 0.41 0.50 Paranda Paranda fort 0 0.01 0.17 0.18 Paranda Shree Bhairavnath temple Sonari 0.18 0.18 1.02 1.38 Paranda Nagoba Temple, Mugav 0.25 0.05 0.31 0.61 Paranda Shree Bhairoba Temple, Khandari 5 0.08 0.48 5.56 Paranda Hazrat Mo. Saheb avaliya sarif dargah,Javla 0.05 0.01 0.06 0.12 Paranda Hazrat Khwaja badrudin Sahid 0.5 0.11 0.61 1.22
Sub total of Taluka 6.03 0.49 3.05 9.57 Umarga Javalga Bet 0.5 0.18 1.02 1.70 Umarga Bhagatvadi Devsthan 0.35 0.12 0.69 1.16 Umarga Achalbet Devsthan,Turori 0.3 0.09 0.81 1.20
Sub total of Taluka 1.15 0.39 2.52 4.06 Lohara Shree Kshetra, Achler 0.3 0.04 0.36 0.70
Sub total of Taluka 0.30 0.04 0.36 0.70 Bhum Aalam prabhu devsthan 3 0.05 0.46 3.51 Bhum Satvai Temple, Mankeshwar 0 0.37 3.35 3.72 Bhum Shree Beleshwar Tirthvikas, Pakhrud 2 0.03 0.27 2.30 Bhum Shree kshetra kuntalgiri 0.25 0.04 0.32 0.60
Sub total of Taluka 5.25 0.49 4.39 10.13 Total (in Lakh) 80.90 6.24 301.17 388.31
a’XYKno
• Lack of domestic tourist arrivals – high local
• Tourists restricted to Tuljabhavani, Nagoba and Ramling Temple
• Need to explore unexplored places for cultural and archaeological
heritage
• High seasonal variations in tourist traffic making it difficult to propose
sustainable infrastructure
Issues
a’XYKno
1.Projected Tourist Visitation
2.Concentutal Designs
a’XYKno
TOURIST POPULATION PROJECTION
Future Tourist Visitation
Projected Local Visitation
Projected Fair/Festival Visitation
Projected Outside Visitation = + +
Growth rate considered is equal to the
growth rate of the town/village
in which the spot is located
Growth rate considered is equal to the
growth rate of the Maharashtra
State
Growth rate considered are:
1) India’s GDP growth rate
2) Maharashtra's GDP growth rate
3) Annual domestic tourist growth rate as envisaged by GoI
• Tourist population projections is undertaken for all 7 Talukas • Projection period considered is next 20 years • 3 different scenario’s were considered Optimistic Pessimistic Most Likely
a’XYKno
PROJECTED TOURIST POPULATION
Estimated Local Visiting Population till 2032 (in lakh)
•Estimated Fair/Festival Visiting Population till 2032 (in lakh) •Estimated Fair/Festival Visiting Population till 2032 (in lakh)
Estimated Fair/Festival Visiting Population till 2032 (in lakh)
Taluka 2012 2017 2022 2027 2032 Osmanabad 1.01 1.34 1.76 2.33 3.07 Tuljapur 3.02 3.62 4.34 5.20 6.23 Kalamb 0.80 1.06 1.41 1.88 2.50 Paranda 0.49 0.54 0.59 0.64 0.70 Umarga 0.39 0.45 0.52 0.60 0.69 Lohara 0.04 0.04 0.05 0.05 0.05 Bhum 0.49 0.57 0.66 0.77 0.90
Total Visitation 6.24 7.62 9.33 11.47 14.15
Taluka 2012 2017 2022 2027 2032 Osmanabad 17.95 22.91 29.24 37.32 47.63 Tuljapur 48.15 61.45 78.43 100.10 127.76 Kalamb 2.07 2.64 3.37 4.30 5.49 Paranda 6.03 7.70 9.82 12.54 16.00 Umarga 1.15 1.47 1.87 2.39 3.05 Lohara 0.30 0.38 0.49 0.62 0.80 Bhum 5.25 6.70 8.55 10.91 13.93
Total Visitation 80.90 103.25 131.78 168.19 214.65
0.00
50.00
100.00
150.00
200.00
250.00
2012 2017 2022 2027 2032
Fair
/festi
val V
isit
ing
po
pu
lati
on
in
L
akh
Osmanabad
Tuljapur
Kalamb
Paranda
Umarga
Lohara
Bhum
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
2012 2017 2022 2027 2032
Lo
cal V
isit
ing
Po
pu
lati
on
in
Lakh
Osmanabad
Tuljapur
Kalamb
Paranda
Umarga
Lohara
Bhum
a’XYKno
PROJECTED TOURIST POPULATION
Scenario 3 GR – 12.36%
Scenario 1 GR - 7.89%
Scenario 2 GR – 10.37%
Taluka 2012 2017 2022 2027 2032 Osmanabad 7.20 10.52 15.38 22.48 32.87 Tuljapur 276.49 404.17 590.82 863.65 1262.49 Kalamb 7.16 10.46 15.29 22.35 32.68 Paranda 3.05 4.46 6.52 9.53 13.93 Umarga 2.52 3.68 5.39 7.87 11.51 Lohara 0.36 0.53 0.78 1.14 1.66 Bhum 4.39 6.42 9.38 13.71 20.05
Total Visitation
301.17 440.25 643.55 940.74 1375.17
Taluka 2012 2017 2022 2027 2032 Osmanabad 7.20 11.79 19.32 31.64 51.83 Tuljapur 276.49 452.92 741.93 1215.34 1990.85 Kalamb 7.16 11.72 19.20 31.46 51.53 Paranda 3.05 5.00 8.18 13.41 21.96 Umarga 2.52 4.13 6.76 11.08 18.15 Lohara 0.36 0.60 0.98 1.60 2.62 Bhum 4.39 7.19 11.78 19.30 31.61
Total Visitation
301.17 493.35 808.15 1323.82 2168.55
Taluka 2012 2017 2022 2027 2032 Osmanabad 7.20 12.78 22.68 40.25 71.45 Tuljapur 276.49 490.76 871.09 1546.15 2744.36 Kalamb 7.16 12.70 22.55 40.02 71.03 Paranda 3.05 5.41 9.61 17.05 30.27 Umarga 2.52 4.47 7.94 14.10 25.02 Lohara 0.36 0.65 1.15 2.03 3.61 Bhum 4.39 7.79 13.83 24.55 43.58
Total Visitation
301.17 534.57 948.84 1684.15 2989.31
a’XYKno
PROJECTED TOURIST POPULATION
Scenario Year
2012 2017 2022 2027 2032 Optimistic Growth Scenario(12.36% - Domestic Tourism Growth rate as envisaged by GoI)
301.17 534.57 948.84 1684.15 2989.31
Moderate Growth Scenario (10.37% - GDP Growth rate of Maharashtra)
301.17 493.345 808.147 1323.82 2168.55
Pessimistic Growth Scenario (7.89% - GDP Growth rate of India)
301.17 440.248 643.552 940.741 1375.17
301
535
949
1,684
2,989
301 493
808
1,324
2,169
301 440
644
941
1,375
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
3500.00
2012 2017 2022 2027 2032
Optimistic Growth Scenario Moderate Growth Scenario Pessimistic Growth Scenario
a’XYKno
To induce tourism activity enhancing the tourism potential of the district
for increasing the number of domestic tourist arrivals from different parts
of the country in turn providing livelihood and economic opportunities for
its native population.
Vision
a’XYKno
2.Conceptual proposals
a’XYKno
RAMLINGA TEMPLE ,YEDSHI
a’XYKno
IDENTIFIED PROJECTS -RAMLING TEMPLE,YEDSHI
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Ramling Temple, Yedshi
Maintenance of Approach Road 2 km 2 km 100 100 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 30 30
Temple Trust/PWD Govt.
Construction of Parking for 200 cars and 50 buses (5000 sq.mt) 250 62.5 62.5
Temple Trust/PWD PPP
Restoration of Gaumukh 150 150
Temple Trust/PWD PPP
Construction of Bhakt nivas (20 rooms with attach Bath) 20 200 200
Temple Trust/PWD Govt.
Restoration of temple structure 150 150
Temple Trust/PWD Govt.
Construction of Water tank (1,00.000 ltr) 100000 ltr 20 20 PWD Govt.
Landscaping of Temple Campus (3000 sq.mt) 3000 sqmt 75 75
Temple Trust/PWD Govt.
Installation of CCTV camera with Surveillance room 25 25
Temple Trust/PWD Govt.
Construction of Children's play garden 15 15
Temple Trust/PWD Govt.
Installation of solar street lights (50 nos.) 50 12.5 12.5
Temple Trust/PWD Govt.
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 847 832 15
a’XYKno
NAGOBA TIRTH,SANGVI MARDI
Location map
a’XYKno
1 Existing Temple
2 Kund
3 Public Convenience Complex
4 Bhakt Nivas
5 Parking
6 Landscaping and Seating
NAGOBA TIRTH, SANGVI MARDI
Conceptual plan
a’XYKno
IDENTIFIED PROJECTS –NAGOBA TIRTH
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Nagoba Mandir, Tirth
Renovation of Temple structure 100 100 Temple Trust/PWD Govt. Landscaping in temple surrounding 2000 sqmt 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Restoration of Kund 25 25 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 2 40 40 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 Temple Trust/PWD Govt. Subtotal 357 257 100
a’XYKno
YEDESHWARI TEMPLE ,YERMALA
Location map
a’XYKno
1 Existing Temple
2 Public Convenience Complex
3 Parking
4 Community Hall
5 Bhakt Nivas
6 Pagoda
YEDESHWARI TEMPLE ,YERMALA
Conceptual plan
a’XYKno
IDENTIFIED PROJECTS –YEDESHWARI DEVI ,YERMALA
Tourist Place
New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing Implementing
Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Yedeshwari Temple, Yermala
Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Reconstruction and Widening of Approach Steps 150 150 PWD Govt. Landscaping in temple surrounding 2000 50 50 PWD Govt. Construction of Public Convenience Complex with Drinking water facility
1 20 20 Temple Trust/PWD Govt.
Construction of Yatri nivas (10 rooms with attach Bath)
10 100 100 Temple Trust/PWD Govt.
Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt)
50 20 20 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 630.75 480.75 150
a’XYKno
NALDURG FORT
Location map
a’XYKno
1 Existing fort 2 Public Convenience complex
3 Heritage Gallery
4 Landscaping and Seating
5 Pagoda
6 Parking
NALDURG FORT
Conceptual plan
a’XYKno
IDENTIFIED PROJECTS –NALDURG FORT
Tourist Place New proposals Tentative Area / No.
Indicative Cost(in lakhs)
Phasing Implementing
Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Naldurg Fort
Restoration of Fort wall and conservation of fort
500 500 ASI Govt.
Landscaping inside Fort structure 3000 sqmt
75 75 ASI Govt.
Construction of Heritage Gallery 1 100 100 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos.
2 40 40 ASI Govt.
Installation of Solar Penal (10 kv) 10 KV 30 30 ASI Govt. Installation of solar street lights (50 nos.) 50 6.25 6.25 ASI Govt. Construction of Parking for 100 cars and 10 buses (2000 sq.mt)
100 25 25 ASI Govt.
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt.
Subtotal 783.25 683.25 100
a’XYKno
DHARASHIV LENYA
a’XYKno
1 Existing Temple
2 Ropeway Platform
3 Public Convenience Complex
4 Parking
5 Landscaping and seating
6 Accommodation
DHARASHIV LENYA
a’XYKno
IDENTIFIED PROJECTS –DHARASHIV CAVES
Tourist Place New proposals Tentative
Area / No.
Indicative Cost
(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I
Phase II
(2012-22)
(2022-32)
Dharashiv Lenya
Maintenance of Approach Road 3 km 3 km 150 150 PWD Govt. Installation of Ropeway service between Hatladevi temple and Dharashiv (2 km ) 2500 2500 ASI PPP
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 ASI PPP
Conservation and restoration of Caves 500 500 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 ASI Govt. Landscaping of Temple Campus 2000 sqmt 30 30 ASI Govt. Solid waste Management 5 5 ASI Govt. Directional Signage 2 2 PWD Govt. Subtotal 3219.5 719.5 2500
a’XYKno
Proposed Projects & Costing
a’XYKno
PROJECT COSTING & FUNDING MECHANISM
28%
15%
10%
14%
4% 2%
8%
18%
Osmanabad
Tuljapur
Kalamb
Paranda
Umarga
Lohara
Bhum
District Level Projects
S. No. Taluka
PPP Funded Project Cost
(in lakhs)
Govt.Funded Project Cost
(in lakhs) Total Project cost(in lakhs)
1 Osmanabad 2850 5522.25 8372.25 2 Tuljapur 200 4161 4361 3 Kalamb 110 2927 3037 4 Paranda 87.5 4165.75 4253.25 5 Umarga 37.5 1282.25 1319.75 6 Lohara 12.5 470.75 483.25 7 Bhum 37.5 2389.75 2427.25 8 District Level Projects 5500 5500
Total Cost 8835 20918.75 29753.75 % of Total Cost 30% 70%
32.26%
2.26%
1.25%
0.99%
0.42%
0.14% 0.42%
62.25%
Osmanabad
Tuljapur
Kalamb
Paranda
Umarga
Lohara
Bhum
District Level Projects
Taluka Wise Project Cost
Taluka Wise PPP Funded Project Cost
S. No. Taluka
Cost in Lakh INR
Phase I Phase II Total for Taluka (2012-22) (2022-32)
1 Osmanabad 4875.75 3496.5 8372.25
2 Tuljapur 3799 562 4361
3 Kalamb 2249 788 3037
4 Paranda 3328.25 925 4253.25
5 Umarga 969.75 350 1319.75
6 Lohara 333.25 150 483.25
7 Bhum 1727.25 700 2427.25
8 District Level Project 3500 2000 5500
Total (Phase wise) 20782.25 8971.5 29753.75
% of Total Cost 69.8% 30.2%
a’XYKno
District level tourism projects
a’XYKno
Osmanabad Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in
lakhs)
Phasing Implementing
Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Hatladevi Temple
Maintenance of Approach Road 3 km 3 km 150 150 PWD Govt. Construction of Public Convenience Complex with Drinking water facility
1 20 20 Temple Trust/PWD Govt.
Construction of Parking for 100 cars and 10 buses (2000 sq.mt) 100 car 25 25 Temple Trust/PWD PPP
Construction of Shops for ritual offerings (5 nos.) 5 25 25 Temple Trust/PWD PPP
Construction of Bhakt nivas (10 rooms with attach Bath) 10 100 100 PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Solid waste Management 5 5 Temple Trust/PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 357 257 100
Siddheshwar Devsthan,Vadgaon
Widening of Approach Road(1.5 km ) 3 km 75 75 PWD Govt. Construction of Public Convenience Complex with Drinking water facility
1 20 20 Temple Trust/PWD Govt.
Construction of Parking for 100 cars and 10 buses (2000 sq.mt) 100 car 25 25 Temple Trust/PWD PPP
Construction of R.C.C Compound wall 400 mt. 24 24 PWD Govt. Construction of Darshan Mandap 1 25 25 PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (25 nos.) 25 6.25 6.25 PWD Govt. Landscaping of Temple Campus 10 10 Temple Trust/PWD Govt. Solid waste Management 5 5 Temple Trust/PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 222.25 173.25 49
Dharashiv Lenya
Maintenance of Approach Road 3 km 3 km 150 150 PWD Govt. Installation of Ropeway service between Hatladevi temple and Dharashiv (2 km )
2500 2500 ASI PPP
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 ASI PPP
Conservation and restoration of Caves 500 500 ASI Govt. Construction of Public Convenience Complex with Drinking water facility
1 20 20 ASI Govt.
Landscaping of Temple Campus 2000 sqmt 30 30 ASI Govt. Solid waste Management 5 5 ASI Govt. Directional Signage 2 2 PWD Govt. Subtotal 3219.5 719.5 2500
a’XYKno
Osmanabad Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in
lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Ramling Temple, Yedshi
Maintenance of Approach Road 2 km 2 km 100 100 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 30 30 Temple Trust/PWD Govt. Construction of Parking for 200 cars and 50 buses (5000 sq.mt) 250 62.5 62.5 Temple Trust/PWD PPP
Restoration of Gaumukh 150 150 Temple Trust/PWD PPP
Construction of Bhakt nivas (20 rooms with attach Bath) 20 200 200 Temple Trust/PWD Govt. Restoration of temple structure 150 150 Temple Trust/PWD Govt. Construction of Water tank (1,00.000 ltr) 100000 ltr 20 20 PWD Govt. Landscaping of Temple Campus (3000 sq.mt) 3000 sqmt 75 75 Temple Trust/PWD Govt. Installation of CCTV camera with Surveillance room 25 25 Temple Trust/PWD Govt. Construction of Children's play garden 15 15 Temple Trust/PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 847 832 15
Sant Gorobakaka Temple & Ramling
Appa Lamture Museum, Ter
Maintenance of Approach Road (3 km) 3 km 150 150 PWD Govt. Construction of Bhakt nivas (10 rooms with attach Bath) 10 75 75 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility (1) temple (2) Museum 2 40 40 PWD Govt. Constriction of Open air theater and Garden 1 100 100 PWD Govt. Construction of ticketing window at museum 1 5 5 PWD Govt. Construction of Accommodation and restaurant facility at museum (10 rooms with attach bath) 10 100 100 PWD Govt. Installation of water supply system (3 km) 100 100 PWD Govt. Construction of Library building 50 50 PWD Govt. Renovation of Ter Railway station 100 100 Central Railway Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 PWD Govt. Extension of Museum building 100 100 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 839.5 539.5 300
a’XYKno
Osmanabad Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in
lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Mahadev Mandir.Dhoki
Maintenance of Approach road( 5 km) 5 km 250 250 PWD Govt. Renovation of Temple Building 50 50 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 343.25 310.75 32.5
Hzt.Khoja Samsodin Dargah
Maintenance of Approach Road (3 km) 3 km 150 150 PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Wakaf Board Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board PPP
Islam Interpretation Center 1 100 100 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Wakaf Board Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Renovation of step well 50 50 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 463.25 363.25 100
Shree Kshetra Dharasur Mardini Mandir
Maintenance of Approach Road (2 km) 2 km 100 100 PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Land scaping of Surround Campus (2000 sqmt) 2000 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 293.25 193.25 100
a’XYKno
Osmanabad Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in
lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Rammandir Bahetulla Sahe Mandir
Maintenance of Approach Road (5 km) 5 km 250 250 PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 400.75 300.75 100
Hemadpanthi Temple, Vagoli
Construction of Approach road (5 km) 5 km 250 250 PWD Govt. Restoration of Temple structure 500 500 PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 PWD PPP
Construction of Bhakt nivas (10 rooms with attach Bath) 10 100 100 PWD Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 893.25 793.25 100
Gadhdev Dhari
Maintenance of Approach Road (5 km) 5 km 250 250 PWD Govt. Maintenance of Approach Steps 100 100 PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Wakaf Board Govt. Construction of Water tank (1,00.000 ltr) 100000ltr 20 20 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 493.25 393.25 100
Total 8372.25 4875.75 3496.5
a’XYKno
Tuljapur Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II (2012-22) (2022-32)
Ramtirth Mandir,Naldurg
Renovation of Temple structure 100 100 PWD Govt. Landscaping in temple surrounding 1000 sqmt 25 25 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Construction of Public Convenience Complex with Drinking water facility 20 20 Temple Trust/PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 PWD Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 268.25 168.25 100
Naldurg Fort
Restoration of Fort wall and conservation of fort 500 500 ASI Govt. Landscaping inside Fort structure 3000 sqmt 75 75 ASI Govt. Construction of Heritage Gallery 1 100 100 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 2 40 40 ASI Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 ASI Govt. Installation of solar street lights (50 nos.) 50 6.25 6.25 ASI Govt. Construction of Parking for 100 cars and 10 buses (2000 sq.mt) 100 25 25 ASI Govt. Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 783.25 683.25 100
Nagoba Mandir, Tirth
Renovation of Temple structure 100 100 Temple Trust/PWD Govt. Landscaping in temple surrounding 2000 sqmt 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Restoration of Kund 25 25 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 2 40 40 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 Temple Trust/PWD Govt. Subtotal 357 257 100
a’XYKno
Tuljapur Taluka
Tourist Place New proposals
Tentative Area /
No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Khandoba Mandir, Andur & Mailarpur
Maintenance of Approach road(5 km) 5 km 250 250 PWD Govt. Construction of Compound wall at Mailarpur temple 200 12 12 Temple Trust/PWD Govt. Renovation of Temple structure at Mailarpur and Andur 100 100 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 2 nos. 1 40 40 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Construction of Cafeteria 1 15 15 Temple Trust/PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 Temple Trust/PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 549 537 12
Amba Bhavani temple Tuljapur
Implementation of proposed Tuljapur development Plan projects in (2011-12) 1841 1841
Tuljapur Development Authority Govt.
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 5 nos. 250 cars 62.5 62.5
Tuljapur Development Authority PPP
Electric car for internal movement of temple campus 10 nos. 10 50 50
Tuljapur Development Authority PPP
Installation of Elevator facility for disabled 200 200
Tuljapur Development Authority Govt.
Construction of Jetty at lake 1 200 200 Tuljapur Development Authority Govt.
Padel boats (15 nos.) 15 50 50 Tuljapur Development Authority PPP
Subtotal 2403.5 2153.5 250 Total 4361 3799 562
a’XYKno
Kalamb Taluka
Tourist Place New proposals Tentative Area
/ No. Indicative
Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Guru Ramchandra Bogle Maharaj Sansthan, Diksal
Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Landscaping in temple surrounding 2000 sqmt 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Restoration of well 25 25 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (50 nos.) 50 12.5 12.5 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 487 387 100
Shree Dutt Mandir Sansthan, Malkapur
Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt. Construction of Compound wall surrounding 18 18 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 20 20 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 348.75 230.75 118
a’XYKno
Kalamb Taluka
Tourist Place New proposals Tentative Area /
No. Indicative
Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II (2012-22) (2022-32)
Yedeshwari Temple, Yermala
Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Reconstruction and Widening of Approach Steps 150 150 PWD Govt. Landscaping in temple surrounding 2000 50 50 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 20 20 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 630.75 480.75 150
Khandeshwar Mandir, Massa
Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 20 20 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 360.75 240.75 120
Mahadev Mandir, Lohata
Maintenance of Approach road (4 km) 4 km 200 200 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 403.25 303.25 100
a’XYKno
Kalamb Taluka
Tourist Place New proposals Tentative Area
/ No. Indicative
Cost(in lakhs)
Phasing
Implementing Agency Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Mahadev Mandir,Chorvale
Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 353.25 253.25 100
Mahadev Mandir, Naigaon
Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 453.25 353.25 100
Total 3037 2249 788
a’XYKno
Paranda Taluka
Tourist Place New proposals Tentative Area /
No. Indicative
Cost(in lakhs)
Phasing
Implementing Agency Mode of Funding
Phase I Phase II (2012-22) (2022-32)
Kalyanswami Samadhi
Peeth,Domgaon
Widening of Road (2 km) 2 km 100 100 PWD Govt. Renovation of Temple structure 50 50 Temple Trust/PWD Govt. Construction of Water front 500 500 PWD Govt. Repairing of Bus stop 100 100 MSRTC Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 923.25 823.25 100
Paranda Fort
Restoration of Fort structure 500 500 ASI Govt. Construction of Cafeteria 1 25 25 ASI Govt. Construction of Heritage Gallery 1 200 200 ASI Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 ASI Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 ASI Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 ASI Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 ASI PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 798.25 598.25 200
Shree Bhaironath Mandir, Sonari
Construction of temple administration office 1 20 20 Temple Trust/PWD Govt. Maintenance of Approach road (2 km) 2 km 100 100 PWD Govt. Construction of Yatri nivas (20 rooms with attach Bath) 10 200 200 Temple Trust/PWD Govt. Installation of CCTV camera with Surveillance room 5 5 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 398.25 198.25 200
a’XYKno
Paranda Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II (2012-22) (2022-32)
Nagoba Tample,Mugav
Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Renovation of Temple structure 30 30 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 453.25 353.25 100
Shree Bhairoba Temple,Khanderi
Widening and resurfacing of approach road (4 km) 4 km 200 200 PWD Govt. Construction of water tank (100000 ltr.) 100000 ltr. 20 20 PWD Govt. Construction of Mangal Karayalaya 150 150 Temple Trust/PWD Govt. Maintenance of Temple 50 50 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Groundwater rig bore 1 3 3 Temple Trust/PWD Govt. Construction of Compound wall 20 20 Temple Trust/PWD Govt. Construction of Yatri nivas (25 rooms with attach Bath) 25 250 250 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 766.25 616.25 150
a’XYKno
Paranda Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II (2012-22) (2022-32)
Hazrat Mo. Saheb avaliya sarif dargah,Javla
Maintenance of Approach road (5 km) 5 km 250 250 PWD Govt. Renovation of Dargah 75 75 Wakaf Board Govt. Landscaping in surround campus 1500 22.5 22.5 Wakaf Board Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Wakaf Board Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Wakaf Board Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 420.75 408.25 12.5
Hazrat Khwaja badrudin Sahid
Maintenance of Approach road ( 2 km) 2 km 100 100 PWD Govt. Construction of Compound wall (4 km) 150 150 Wakaf Board Govt. Construction of RCC elevated water tank (100000 ltr.) 100000 ltr. 20 20 PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Wakaf Board Govt. Construction of Cultural Hall 1 150 150 PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Wakaf Board Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Wakaf Board PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 493.25 330.75 162.5
Total 4253.25 3328.25 925
a’XYKno
Umarga Taluka
Tourist Place New proposals Tentative Area
/ No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Kesar Javalga
Construction of Approach road( 3 km) 3 km 150 150 PWD Govt.
Construction of Yatri nivas (15 rooms with attach Bath) 15 150 150 Temple Trust/PWD Govt.
Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.
Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 373.25 223.25 150
Bhagatwadi Devsthan
Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt.
Renovation of Temple 100 100 Temple Trust/PWD Govt. Construction of Entry gate 1 50 50 PWD Govt. Upgradation of Approach steps 1 100 50 50 PWD Govt. Construction of RCC elevated water tank (100000 ltr.) 100000 ltr. 20 20 PWD Govt.
Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.
Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 493.25 443.25 50
Achalbet
Maintenance of Approach road (3 km) 3 km 150 150 PWD Govt.
Landscaping in temple surrounding 2000 30 30 Temple Trust/PWD Govt. Construction of Entry gate 1 50 50 PWD Govt.
Construction of Yatri nivas (15 rooms with attach Bath) 15 150 150 Temple Trust/PWD Govt.
Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.
Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 453.25 303.25 150
Total 1319.75 969.75 350
a’XYKno
Lohara Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Shree Kshetra,Achler
Construction of Approach road(2 km) 2 km 100 100 PWD Govt. Construction of Mangal Karayalaya 150 150 Temple Trust/PWD Govt. Renovation of Approach steps 10 10 Temple Trust/PWD Govt. Construction of Yatri nivas (15 rooms with attach Bath) 15 150 150 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 20 20 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 483.25 333.25 150
Total 483.25 333.25 150
a’XYKno
Bhum Taluka
Tourist Place New proposals Tentative Area /
No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Shree Kshetra Alamprabhu devsthan
Maintenance of Approach Road (3 km) 2 km 100 100 PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100
Temple Trust/PWD Govt.
Landscaping in temple sorrounding 1500 22.5 22.5 Temple Trust/PWD Govt.
Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.
Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5
Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 275.75 175.75 100
Shree Satvai devi mandir,Mankeshwar
Maintenance of Approach road (4 km) 4 km 200 200 PWD Govt.
Construction of Dining Hall with Kitchen facility 75 75 Temple Trust/PWD Govt.
Construction of Yatri nivas (100 rooms with attach Bath) 100 1000 500 500 PWD Govt. Construction of Public Convenience Complex with Drinking water facility (2 nos.) 2 40 40
Temple Trust/PWD Govt.
Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt.
Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt.
Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5
Temple Trust/PWD PPP
Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 1368.25 868.25 500
a’XYKno
Bhum Taluka
Tourist Place New proposals Tentative
Area / No.
Indicative Cost(in lakhs)
Phasing
Implementing Agency
Mode of Funding
Phase I Phase II
(2012-22) (2022-32)
Shree Beleshwar Tirthvikas,Pakhrud
Maintenance of Approach road (10 km) 10 km 500 500 PWD Govt.
Maintenance of Temple structure 50 50 Temple Trust/PWD Govt. Landscaping in surrounding campus 3000 50 50 Temple Trust/PWD Govt. Construction of Public Convenience Complex with Drinking water facility 1 30 30 Temple Trust/PWD Govt. Construction of Yatri nivas (10 rooms with attach Bath) 10 100 100 Temple Trust/PWD Govt. Installation of Solar Penal (10 kv) 10 KV 30 30 PWD Govt. Installation of solar street lights (15 nos.) 15 3.75 3.75 Temple Trust/PWD Govt. Construction of Parking for 50 cars and 10 buses (2000 sq.mt) 50 12.5 12.5 Temple Trust/PWD PPP Solid waste Management 5 5 PWD Govt. Directional Signage 2 2 PWD Govt. Subtotal 783.25 683.25 100
Total 2427.25 1727.25 700
a’XYKno
Circuit Designing
a’XYKno
CIRCUIT DESIGNING
Need for Circuit Provide a varied experience to the tourist
Aid to the decision making of tourists
Facilitate visit to the maximum possible destinations in limited time
Aid economic development of the region by facilitating the movement of tourists to more sites (ripple effect)
Parameters adopted for formation of Circuit • Variety of tourism attractions in the circuit i.e. the varied (complete) experience that can be given to the
tourist in the circuit • Length of visit of tourist, since this affects the distance to which the tourist is prepared to travel
Type of Circuits • One Day & Two Day circuits • Interest Based circuits.
a’XYKno
One Day & Two Day Circuits
a’XYKno
ONE DAY CIRCUIT
Option-(A) Osmanabad (1) Hatladevi Temple (2) Dharashiv Lenya (3) Hemadpanthi Temple (4) Garhdev Dhari (5 ) Yedshi and back to Osmanabad One can visit Hz. Khojasamsodin Dargah, or Shree Dharasur Mardini Temple as replacement of any of above destination as Osmanabad has only religious spots all spots nearby is not covered as part of one circuit.
a’XYKno
TWO DAY CIRCUIT
Option 2(A)
Day 1 – Osmanabad (1), Vadgaon (2),
Tuljapur (3), Nagoba Temple (4) Andur back
to Tuljapur
Day 2 – Tuljapur (5) Naldurg Fort (6)
Ramtirth (7) Achler
One can visit temple of Tuljapur, Vadgaon
and Nagoba Temple and can customize in to
one day circuit or any option among spots can
be chosen.
a’XYKno
TWO DAY CIRCUIT
Option (B)
Day 1 – Osmanabad (1) Ter (2) Naigaon (3)
Lohata (4) Diksal and Halt at Osmanabad
Day 2 - From Osmanabad (5),Malkapur (6)
Yermala (7) Massa and back to Osmanabad
a’XYKno
TWO DAY CIRCUIT
Option (C)
Day 1 – Paranda (1) Paranda Fort (2) Domgaon
(3) Sonari (4) Mugav (5) Malkapur and Halt at
Paranda
Day 2 - From Paranda (5) Mankeshwar
(6) Kunthalgiri (7) Pakhrud and back to Osmanabad
a’XYKno
Interest Type Circuits
a’XYKno
HERITAGE CIRCUIT
Day 1: Osmanabad (1), Naldurg Fort (2), Dharashiv Caves (3), Ter and halt at Osmanabad
Day 2: From Osmanabad to (4), Paranda Fort (5), and Mankeshwar and Back to Osmanabad
a’XYKno
FUNDING MECHANISM
Source Schemes
Central
Government
1. Product/Infrastructure Development for Destinations and Circuits” (PIDDC)
A. Major destinations and circuits development
B. Rural Tourism infrastructure development
2. Scheme for organizing fair & festival and tourism related events (DPPH)
3. Assistance to Central Agencies for tourism infrastructure development
4. Assistance for Large Revenue Generating Projects (LRG)
5. Financial assistance for ‘Setting up, Promotion and Strengthening of Regional and Local
Museums
Maharashtra State
Government
1. TirthKshetra Vikas Yojana
2. Tourism Incentives Scheme under the Maharashtra Tourism Policy, 2006
Institutional Finances Financial assistance to enterprises for setting up and/or development of tourism-related
projects: by Tourism Finance Corporation of India Ltd (TFCI)
a’XYKno
PIDDC - Major destinations and circuits development
Focus Improvement of existing product and developing new tourism products to the world standard and focus on Integrated Infrastructure Development of the tourist sites.
Permissible Activities
Landscaping, parks, fencing, compound wall etc Illumination of the tourist destination and the area around and SEL Shows etc
Solid waste management and sewerage management, Public Conveniences, etc Improvement of road connectivity leading to tourist sites, especially from the NH/SH and other entry points Wayside Public Conveniences Equipments related to tourism like water sports, adventure sports, eco-friendly modes of transport Refurbishment of the Monuments Signages and display boards Documentation on places of interest at the locations
Tourist Arrival Centres, Reception Centres, Interpretation Centres Improvement of municipal services directly related to Tourism Other work/activities directly related to tourism
Eligibility Destination must be among the most visited sites in the State, or a recognized Heritage monument. A group of tourist attractions located in the same village, town or city would also qualify
Funding
Financial assistance up to Rs 5.0 crore is provided for the development of destinations and Rs. 8.00 crore for development of Circuits
The MoT would bear 100% of the project cost based on the project plan and estimates submitted, excluding the items which are the exclusive responsibility of the State Governments
a’XYKno
PIDDC - Rural Tourism infrastructure development
Focus
Thrust is on promotion of village tourism as the primary tourism product. Tourism form that showcases the rural life, art, culture and heritage at rural locations. It can include farm/agricultural tourism, cultural tourism, nature tourism, adventure tourism and eco - tourism. Tourism which meshes with seasonality and local events and is based on preservation of culture, heritage and traditions.
Permissible Activities
Landscaping, development of parks, fencing, compound wall etc Improvements to roads within the Panchayat limits. This shall not include any major road which connects the
village Illumination in the village Providing for improvement in solid waste management and sewerage management Construction of wayside amenities Procurement of equipments directly related to tourism, like water sports, adventure sports, eco-friendly modes
of transport for moving within the tourism zone Refurbishment of the Monuments Signages, Reception Centres Other work/activities directly related to tourism Tourist Accommodation
Funding A maximum of Rs 50.0 lakh is sanctioned for each project under this scheme for development of tourism related infrastructure
a’XYKno
Scheme for organizing fair & festival and tourism related events
Focus The Department of Tourism shall provide financial assistance to State Governments for organizing fairs/festivals and tourism related events such as seminars, conclaves, conventions etc. for the promotion of tourism
Permissible Activities
Creation of semi permanent structures Production of posters, pamphlets, advertisement in news-paper and production of film Remuneration of artists Sitting arrangements, lighting, sound, lodging &boarding, transportation, hiring of space and other similar
activities
Funding
Ministry of Tourism, Government of India would provide maximum financial assistance of Rs. 25.00 Lakh per fair /festival / event in the case of States. The State Government organizing the event would contribute atleast 50 % of the total expenditure involved on the fair / festival or event.
a’XYKno
Large Revenue Generating Projects (LRG)
Focus
A project, which is a tourist attraction, or used by tourists and generates large revenue through a levy of fee or user charges on the visitors. The projects promoted by Public Sector Undertakings, Agencies, or Autonomous Bodies of Central/State Governments as well as projects promoted by private sector / PPP Projects recommended by the State Governments/UT Administrations will be eligible for assistance.
Permissible Activities
Tourist trains Cruise vessels Cruise Terminals Convention Centres Golf Courses open for both domestic and international tourists, Health and Rejuvenation facilities and Last mile connectivity to tourist destinations (air and cruise including heli tourism) etc would qualify for
assistance However Hotel & Restaurant component will not be eligible for assistance. Procurement of vehicles and sports
facilities like stadiums will also not be eligible for assistance under the scheme
Funding
The subsidy under the scheme will have a cap of Rs 50 Cr subject to a maximum of 25% of total project cost or 50% of equity contribution of the promoters, whichever is Lower There should be a minimum loan component of 25% in the case of private sector/ PPP projects.
a’XYKno
Setting up, Promotion and Strengthening of Regional and Local Museum
Focus Development of both new museums and existing museums
Permissible Activities
Financial assistance is provided for professional development of museums, managed by voluntary organizations, institutions, societies, trusts, local bodies, etc. including universities & colleges registered under the Registration of Societies Act of 1860 (XXI) or those managed by the State Government. The broad range includes museums for promotion of:
a) Antiquities b) Numismatics c) Paintings d) Ethnological collection e) Folk art f) Others including Art & Crafts, Textiles, Stamps, etc.
Funding
Maximum financial assistance admissible (Rs. in Lakhs)
Category 1 Category 2 Setting up of New Museum 600 300 Development of Infrastructure of Existing Museum 500 250 Category I : State museums and renowned museums with exquisite collections Category II : Other museums For all purposes grant would be in the ratio of 80:20. A maximum of and up to 80% of the estimated cost would be provided by the Central Government and a minimum of 20% and balance, if any, will be met by the State Government/Institution, as the case may be.
Scheme by Ministry of Culture, Govt. of India
a’XYKno
Tourism Incentive scheme under Maharashtra Tourism Policy 2006
Focus Incentives to encourage private partnership in tourism related activities and infrastructure development
Permissible Activities
Hotels, Heritage Hotels, Resorts and Health Farms, Health & Wellness spa units registered under the Bed and Breakfast scheme of MTDC.
Motels and wayside amenities Apartment Hotels/Service Apartments Water Sports and Amusement Parks Arts and Crafts Villages Golf Courses Camping, Caravanning and Tent Facilities Arial Ropeways Convention Centres Development of Hill Stations Adventure Tourism Projects Houseboats Eco-Tourism Projects. Museums and Aquariums
Zones for tourism
Zone A Mumbai, Mumbai Suburban District, Navi Mumbai, Thane and Pune Municipal Corporation and Pimpri Chinchwad Municipal Corporation areas.
Zone B All Municipal Corporations (except areas in Zone A) and A Class Municipalities. Zone C All districts of Maharashtra except areas in Zone A and B
a’XYKno
Tourism Incentive scheme under Maharashtra Tourism Policy 2006
Eligibility criteria for units
Eligible units (project approved) should have a minimum fixed capital investment of Rs. 100 lakhs or more, Rs. 50 lakhs, and Rs. 25 lakhs in A, B and C zone respectively which should be made within 3 years, 2 years and 18 months respectively from the date of registration.
Land Policy
If an investor approaches the MTDC with a viable project on a particular plot of land and undertakes to bear the cost of acquisition and escalation thereof, the MTDC will acquire such land through the Collector and lease the same to the private investor on stipulated terms and conditions in accordance with the government rules and regulations.
Incentives
Fiscal incentives
Total exemption from Luxury Tax (as applicable to Hotels) for a period of 7 & 10 years in the B and C zones respectively & 50% exemption for a period of 5 years in A zone.
Total exemption from Entertainment Tax/Amusement Tax for a period of 5, 7 and 10 years in the A, B, and C zones respectively
Total exemption from Stamp Duty for the projects located in B and C zones and 50% exemption from stamp duty for projects located in A zone.
Electricity concessions Electricity duty will be levied at industrial rates for the respective period
Renewal of Licenses Various licenses and clearances necessary in tourism projects are required to be renewed every year. By this Policy 2006, these licenses/permissions will require renewal every 5 years.
a’XYKno
MARKETING STRATEGY
Negligible marketing efforts for promotion of
tourism in Osmanabad.
Currently, MTDC does not have any office
setup in Osmanabad and hence does not arrange
for travel tours.
• Create a positive image
• Increase awareness for tourist attractions
• Use optimal mix of media vehicles
Attract tourists
• Enhance tourist satisfaction
• Provide total experience in the region Encourage higher
spending by tourists
a’XYKno
PROMOTIONAL BUDGET
S. No. Promotional Expenditure Cost
(in lakhs)
Phasing
Phase I
(2012-15)
Phase II
(2015-18)
1 Graphic Design & Corporate Identity Programme by Ad Agency 10.00 5.00 5.00
2 FAM Tours (Familiarization tour for tour operators) 60.00 30.00 30.00
3 Direct Mailers (A6 size) 25.00 12.50 12.50
4 Printed Tissues / Folder (B/W) 20.00 10.00 10.00
5 Information broachers 52.00 26.00 26.00
6 Advertisement (Hoardings, web based, mobile based etc) 22.00 11.00 11.00
7 Separate website showcasing Osmanabad tourism 5.00 5.00
8 Organising competitions for promotion of Osmanabad tourism 6.00 3.00 3.00
9 Capacity building programme 10.00 5.00 5.00
Total 210.00 107.50 102.50
• A Grapic design and Corporate Identity programme will be developed by a professional ad agency
• Total 250 FAM tours will be organized in two phases with a cost of Rs. 20000 per operator
• 1 lakh direct mailers will posted in the next six years period
• Approx. 1000 paper printed tissues/ folders will be distributed in trains per day
• Approx. 10000 broachers of individual tourist spots & 10000 broachers of the circuits will be printed
• A capacity building programme has been planned for training of guides, hotel operators etc
• Other expenses include organizing competitions, public relations measures etc
a’XYKno
About Project Management Consultant
a’XYKno
About áXYKno
Investment Banking
áXYKno Group
Natural Resources & Energy Railways Infrastructure Clean Energy
Advising and implementing 30 coal blocks amounting to 7 billion tonnes of coal resources and 10,000 MW of Power Plant.
Advising and Implementing Large Infrastructure Projects of various state development and transport authorities in India.
Advising more than 1,000 MW Clean Energy: Hydro, Wind, Solar, Biomass.
Turn Key solutions for Rail & Railway sidings through expert team headed by Mr.K.C.Jena Ex-Chairman Railway Board.
Successfully concluded Debt and Equity syndication and M&A Transaction across sectors.
áXYKno is a ISO 9000:2008 company having 100+ professionals working across sectors and currently advising and implementing PPP’s for Government aggregating to ` 1 Lac Crores.
a’XYKno
Presenting áXYKno
a’XYKno
PPP’s for Government aggregating ` 1,00,000 Crores
Implementing more than 10,000 MW Power Plants as
Project Management Consultants through PPP
Implementing robust bidding process and PPP framework
involving more than 30+ coal blocks first time in India
Debt & Equity syndication of
over ` 8000 Crores
Expertise for advising 50+ M&A transactions across
sectors
Advising and Implementing large Infrastructure projects
Advising and implementing 8 billion tonnes of coal reserves
under PPP
Implementing Unique mHealth innovation to
reduce mortality
Infrastructure
NR
E
a’XYKno
Co-ordinates
Nagpur
a’XYKno Capital Services Limited a’XYKno Financial Centre, Level 3, Leela Vista, Bajaj Nagar Square, WHC Road, Nagpur – 440010, Phone No.: +91 0712 6467968 to 78,
6467980 to 88 Fax : 0712 2245338
Mumbai
Level 1, Donald House, Opp. Electric House, Colaba Causeway Mumbai – 440 001, Phone No – 022 22822683, 22822684 Fax : 022 22822684
New Delhi
51 , Babar Road Bengali Mar ket New Delhi 110001 +91 9503005233
Thiruvananthapuram
Block No. 5D SFS Palace Court Kowdiar, Thiruvananthapuram, Kerala India - 695003
Pune B-3, Level 2, 'Shree Dwarka', Adjacent to CENTRAL MALL, Ganeshkhind Road PUNE 411 016 Maharashtra, India Call : +91-20-25666511, 512, 513 Fax : +91-20-25666514
Jabalpur
D-5, Deep Tower Kachiyana Road, Golbazar, Jabalpur India - 482002
Reach Us:
www.axykno.com, [email protected]