District Level Implementation Committee (DLIC), District

Irrigation Plan (DIP) District Dewas M.P.

S

No.

Name Designation Position in DLIC

1 Shri Ashutosh Awasthi Distt Collector Chairman

2 Shri Prabal Sipaha CEO, Zila Panchayat Deputy Chairman

3 Shri P.S. Champawat Conservator Forest Member

4 Shri Kailash Chandra Waskel DDA, Deptt. of Agri. Member Secretary

5 Shri Uttam Singh Jadon Project Director (ATMA) Member

6 Shri Mukesh chaturvedi EE WRD Member

7 Shri B S Solanki EE RES Member

8 Shri S. N. Raju EE PHE Member

9 Shri N. S. Tomar Asst. Director Horticulture Member

10 Shri R K Gupta Asst, Geo hydrologist Member

11 Dr R P sharma Head and Scientist KVK Member

12 Shri Bhoopesh Karoliya Lead Bank officer Member

13 Shri Sunil Chaturvedi NGO Representative Member

14 Shri N. S. Rajput Farmer Member

15 Shri Kailash Tada Farmer Member

Page 3: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

INDEX

I

N

D

E

X

- - Introduction 1-11

I

1.0 General Information of the District

1.1 District Profile 12-15

1.2 Demography 16-18

1.3 Bio mass and Livestock 18-21

1.4 Agro Ecology, Climate, Hydrology, Topography 21-23

1.5 Soil Profile 24-29

1.6 Soil Erosion & Runoff Status 30-33

1.7 Land use Pattern 33-37

1.8 Drainage 37

- SWOT Analysis 38-40

- Challenges 40

- Vision 40-42

2 District Irrigation Profile

II

2.0 District Irrigation Profile 43

2.1 Area & Crop wise Irrigation 44

2.2 Production & Productivity of Major Crops 45-46

2.3 Irrigation Based Classification 47

3 District Water Profile

III

3.0 District Water Profile 48

3.1 Status of Water availability 48-49

3.2 Status of Ground Water availability 49-50

3.3 Status of Command Area 50-51

3.4 Existing Type of Irrigation 51-52

Page 4: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

I

N

D

E

X

IV

4.0 Water Requirement/ Demand

4.1 Domestic Water Requirement/Demand 53-55

4.2 Crop Water Requirement/Demand 56-58

4.3 Livestock Water Requirement/Demand 59

4.4 Industrial Water Requirement/Demand 60

4.5 Water Demand for Power generation 61

4.6 Water Demand of the District for Various Sector 61

4.7 Water Budget 62

5.0 Strategic Plan for Irrigation in District- Dewas

V

5.1 Strategic Plan for Irrigation g methodology 63-64

5.2 Activity/Target/Budget/Timeline 65-131

Summary of Financial Requirement 132

Out Comes 181

Page 5: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

PRADHAN MANTRI KRISHI SINCHAYEE YOJANA

Introduction -

India is still long way from eradicating poverty and hunger, while the gulf between rich

and poor is ever deepening in most states. The barometers of Indian economy are showing

warning signals since past decade, despite remedial measures taken with knee jerk action, certain

segments of economy still reeling under slow and sluggish growth. The population clock has

surpassed 1.25 billion and is expected to reach 1.5 billion by 2025. The per caput availability of

natural resources such as arable land, irrigation water, vegetation is shrinking due to over

exploitation and increasing demands from the urban and industrial sector. Agricultural production

has been stagnant, the growth rate sliding down from 3.5% in eighties to 2.4% in nineties and

1.4% in new millennium. Corresponding investments in agriculture from all quarters is declining

too, as the contribution of the agriculture sector is sleeping down from >48% at the start of the

planned development paradigm in fifties to <15% now.

Unless concrete measures are taken urgently, Indian agriculture will be in a state of crisis

in the coming years. To safeguard food security to the growing population and to maintain the

environmental quality without further deterioration of the available natural resources have to be

effectively harnessed and efficiently managed this is particularly important in the rainfed areas,

which form over 55% of the cultivated area. An ever –green revolution is needed to achieve

the goals of food security, environmental quality and economic prosperity.

Agriculture is not a commodity machine but the backbone of the Livelihood security

system in India, where over 60% of the population depends for their livelihood. Approaches,

ascertaining dignified livelihoods have been evolved from the thinking that the root cause to all

ills is food insecurity.

In the process of modernization many farming systems considered as the traditional were

metamorphosed to specialized commodity based production systems. This enhanced crop

productivity per unit area. It however, over exploited resources, created imbalance and curtailed

input use efficiency. The mounting cast of cultivation and declining productivity is a matter of

serious concern of profitability and farm income. Integrated Farming System combined with

livestock, agriculture, horticulture, agro- industry in an expanded symbiotic or synergistic

manner, so that the wastes of one process become the input for other processes. This provided

means of producing energy, manure and feed for optimum productivity and costs. Moreover, it is

a complex interrelated matrix of soil, water, plants, animals, implements, power, labor, capital

and other inputs controlled in part by farming families and influenced to varying degrees by

Page 6: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

political, economic, industrial and social forces that operate at many levels. In our country the

National Water Policy adopted in September 1987 by the natural water resources council stresses

that “Water is a prime natural resource” a basic human need and a precious asset of a nation.

The world water council (WWC) has given a warning that by 2025 much of the world population

will suffer from water scarcity. The water is also ritual for realizing the full potential of the

agriculture sector and countries development. Optimum development and efficient utilization of

water resources, therefore assumes great significance.

Crop production suffers not only from drought but also from unscientific use of the

available irrigation water. In addition to solarization and other form of land degradation, depletion

and pollution of water resources floods and drainage, water losses due to seepage in command

areas, water logging due to lack of adequate drainage facilities and displacement of human beings

are never problems leading to shrinking biological diversity and threat to global change. Thus in

view of the ritual importance for human and animal life, for maintain ecological balance and for

economic and developmental activities of all kinds and management of this increasing scarcity.

The planning and management of this resource and its optional and equitable use become a

matter of the almost urgency. There is need for harvesting rain water at any cost and its optional

utilization. By harvesting rain water through “Jal Sanchay” and “Jal Sinchan” we will nurture

water conservation and ground water recharge.

Out of about 141 m. ha. net area sown in the country about 65 million hectare (or 45%) is

presently covered under irrigation. Substantial dependency on rainfall makes cultivation in rainfed

areas a high risk, less productivity & profitable profession empirical evidences suggest that

assured or protective irrigation encourages farmers to invest more in farming technology and

inputs leading to productivity enhancement and increased farm income.

Concerned over the slow pace of growth in Agriculture and allied sectors, the Govt. of

India have launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to ensure access to

some means of protective irrigation to all Agriculture farms in the country to produce “ per drop

more crop” thus bringing much desired rural prosperity.

The Objectives of PMKSY –

Enhance the physical access of water on the farm and expand cultivable area under assured

irrigation (Har Khet ko pani).

Integration of water source, distribution and its efficient use, to make best use of water

through appropriate technologies and practices.

Improve on-farm water use efficiency to reduce wastage and increase availability.

Page 7: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Enhance the adoption of precision-irrigation and other water saving technologies (More

crop per drop).

Enhance recharge of aquifers and introduce sustainable water conservation practices.

Ensure the integrated development of rain fed areas using the watershed approach.

Promote extension activities relating to water harvesting, water management and crop

alignment for farmers and grass root level field functionaries.

Attract greater private/ Community investments in irrigation.

Over all to ensure and exploit the agro climate superiority of the country on sustainable

basis for improved rural livelihood.

Strategy & Focus Areas –

To achieve above objectives, PMKSY will strategize by focusing on end-to end solution in

irrigation supply chain, viz. water sources, distribution network, efficient farm level applications,

extension services on new technologies & information etc. Broadly, PMKSY will focus on -

1- Creation of new water sources; repair, restoration and renovation of defunct water sources;

construction of water harvesting structures, secondary & micro storage, groundwater

development, enhancing potentials of traditional water bodies at village level.

2- Developing/augmenting distribution network where irrigation sources (both assured and

protective) are available or created.

3- Promotion of scientific moisture conservation and run off control measures to improve ground

water recharge so as to create opportunities for farmer to access recharged water through

shallow tube/dug wells.

4- Promoting efficient water conveyance and field application devices within the farm viz,

underground piping system, Drip & Sprinklers, pivots, rain-guns and other application devices

etc.

5- Encouraging community irrigation through registered user groups/farmer producers‘

organizations/NGOs.

6- Farmer oriented activities like capacity building, training and exposure visits, demonstrations,

farm schools, skill development in efficient water and crop management practices (crop

alignment) including large scale awareness on more crop per drop of water through mass

media campaign, exhibitions, field days, and extension activities through short animation

films etc.

Page 8: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Balancing Water Demand & Supply Chain

Water Sources DistributionNetwork

Water Use Efficiency

Crop & water management

• Creation• Repair,

Restoration Renovation

• Diversion & redistribution

• Strengthening distribution network/Channels

• Efficient usage-

micro irrigation• Community

owned &

managed

irrigation

• Alignment of crops

• Moisture conservation

• Credit mobilization

Har Khet Ko Pani Per Drop More Crop

2

PM

KS

Y -

Dis

tric

t Irrig

ati

on

Pla

n D

istr

ict

Seh

ore M

.P.

Approach - End to End Solution :

Integrated watershed Management

Programme Components –

A. Accelerated Irrigation Benefit Programme (AIBP) -

To focus on faster completion of ongoing Major and Medium Irrigation including National

Projects.

B. PMKSY (Har Khet Ko Pani ) -

Creation of new water sources through Minor Irrigation (both surface and ground

water).

Repair, restoration and renovation of water bodies; strengthening carrying capacity of

traditional water sources, construction rain water harvesting structures.

Command area development, strengthening and creation of distribution network from

source to the farm.

Ground water development in the areas where it is abundant, so that sink is created to

store runoff/ flood water during peak rainy season.

Page 9: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Improvement in water management and distribution system for water bodies to take

advantage of the available source which is not tapped to its fullest capacity at least

10% of the command area to be covered under micro/precision irrigation.

Diversion of water from source of different location where it is plenty to nearby water

scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement

requirements beyond IWMP and MGNREGS irrespective of irrigation command.

Creating and rejuvenating traditional water storage systems like Katas, Bandhas at

feasible locations.

PMKSY (Per Drop More Crop) –

Programme management, preparation of State/District Irrigation Plan, approval of

annual action plan, Monitoring etc.

Promoting efficient water conveyance and precision water application devices like drips,

sprinklers, pivots, rain-guns in the farm (Jal Sinchan).

Topping up of input cost particularly under civil construction beyond permissible limit

(40%), under MGNREGS for activities like lining inlet, outlet, silt traps, distribution

system etc.

Construction of micro irrigation structures to supplement source creation activities

including tube wells and dug wells (in areas where ground water is available and not

under semi critical /critical /over exploited category of development) which are not

supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed) and MGNREGS

as per block/district irrigation plan.

Secondary storage structures at tail end of canal system to store water when available

in abundance (rainy season) or from perennial sources like streams for use during dry

periods through effective on-farm water management.

Water lifting devices like diesel/ electric/ solar pump sets including water carriage

pipes, underground piping system.

Extension activities for promotion of scientific moisture conservation and agronomic

measures including cropping alignment to maximize use of available water including

rainfall and minimize irrigation requirement.

Capacity building, training and awareness campaign including low cost publications,

use of Pico projectors and low cost films for encouraging potential use water source

through technological, agronomic and management practices including community

irrigation.

The extension workers will be empowered to disseminate relevant technologies under

PMKSY only after requisite training is provided to them especially in the area of

promotion of scientific moisture conservation and agronomic measures, improved/

innovative distribution system like pipe and box outlet system etc.

Page 10: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Information Communication Technology (ICT) interventions through NeGP-A to be

made use in the field of water use efficiency, precision irrigation technologies, on farm

water management, crop alignment etc. and also to do intensive monitoring of the

Scheme.

Effective management of runoff water and improved soil & moisture conservation

activities such as ridge area treatment, drainage line treatment, rain water harvesting,

in-situ moisture conservation and other allied activities on watershed basis.

Converging with MGNREGS for creation of water source to full potential in identified

backward rainfed blocks including renovation of traditional water bodies.

District and Plans -

District Irrigation Plans (DIPs State Irrigation) shall be the cornerstone for planning

and implementation of PMKSY. DIPs will identify the gaps in irrigation infrastructure after taking

into consideration the District Agriculture Plans (DAPs) already prepared for Rashtriya Krishi Vikas

Yojana (RKVY) vis-à-vis irrigation infrastructure currently available and resources that would be

added during XII Plan from other ongoing schemes (both State and Central), like Mahatma

Gandhi National Rural Employment Guarantee Scheme(MGNREGS), Rashtriya Krishi Vikash

Yojana (RKVY), Rural Infrastructure Development Fund (RIDF), Member of Parliament Local Area

Development (MPLAD) Scheme, Member of Legislative Assembly Local Area Development

(MLALAD) Scheme, Local body funds etc. The gaps identified under Strategic Research &

Extension Plan (SREGP) will be made use in preparation of DIP.

DIPs will present holistic irrigation development perspective of the district outlining

medium to long term development plans integrating three components viz. water sources,

distribution network and water use applications incorporating all usage of water like drinking &

domestic use, irrigation and industry. Preparation of DIP will be taken up as joint exercise of all

participating departments. DIP will form the compendium of all existing and proposed water

resource network system in the district.

The DIPs may be prepared at two levels, the block and the district. Keeping in view the

convenience of map preparation and data collection, the work would be primarily done at block

level. Block wise irrigation plan is to be prepared depending on the available and potential water

resources and water requirement for agriculture sector prioritizing the activities based on socio-

economic and location specific requirement. In case of planning is made based on basin/sub basin

level, the comprehensive irrigation plan may cover more than one district. The activities identified

in the basin/sub-basin plan can be further segregated into district/block level action plans. Use of

satellite imagery, topo sheets and available database may be appropriately utilized for developing

Page 11: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

irrigation plans at least on pilot basis to begin with and subsequently may be extended to all

projects. DPRs of watershed projects should be taken into account while preparation of DIPs.

These plans need to be developed following intensive participatory consultation

Process including Panchayati Raj Institutions. Agriculture Universities in the State May also be

closely involved with the formulation and implementation of the Detailed Project Report and the

District Level Plans. Technical, financial and human resources available for this sector with

departments of rural development, urban development, drinking water, environment & forest,

science & technology, Industrial policy etc. to be leveraged for comprehensive development of

water sector.

Programme Architecture -

PMKSY will be implemented in area development mode only by adopting a ‗decentralized

State level planning and projectised execution‘ structure that will allow States to draw up their

own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years. Initial

phase of implementation will be remaining two years of XII Plan.

As PMKSY will be a area-based scheme with projectised approach, Project Reports will

have to be prepared for each of the PMKSY component based on the comprehensive irrigation

plan incorporating all essential ingredients i.e. feasibility studies, competencies of the

implementing agencies, anticipated benefits (outputs/outcomes) that will flow to the farmers/

State, definite time-lines for implementation etc.

Nodal Department -

Since, the final outcome of PMKSY is to ensure access to efficient delivery and application

of water at every farm thereby enhancing agricultural production & productivity, State Agriculture

Department will be the Nodal Department for implementation of PMKSY. All communication

between Ministry of Agriculture (MOA) and State Government would be with and through the

nodal department.

However, the implementing departments for the four components like AIBP, PMKSY (Har

Khet Ko Pani), PMKSY (Per Drop More Crop) and PMKSY (Watershed Development) will be decided

by the respective programme Ministry/Department.

Nodal Department/Agency identified by State will collate all the sub projects of each

cluster received from different implementing departments/districts as one DPR and place before

the Inter Departmental Working Group (IDWG) for scrutiny and State Level Sanctioning

Committee (SLSC) for sanction.

Page 12: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Nodal department/agency will also be responsible for monitoring, coordinating physical &

financial progress with implementing departments/agencies and furnishing consolidated Utilisation

Certificates (UC) and physical/financial progress reports to Govt. of India.

Convergence -

PMKSY will ensure convergence with all rural assets/infrastructure based programmes

related to water conservation and management programmes / schemes like Mahatma Gandhi

National Rural Employment Guarantee Scheme (MGNREGS), Rashtriya Krishi Vikash Yojana

(RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification programmes, Rural

Infrastructure Development Fund (RIDF), Member of Parliament Local Area Development (MPLAD)

Scheme, Member of Legislative Assembly Local Area Development (MLALAD) Scheme, Local body

funds, Working Plan of State Forest Department etc. In most cases the labour intensive works like

earth works for source creation may be taken up under MGNREGA. Emphasis be given for utilizing

MGNREGA fund for de-silting of ponds, canals, defunct water bodies like old ponds, Jal Mandir,

khul, Tanka etc. to improve storage capacity and creating scopes for water availability for

irrigation purposes. PMKSY (Per Drop More Crop) fund may also be used for topping up of

material cost beyond the specified limit, i.e., 40% in the MGNERGA for lining, inlet, outlet, silt

trap, adjustable gates etc. All stake holders viz farmers, Panchayat and grass route level

functionaries be made aware of scientific/technical processes of cleaning canals, de-siltation,

construction of water harvesting structures etc., through extension activities including use of IEC,

short animation films etc. to get maximum benefit of MGNREGA for these works. Other works can

be taken up from PMKSY (Har Khet Ko Pani), PMKSY (Watershed) etc. depending on the type and

nature of works.

Illustrative Activities under PMKSY –

Sl .

No.

Programme

Components

Illustrative Activities

01 AIBP To focus on faster completion of ongoing Major and Medium

Irrigation including National Projects.

02 PMKSY

(Har Khet

ko Pani)

Creation of new water sources through Minor Irrigation (both

surface and ground water) Repair, restoration and renovation of

water bodies; strengthening carrying capacity of traditional water

sources, construction rain water harvesting structures (Jal

Page 13: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Sanchay).

Command area development, strengthening and creation of

distribution network from source to the farm.

Improvement in water management and distribution system for

water bodies to take advantage of the available source which is

not tapped to its fullest capacity (deriving benefits from low

hanging fruits). At least 10% of the command area to be covered

under micro/precision irrigation.

Diversion of water from source of different location where it is

plenty to nearby water scarce areas, lift irrigation from water

bodies/rivers at lower elevation to supplement requirements

beyond IWMP and MGNREGS irrespective of irrigation command.

Creation and rejuvenation of traditional water storage systems

like Katas, Bandhas at feasible locations.

03 PMKSY

(Watershed)

Water harvesting structures such as check dams, nala bund, farm

ponds, tanks etc.

Capacity building, entry point activities, ridge area treatment,

drainage line treatment, soil and moisture conservation, nursery

raising, afforestation, horticulture, pasture development,

livelihood activities for the asset-less persons and production

system & micro enterprises for small and marginal farmers etc.

Effective rainfall management like field bunding, contour

bunding/trenching, staggered trenching, land levelling, mulching

etc.

04 PMKSY

(Per drop

more crop)

Programme management, preparation of State/District Irrigation

Plan, approval of annual action plan, Monitoring etc.

Promoting efficient water conveyance and precision water

application devices like drips, sprinklers, pivots, rain-guns in the

farm (Jal Sinchan);

Topping up of input cost particularly under civil construction

beyond permissible limit (40%), under MGNREGS for activities like

lining inlet, outlet, silt traps, distribution system etc.

Construction of micro irrigation structures to supplement source

creation activities including tube wells and dug wells (in areas

where ground water is available and not under semi critical

/critical /over exploited category of development) which are not

Page 14: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

supported under PMKSY (WR), PMKSY (Watershed) and

MGNREGS.

Secondary storage structures at tail end of canal system to store

water when available in abundance (rainy season) or from

perennial sources like streams for use during dry periods through

effective on-farm water management.

Water lifting devices like diesel/ electric/ solar pumpsets including

water carriage pipes.

Extension activities for promotion of scientific moisture

conservation and agronomic measures including cropping

alignment to maximise use of available water including rainfall

and minimise irrigation requirement (Jal sarankchan).

Capacity building, training for encouraging potential use water

source through technological, agronomic and management

practices including community irrigation.

Awareness campaign on water saving technologies, practices,

programmes etc organisation of workshops, conferences,

publication of booklets, pamphlets, success stories, documentary,

advertisements etc.

Improved/innovative distribution system like pipe and box outlet

system with controlled outlet and other activities of enhancing

water use efficiency.

05 MGNREGA Water harvesting structures on individual lands of vulnerable

sections, creation of new irrigation sources, pgradation/desilting

of traditional water bodies, water conservation works etc.

Supplementing soil and water conservation works in the identified

back ward rainfed blocks by overlaying of the plans with that of

watershed projects for development to full potential

Desiltation of canal & distribution system, Deepening and

desiltation of existing water bodies, strengthening of

bunds/embankments etc.

Restoring the potential of traditional water storage systems like

Jal Mandir; Khatri, Kuhl, Zabo, Ooranis ,Dongs , Katas, Bandhas

etc.through disiltation and deepening activities.

Page 15: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 16: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

CHAPTER-1

1.1. District Profile

Dewas District in Ujjain Revenue Division, is situated on the Malwa plateau in the West-central

part of Madhya Pradesh and lies between 20°17´ and 23°20´ North latitude and 75°54´ and

77°08´ East longitude. The district is bounded by Ujjain district in the north, Indore district in

the west, West-Nimar district in the south-west, East Nimar district in the south, Hoshangabad

district in the South East, Sehore district in the east and Shajapur district in the North-East. The

tropic of cancer passes through the district near Nemawar village south of Khategaon town.

The district gets its name from the district headquarters town, Dewas which is said to have been

derived on the basis of two traditions. One is that Dewas lies on the foot of a conical hill, known

as Chamunda hill about 300 ft. above the ground level on top of which the shrine of Chamunda is

located. The image of the Goddess is cut in rocky wall of a cave. It is, therefore, known as Devi

Vashini or the Goddess's residence. From this the name Dewas (dev-vas) seems to have been

derived.

The district is now divided in to 9 tehsils viz. Sonkatch, Dewas, Bagli, Kannod, Tonk-Khurd,

Khategaon, Satwas, Hatpipliya and Udainagar. Dewas tehsil is situated on the north-western

part of the district, Sonkatch on the north-eastern part, Bagli on the south, Kannod on the

south-central part and Khategaon on the South-east. Weather road connects all the tahsil head

quarters. The Head-quarters of Dewas tehsil, which is also the district headquarters, is situated

on The Bombay-Agra National Highway No.3 and is also connected by broad-gauge railway line

of western Railway.

There are 1156 villages in the district. The district has a total population of 1563715 as per

census 2011.

District has 1 nagar palika Dewas and 3 nagar panchayats satwas, Kantaphod and Loharda. There

are five assembly constituencies and 3 Parliamentary constituency falls under Dewas district.Total

geographical area of the district is 701307 Ha. Out of which 206690 Ha. Is forest area and

402584 Ha. Area is net sown area under Agriculture.

Average annual rainfall of district is 1067.08 mm. District Location Map is given is below.

Page 17: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.2. Table 1-1-1 District Profile

District Profile

District Code 437

Geographical Area 701307

Latitude lies between 20°17´ and 23°20´ North latitude

Longitude lies between 75°54´ and 77°08´ East longitude

Area under Forest 206690

Area under Agriculture use 402584

Net Sown Area 402584

Gross Cropped Area 736470

Net irrigated (Kharif and Rabi ) 171829

Net Rainfed 512809

Total no.of block 06

Total no.of Panchyat 496

Total no.of Villege 1156

Total Population 1563715

Population Growth Rate 19.53

Total Male Population 805359

Total Female Population 758356

Total Population ST 272701

Total Population SC 292007

Total Population GEN 999007

Page 18: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 19: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 1-1-2 Rain fed Area in District

Sr No Name of Block Rainfed Area (Ha)

1 Dewas 45753

2 Tokkhurd 31894

3 Sonkatch 24479

4 Bagli 55809

5 Kannod 57379

6 Khategaon 48988

Total Area 264302

45753

31894

24479

55809

57379

48988

Rainfed Area (Ha.)

Dewas

Tokkhurd

Sonkatch

Bagli

Kannod

Khategaon

Page 20: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.2 Demography

There are 1156 villages in the district Dewas. The district has a total population of 1563715 out of

which the Schedule casts comprise 292007, Schedule Tribes 272701, other backward and general

castes 999007. According to census 2011 of the total population, there are 805359 males and

758356 females.

Table 1-2-1 Block wise Population Details District – Dewas

S no. Block Name Male Female Children ST SC GEN Total

1 Dewas 261043 244905 65904 20660 105658 379630 505948

2 Tokkhurd 68699 65084 18119 1579 32639 99565 133783

3 Sonkatch 88320 83988 24730 2289 47017 123002 172308

4 Bagli 154413 147352 48246 110356 47954 143455 301765

5 Kannod 133394 125082 42339 91189 31418 135869 258476

6 Khategaon 99490 91945 30301 46628 27321 117486 191435

Total 805359 758356 229339 272701 292007 999007 1563715

0

50000

100000

150000

200000

250000

300000

350000

400000

Dewas Tokkhurd Sonkatch Bagli Kannod Khategaon

Male

Female

Children

ST

SC

GEN

Page 21: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 1-2-2 Urban Population of District – Dewas

S.no Block Male Female Children ST SC GEN Total

1 Dewas 150081 139469 35437 9861 56366 223323 289550

2 Tokkhurd 4124 3855 1104 87 1488 6404 7979

3 Sonkatch 19784 18579 5257 802 6566 30995 38363

4 Bagli 19969 19026 5439 4909 6237 27849 38995

5 Kannod 26515 24944 7629 8054 5040 38365 51459

6 Khategaon 13166 12247 3323 1927 1902 21584 25413

Total 233639 218120 58189

25640 77599 348520 451759

0

50000

100000

150000

200000

250000

Male Female Children ST SC GEN

Dewas

Tokkhurd

Sonkatch

Bagli

Kannod

Khategaon

Page 22: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 1-2-3 Block wise no of House Hold

Sr no. Block Name House Hold Total

Population

Male Female

1 Dewas 99062 505948 261043 244905

2 Tokkhurd 26480 133783 68699 65084

3 Sonkatch 32720 172308 88320 83988

4 Bagli 59779 301765 154413 147352

5 Kannod 52862 258476 133394 125082

6 Khategaon 37968 191435 99490 91945

Total 308871 1563715 805359 758356

1.3 Biomass and Livestock

Water plays an important role in livestock productivity. Livestock productivity in pastoral areas

depends greatly on the availability of water. There are several factors, which determine water

balance, water turnover and functions of the animal. Assessment of livestock and water

requirement is helpful in modelling water and livestock relationships. The demand for meat, dairy

products and eggs rises faster than the demand for crops; thus both scenarios call for livestock

production to increase relatively more rapidly than crops.

99062

26480

32720

59779

52862

37968

House Hold

Dewas

Tokkhurd

Sonkatch

Bagli

Kannod

Khategaon

Page 23: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Kirda and Riechardt 1986). Livestock and poultry water consumption depend on a number of

physiological and environmental conditions such as:

• Type and size of animal or bird.

• Physiological state (lactating, pregnant or growing)

• Activity level.

• Type of diet-dry hay, silage or lush pasture.

• Temperature-hot summer days above 25 0C can sometimes double the water

consumption of animals.

• Water quality - palatability and salt content.

The economy of Dewas district is primarily agriculture and livestock based. There is good

quantum of animal resources in the district. As the metro like Indore is near to Dewas district

hence, the scope for the increase the production potentiality of the animals. Simultaneously

additional employments may also be generating for the community. As forests are disappeared

rapidly so that there is considerable decrease in the fodder production as mostly there is the

practice of the open grazing in the rural areas. With the continues deficit in rainfall the

possibilities of rain water conservation above and below the ground is decreased since traditional

tanks are also neglected. In the absences of effective rainfall fodder production and water for

drinking to animals is very difficult in the region.

Table1-3-1 Small Animals of Dewas District

Sr.no Name of the

Block

Small Animals

Pouitry

(Nos)

Pigs

(Nos)

Goat

(Nos)

Sheeps

(Nos)

Total

1 Dewas 12952 562 27531 6 41051

2 Tokkhurd 3381 99 17574 2 21056

3 Sonkatch 3380 285 19790 0 23455

4 Bagli 49424 482 47041 0 96947

5 Kannod 11038 97 32407 0 43542

6 Khategaon 5298 131 16432 0 21861

Total 85473 1656 160775 8 247912

Page 24: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table1-3-2 Large Animals of Dewas District

Sr.no Name of the

Block

Large Animals

Indigenous

Cow (nos)

Hybrid Cow (nos)

In

Descriptives

Buffalo (nos)

Hybrid Buffalo (nos)

Total

1 Dewas 17765 26648 23364 35047 102824

2 Tokkhurd 13955 20933 14699 22049 71636

3 Sonkatch 32208 19812 10778 16168 78966

4 Bagli 37056 55584 16103 24155 132898

5 Kannod 32830 49244 13737 20605 116416

6 Khategaon 19414 29120 10513 15770 74817

Total 134228 201341 89195 133793 558557

0

10000

20000

30000

40000

50000

60000

Dewas Tokkhurd Sonkatch Bagli Kannod Khategaon

Small Animals Pouitry(Nos)

Small Animals Pigs (Nos)

Small Animals Goat (Nos)

Small Animals Sheeps (Nos)

Page 25: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.4 Agro-Ecology, Climate, Hydrology and Topography

District Dewas falls under Malwa plateau which is a potential region in Madhya

Pradesh. Dewas has been divided into two agro ecological situation one comprising of block

Dewas, Sonkatch, Tonkkhurd and half area of Bagli comes under Malwa plateau and second

one is Nimar valley it is comprising Khategaon, Kannod and half area of Bagli block. Almost

three fourths of the area in the district is covered by black cotton soils, which is occupied by

Deccan Basalts. The principal crop grown in the district is Soybean, Maize, Cotton, Wheat,

Gram etc. District has an area of 7020.84 sq km. And out of this about 2066 sq km area is

covered under forest area which accounts for about 29% of total area.

The average annual rainfall of Dewas district is 1067 mm. Rainfall increases from

west to east and is lowest in the southwestern portion. About 90 % of the rainfall takes place

from June to September; only 5 - 8% takes place in the winter months and only about 2% in

summer. It is only during the monsoon that surplus water for deep percolation is available in

the district. The normal rainfall follows a normal distribution during the year.

The climate of Dewas district is semi- tropical, characterized by hot summer and

well distributed rainfall during the south west monsoon season. January is the coldest month

0

10000

20000

30000

40000

50000

60000

Large Animals Hybrid Cow

Large Animals In Descriptives Buffalo (nos)

Large Animals Hybrid Buffalo (nos)

Large Animals Hybrid Buffalo (nos)

Page 26: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

with the temperature falling as low as 4˚C - 5˚C. The period from March to first week of June

is the summer season. May is the hottest month when the temperature may go upto 45˚C

Table 1-4-1 Agro-Ecological Zone

Sr.no Agro-

Ecological

zone Type

Type of

Terrain

Block

Areas

(Ha)

Normal

Annual

Rainfall (mm)

Average

Monthly Rain

Fall(mm.)

No.of Rainy

Days (no.)

1 2 3 4 5 6 7

Dewas

Malwa plateau

Plain 100744 1047.30 87.27 39

Tokkhurd Plain 64208 831.00 69.25 32

Sonkatch Plain 64714 1021.8 85.15 31

Bagli

Plain &

Hilly

192623

1052.70

87.72 34

Kannod

Plain &

Hilly

167036

1180.00 98.33 45

Khategaon

Plain &

Hilly

111982 1269.70 105.80 42

District Dewas 701307 1067.08 88.92 38

Page 27: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 1-4-2 Temperature

Sr no

Average Weekly Temperature (˚C) in District - Dewas

Period

Summer

(April.-May)

Winter

(Oct.- Mar)

Rainy

(Jun-Sep.)

Min Max Mean Min Max Mean Min Max Mean

1 2 3 4 5 6 7 8 9 10

Dewas 18 43 31 7 37 22.4 18 41 26.5

0

200

400

600

800

1000

1200

1400

Dewas Tokkhurd Sonkatch Bagli Kannod Khategaon

Normal Annual Rainfall (mm)

Normal Annual Rainfall (mm)

Page 28: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.5 Soil Profile

The soil of Dewas district almost three fourths of the area in the district is covered by black cotton

soils, which is occupied by Deccan Basalts. The southern part has red-yellow mixed soils derived

from sandstone, shale, gneiss. The alluvial soils are found along the river courses. The higher

elevations i.e. the hilly regions have a cover of murum, which comprises small rounded pieces of

weathered trap. The Vindhyans and Bijawars have a thin cover of sandy loams. The soils in

granitic area are clayey. The schist has a thin capping of loam with lot of quartz grains. The

alluvium is derived from hill slopes by numerous streams and watercourses.

Among black cotton soil in which deep black soil constitutes 539600 ha (88.68%) medium deep

black soil 11400ha (1.90%) and shallow soil constitutes 57200ha (9.42%).The clay have property

of churning within the Pedar and the process of churning causes vertical mixing and leads to the

development of typical features like gilgai, micro relief wide (5-15cm) deep (1-2mtr) cracks . The

water losses from cracks is as high as 55% from surface, soils are low in N medium in P and high

in K content.

1.5.1. Slope

Slope of land is also one of the important physiographic aspects influencing the land use of an

area. The effect of slope on agriculture may be both direct and indirect. The most obvious direct

influence of slope is in the form of the restrained on cultivation and accessibility. The indirect

effect of slope manifests itself in pedagogical and climatic modification including the position of

water table, development of soils, air drainage, and

relative freedom from frost. This classification gives information regarding slope percent classes in

the study area.

Page 29: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 30: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 1-5-2 Slope Category of District:

Slope Category Area in Ha

Nearly level to very gental1 (0-3%) 158707

Very gental to gentale (1-5%) 292124

Gentale to moderate (3-10%) 147704

Strong to Steep (10-25%) 31398

Moderately steep to steep (15-33%) 17502

Steep to very steep (25-50%) 31903

Miscellaneous 17184

Total 696522

46880

162491

110619

337434

2151417184

17184

Area (Ha)

None to Slight

Slight to Moderate

Moderate

Moderate to Severe

Severe

Miscellaneous

Miscellaneous

Page 31: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.6 Soil depth

The mean depth of the soil layer within the sampling area is assessed by studying conditions in

the terrain, both on the test area and in its immediate vicinity. The soil depth on the test area

(humus layer + mineral soil) is specified as one of the following four classes:

Deep Soil Mean soil depth greater than 70 cm. Bedrock outcrop lacking in both the test

area and its immediate vicinity similar topography

Fairly Shallow

Soil

Mean soil depth 20-70 cm. Occasional visible bedrock outcrop present. If there

is only one bedrock outcrop it must lie wholly or partly within the test area.

Very

shallow soil

Mean soil depth less than 20 cm. Frequent occurrence of bedrock outcrop. At

least one bedrock outcrop it must within the test area. The soil may be deep

within small fissure in the bedrock

Varying Soil

Depth

Wide Variation in soil depth within the test area due to broad crevasses in the

bedrock, which occasionally emerges as outcrop at the surface

Page 32: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.6.1. Soil Texture

Soil texture has an important role in nutrient management because it influences nutrient

retention. For instance, finer textured soils tend to have greater ability to store soil nutrients.

Soil texture is the relative proportions of sand, silt, or clay in a soil. The soil textural class is a

grouping of soils based upon these relative proportions. Soils with the finest texture are called

clay soils, while soils with the coarsest texture are called sands. However, a soil that has a

relatively even mixture of sand, silt, and clay and exhibits the properties from each separate is

called a loam. There are different types of loams, based upon which soil separate is most

abundantly present. If the percentages of clay, silt, and sand in a soil are known (primarily

through laboratory analysis), you may use the textural triangle to determine the texture class of

your soil.

Page 33: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 34: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.7. Soil Erosion

Soil erosion is a naturally occurring process that affects all landforms. In agriculture, soil erosion

refers to the wearing away of a field's topsoil by the natural physical forces of weather and wind

or through forces associated with farming activities such as tillage.

Erosion, whether it is by water, wind or tillage, involves three distinct actions – soil

detachment, movement and deposition. Topsoil, which is high in organic matter, fertility and soil

life, is relocated elsewhere "on-site" where it builds up over time or is carried "off-site" where it

fills in drainage channels. Soil erosion reduces cropland productivity and contributes to the

pollution of adjacent watercourses, wetlands, and lakes.

Soil erosion can be a slow process that continues relatively unnoticed or can occur at

an alarming rate, causing serious loss of topsoil. Soil compaction, low organic matter, loss of soil

structure, poor internal drainage, salinisation, and soil acidity problems are other serious soil

degradation conditions that can accelerate the soil erosion process. The greater the intensity and

duration of a rainstorm, the higher the erosion potential. The impact of raindrops on the soil

surface can break down soil aggregates and disperse the aggregate material. Lighter aggregate

materials such as very fine sand, silt, clay and organic matter are easily removed by the raindrop

splash and runoff water; greater raindrop energy or runoff amounts are required to move larger

sand and gravel particles. Soil movement by rainfall (raindrop splash) is usually greatest and

most noticeable during short-duration, high-intensity thunderstorms. Although the erosion caused

by long-lasting and less-intense storms is not usually as spectacular or noticeable as that

produced during thunderstorms, the amount of soil loss can be significant, especially when

compounded over time.

Page 35: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 1-7-1: Spatial Soil Erosion Classes

Sr

No

Erosion Class Area (Ha)

1 None to Slight 46880

2 Slight to Moderate 162491

3 Moderate 110619

4 Moderate to Severe 337434

5 Severe 21514

6 Miscellaneous 17184

Total 696522

46880

162491

110619

337434

21514

17184

17184

55882

Area (Ha)

None to Slight

Slight to Moderate

Moderate

Moderate to Severe

Severe

Miscellaneous

Miscellaneous

Page 36: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 1-7-2 Land capability classification

Sr No Land Capability Classes Area (Ha)

1 II 259355

2 III 120559

3 IV 70085

4 VI 24960

5 VII 18830

6 Forest 185549

7 Miscellaneous 17184

Total 696522

Page 37: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Area (Ha.)

1.8. Land use

1.8.1. Concept of Land use

Land use is a function of four variables, land, water, air and man, each plays in its own

role in composing its life history. Land constitutes its body, water runs through its veins like

blood, air gives it oxygen and man acts as the dynamic actor to reflect its types, pattern and

distribution. Land varies in altitudes, forms and expressions. Man has played his part on land to

portray the different phases of his ties with it. The Homo-sapiens moved from one topography to

another where climate, flora and fauna also changed. He used land, flora and fauna to fit his

limited wants. Men multiplied, their wants increased and become complex, the uses of land also

increased, methods and technology also changed. Over a period, geographic pattern of

agricultural landuse are the outcome of concurrent interaction between the variable combinations

of natural condition and human circumstances. Primarily, these are influenced by natural

condition and thereafter affected by human circumstances because of their colonizing capability.

The human circumstances are mainly responsible for dynamism in agriculture landuse or changing

cropland occupancy.

Therefore, efficient cropland occupancy, say cropping pattern, implies the most successful use

of agriculture land, consequent upon development of irrigation facilities and application of modern

methods of farm technology. The key to the most important aspect of landuse lies in the relation

of population to land.

Page 38: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.8.2. Land Use Classification

The conservation and development of land resource is in area needs special focus. It needs

well thought and rational planning, which in turn depends upon minute observation of land use

pattern. The aim of this study is clear visualization of local land environment. The intense and

focused study of the details of land use puts us in a position to conserve the important elements

of the nature, which otherwise lead in a direction of destruction and consequently threaten the

social strata. The present study focuses mainly on dimension, which is very important from the

sustainability point of view that is distribution of different groups of land use, i.e. their ratios in

the region.

Land use classification by Statistical Department of Government of India.

I. Geographical Area - Area calculated by Survey Department.

II. Reported Area (Statistical area related to land use)

1. Forest .

2. Land not Available for Cultivation .

a) Land Put to Non- Agricultural Use.

b) Barren and Uncultivable Land.

3. Other Uncultivable and excluding Fallow Land.

a) Permanent Pastures and Other Grazing Land.

b) Miscellaneous Tree Crops and Gardens.

c) Culturable Waste Land.

4. Fallow Land a) Fallow Other than Current Fallow b) Current Fallow

5. Cultivated Land a) Net Sown Area, b) Area Sown More Than Once.

I. Net Irrigated Area.

II. Total Irrigated Area.

The analysis of land use in the present study is based on district statistical magazine, data

available at block level and revenue office. Following categories of land use have been recognised

in the study area. In the analysis of land use pattern study has been adopted at block level:

Forest Cover, Barren and cultivable waste land, Current Fallow land, Other Fallow land, Barren &

uncultivable Land, Land put to non-agricultural Use, Pastures and Grazing Land, Area under bush,

forest & garden, Net area sown.

Page 39: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table1-8-3 Land use pattern

Area in ha.

S. No.

Name of the

Block

No of Gram

Panchayat

Total Geographica

l Area

Area under Agriculture

Area under Forest

Area under Wastel

and

Area under other uses

Gross Cropped Area (1)

Net Sown Area (2)

Area sown more than once (1-2)

Cropping Intensity

(%)

1 Dewas 96 100744 161257 83593 77664 192.91 835 3486 12830

2 Tokkurd 59 64208 96888 52497 44391 184.56 537 2019 9155

3 Sonkach 66 64714 86503 46401 40102 186.42 6604 1113 10596

4 Bagli 118 192623 133146 76180 56956 174.78 95455 5345 15643

5 Kannod 85 167036 121665 72300 49365 168.28 78908 372 15456

6 Khatgaon 72 111982 137011 71613 65398 191.32 24351 361 15657

Total 496 701307 736470 402584 333876 182.94 206690 12696 79337

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Dewas Tokkurd Sonkach Bagli Kannod Khatgaon

Total Geographical Area

Net Sown Area (2)

Area under Forest

Area under Wasteland

Area under other uses

Page 40: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Special Extent of Land Use / Land Cover -

The status of vegetation cover and land use practices is another precious information for

planning the forest soil and water conservation and horticulture. The land use / land cover status

of the district has been generated by using remote sensing data. The special distribution of

various land use classes has been shown in the table given below.

Special Extent of Land use/Land Cover

S N Land use / Land Cover Classes Area (ha.)

1 Multiple crop cultivation 166821

2 Single crop cultivation 159607

3 Single crop cultivation & partly under cultivable waste land 9014

4 Deciduous forest (Single story) 10-20 % cover 119509

5 Deciduous forest (Single story) 10-20 % cover

& partly under cultivable waste land

2311

6 Deciduous forest (Single story) 20-40 % cover 19455

7 Deciduous forest (Single story) 20-40 % cover

& partly under cultivable waste land

44274

8 Grass land / Pasture (> 10 % cover) 12290

9 Cultivable waste land and partly under single crop cultivation 210

10 Cultivable waste land and partly under thin forest 123630

11 Culturable waste land and partially under thin forest 191

11 Cultivable waste land 22026

12 Miscellaneous 17184

Total 696522

Page 41: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1.9 Drainage -

A drainage system is the pattern formed by the streams, rivers lakes in a particulars drainage

basin. They are governed by the topography of the land, whether a particular region is dominated

by hard or soft rocks, and the gradient of the land. A drainage basin is the topography region

from which a streams receives runoff, through flow and ground water flow. Drainage basin is

divided from each other by topographic barriers called watershed. A watershed represents all of

the streams tributaries that flow to some location along the stream channel

Page 42: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Swot Analysis -

SWOT Analysis is a strategic planning tool used to evaluate the Strengths, Weaknesses,

Opportunities, and threats involved in project or programme. It involves specifying the objective

of the project and identifying the internal and external factors that are favorable and unfavorable

to achieving the objective. The district profile in the last chapter detailed a lot on the status of the

district on various parameters. A thorough look of the profile would guide us not only

underdeveloped status of the district but also to the factors behind this. It exposes various gaps

and strengths within the district. Before designing any project or program for removing the

poverty, backwardness, it would quite meaningful to study the strengths of the district, which

need to be harnessed to overcome this situation of under-development. Simultaneously, we also

need to identify the weak areas, which needed to be addressed to bring the district in comparable

position to the various state and national level development indicators.

Strength -

There are number of strengths in the district, which need to be further strengthened and

optimally harnessed to remove the existing state of poverty, backwardness and

underdevelopment:

Suitability of climate and soil (medium black) for various, Cereals, Oilseeds, Pulses &

Horticultural crops.

Page 43: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Sufficient average annual rainfall (1067.08 mm.).

Excellent institutional support- Agriculture collage Indore, Krishi Vigyan Kendra Dewas.

About 50% area under irrigation.

About 60% area under cultivation of total geographical area.

Sufficient availability of Agriculture labours.

Good marketing connectivity (Road & rail etc.) to the metro cities.

Quality wheat producing district.

Existing Poultry and milk industries well established and functional.

Weakness -

Like in all the places, there are a large number of weaknesses in the district, which is

responsible, to an extent, for its backwardness. Here‘s a list of some of the weaknesses of the

district comprising of both the problems and the constraints:

Large area of cultivable land lying under rainfed Agriculture.

Unavailability of quality inputs i.e. seeds & planting material and their quality and

timely availability.

Proper marketing channels for commodity chain are not well developed.

Focus on post harvest and storage management is very low.

Undulation of arable land is serious cause for enhancing input use efficiency. .

Diversifications of the farming system is very low

Lack of awareness toward the schemes and market demand at farmer‘s level.

Numbers of small and marginal farmers are more which is limiting to take

Innovation / diversification in agriculture.

Farmers‘ attitude and traditional practices for the farming limiting to get optimum

Production potential.

Opportunities –

If one look at the strengths that are there in the district and observe the weaknesses of

the district, one can easily find a lot of opportunity areas to work on, to take the district on the

path of development.

Here are some of the ‗opportunities‘, clearly evident from the profile of the district, the

strengths that operate in favors of the district and the weaknesses that one need to work towards

addressing.

Page 44: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Potential for crop/ agriculture and other components of the farming system

diversification.

Opportunity cost for the labour is comparatively low and labour availability.

Scope for organic cultivation since material required for the same is available in

sufficient quantity.

Floriculture- an option as district is near to metro.

Gap in production potential of the prominent crops.

Easy e- extension in rural areas due to IT revolution in the country.

Improving purchasing capacity.

The dairy and diary product can be an opportunity for the marginal and small farmers.

The farm mechanization can be enhance as the required industries are readily

available.

Scope exists to increase the returns to farmers by establishing small agro processing

units in production catchments.

Scope for entrepreneurship development for custom hiring of high capacity and costly

farm machinery.

Threats -

Over exploitation of the ground water and subsequent decline in water table.

Small & reducing size of land holdings with associates constraints of being resource

poor, low risk taking abilities, thereby extension of new technologies further difficult.

Natural calamities like draughts, pest and disease appearance.

Deterioration in soil health due to chemical based cropping system.

Biological and environmental degradation.

Challenges –

Management in forest area- approx 29 % of total land.

Water scarce upland/ plateau.

Tribal hamlets & forest villages.

Policy Issues- e.g. flat feasibility criteria in Irrigation Department.

Long-term Credit mobilization from banks (equipments etc.).

Ensuring adequate power supply for improvised irrigation.

Coordination issues, especially with forest regulations.

Vision -

Preamble -

Agriculture development in most part of the country remain under the shadow of green

revolution fallowed by high yield varieties, assured irrigation, use of chemical fertilizers and agro -

Page 45: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

chemicals, mechanization, this demanded higher investment per unit area and hence need for

institutional credit. Areas where the assured irrigation potential was created, the rest followed the

suit and demonstrated the fast track development in the farm sector. The trickle down of the

green revolution technologies reached the areas where partial irrigation was possible by using

either ground water or rain water. The extension apparatus devised strategies that succeeded

well in the assured irrigated command areas. A comparison was drawn between irrigated areas

and rainfed areas and the later was termed as low potential areas. The research agenda was

heavily favored the better off irrigated areas, leading to continuous neglect of poorly endowed

areas in terms of land and water.

The techno – centric approach to research and extension worked in isolation with markets,

neglecting the consumer preferences on one hand and potential of local land races, breeds,

species on the other hand. This is reflected in to the adoption of the new technologies and

adoption behavior of the farmers, low adoption of new technologies was seen as backwardness of

the area and farmers in such areas were termed as laggards. District Dewas is no exception to

this national phenomenon. The district produces best quality chickpea and other pulses, being

close to state‘ economic capital town and having a natural endowment of rainfall for Collecting

water for irrigation, district has diversified its farming system with horticulture, livestock and

fresh water fisheries.

The insufficient irrigational water use devices, commercially viable market support system,

lack of farmers‘ interest, and value addition and agro industries in the district results in to a

missed opportunity for the farming community. While discussing the issue of developing a grand

vision, most farmers, public representatives and officials expressed their opinion that we have

lacking behind irrigation facilities resulting uncertainty in farm income. However we have market

technologies and ready to invest tell us how we can share the pie and get the rightful benefit

from what we do on our farms, this formed basis for developing a vision statement as shown

under.

Vision Statement -

―Harassing potential of rain water and its optimal use in irrigation for production of high

value crops and dairy for rural prosperity. ―

Detailing the Vision -

The vision based on the strength of the district in terms of its natural endowments

productive soils cape, Live network of seasonal rivers and nalas, ground water within reach

enough area under tree cover and above all a will to work in harmony with nature. In fact

increase in area under irrigation may provide employment opportunity to rural people. Any

progress in terms of yield increase of crops and during product would add to the farmer‘s

additional income.

Page 46: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

The district has significant annual rainfall the area under irrigation may be brought by

systematic rain water harvesting measures, judicious draft from ground water sources. It is

believed that an additional area approx 15 % of the present irrigated area may be brought under

assured irrigation command by remodelling the canal system

The On Farm water management issues could best be answered by using low energy

precision application technologies e.g. sprinkler irrigation, drip irrigation, rain guns besides

developing the water uses and following water scheduling systematically.

Agro based industries including food processing especially based on vegetables and fruits.

Dairy and poultry could prove most rewarding activities the vision of harnessing potential of the

district could only be achieved by putting the processing and value addition on the priority.

Veterinary health services are need especially in the milk sheds to address the ever

increasing need for professional services. Small ruminants play vital role in the livestock the

readily available market makes it most opted enterprise among small and marginal farmers.

The Vision calls for a paradigm shift in term of community based management of

resources, processes and interventions. Inclusion of information technology enabled services like

use of telecommunication, web cast, community Radio, Weather based agronomic advisories and

market intelligence are the most sought after services, if the Vision of harnessing the potential in

the most market survey member is to be realized.

The farm sector has potential to alleviate poverty among rural poor while meaningfully

engaging them in to enterprises like post harvesting, processing production of organic inputs etc.

The local communities engaged in farm sector especially the literate youth in the rural

areas are sensitive to the change taking place due to national and private development efforts.

The aspirations are growing high and demand for better amenities employment guarantee, better

quality of life are on the rise. The vision if realized in letter and spirit shall fulfill all hopes and

aspirations among the rural youth and provide them ample opportunity to prove their mantle.

Page 47: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 48: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter - 2 District irrigation Profile

Irrigation is the artificial application of water to the land or soil. It is used to assist in the growing

of agricultural crops, maintenance of landscapes, and re-vegetation of disturbed soils in dry areas

and during periods of inadequate rainfall. There is a great necessity of irrigation in Indian

agriculture. India has a great diversity and variety of climate and weather conditions. These

conditions range from extreme of heat to extreme of cold and from extreme dryness to excessive

rainfall. Due to some reasons irrigation is needed in Indian agriculture.

Uncertainty of Monsoon rainfall both in time and place.

Irregularity in distribution of rainfall throughout the year.

Excessive rainfall causing flood.

Draught is an annual event in some areas.

India is a land of Rabi Crops. But there is not rainfall in winter months.

Some soils need more water.

Introduction of H.Y.V seeds and multiple cropping need water throughout the year.

The types of Irrigation mainly practiced in India are:

Tanks : (a) Tanks and Barrages

Well : (a) Dug Well (b) Tube Well: (i) Shallow. (ii) Deep.

Canal : Perennial (b) Non-Perennial

Rivers : Seasonal rivers / Nalas

2.1. Crop water Requirement

Crop water requirement is the water required by the plants for its survival, growth,

development and to produce economic parts. This requirement is applied either naturally by

precipitation or artificially by irrigation. Hence the crop water requirement includes all losses like:

a) Transpiration loss through leaves (T), b) Evaporation loss through soil surface in cropped area

(E), c) Amount of weather used by plants (WP) for its metabolic activities which is estimated as

less than 1% of the total water absorption. These three components cannot be separated so

easily. Hence the ET loss is taken as crop water use or crop water consumptive use. d) Other

application losses are conveyance loss, percolation loss, runoff loss, etc., (WL). e) The water

required for special purposes (WSP) like palewa operation, ploughing operation, land preparation,

leaching, requirement, for the purpose of weeding, for dissolving fertilizer and chemical, etc.

Hence the water requirement is symbolically represented as:

WR = T + E + WP + WL + WSP

Page 49: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

(The other application losses and special purposes are mostly indented for wet land

cultivation. Hence for irrigated dry land crop the ET loss alone is accounted for crop water

requirement). The estimations of the water requirement of crop are one of the basic needs for

crop planning on the farm and for the planning of any irrigation project.

Table 2-1 Crop wise Irrigation Status in Dewas

The district has good potential for irrigation through different sources. Though most of the area

under irrigation is dependent on rainfall. If there is deficit in rainfall, the area under irrigation

drastically reduced. The major sources of irrigation in the district are Tube Wells, Dug Wells,

Tanks, Barrages and seasonal rivers. The area wise crop wise irrigation potential in the district

given as under:

Area-wise, Crop-wise Irrigation Status:

Crop

Type

Kharif (area In Ha) Rabi (Area In Ha) Zaid (Area in Ha) Total

Irrig ated

Rain fed

Total Irriga ted

Rain fed

Total Irriga ted

Rain fed

Total Irriga ted

Rain fed

Total

1 2 3 4 5 6 7 8 9 10 11 12 13

Cerals 0 433 433 174899 257 175156 0 0 0 174899 595 175494

Coares

Cerales

0 11937 11937 0 0 0 0 0 0 0 12032 1232

Pules 0 5741 5741 0 135003 135003 4930 0 4930 4930 140744 145674

Oil seed 0 348150 348150 0 452 452 0 0 0 0 348602 348602

Fibre 0 10836 10836 0 0 0 0 0 0 0 10836 10836

Any Other crop

0 0 0 0 0 0 0 0 0 0 0 0

Total 0 377097 377097 174899 135712 310611 4930 0 4930 179829 512809 692638

Page 50: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

2.2 Production and Productivity of Major Crops

Dewas is developing district of the state & important district for agriculture point of view.

Here major crops grown in the district are Soybean, Maize, Cotton in Kharif however wheat &

Chickpea in Rabi season. The prominent cropping system prevails in the district are Soybean –

Wheat and Soybean – Chickpea. The productivity of the major crop is not better since the crops

are dependent on rains. The Gram Doller of the district is very popular and producing good

quantum which supplying all over the country. Present production and productivity of major crop

in the district is given as an under:-

Agriculture

Season

Name

Of

Crops

Rainfed Irrigated Total

Are

a (

ha.)

Pro

du

ctio

n

(000m

t./y

r.)

Pro

du

ctiv

ity

(Kgs.

/ha.)

Cost

of

Cu

ltiv

ati

on

(Rs.

/ha.)

Pro

du

ctio

n

(000m

t./y

r.)

Pro

du

ctiv

ity

(Kgs.

/ha.)

Cost

of

Cu

ltiv

ati

on

(Rs.

/ha.)

Pro

du

ctio

n

(000m

t./y

r.)

Pro

du

ctiv

ity

(Kgs.

/ha.)

Cost

of

Cu

ltiv

ati

on

(Rs.

/ha.)

A. K

hari

f

Paddy 200 0.19 950 0 0 0 0.19 950

Maize 11200 14 1250 28156 0 0 0 14 1250 28156

Moong 630 0.28 450 20445 0 0 0 0.28 450 20445

Urd 320 0.14 450 20445 0 0 0 0.14 450 20445

Arhar 5100 4.21 825 23855 0 0 0 4.21 825 23855

Soybean 337360 219.28 650 35688 0 0 0 219.28 650 35688

Cotton 9350 13.56 1450 37180 0 0 0 13.56 1450 37180

B. R

ab

i

Wheat 175000 0 0 0 656.25 3750 34899 656.25 3750 34899

Maize 0 0 0 0 0 0 0 0 0 0

Gram 145000 0 0 0 173.25 1050 31293 173.25 1050 31293

Mustard 870 0 0 0 1.48 1080 25415 1.48 1080 25415

C. Zaid Moong 0 0 0 0 0 0 0 0 0 0

Page 51: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

HORTICULTURE

Types

of

Crop

Name Of

Crops

Rainfed Irrigated Total

Are

a (

ha

.)

Pro

du

ctio

n

(00

0m

t./y

r.)

Pro

du

ctiv

ity

(Kg

s./h

a.)

Co

st o

f

Cu

ltiv

ati

on

(Rs.

/ha

.)

Pro

du

ctio

n

(Met

ric

ton

e/y

r.)

Pro

du

ctiv

ity

(Ma

tric

ton

e/h

a.)

Co

st o

f

Cu

ltiv

ati

on

(Rs.

/ha

.)

Pro

du

ctio

n

(Met

ric

ton

e/y

r.)

Pro

du

ctiv

ity

(Ma

tric

ton

e/h

a.)

Co

st o

f

Cu

ltiv

ati

on

(Rs.

/ha

.)

A.V

egeta

ble

Potato 7881 0 0 0 154378 19.59 48000 154378 19.59 48000

Tomato 1920 0 0 0 74880 39.00 265000 74880 39.00 265000

Brinjal 1046 0 0 0 24184 23.12 15000 24184 23.12 15000

Pea 5720 0 0 0 38515 6.73 18000 38515 6.73 18000

Cole Crop 1712 0 0 0 47623 27.82 25000 47623 27.82 25000

Cucurbits 2750 0 0 0 45380 16.50 18000 45380 16.50 18000

Carrot 172 0 0 0 1302 7.57 12500 1302 7.57 12500

Colocasia 157 0 0 0 1922 12.24 14000 1922 12.24 14000

Okra 1034 0 0 0 16544 16.00 10500 16544 16.00 10500

Onion 5195 0 0 0 156610 30.15 25000 156610 30.15 25000

Other 934 0 0 0 9853 10.55 18000 9853 10.55 18000

B. F

ruit

s

Mango 510 0 0 0 1379 2.70 85000 1379 2.70 85000

Guava 480 0 0 0 8016 16.70 102000 8016 16.70 102000

Orange 510 0 0 0 9282 18.20 119000 9282 18.20 119000

Pomegranate 300 0 0 0 3330 11.10 112000 3330 11.10 112000

Citrus 262 0 0 0 4181 15.96 95000 4181 15.96 95000

Aonla 223 0 0 0 2060 9.24 55000 2060 9.24 55000

Other 347 0 0 0 4905 14.14 48500 4905 14.14 48500

C.F

low

ers

Marigold 335 0 0 0 3055 9.12 96500 3055 9.12 96500

Rose 120 0 0 0 509 4.24 104000 509 4.24 104000

Gladiolus 40 0 0 0 166 4.15 85000 166 4.15 85000

Glodia 206 0 0 0 4996 24.25 65000 4996 24.25 65000

Safed Bijali 144 0 0 0 3542 24.60 56000 3542 24.60 56000

Other 189 0 0 0 1089 5.76 65000 1089 5.76 65000

D.S

pic

es

Chilli 1755 0 0 0 49667 28.30 265000 49667 28.30 265000

Coriander 1325 0 0 0 38708 29.21 35000 38708 29.21 35000

Garlic 2860 0 0 0 23309 8.15 58500 23309 8.15 58500

Ginger 115 0 0 0 2427 21.10 47500 2427 21.10 47500

Turmeric 140 0 0 0 2695 19.25 22500 2695 19.25 22500

Page 52: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 2.3 Irrigated and Un irrigated Area

A total around 50% of cultivable land is under irrigation. Average rainfall of the district is 1067.08 mm with the average 38 raining days.

The much sources of irrigation are Tube well, Dug wells and Ponds. Area under command is only 17424 ha. Where canal irrigation system is

followed. The irrigated area under Tube wells, Dug wells, and Ponds, mainly depended on rains. Block wise irrigation based classification is given

as under –

(Area in Ha)

Sr.no Block Sown Area Irrigated Wholly Un- irrigated Wholly

Irrigated Partly

Irrigated

Total

1 Dewas 83593 15106 24701 39807 21052

2 Tokkhurd 52497 8785 11294 20079 20600

3 Sonkatch 46401 21175 11087 32262 13392

4 Bagli 76180 11485 18531 30016 37278

5 Kannod 72300 6800 24238 31038 33141

6 Khategaon 71613 20129 22660 42789 26328

Toatal District 402584 83480 112511 195991 151791

Source : Agricensus 2011

Page 53: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 54: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter - 3 District Water Profile

Dynamic ground water resources of the district have been estimated for base year -2008/09 on block-

wise basis. Out 6,98,044 ha of geographical area, 5,56,382 ha ( 80%) is ground water recharge worthy

area and 1,41,662 ha (20%) is hilly area. There are six number of assessment units (block) in the

district which fall under non-command (98 %) and command (2.% Bagli and Kannod) sub units. Bagli,

Kannod and Tonkkhurd blocks of the district are categorized as safe blocks. Kahtegaon block of the

district is categorized as semi critical block (safe in 2003/04), Dewas and Sonkatch (critical in 2003/04)

blocks as over exploited with highest stage of ground water development of 113 % in Dewas block. The

net ground water availability in the district is 79,141 ham and ground water draft for all uses is 63,383

ham, making stage of ground water development 80% (66 % in 2004) as a whole for district. After

making allocation for future domestic and industrial supply for next 25 years, balance available ground

water for future irrigation would be 14,849 ham.

The ground water development in the district is being done by dug wells and bore wells. The dug wells‘

depth varies from 5 to 20 m and their diameter varies from 1 to 4 m. The bore wells drilled in the area

are 60 to 150 m deep with diameter of 100 to 150 mm.

Ground water is the main source of drinking in the district covering 1156 no. of villages. The

contribution from the ground water for irrigation comes to nearly 25% of the net sown area. The use of

ground water for irrigation purpose in non-command area is maximum. The ground water development

in the district is mainly for domestic and irrigation purposes. Nearly 75% of the population living in the

rural areas is dependent on ground water for their domestic water demand

Table 3-1 Status of Water Availability

Total 932.58 MCM water is available by all the sources. Surface water avalibility is around 141.17

MCM. However ground water is available 791.41 MCM. Source wise status of water avalibility is given in

the following table:

Sr No Sources Total availability of Water (MCM)

A Surface

1 Tanks 134.11

2 Barrages 7.06

3 Others 0

B Ground Water

1 Dug Wells, Tubwell and other 791.41

Total 932.58

Page 55: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 3-2 Status of Ground Water Availability

According to data available the Dewas and Sonkatch blocks are in critical zone while Khategaon block is

considered as semi critical zone. To improve the water table in critical zone we need to develop a

strategic plan. Over exploitation of ground water for irrigation purpose leads to following the moost of

area under critical zone. The block wise status of ground water availability is give as under :

Status of Ground Water Availability

Status of Block as per CGDB Ground Water (HaM)

Block Critical Semi -

Critical

Safe Draft Recharge Gap

Dewas Critical - - 19502.21 18164.87 -1337.34

Tokkhurd - - Safe 11717.79 11197.68 -520.11

Sonkatch Critical - - 8055.12 10985.35 2930.23

Bagli - - Safe 13455.24 20575.32 7120.08

Kannod - - Safe 8520.68 12120.09 3599.41

Khategaon - Semi-

Critical

- 10693.09 12602.22 1909.13

Total 71944.13 85645.53 13701.4

134.11

7.06

0

791.41

932.58

Total availability of Water (MCM)

Surface

Tanks

Barrages

Others

Ground Water

Dug Wells, Tubwell and other

Total

Page 56: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

3-3 Status of Command Area

Surface water/ Rain water stand in reservoirs or flowing water in the river is distributed for irrigation

through a network which is known as command area/ canal system. A canal takes off the head work off

either a water storage dam or barrage or diversion. Good canal management result in increase

production, more benefits to its user and better living. The canal network consists of Canals,

distributetaries, water courses and field channels which are termed according to their capacity. The

status of command area in Dewas district is tabulated as water courses and field channels which are

termed according to their capacity. The status of command area in Dewas district is tabulated as

under:

Status of Command area District Dewas

Area in Ha.

Name of the

Blocks

Information of Canal Command Information on the other Services

Command Total Area

Total

Area

Developed

Area

Undeveloped

Area

Total

Area

Developed

Area

Undeveloped

Area

Developed

Command

Undeveloped

Command

1 2 3 4 5 6 7 8 4+7 5+8

1 Dewas 603 603 0 0 0 0 603 0

2 Sonkacha 2337 2337 0 0 0 0 2337 0

3 Tonkkhurd 2889 2889 0 0 0 0 2889 0

4 Bagli 2378 2378 0 918 918 0 3295 0

5 Kannod 4220 4220 0 3164 3029 0 7384 0

6 Khategone 135 135 0 781 781 0 916 0

Total 12562 12562 0 4862 4727 0 17424 0

3-4 Existing type of irrigation:-

In the district under surface water irrigation Barrages and Tanks covered area 17424 ha with 141.17

MCM capacity, underground water there are mostly tub wells and dug wells are main source of

irrigation about 34507 and 42955 in numbers respectively. Few water harvesting structure are also in

existence from where farmers irrigate their crops. In the water extracting device t here are mostly

electric pimps having in numbers 87733 wherever 9420 numbers of diseal pumps are also available

,block wise number of irrigation sources and its command are as given in the table :

Page 57: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Name of District: Dewas

Blocks/

Source of

Irrigation

Surface Irrigation (1) Ground Water (2)

Oth

er S

ou

rces

In

clu

din

g

Tra

dit

ion

al

W?H

S (

3)

Tre

ate

d e

fflu

ent

dis

charg

ed

from

ST

P

Water extraction

devices/Lift. Total

Canal Based Tanks/Ponds/Reserv

oirs

Tube

wells Open Wells

Bore

Well

Ele

ctri

city

pu

mp

(4)

Die

sel

pu

mp

(5)

Oth

ers

(6)

Irri

gati

on

sou

rces

(1+

2+

3)

Wate

r ex

tra

ctin

g u

nit

s

(4+

5+

6) Re

ma

rks

Govt.

Can

al

Com

mu

nit

y/

Pvt.

Can

al

Com

mu

nit

y P

on

ds

Incl

ud

ing S

mall

Ind

ivid

ual/

P

vt.

Pon

ds

Govt.

Res

ervoir

/

Dam

s

Govt.

Pvt.

Com

mu

nit

y/

Govt.

Pvt.

Govt.

Pvt.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Dewas 425 0 0 0 60 0 8020 0 6629 0 0 118 0 16350 37 0 67980 0

Sonkatch 1762 0 0 0 0 0 6453 0 5660 0 0 205 0 13047 129 0 35640 370

Tonkkhurd 2808 0 0 0 0 0 2860 0 4704 0 0 81 0 9442 340 0 25963 0

Bagli 2378 0 0 0 762.6 0 6972 0 12987 0 0 155 0 20370 6848 0 51045 0

Kannod 4220 0 0 0 2330 0 3291 0 8070 0 0 834 0 12505 790 0 46833 0

Khategaon 135 0 0 0 65 0 9795 0 5691 0 0 715.6 0 16009 1275 0 56997 0

Total 11728 0 0 0 3218 0 34507 0 42955 0 0 2108.6 0 87733 9420 0 284458 370

Page 58: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 59: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter- 4 -Water Requirement/Demand

4.1. Domestic Water Demand:

According to Froukh the term ‗domestic water demand‘ is the amount of water required for

domestic uses. Water demand forecasting is essential to water utilities, both for day-to-day

operations and for long-term planning. A number of factors like climate, culture, food habits, work

and working conditions, level and type of development, and physiology determine the domestic

requirement of water.

As per the Bureau of Indian Standards (BIS), a minimum water supply of 200 litre per capita per

day (lpcd) should be provided for domestic consumption in cities with full flushing systems. It also

mentions that the amount of water supply may be reduced to 135 lpcd for the Lower Income

Group (LIG) inhabitants and the economically weaker sections (EWS) of the society and in small

towns.

Table 4-1.1: Breakup of Average Daily Domestic Water Consumption Rate

Sr. No. Water use Consumption in liter per person per day

1 Drinking 5

2 Cooking 5

3 Bathing (Including ablution) 55

4 Washing Cloths 20

5 Washing of Utentials 10

6 Cleaning of House 10

7 Flushing of Laterins 30

Total 135

Source: Central Public Health and Environmental engineering Organization

(CPHEEO India Water portal)

Page 60: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 4-1.2: Present Water Requirement/Demand

Unit (MCM)

Present Water Demand Source: CWC ,WRD,PHE

Block Population

in 2011

Decadal

Growth

Rate

Projected

Population

in 2015

Present

Water

Requirement

Projected

Population

in 2020

Water

demand in

2020

Water Gap in

2020

Dewas 505948 19.53 555353 0.074972655 604759 0.08164255 0.006669895

Tokkhurd 133783 19.53 146843 0.019823805 159910 0.02158796 0.001764155

Sonkatch 172308 19.53 189133 0.025532955 205959 0.02780457 0.002271615

Bagli 301765 19.53 331230 0.04471605 360699 0.04869446 0.00397841

Kannod 258476 19.53 283716 0.03830166 308956 0.04170911 0.00340745

Khategaon 191735 19.53 210453 0.028411155 229180 0.03093941 0.002528255

Total District 1563715 1716728 0.23175828 1869467 0.25237806 0.02061978

Estimated @ 135 litre per person per day

Estimated Gross water demand for a year

From above, the total population of the district Dewas in the year 2011 was 1563715. The

decadal growth rate for the district is 19.53% and accordingly its projected population in the year

2020 is estimated to be 1869467.

Adopted average rate of per capita domestic water requirement is 135 litre per day. Based on this

information, gross domestic water demand for the whole district for the current year is

0.23175828 MCM. Correspondingly the projected annual gross domestic water demand in the

year 2020 is 0.25237806 MCM. Thus the estimated gap in the projected annual gross domestic

water demand is 0.02061978 MCM for the district Dewas.

Page 61: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

4.2. Crop water Demand:

It is essential to know the water requirement of a crop which is the total quantity of water

required from its sowing time up to the harvest. Naturally different crops have different water

0

100000

200000

300000

400000

500000

600000

700000

Dewas Tokkhurd Sonkatch Bagli Kannod Khategaon

Population in 2011

Project Population in 2015

Project Population in 2020

0

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

Dewas Tokkhurd Sonkatch Bagli Kannod Khategaon

Present Water Requirement

Water demand in 2020

Water Gap in 2020

Page 62: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

requirements at their different stages of growth and at the same time, at different places in the

same country, depending upon the climate, type of soil, method of cultivation, effective rain fall

etc. for the that particular place. The total water required for the crop growth is not uniformly distributed over its entire life span.

Actually, the watering stops some time before harvesting of the crop. The time duration from the

first irrigation during sowing up to the last before its harvest is called the base period for that

particular crop. Though the crop period is slightly more than the base period, they do not differ

for practical purposes. The total depth of water required to raise a crop over a unit area of the

land is usually called delta. Some typical values of the delta for common crops in typically

occurring natural conditions and different regions of India are as follows:

Rice:

• 1000mm to 1500mm for heavy soils or high water table

• 1500mm to 2000mm for medium soils

• 2000 to 2500 for light soils or deep water table

• 1600mm for upland conditions

Wheat:

• 250mm to 400mm in northern India

• 500mm to 600mm in central India

Barley:

450mm

Maize:

• 100mm during rainy season

• 500mm during winter season

• 900mm during summer season

Cotton:

400 – 500mm

Sugarcane:

• 1400mm to 1500mm in Bihar

• 1600mm to 1700mm in Andhra Pradesh

• 1700mm to 1800mm in Punjab

• 2200mm to 2400mm in Madhya Pradesh • 2800mm to 3000mm in Maharashtra

(Based upon the Handbook of Agriculture (fifth edition, 2000) published by the Indian

Council of Agricultural Research)

Page 63: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 4.2.1 : Crop Water Requirement for the District Dewas

S. No Name of Crops Area sown (ha.)

Crop Water Demand

(mm)

Water Potential required (MCM)

Existing potential

Water Potential to be created

(MCM)

(MCM)

A Kharif

1 Paddy 200 1650 3.30 3.30 0.00

2 Maize 11200 750 84.00 84.00 0.00

3 Jowar 860 550 4.73 4.73 0.00

4 Pigeon Pea 5100 350 17.85 8.16 9.70

5 Green Gram 630 200 1.26 1.26 0.00

6 Black Gram 320 250 0.80 0.80 0.00

7 Soya bean 337360 800 2698.88 2120.00 578.88

8 Ground nut 350 650 2.28 2.28 0.00

9 Cotton 9350 700 65.45 39.00 26.45

Total 365370 2878.55 2263.52 615.03

B Rabi

1 Wheat 175000 500 875.00 415.00 460.00

2 Gram 145000 200 290.00 97.00 193.00

3 Pea 610 200 1.22 1.02 0.20

4 Mustard 870 200 1.74 0.72 1.02

5 Linseed 60 200 0.12 0.00 0.12

6 others 12696 400 50.78 6.00 44.78

7 fallow and westland 35600 300 106.80 0.00 106.80

8 Sugarcane 80 1200 0.96 0.96 0.00

Total 369916 1326.62 520.70 805.92

C Zaid

1 moong 5245 500 26.23 26.23 0.00

2 moong projected 16000 500 80.00 0.00 80.00

Total 21245 106.23 26.23 80.00

D Horticultural crops

1 Vege tables 28521 473 134.05 112.00 22.05

2 Fruits 2632 843 12.37 7.00 5.37

3 Flowers 701 550 3.29 1.90 1.39

4 Spices 6528 457 30.68 19.00 11.68

Total 38382 180.40 139.90 40.50

Grand total 794913 4491.79 2950.35 1541.44

Page 64: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

4.2.2 : Crop Water Demand Block wise

Block Total Gross Cropped Area

Present water demand (MCM)

Water demand in Year 2020

(MCM)

Existing Potential (MCM)

Water Potential to be created in

year 2020 (MCM)

Dewas 170997 966.2459 1007.91 634.40 373.51

Tokkhurd 106628 602.5186 644.18 395.59 248.59

Sonkatch 96243 543.8365 585.5 357.06 228.44

Bagli 142886 807.4002 849.06 531.31 317.75

Kannod 131408 742.5419 784.2 487.55 296.65

Khategaon 146751 829.24 870.9 544.45 326.45

Total District 794913 4491.783 4741.74 2950.35 1791.39

The Crop water requirement for the district Dewas for major crops is estimated based on the

water depth required for each crop and the area sown, as given in the table 4.3. 90 percent of the

water is consumed by the Soybean, Wheat and Gram only. Total crop water demand for 2015 is

4491.78 MCM, whereas the existing water availability is 2950.35 MCM. Hence a potential of

1791.39 MCM has to be created for 2020 and in 2020 crop water demand is goes up to 4741.74

MCM.

4.3. Livestock water Demand:

Global trend in the animal production indicates a rapid and massive increase in the consumption

of livestock products. It is predicted that the meat and milk consumption will grow @ 2.8 and

0

200

400

600

800

1000

1200

Present water demand (MCM)

Water demand in Year 2020 (MCM)

Existing Potential (MCM)

Water Potential to be created in year 2020 (MCM)

Page 65: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

3.3% per annum, respectively, in developing countries like India where the whole system of rural

economy has revolved around livestock production. Providing enough quality water is essential for

good livestock husbandry.

Water makes up to 80% of the blood and regulates the body temperature and is vital for organ

functions such as digestion, waste removal and absorption of nutrients. Understanding daily

livestock watering needs is the key function when designing a livestock watering system.

The daily water requirement of livestock varies significantly among animal species. The animal's

size and growth stage will have a strong influence on its daily water intake. Consumption rates

can be affected by environmental and management factors. Air temperature, relative humidity

and the level of animal exertion or production level are examples of these factors. The quality of

water, which includes temperature, salinity and impurities affecting the taste and odor, will also

have an effect. The water content of the animal's diet would also influence its drinking habits.

Feed with relatively high moisture content decreases the actual quantity of drinking water

required.

Table 4.3.1 gives block water demand for livestock for current year and for 2020. Number of

livestock as per 2011 census is 806469 and present water demand is 17.16 MCM. Estimation is

done based on livestock water demand which is different for types of animals.

Table 4-3.1 : Livestock water Demand

Block Total No. of

Livestock

Present water

demand (MCM)

Water demand in

Year 2020

(MCM)

Existing Potential

(MCM)

Water Potential to

be created (MCM)

Dewas 143875 3.14855 3.160884 3.14855 0.012334

Tokkhurd 92692 2.182934 2.190675 2.182934 0.007741

Sonkatch 102421 2.409524 2.418321 2.409524 0.008797

Bagli 229845 4.131982 4.152937 4.131982 0.020955

Kannod 159958 3.568396 3.582658 3.568396 0.014262

Khategaon 96678 2.269547 2.276811 2.269547 0.007264

Total District 806469 17.15765 17.22904 17.15765 0.07139

Table 4-3.2 : Water Consumption by Animal / Birds

Sr. No. Livestock Category Water Requirement

Range

Average water Use

Liter per day

1 Poultry 0.16-0.24 0.20

2 Small Animals 13-20 16.5

3 Large Animals 39-59 49

(Source: Adopted from the Nutrient Requirement of Poultry, Sheep, Cattle: 9th

edition Washington, D.C. National Research

Council, 1994)

Page 66: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

4.4: Industrial Water Demand

The main sources of water for the industrial sector are groundwater and surface water.

Groundwater has emerged as an important source to meet the water requirement of industries.

Choice of water source depends on the assured and regular availability and supply of the desired

quantity of water and its cost of supply right from the source.

While the running cost of surface water is mainly the price paid to the supplier—the municipal

bodies; the cost of groundwater is the extraction cost—energy used (electricity/diesel). Since the

prices of all the inputs, water, electricity, and diesel are administered or regulated by the

government, the inefficient use of water remains a normal practice.Net Water demand for the

industries in the district Dewas in the current year is 9.12MCM.Industrial water demand for the

year 2020 is estimated at 12.41MCM.

(The following data is obtained from CGWB and the District Industries Department)

Table-4.4.1: Block wise Industrial Water Demand

Block Type of Industry No. of

Existing

type

Industry

Water

demand

(MCM)

No. of

Proposed

Industry in

2020

Water

demand in

Year 2020

(MCM)

Existing

potential

(MCM)

Water

Potential to be

created (MCM)

Dewas Engineering,

Food Processing

and others

544 9.125 100 10.95 1.095 9.855

Tokkhurd 0 0 0 0 0 0

Sonkatch 0 0 100 0.365 0 0.365

Bagli 0 0 100 0.365 0 0.365

Kannod 0 0 0 0 0 0

Khategaon 0 0 200 0.730 0 0.730

Total District 544 9.125 500 12.41 1.095 11.315

4.5 : Water demand for Power generation:

There is no power generation plant in the district Dewas. No additional water is required for this

purpose.

Page 67: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Summary of Present Water Demand and Projected Water Demand of the District for

Various sectors In the Year 2020

Table-4.6.1: Summary of Present Water Demand of the District for Various sectors (MCM): In Year 2015

Blocks Domestic Crop Livestock Industrial Power gen. Total

Dewas 0.074972655 966.2459 3.14855 9.125 0 978.594423 Tokkhurd 0.019823805 602.5186 2.182934 0 0 604.721358 Sonkatch 0.025532955 543.8365 2.409524 0 0 546.271557

Bagli 0.04471605 807.4002 4.131982 0 0 811.576898 Kannod 0.03830166 742.5419 3.568396 0 0 746.148598

Khategaon 0.028411155 829.2400 2.269547 0 0 831.537958

Total District 0.23175828 4491.783 17.15765 9.125 0 4518.29741

Table-4.6.2: Projected Water Demand of the District for Various sectors (MCM): In the Year 2020

Blocks Domestic Crop Livestock Industrial Power

gen.

Total

Dewas 0.08164255 1007.91 3.160 10.95 0 1022.10

Tokkhurd 0.02158796 644.18 2.190 0 0 646.39

Sonkatch 0.02780457 585.5 2.41 0.365 0 588.31

Bagli 0.04869446 849.06 4.15 0.365 0 853.62

Kannod 0.04170911 784.2 3.58 0 0 787.82

Khategaon 0.03093941 870.9 2.27 0.73 0 873.93

Total District 0.25237806 4741.74 17.22 12.41 0 4771.63

Based on the above estimation, it is reflected that total current water requirement for the entire

district Dewas is 4518.29741 MCM. Highest water requirement is in the block Dewas and lowest

requirement is in the block Sonkatch of the district. Due to rapid urbanization and increasing

population, in the year 2020, the projected total water requirement for the entire district would

be about 4771.63 MCM.

4.7 Water Budget:

A water budget for a region reflects the relationship between the water inputs from its different

sources and output required for water consumption or requirement for various purposes for that

region. Thus we have a direct comparison of total quantity of water available from its various

sources and various water demands put on them. The following data provides current (Year 2015)

and projected total water requirement (Year 2020) between the current availability of water and

its demand in the district Dewas.

Page 68: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table : 4.7.1: Water Budget

Water Demand (MCM) Available Water (MCM) Water Potential to be Generated

(MCM)

Year

Do

mes

tic

Irri

gati

on

(g

ap)

Live

Sto

ck

Ind

ust

rial

Tota

l

Year

Surf

ace

Wat

er

Gro

un

d

Wat

er

Tota

l

2020 0.26 1791.39 17.16 12.41 1821.2 2015 141.17 791.41 932.58 888.64

The demand for water increase with expanding population, livestock, Industrial etc. It is

estimated that 0.26 MCM for domestic purposes, 12.41 MCM water is needed for Industry and

17.16 MCM for Livestock. The available and created water resources have to be very efficient

utilized by minimizing water losses in the irrigation system, more efficient water management in

the crop land by enhancing use of micro irrigation systems.

Page 69: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 70: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter -5 Strategic Action plan

Water is essential for sustaining life and at the same time, it is an important component

for almost all developmental plans. Obviously the schemes for development of water resources for

beneficial use of the society have been taken up since the time immemorial. Considerable

progress has been made in respect of water resources development in India after independence

through various Plans and such developments have helped in almost five fold increase in creation

of irrigation potential. Total created irrigation potential at pre-Plan period was about 22.6 million

hectares (Mha) which at present is about 108.2 Mha. There has also been appreciable

development in the areas of drinking water supply and other uses. However, growing population,

urbanization and industrialization has led to considerable increase in demand of water for various

purposes e.g., irrigation, domestic needs, industrial requirements etc.

In this regard, it may be mentioned that the water sector has very strong linkages with all other

developmental activities. In view of fast changing development scenario, it is emphasized that the

key priorities and identified strategies cannot be considered as static and firm. These need to be

reviewed and improved upon from time to time. In this regard a comprehensive ―Strategic Plan

for District Irrigation‖ has been preparedthrough geospatial approach:

5.1. Methodology

Diverse research methodologies using RS and GIS have been applied by different authors to

identify potential rainwater harvestings in remote and data scarce areas; in most of these

methods, thematic maps are derived from remote sensing data and integrated in GIS to evaluate

suitable sites for rainwater harvesting. Remote sensing is of immense use for natural resources

mapping and generating necessary spatial database required as an input for GIS analysis. GIS is

a tool for collecting, storing and analyzing spatial and non - spatial data, and developing a model

based on local factors can be used to evaluate appropriate natural resources development and

management action plans. Both these techniques can complement each other to be used as an

effective tool for selecting suitable sites for water harvesting structures.

In assessment of proposed rainwater harvesting structures potential using GIS and RS, outlines

six key factors that require to be integrated into a GIS framework in order to successfully develop

a suitable model for RWH. This include; rainfall, hydrology (rainfall runoff relationships), slope,

land cover, soils (texture, structure, depth) and socio-economics of the area under consideration.

The following criteria have been followed for making decision on selecting suitable site for various

water harvesting structures as per Integrated Mission for Sustainable Development (IMSD)

guidelines.

Page 71: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Check dams

The slope should be less than 15 per cent.

The land use may be barren, shrub land and riverbed.

The infiltration rate of the soil should be less.

The type of soil should be sandy clay loam.

Percolation tanks and nala bunds

The slope should be less than 10 per cent.

The infiltration rate of the soil should be moderately high.

The land use / cover may be barren or scrub land.

The type of soil should be silt loam.

The suitability of WHS sites can be confirmed as the site is located on second and third order

drainage and satisfies the conditions of land use, soil type and slope as per IMSD guidelines.

Water harvesting structures are extremely important to conserve precious natural resources like,

soil and water, which is depleting day by day at alarming rate. The following table provide

strategic action plan for irrigation for each block as well as for whole district and estimated costs

and period of implementation.

5.2. Prioritization of Blocks and activity for Strategic Planning

The prioritization is the heart of the programme in which any programme will be implemented.

Some of the important activities to be included in first phase or first year and some of the activity

included in last year or last phase. For prioritization of the activity and block fallowing criteria has

been adopted.

1. Map the present situation.

2. Talk to local peoples and public representatives.

3. Availability of Resources.

4. Poverty Index.

5. Percentage of SC & ST Population.

6. Percentage of Formers .

7. Cropping Intensity.

8. Ground Water Situation.

9. Available of Degraded Land. 10. Land Capability Status.

11. Percentage of Irrigated area to total cropped area.

Page 72: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 5-1 Component wise and year wise Strategic Action plan

Comonent 1st year 2nd year 3rd year 4th year 5th year Total cost

(Rs.in

Crore)

AIBP 0 0 0 0 0 0

Her Khet ko pani 26.00 59.00 48.00 39.00 24.71 196.71

MGNREGA 40.6 54.12 55.14 59.85 61.61 271.32

Pr Drop More Crop 58.16 83.78 83.78 83.78 83.78 393.28

PMKSY(IWMP) 22.9 11.05 11.14 3.33 2.08 50.50

Grand Total 147.66 207.95 198.06 185.96 172.18 911.81

Table 5-2 Total Proposed Structures

Structure Total no.

Water

Storage/structure

(cum)

Total Water

Storage(cum)

Stop Dam 996 3500 3486000 Chek Dam 1255 2500 3137500

Tank 186 4500 837000 Sunken Pond 0 0 0 Farm Pond 3590 2200 7898000

Earthen Chek 0 0 0 Percolation Tank 333 2000 666000 Contour Trenches 91599 1 91599

Gabion 1631 0 0

LBS 1346 0 0 Dikes 197 0 0

Soak Pit 457 0 0

Dug Well Recharge 2778 0 0 Recharge Shaft 0 0 0

Dug Well 0 0 0 Total 104368 16116099

Total Water storage 16.11 MCM

Page 73: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Table 5.2 Water Saving

Component Area in ha. Water Saving /work Total water saving

in (cum)

Land Development 151000 1000 151000000

Drip Irrigation 15000 3000 45000000

Sprinklers 50000 2000 100000000

On Going Watershed Activity

On Going Project PMKSY (IWMP)

Name of Block Project Year Area Cost in lakh

Rs.

Dewas IWMP 1 2010-11 6066 728

Bagli IWMP 2 2010-11 5491 659

Sonkacch IWMP 3 2010-11 4538 545

Kannod IWMP 4 2010-11 5695 683

Sonkacch IWMP 6 2012-13 6643 797

Bagli IWMP 7 2012-13 6609 793

Bagli IWMP 8 2012-13 6035 724

Dewas IWMP 9 2014-15 5048 606

Bagli IWMP 10 2014-15 3950 474

Kannod IWMP 12 2014-15 5471 657

Total 55546 6666

Proposed Work by MP & MLA

S.No. Name of proposed work

Block Amount in Lakh Rs.

Remarks

1 Tanks/Stop dam Dewas 20.00

2 Tanks/Stop dam Tonkkhurd 20.00

3 Tanks/Stop dam Sonkutch 20.00

4 Tanks/Stop dam Bagli 20.00

5 Tanks/Stop dam Kannod 20.00

6 Tanks/Stop dam Khategaon 20.00

Page 74: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Fund Required from PMKSY (IWMP) on Going Project (Rs.in Lakh)

Name of

Block

Project 1st year 2nd year 3rd year 4th year 5th year Total cost

(Rs.in Crore)

Dewas IWMP 1 3.95 0.00 0.00 0.00 0.00 3.95

Bagli IWMP 2 2.94 0.00 0.00 0.00 0.00 2.94

Sonkutch IWMP 3 2.41 0.00 0.00 0.00 0.00 2.41

Kannod IWMP 4 5.34 0.00 0.00 0.00 0.00 5.34

Sonkutch IWMP 6 2.30 2.10 2.05 0.00 0.00 6.45

Bagli IWMP 7 1.82 2.67 2.67 0.00 0.00 7.16

Bagli IWMP 8 1.31 2.40 2.40 0.00 0.00 6.10

Dewas IWMP 9 0.61 1.68 1.82 0.93 0.61 5.64

Bagli IWMP 10 0.79 1.00 1.00 1.00 0.56 4.35

Kannod IWMP 12 1.43 1.20 1.20 1.40 0.92 6.14

Total 22.90 11.05 11.14 3.33 2.08 50.50

Water Use Association in district Dewas

The jal Upbhokta Santha of the existing irrigation water bodies formed by Water

Resources department in district is 24

Sr.No. Name of project Name of Department

Name of The WUA

Kannod 1 Chandrakeshar Dam Water Recourses

Department Division Dewas

(1) Kantafod, (2)Satwas, (3) Jansur, (4)Rehmanpura

2 Borani Tank (5) Borani

3 Satwas Tank (5) Borani

Bagli

4 Koop Tank (6) Koop

5 Bhikupura Tank (7) Bhikupura

6 Pankua Tank No.1 (8) Pankua

7 Pankua No.2 (8) Pankua

8 Paras Tank (9) Paras

9 Bori Tank (10) Bori

10 Dangrakheda Tank (10) Bori

11 Mahigaon Tank (11) Mahigaon

12 Mendia Tank

13 Patadi Tank (12) Nagda

Page 75: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Sr.No. Name of project Name of Department

Name of The WUA

Dewas Water Recourses Department Division Dewas

14 Amlawati Tank (13) Sindhani

15 NagdaTank (12) Nagda

16 Sidhni Tank (13) Sindhani

17 Satbarli Tank (12) Nagda

18 SiyaTank (13) Sindhani

Sonkatch

19 Aghera Tank (14) Momanpura

20 Arniya LIS (15) Ganjpura

21 Bhutia Tank (16) Pipalranwa

22 Chayyan Maina Tank (17) Chhayanmaina

23 Dehri LIS (15) Ganjpura

24 Ganjpura LIS (15) Ganjpura

25 Lakumdi Tank (16) Pipalranwa

26 Momanpura Tank (14) Momanpura

27 New Rajanal Tank (18) New Rajanal

28 Orni Tank (19) Orani

29 Pipal Ranwa

(16) Pipalranwa

Tonkkhurd

30 Bhesa khedi Tank (20) Bhesa khedi

31 Chandgarh Tank (21) Chandgarh

32 Chidawad Tank (22) Chidawad

33 Guradia Tank (23) Guradia Surdas

34 Guradia SurdasTank (23) Guradia Surdas

35 PadliaTank (22) Chidawad

36 Sadak Piplia Tank (22) Chidawad

Khategone

37 Taklikheda Tank (24) Taklikheda

Page 76: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Details of Lined & unlined Canal of Existing of the

Irrigation tanks

Sno Type of Canal Lined (in KM) Unlined (in KM) Total (in KM) Cost (in Lakhs)

1 Main Canal 23.44 116.35 139.79 2327.00

2 Distributary Canal 0.00 9.63 9.63 173.34

3 Minor Canal 0.00 71.54 71.54 1144.64

Total 23.44 197.52 220.96 3644.98

Table Action Plan 2016-17

Component Proposed Amount (Rs.in Crore)

Command area (In Ha)

AIBP 0.00 0

Har Khet ko Pani 26.00 1300

Per Drop More Crop 58.16 9960

PMKSY

(IWMP+MGNREGS) 63.50 2560

Total 147.66 13820

Lined17%

Unlined83%

Details of Lined & Unlined Irrigation Canals of the WRD Tanks

Page 77: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Department Wise Budget Provision

Comonent 1st year 2nd year 3rd year 4th year 5th year Total cost

(Rs.in

Crore)

DOLR/MORD 63.5 65.17 66.28 63.18 63.69 321.82

MOA & FW-

DAC&FW 58.16 83.78 83.78 83.78 83.78 393.28

MOUD 0 0 0 0 0 0

MOWR 26 59 48 39 24.71 196.71

Grand Total 147.66 207.95 198.06 185.96 172.18 911.81

Page 78: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Annexure 1 Tables for collecting information on DIP

Water Resources Division Dewas

Chapter V: Strategic Action Plan for Irrigation in District Under PMSKY :

5- Strategic Action Plan for irrigation in District Under PMSKY

S.No.

Name of

the

Blocks/Sub

Disticts

Concerned

Ministry/

Department

Compon

ent Activity

Name of

Project

Total

Number

Capacity

(mcum)

Command

Area/

Irrigation

Potential(Ha.)

Period of

Implementation

(5/7 yrs.)

Estimat

ed

cost(In

lakhs)

1 2 3 4 5 6 7 8 9 10 11

1 - MoWR AIBP Major

Irrigation - - - - - -

2 - MoWR - Medium

Irrigation - - - - - -

Annexure 1 Tables for collacting information on DIP

3 Sonkutch MoWR Har khet

ko pani

Surface Minor

Irrigation

Bisakhedi

Barrage 1 0.614 215 5 296.25

4 Sonkutch

MoWR Har khet

ko pani

Surface Minor

Irrigation

Kheriashau

Barrage 1 0.600 210 5 241.74

5 Sonkutch

MoWR Har khet

ko pani

Surface Minor

Irrigation

Eklera

Barrage 1 1.314 460 5 682.8

Total 3 2.528 885 15 1220.79

6 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Chatarpur

01 Barrage 1 0.114 40 3 52

7 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Chatarpur

02 Barrage 1 0.143 50 3 65

8 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Nayapura

Barrage 1 0.129 45 3 58.5

9 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Awalda 01

Barrage 1 0.157 55 3

71.5

Page 79: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1 2 3 4 5 6 7 8 9 10 11

10 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Awalda 02

Barrage 1 0.186 65 3 84.5

11 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Samgi

Barrage 1 0.429 150 4 195

12 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Dhawdia

Barrage 1 0.129 45 3 58.5

13 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Rajgarh

Barrage 1 0.157 55 3 71.5

14 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Paras

Barrage 1 0.243 85 4 110.5

15 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Ankheli

Barrage 1 0.457 160 5 208

16 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Mail Ghat

Barrage 1 0.486 170 5 234

17 Bagli MoWR Har khet

ko pani

Surface Minor

Irrigation

Piplia

Lohar

Barrage

1 0.600 210 5 320

18 Bagli MoWR Har khet

ko pani

Surface Minor

Irrigation

Patpadi

Tank 1 5.280 1848 7 6086.36

19 Bagali MoWR Har khet

ko pani

Surface Minor

Irrigation

Borekhaliy

a Tank 1 1.149 402 6 1367

Total 14 9.659 3380 56 8982.36

Page 80: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1 2 3 4 5 6 7 8 9 10 11

20 Kannod MoWR Har khet ko

pani

Surface

Minor

Irrigation

Bhandaria

Barrage 1 0.600 210 5 357

21 Kannod MoWR Har khet ko

pani

Surface

Minor

Irrigation

Mansuria

Barrage 1 0.571 200 5 290

22 Kannod MoWR Har khet ko

pani

Surface

Minor

Irrigation

Ratway

Barrage 1 0.600 210 5 279.5

Total 3 1.771 620 15 926.5

23 Khategone MoWR Har khet ko

pani

Surface

Minor

Irrigation

Jamner

Kundgone

Barrage

1 0.629 220 5 340

24 Khategone MoWR Har khet ko

pani

Surface

Minor

Irrigation

Bandi

Barrage 1 0.600 210 5 276.9

25 Khategone MoWR Har khet ko

pani

Surface

Minor

Irrigation

Bhukiya

Barrage 1 0.614 215 5 280.8

26 Khategone MoWR Har khet ko

pani

Surface

Minor

Irrigation

Kana

Barrage 1 0.629 220 6 288.6

27 Khategone MoWR Har khet ko

pani

Surface

Minor

Irrigation

Kherkheda

Barrage 1 0.686 240 5 388.8

28 Khategone MoWR Har khet ko

pani

Surface

Minor

Irrigation

Puroni

Barrage 1 0.600 210 5 347.2

29 Khategone MoWR Har khet ko

pani

Surface

Minor

Irrigation

Sandalpur

Barrage 1 0.600 210 5 274.3

Total 7 4.358 1525 36 2196.6

Page 81: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1 2 3 4 5 6 7 8 9 10 11

30 Dewas MoWR Har khet

ko pani

Canal liining

works of

unlined

Canal of

Irrigation

Tanks

2 Medium

project &

35 Minor

tanks

Project

(As per

Annexure -

)

37 79.92 14545 3644.98

31 Dewas MoWR Har khet

ko pani

Command

Area

Development

Works

Datuni

Tank 1 49.13 9900 5 2700.00

Total

38 129.05 24445 5 6344.98

Grand Total

65 147.366 30855 128 19671.23

Page 82: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2016-17 MoA&FW

District Dewas

S. no. Component Activity No. Of

Units

Unit Cost

Rs

As per

scheme

norms

maxi.

Subsidy

Estimated

cost Rs in

Crore

Irrigation

Potential/ Command

Area

enhanced

in Hectares

Main

scheme

Concerned

Ministry

Concerned

Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 2500 100000 80000 20 2500 RKVY MoA&FW Do H

2 Sprinkler 2500 25000 15000 3.75 2500 RKVY MoA&FW Do A

3 Rain guns 300 50000 15000 0.45 300 RKVY MoA&FW Do A

4 On farm managment Pipe line etc.

2200 70000 15000 3.3 - RKVY MoA&FW Do A

5 Desal Electric Pump 2000 25000 10000 2 - RKVY MoA&FW Do A

6 Land Development 25000 5000 NA 12.5 - NAMSA MoA&FW Do A

7 Talab 200 250000 100000 2 200 NAMSA MoA&FW Do A

8 Water Harwesting Structure

50 2000000 2000000 10 1000 NAMSA MoA&FW Do A

9 Check Dam 50 200000 200000 1 50 NAMSA MoA&FW Do AH

10

Ca

pa

city B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 25 36000 36000 0.09 - ATMA MoA&FW Do A

11 Training to Farmer 50 24000 24000 0.12 - ATMA MoA&FW Do A

12 Exposer Visit Within State

- 400/man

day 400/man

day 0.36 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State

- 800/man

day 800/man

day 0.72 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 6 100000 100000 0.06 - ATMA MoA&FW Do A

16 Demonstration 4025 4000 4000 1.61 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.16 - ATMA MoA&FW Do A

Total 58.16

Page 83: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2016-17 MoA&FW

Block - Dewas

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 400 100000 80000 3.2 400 RKVY MoA&FW Do H

2 Sprinkler 400 25000 15000 0.6 400 RKVY MoA&FW Do A

3 Rain guns 50 50000 15000 0.075 50 RKVY MoA&FW Do A

4 On farm managment Pipe line etc.

350 70000 15000 0.525 - RKVY MoA&FW Do A

5 Desal Electric Pump 330 25000 10000 0.33 - RKVY MoA&FW Do A

6 Land Development 4100 5000 - 2.05 - NAMSA MoA&FW Do A

7 Talab 30 250000 100000 0.3 30 NAMSA MoA&FW Do A

8 Water Harwesting Structure

8 2000000 2000000 1.6 160 NAMSA MoA&FW Do A

9 Check Dam 8 200000 200000 0.16 8 NAMSA MoA&FW Do A

10

Ca

pa

city B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 8 24000 24000 0.02 - ATMA MoA&FW Do A

12 Exposer Visit Within State

- 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State

- 800 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

16 Demonstration 670 4000 4000 0.268 - ATMA MoA&FW Do A

17 IEC Activities 0 0 0 0.035 - ATMA MoA&FW Do A

Total 9.408

Page 84: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2016-17 MoA&FW

Block - Tonkkhurd

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 400 100000 80000 3.2 400 RKVY MoA&FW Do H

2 Sprinkler 400 25000 15000 0.6 400 RKVY MoA&FW Do A

3 Rain guns 50 50000 15000 0.075 50 RKVY MoA&FW Do A

4 On farm managment Pipe line etc.

350 70000 15000 0.525 - RKVY MoA&FW Do A

5 Desal Electric Pump 330 25000 10000 0.33 - RKVY MoA&FW Do A

6 Land Development 4100 5000 - 2.05 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting Structure

8 2000000 2000000 1.6 160 NAMSA MoA&FW Do A

9 Check Dam 8 200000 200000 0.16 8 NAMSA MoA&FW Do A

10

Ca

pa

city B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 8 24000 24000 0.02 - ATMA MoA&FW Do A

12 Exposer Visit Whithin State

- 400/man

day 400/ man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State

- 800/ man

day 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 670 4000 4000 0.268 - ATMA MoA&FW Do A

16 IEC Activities 0 0 0 0.025 - ATMA MoA&FW Do A

Total 9.558

Page 85: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2016-17 MoA&FW

Block - Sonkatch

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 400 100000 80000 3.2 400 RKVY MoA&FW Do H

2 Sprinkler 400 25000 15000 0.6 400 RKVY MoA&FW Do A

3 Rain guns 50 50000 15000 0.075 50 RKVY MoA&FW Do A

4 On farm managment Pipe line etc.

400 70000 15000 0.6 - RKVY MoA&FW Do A

5 Desal Electric Pump 330 25000 10000 0.33 - RKVY MoA&FW Do A

6 Land Development 4100 5000 5000 2.05 - NAMSA MoA&FW Do A

7 Talab 30 250000 100000 0.3 30 NAMSA MoA&FW Do A

8 Water Harwesting Structure

8 2000000 2000000 1.6 160 NAMSA MoA&FW Do A

9 Check Dam 8 200000 200000 0.16 8 NAMSA MoA&FW Do A

10

Ca

pa

city B

uild

ing

Exte

nsio

n A

ctivitie

s

Training to field Staffs 4 36000 36000 0.015 0 ATMA MoA&FW Do A

11 Training to Farmer 8 24000 24000 0.02 0 ATMA MoA&FW Do A

12 Exposer Visit Within State

- 400 400/ man

day 0.06 0 ATMA MoA&FW Do A

13 Exposer Visit Out Of State

- 800 800/ man

day 0.12 0 ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 0 ATMA MoA&FW Do A

15 Demonstration 670 4000 4000 0.268 0 ATMA MoA&FW Do A

16 IEC Activities 0 0 0 0.025 0 ATMA MoA&FW Do A

Total 9.433

Page 86: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2016-17 MoA&FW

Block - Bagli

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 500 100000 80000 4 400 RKVY MoA&FW Do H

2 Sprinkler 400 25000 15000 0.6 400 RKVY MoA&FW Do A

3 Rain guns 50 50000 15000 0.075 50 RKVY MoA&FW Do A

4 On farm managment

Pipe line etc. 400 70000 15000 0.6 - RKVY MoA&FW Do A

5 Desal Electric Pump 330 25000 10000 0.33 - RKVY MoA&FW Do A

6 Land Development 4500 5000 - 2.25 - NAMSA MoA&FW Do A

7 Talab 30 250000 100000 0.3 30 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Ca

pa

city B

uild

ing

Exte

nsio

n A

ctivitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 8 24000 24000 0.02 - ATMA MoA&FW Do A

12 Exposer Visit Whithin

State - 400

400/ man day

0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of

State - 800

800/man day

0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 675 4000 4000 0.27 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.025 - ATMA MoA&FW Do A

Total 10.875

Page 87: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2016-17 MoA&FW

Block - Kannod

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 400 100000 80000 3.2 400 RKVY MoA&FW Do H

2 Sprinkler 400 25000 15000 0.6 400 RKVY MoA&FW Do A

3 Rain guns 50 50000 15000 0.075 50 RKVY MoA&FW Do A

4 On farm managment

Pipe line etc. 350 70000 15000 0.525 - RKVY MoA&FW Do A

5 Desal Electric Pump 330 25000 10000 0.33 - RKVY MoA&FW Do A

6 Land Development 4100 5000 - 2.05 - NAMSA MoA&FW Do A

7 Talab 30 250000 100000 0.3 30 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 8 2000000 2000000 1.6 160 NAMSA MoA&FW Do A

9 Check Dam 8 200000 200000 0.16 8 NAMSA MoA&FW Do A

10

Ca

pa

city B

uild

ing

Exte

nsio

n A

ctivitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 8 24000 24000 0.02 - ATMA MoA&FW Do A

12 Exposer Visit Whithin

State - 36000 36000 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of

State - 24000 24000 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 670 4000 4000 0.268 - ATMA MoA&FW Do A

16 IEC Activities 0 0 0 0.025 - ATMA MoA&FW Do A

Total 9.358

Page 88: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2016-17 MoA&FW

Block - Khategaon

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 400 100000 80000 3.2 400 RKVY MoA&FW Do H

2 Sprinkler 500 25000 15000 0.75 500 RKVY MoA&FW Do A

3 Rain guns 50 50000 15000 0.075 50 RKVY MoA&FW Do A

4 On farm managment

Pipe line etc. 350 70000 15000 0.525 - RKVY MoA&FW Do A

5 Desal Electric Pump 350 25000 10000 0.35 - RKVY MoA&FW Do A

6 Land Development 4100 5000 - 2.05 - NAMSA MoA&FW Do A

7 Talab 30 250000 100000 0.3 30 NAMSA MoA&FW Do A

8 Water Harvesting

Structure 8 2000000 2000000 1.6 160 NAMSA MoA&FW Do A

9 Check Dam 8 200000 200000 0.16 8 NAMSA MoA&FW Do A

10

Ca

pa

city B

uild

ing

Exte

nsio

n A

ctivitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 8 24000 24000 0.02 - ATMA MoA&FW Do A

12 Exposer Visit Within

State - 400

400/ man day

0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of

State - 800

800/ man day

0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 670 4000 4000 0.268 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.025 - ATMA MoA&FW Do A

Total 9.528

Page 89: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2017-18 MoA&FW

District Dewas

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 3600 100000 80000 28.8 3600 RKVY MoA&FW Do H

2 Sprinkler 4200 25000 15000 6.3 4200 RKVY MoA&FW Do A

3 Rain guns 600 50000 15000 0.9 600 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 4200 70000 15000 6.3 - RKVY MoA&FW Do A

5 Desal Electric Pump 3000 25000 10000 3 - RKVY MoA&FW Do A

6 Land Development 39600 5000 NA 19.8 - NAMSA MoA&FW Do A

7 Talab 300 250000 100000 3 300 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 60 2000000 2000000 12 1200 NAMSA MoA&FW Do A

9 Check Dam 60 200000 200000 1.2 60 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 25 36000 36000 0.09 - ATMA MoA&FW Do A

11 Training to Farmer 60 24000 24000 0.144 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/ man

day 0.36 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/man

day 0.72 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 6 100000 100000 0.06 - ATMA MoA&FW Do A

16 Demonstration 2250 4000 4000 0.9 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.166 - ATMA MoA&FW Do A

Total 83.78

Page 90: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2017-18 MoA&FW

Block - Dewas

S. no.

Component Activity No. Of Units

Unit Cost Rs

As per scheme

norms maxi. Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 24000 24000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

16 Demonstration 375 4000 4000 0.15 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.996

Page 91: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2017-18 MoA&FW

Block - Tonkkhurd

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment

Pipe line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within

State - 400

400/man day

0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of

State - 800

800/ man day

0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 92: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2017-18 MoA&FW

Block - sonkatch

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Traning to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Traning to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Whithin

State - 400

400/man day

0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 93: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2017-18 MoA&FW

Block - Bagli

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/manday 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.031 - ATMA MoA&FW Do A

Total 13.97

Page 94: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2017-18 MoA&FW

Block - Kannod

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 0 NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/ man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.966

Page 95: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2017-18 MoA&FW

Block - Khategaon

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimeted cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 160 4000 4000 0.15 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.956

Page 96: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2018-19 MoA&FW

District Dewas

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 3600 100000 80000 28.8 3600 RKVY MoA&FW Do H

2 Sprinkler 4200 25000 15000 6.3 4200 RKVY MoA&FW Do A

3 Rain guns 600 50000 15000 0.9 600 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 4200 70000 15000 6.3 - RKVY MoA&FW Do A

5 Desal Electric Pump 3000 25000 10000 3 - RKVY MoA&FW Do A

6 Land Development 39600 5000 NA 19.8 - NAMSA MoA&FW Do A

7 Talab 300 250000 100000 3 300 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 60 2000000 2000000 12 1200 NAMSA MoA&FW Do A

9 Check Dam 60 200000 200000 1.2 60 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 25 36000 36000 0.09 - ATMA MoA&FW Do A

11 Training to Farmer 60 24000 24000 0.144 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/ man

day 0.36 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/man

day 0.72 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 6 100000 100000 0.06 - ATMA MoA&FW Do A

16 Demonstration 2250 4000 4000 0.9 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.166 - ATMA MoA&FW Do A

Total 83.78

Page 97: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2018-19 MoA&FW

Block - Dewas

S. no.

Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 24000 24000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

16 Demonstration 375 4000 4000 0.15 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.996

Page 98: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2018-19 MoA&FW

Block - Tonkkhurd

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 99: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2018-19 MoA&FW

Block - sonkatch

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Traning to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Traning to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Whithin

State - 400

400/man day

0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 100: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2018-19 MoA&FW

Block - Bagli

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/manday 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.031 - ATMA MoA&FW Do A

Total 13.97

Page 101: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2018-19 MoA&FW

Block - Kannod

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 0 NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/ man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.966

Page 102: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2018-19 MoA&FW

Block - Khategaon

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimeted cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 160 4000 4000 0.15 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.956

Page 103: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2019-20 MoA&FW

District Dewas

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 3600 100000 80000 28.8 3600 RKVY MoA&FW Do H

2 Sprinkler 4200 25000 15000 6.3 4200 RKVY MoA&FW Do A

3 Rain guns 600 50000 15000 0.9 600 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 4200 70000 15000 6.3 - RKVY MoA&FW Do A

5 Desal Electric Pump 3000 25000 10000 3 - RKVY MoA&FW Do A

6 Land Development 39600 5000 NA 19.8 - NAMSA MoA&FW Do A

7 Talab 300 250000 100000 3 300 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 60 2000000 2000000 12 1200 NAMSA MoA&FW Do A

9 Check Dam 60 200000 200000 1.2 60 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 25 36000 36000 0.09 - ATMA MoA&FW Do A

11 Training to Farmer 60 24000 24000 0.144 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/ man

day 0.36 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/man

day 0.72 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 6 100000 100000 0.06 - ATMA MoA&FW Do A

16 Demonstration 2250 4000 4000 0.9 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.166 - ATMA MoA&FW Do A

Total 83.78

Page 104: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2019-20 MoA&FW

Block - Dewas

S. no.

Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 24000 24000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

16 Demonstration 375 4000 4000 0.15 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.996

Page 105: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2019-20 MoA&FW

Block - Tonkkhurd

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 106: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2019-20 MoA&FW

Block - sonkatch

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Traning to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Traning to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Whithin

State - 400

400/man day

0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 107: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2019-20 MoA&FW

Block - Bagli

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/manday 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.031 - ATMA MoA&FW Do A

Total 13.97

Page 108: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2019-20 MoA&FW

Block - Kannod

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 0 NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/ man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.966

Page 109: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2019-20 MoA&FW

Block - Khategaon

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimeted cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 160 4000 4000 0.15 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.956

Page 110: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2020-21 MoA&FW

District Dewas

S.no. Compone

nt Activity

No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Comm

and Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Departmen

t

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 3600 100000 80000 28.8 3600 RKVY MoA&FW Do H

2 Sprinkler 4200 25000 15000 6.3 4200 RKVY MoA&FW Do A

3 Rain guns 600 50000 15000 0.9 600 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 4200 70000 15000 6.3 - RKVY MoA&FW Do A

5 Desal Electric Pump 3000 25000 10000 3 - RKVY MoA&FW Do A

6 Land Development 39600 5000 NA 19.8 - NAMSA MoA&FW Do A

7 Talab 300 250000 100000 3 300 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 60 2000000 2000000 12 1200 NAMSA MoA&FW Do A

9 Check Dam 60 200000 200000 1.2 60 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 25 36000 36000 0.09 - ATMA MoA&FW Do A

11 Training to Farmer 60 24000 24000 0.144 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/ man

day 0.36 - ATMA MoA&FW Do A

13 Exposer Visit Out Of

State - 800

800/man day

0.72 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 6 100000 100000 0.06 - ATMA MoA&FW Do A

16 Demonstration 2250 4000 4000 0.9 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.166 - ATMA MoA&FW Do A

Total 83.78

Page 111: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2020-21 MoA&FW

Block - Dewas

S. no.

Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 24000 24000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of

State - 800

800/man day

0.12 - ATMA MoA&FW Do A

14 Workshop District level 1 400000 400000 0.04 - ATMA MoA&FW Do A

15 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

16 Demonstration 375 4000 4000 0.15 - ATMA MoA&FW Do A

17 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.996

Page 112: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2020-21 MoA&FW

Block - Tonkkhurd

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 113: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2020-21 MoA&FW

Block - sonkatch

S.no. Component Activity No. Of Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Traning to field Staffs 4 36000 36000 0.015 - ATMA MoA&FW Do A

11 Traning to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Whithin

State - 400

400/man day

0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800 800/ man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 350 4000 4000 0.14 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.946

Page 114: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIALYEAR 2020-21 MoA&FW

Block - Bagli

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 NA 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/manday 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.031 - ATMA MoA&FW Do A

Total 13.97

Page 115: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2020-21 MoA&FW

Block - Kannod

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimated cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 0 NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/ man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 400 4000 4000 0.16 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 ATMA MoA&FW Do A

Total 13.966

Page 116: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 2020-21 MoA&FW

Block - Khategaon

S.no. Component Activity No. Of

Units

Unit Cost Rs

As per scheme norms maxi.

Subsidy

Estimeted cost Rs in

Crore

Irrigation Potential/Command Area enhanced in

Hectares

Main scheme

Concerned Ministry

Concerned Department

1

PE

R D

RO

P M

OR

E C

RO

P

Drip 600 100000 80000 4.8 600 RKVY MoA&FW Do H

2 Sprinkler 700 25000 15000 1.05 700 RKVY MoA&FW Do A

3 Rain guns 100 50000 15000 0.15 100 RKVY MoA&FW Do A

4 On farm managment Pipe

line etc. 700 70000 15000 1.05 - RKVY MoA&FW Do A

5 Desal Electric Pump 500 25000 10000 0.5 - RKVY MoA&FW Do A

6 Land Development 6600 5000 5000 3.3 - NAMSA MoA&FW Do A

7 Talab 50 250000 100000 0.5 50 NAMSA MoA&FW Do A

8 Water Harwesting

Structure 10 2000000 2000000 2 200 NAMSA MoA&FW Do A

9 Check Dam 10 200000 200000 0.2 10 NAMSA MoA&FW Do A

10

Capacity B

uild

ing E

xte

nsio

n

Activitie

s

Training to field Staffs 4 20000 20000 0.015 - ATMA MoA&FW Do A

11 Training to Farmer 10 10000 10000 0.024 - ATMA MoA&FW Do A

12 Exposer Visit Within State - 400/man

day 400/man

day 0.06 - ATMA MoA&FW Do A

13 Exposer Visit Out Of State - 800/man

day 800/man

day 0.12 - ATMA MoA&FW Do A

14 Workshop Block level 1 100000 100000 0.01 - ATMA MoA&FW Do A

15 Demonstration 160 4000 4000 0.15 - ATMA MoA&FW Do A

16 IEC Activities - - - 0.027 - ATMA MoA&FW Do A

Total 13.956

Page 117: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 16-17 MoA&FW

S.no. Name of the

Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 2500 2500 1 20.000

2 MOA & FWDAC&FW DPAP Sprinkler 2500 2500 1 3.750

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 300 300 1 0.450

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development 25000 ha 0 1 12.500

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

100 1050 1 11.000

7 MOAWR&DAC&FW Secondary

Storage Structure 200 200 1 2.000

8 MOAWR&DAC&FW

On farm Development

(distribution pump/ pipe / raised bed

and furrow system etc.)

4200 0 1 5.300

Extension Activities

0 0 1 3.160

Total 6550

58.160

Page 118: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 16-17 MoA&FW

S.no.

Name of the Block / Sub

Districts

Concerned Ministry/

Department Component Activity

Total Number/Capacity/C

um

Command Area/Irrigation Potential

(Ha.)

Period of Implementation (5/7 Year)

Estimated cost ( in crores Rs.)

1

Dew

as

MOA &

FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 400 400 1 3.2

2 MOA &

FWDAC&FW DPAP Sprinkler 400 400 1 0.6

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW

Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW

Rain Guns 50 50 1 0.075

5

MOAWR&DAC&FW

Per drop more crop (supplementary

water management activities)

Land Development

4100 0 1 2.05

6

MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

16 168 1 1.76

7

MOAWR&DAC&FW

Secondary Storage Structure

30 30 1 0.3

8

MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

680 0 1 0.855

Extension Activities

0 0 1 0.568

Total 1048 9.408

Page 119: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 16-17 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

To

nkkh

urd

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 400 400 1 3.200

2 MOA & FWDAC&FW DPAP Sprinkler 400 400 1 0.600

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 50 50 1 0.075

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

4100 0 1 2.050

6 MOAWR&DAC&FW

Drought proofing through

check Dams/ Water

harvesting structures

16 168 1 1.760

7 MOAWR&DAC&FW Secondary

Storage Structure

50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

680 0 1 0.855

Extension Activities

0 0 1 0.518

Total 1068 9.558

Page 120: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 16-17 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

So

nkatc

h

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 400 400 1 3.200

2 MOA & FWDAC&FW DPAP Sprinkler 400 400 1 0.600

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 50 50 1 0.075

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

4100 0 1 2.050

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

16 168 1 1.76

7 MOAWR&DAC&FW Secondary

Storage Structure 30 30 1 0.300

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

730 0 1 0.930

Extension Activities

0 0 1 0.518

Total 1048 9.433

Page 121: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 16-17 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Bag

li

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 500 500 1 4.000

2 MOA & FWDAC&FW DPAP Sprinkler 400 400 1 0.600

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 50 50 1 0.075

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

4500 0 1 2.250

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 220 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 30 30 1 0.300

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

730 0 1 0.930

Extension Activities

0 0 1 0.520

Total 1200 10.875

Page 122: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 16-17 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Kan

no

d

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 400 400 1 3.200

2 MOA & FWDAC&FW DPAP Sprinkler 400 400 1 0.600

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 50 50 1 0.075

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

4100 0 1 2.050

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

16 168 1 1.760

7 MOAWR&DAC&FW Secondary

Storage Structure 30 30 1 0.300

8 MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

680 0 1 0.855

Extension Activities

0 0 5 0.518

Total 1048 9.358

Page 123: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 16-17 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

kh

ate

gao

n

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 400 400 1 3.200

2 MOA & FWDAC&FW DPAP Sprinkler 500 500 1 0.750

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 50 50 1 0.075

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

4100 0 1 2.050

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

16 168 1 1.760

7 MOAWR&DAC&FW Secondary

Storage Structure 30 30 1 0.300

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

700 0 1 0.875

Extension Activities

0 0 1 0.518

Total 1148 9.528

Page 124: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 17-18 MoA&FW

S.no. Name of the

Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 3600 3600 1 28.800

2 MOA & FWDAC&FW DPAP Sprinkler 4200 4200 1 6.300

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 600 600 1 0.900

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

39600 0 1 19.800

6 MOAWR&DAC&FW

Drought proofing through

check Dams/ Water

harvesting structures

120 1260 1 13.200

7 MOAWR&DAC&FW Secondary

Storage Structure

300 300 1 3.000

8 MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

7200 0 1 9.300

Extension Activities

0 0 1 2.480

Total 9960 83.780

Page 125: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 17-18 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.446

Total 1660 13.996

Page 126: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 17-18 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

To

nkkh

urd

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution

pump/pipe / raised bed and furrow

system etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

1660 13.946

Page 127: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 17-18 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

So

nkatc

h

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

Total 1660 13.946

Page 128: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 17-18 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Bag

li

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development

(distribution pump/ pipe / raised bed

and furrow system etc.)

1200 0 1 1.55

Extension Activities

0 0 1 0.420

Total 1660 13.970

Page 129: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 17-18 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Kan

no

d

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.416

Total 1660 13.966

Page 130: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 17-18 MoA&FW

S.no. Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year) Estimated cost ( in

crores Rs.)

1

Kh

ate

gao

n

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4 MOA & FWDAC&FW

Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5

MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6

MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7

MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8

MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.406

Total 1660 13.956

Page 131: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 18-19 MoA&FW

S.no. Name of the

Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 3600 3600 1 28.800

2 MOA & FWDAC&FW DPAP Sprinkler 4200 4200 1 6.300

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 600 600 1 0.900

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

39600 0 1 19.800

6 MOAWR&DAC&FW

Drought proofing

through check Dams/ Water

harvesting structures

120 1260 1 13.200

7 MOAWR&DAC&FW Secondary

Storage Structure

300 300 1 3.000

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

7200 0 1 9.300

Extension Activities

0 0 1 2.480

Total 9960 83.780

Page 132: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 18-19 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.446

Total 1660 13.996

Page 133: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 18-19 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

To

nkkh

urd

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution

pump/pipe / raised bed and furrow

system etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

1660 13.946

Page 134: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 18-19 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

So

nkatc

h

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

Total 1660 13.946

Page 135: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 18-19 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Bag

li

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development)

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development

(distribution pump/ pipe / raised bed

and furrow system etc.)

1200 0 1 1.55

Extension Activities

0 0 1 0.420

Total 1660 13.970

Page 136: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 18-19 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Kan

no

d

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.416

Total 1660 13.966

Page 137: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 18-19 MoA&FW

S.no. Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year) Estimated cost ( in

crores Rs.)

1

Kh

ate

gao

n

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4 MOA & FWDAC&FW

Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6

MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7

MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8

MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.406

Total 1660 13.956

Page 138: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 19-20 MoA&FW

S.no. Name of the

Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 3600 3600 1 28.800

2 MOA & FWDAC&FW DPAP Sprinkler 4200 4200 1 6.300

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 600 600 1 0.900

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

39600 0 1 19.800

6 MOAWR&DAC&FW

Drought proofing

through check Dams/ Water

harvesting structures

120 1260 1 13.200

7 MOAWR&DAC&FW Secondary

Storage Structure

300 300 1 3.000

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

7200 0 1 9.300

Extension Activities

0 0 1 2.480

Total 9960 83.780

Page 139: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 19-20 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.446

Total 1660 13.996

Page 140: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 19-20 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

To

nkkh

urd

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution

pump/pipe / raised bed and furrow

system etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

1660 13.946

Page 141: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 19-20 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

So

nkatc

h

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

Total 1660 13.946

Page 142: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 19-20 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Bag

li

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.55

Extension Activities

0 0 1 0.420

Total 1660 13.970

Page 143: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 19-20 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Kan

no

d

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.416

Total 1660 13.966

Page 144: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 19-20 MoA&FW

S.no. Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year) Estimated cost ( in

crores Rs.)

1

Kh

ate

gao

n

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4 MOA & FWDAC&FW

Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6

MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7

MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8

MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.406

Total 1660 13.956

Page 145: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 20-21 MoA&FW

S.no. Name of the

Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 3600 3600 1 28.800

2 MOA & FWDAC&FW DPAP Sprinkler 4200 4200 1 6.300

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 600 600 1 0.900

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

39600 0 1 19.800

6 MOAWR&DAC&FW

Drought proofing

through check Dams/ Water

harvesting structures

120 1260 1 13.200

7 MOAWR&DAC&FW Secondary

Storage Structure

300 300 1 3.000

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

7200 0 1 9.300

Extension Activities

0 0 1 2.480

Total 9960 83.780

Page 146: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 20-21 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Dew

as

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.446

Total 1660 13.996

Page 147: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 20-21 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

To

nkkh

urd

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development

(distribution pump/ pipe / raised bed

and furrow system etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

1660 13.946

Page 148: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 20-21 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

So

nkatc

h

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.396

Total 1660 13.946

Page 149: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 20-21 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Bag

li

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing

through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure

50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.55

Extension Activities

0 0 1 0.420

Total 1660 13.970

Page 150: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 20-21 MoA&FW

S.no.

Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total

Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in

crores Rs.)

1

Kan

no

d

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4

MOA & FWDAC&FW Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6 MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7 MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8 MOAWR&DAC&FW

On farm Development (distribution pump/pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.416

Total 1660 13.966

Page 151: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

COMPONENT PER DROP MORE CROP AND CAPACITY BUILDING ACTIVITIES FINANCIAL YEAR 20-21 MoA&FW

S.no. Name of the Block /

Sub Districts

Concerned Ministry/ Department

Component Activity Total Number/Capacity/Cum

Command Area/Irrigation

Potential (Ha.)

Period of Implementation

(5/7 Year) Estimated cost ( in

crores Rs.)

1

Kh

ate

gao

n

MOA & FWDAC&FW

Per Drop More crop (Micro Irrigation)

DPAP Drip 600 600 1 4.800

2 MOA & FWDAC&FW DPAP Sprinkler 700 700 1 1.050

3 MOA & DAC&FW Non-DPAP Drip 0 0 1 0

4 MOA & FWDAC&FW

Non-DPAP Sprinkler

0 0 1 0

MOA & FWDAC&FW Rain Guns 100 100 1 0.150

5 MOAWR&DAC&FW

Per drop more crop

(supplementary water

management activities)

Land Development

6600 0 1 3.300

6

MOAWR&DAC&FW

Drought proofing through check Dams/ Water

harvesting structures

20 210 1 2.200

7

MOAWR&DAC&FW Secondary

Storage Structure 50 50 1 0.500

8

MOAWR&DAC&FW

On farm Development (distribution pump/ pipe /

raised bed and furrow system

etc.)

1200 0 1 1.550

Extension Activities

0 0 1 0.406

Total 1660 13.956

Page 152: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

District –Dewas

Component

Activity Unit Quantity

Water Storage Capacity in MCM

Irrigation Potential/ Command Area enhanced in Hectares

Estimated Cost Rs in Crore

Main Scheme

Concerned Ministry

Scheme Convergence with

Concerned Ministry

PMKSY MGNRE

GS Converg

ence (Newly Structur

es)

Stop Dam No. 815 5.3456 1635.25 86.63 MGNREGS MoRD PMKSY MoA&FW

Cheek Dam No. 1199 3.3585 3209.553 47.00 MGNREGS MoRD PMKSY MoA&FW

Tank No. 141 0.7224 820 49.33 MGNREGS MoRD PMKSY MoA&FW

Sunken Pond No. 0 0 0 0.00 MGNREGS MoRD PMKSY MoA&FW

Farm Pond No. 1331 7.6417 1369.9 24.03 MGNREGS MoRD PMKSY MoA&FW

earthen Cheek No. 63 0.1052 2.25 3.01 MGNREGS MoRD PMKSY MoA&FW

Percolation tank No. 333 2.747 392 10.89 MGNREGS MoRD PMKSY MoA&FW

Contour

trenches Rmt 17274 0.015 0 0.28 MGNREGS MoRD PMKSY MoA&FW

Gabion No. 1442 1.1642 8.64 27.74 MGNREGS MoRD PMKSY MoA&FW

LBS No. 235 0 0 0.71 MGNREGS MoRD PMKSY MoA&FW

Dikes No. 197 0 0 0.61 MGNREGS MoRD PMKSY MoA&FW

Soak Pit No. 457 0 0 0.57 MGNREGS MoRD PMKSY MoA&FW

Dug Well No. 306 0 0 6.64 MGNREGS MoRD PMKSY MoA&FW

Recharge Shaft No. 0 0 0 0.00 MGNREGS MoRD PMKSY MoA&FW

23793 21.08 7437.59 257.42 - - - -

Page 153: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

District –Dewas

Componen

t Activity Unit

Quantit

y

Water

Storage

Capacity

in MCM

Irrigation

Potential/

Command

Area

enhanced

in

Hectares

Estimated

Cost Rs in

Crore

Main

Scheme

Concerne

d Ministry

Scheme

Convergenc

e with

Concerne

d Ministry

PM

KSY M

GN

REG

S

Converg

ence

(Renovation)

Stop Dam No. 156 2.1842 209.459 7.413

PMKSY MoA & FW MGNREGS MoRD

Chek Dam No. 40 0.2812 69.584 0.533

PMKSY MoA & FW MGNREGS MoRD

Tank No. 161 12.737 910.1 5.947

PMKSY MoA & FW MGNREGS MoRD

TOTAL 357 15.2024 1189.143 13.894

- - - -

Page 154: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Tonkkhurd, District –Dewas

Component

Activity Unit Quantity

Water Storage Capacity in MCM

Irrigation Potential/ Command

Area enhanced in

Hectares

Estimated Cost Rs in

Crore

Main Scheme

Concerned Ministry

Scheme Convergence

with

Concerned Ministry

Stop Dam

No. 124 1.7504 279.18 19.05 MGNREGS MoRD PMKSY MoA&FW

PM

KS

Y M

GN

RE

GS

Con

verg

en

ce (N

ew

ly S

tructu

res)

Cheek Dam No. 101 0.4235 156 3.36 MGNREGS MoRD PMKSY MoA&FW

Tank No. 5 0.338 115 1.42 MGNREGS MoRD PMKSY MoA&FW

Sunken Pond No. 0 0 0 0.00 MGNREGS MoRD PMKSY MoA&FW

Farm Pond 0 No. 350 5.67 0 5.49 MGNREGS MoRD PMKSY MoA&FW

earthen Cheek No. 0 0 0 0.00 MGNREGS MoRD PMKSY MoA&FW

Percolation tank No. 29 0.021 0 1.59 MGNREGS MoRD PMKSY MoA&FW

Contour trenches Rmt

8004 0 0 0.07 MGNREGS MoRD PMKSY MoA&FW

Gabion No. 201 0.13 0 4.12 MGNREGS MoRD PMKSY MoA&FW

LBS No. 57 0 0 0.32 MGNREGS MoRD PMKSY MoA&FW

Dikes No. 0 0 0 0.00 MGNREGS MoRD PMKSY MoA&FW

Soak Pit No. 0 0 0 0.00 MGNREGS MoRD PMKSY MoA&FW

Dug Well No.

45 0.00 0.00 1.10 MGNREGS MoRD PMKSY MoA&FW

Recharge Shaft No. 0 0 0 0.00 MGNREGS MoRD PMKSY MoA&FW

8916 8.33 550.18 36.53 - - - -

Page 155: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Tonkkhurd District –Dewas

Component Activit

y

Unit Quantit

y

Water

Storage

Capacit

y in

MCM

Irrigation

Potential/

Command

Area

enhanced

in Hectares

Estimate

d Cost Rs

in Crore

Main

Scheme

Concerne

d Ministry

Scheme

Convergenc

e with

Concerned

Ministry

PM

KSY M

GN

REG

S

Converg

ence (

Renovation) Stop

Dam No. 16 0.298 49.27 1.5512 PMKSY MoA & FW MGNREGS MoRD

Chek Dam

No. 3 0.01125 3.21 0.06871 PMKSY MoA & FW MGNREGS MoRD

Tank No. 24 7.906 38.6 0.7185 PMKSY MoA & FW MGNREGS MoRD

TOTAL 43 8.22 91.08 2.34 - - - -

Page 156: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Bagli , District –Dewas Compo

nent

Activity Unit Quantity Water Storage Capacity in MCM

Irrigation Potential/ Command

Area enhanced in

Hectares

Estimated Cost Rs in Crore

Main Scheme Concerned Ministry

Scheme Convergence

with

Concerned Ministry

Stop Dam

No. 54 0.0972 0 9.33 MGNREGS MoRD PMKSY MoA&FW

PM

KS

Y M

GN

RE

GS

Co

nve

rge

nce (N

ew

ly S

tructu

res)

Cheek Dam No. 349 0.5235 1745 13.34 MGNREGS MoRD PMKSY MoA&FW

Tank No. 117 0.1404 585 45.92 MGNREGS MoRD PMKSY MoA&FW

Sunken Pond No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Farm Pond No. 187 0.2244 0 2.84 MGNREGS MoRD PMKSY MoA&FW

earthen Cheek No. 54 0.0972 0 2.92 MGNREGS MoRD PMKSY MoA&FW

Percolation tank No. 51 0.5235 102 2.26 MGNREGS MoRD PMKSY MoA&FW

Contour

trenches Rmt 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Gabion No. 117 0 0 3.73 MGNREGS MoRD PMKSY MoA&FW

LBS No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Dikes No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Soak Pit No. 153 0 0 0.29 MGNREGS MoRD PMKSY MoA&FW

Dug Well No. 65 0 0 1.45 MGNREGS MoRD PMKSY MoA&FW

Recharge Shaft No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

1147 1.61 2432.00 82.08 - - - -

Page 157: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Bagli , District –Dewas

Component Activity Unit Quantity Water Storage Capacity in MCM

Irrigation Potential/ Command

Area

enhanced in Hectares

Estimated Cost Rs in

Crore

Main Scheme Concerned Ministry

Scheme Convergence

with

Concerned Ministry

PM

KSY M

GN

REG

S C

onverg

ence

(Renovatio

n)

Stop

Dam No. 11 0.32 10.03 0.48 PMKSY MoA & FW MGNREGS MoRD

Chek

Dam No. 6 0.03 9.25 0.10 PMKSY MoA & FW MGNREGS MoRD

Tank No. 48 2.38 120.33 3.77 PMKSY MoA & FW MGNREGS MoRD

TOTAL 65 2.72 139.61 4.35 - - - -

Page 158: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Kannod , District –Dewas Component Activity Unit Quantity Water

Storage Capacity in MCM

Irrigation Potential/ Command Area enhanced in Hectares

Estimated Cost Rs in Crore

Main Scheme

Concerned Ministry

Scheme Convergence with

Concerned Ministry

Stop Dam No. 135 1.213 150.07 10.55 MGNREGS MoRD PMKSY MoA&FW

PM

KS

Y M

GN

RE

GS

Con

verg

en

ce

(Ne

wly

Stru

ctu

res)

Cheek Dam No. 156 0.2515 76.553 3.053 MGNREGS MoRD PMKSY MoA&FW

Tank No. 12 0.204 15 1.04 MGNREGS MoRD PMKSY MoA&FW

Sunken Pond No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Farm Pond No. 153 0.2448 179.9 3.24 MGNREGS MoRD PMKSY MoA&FW

earthen Cheek No. 9 0.008 2.25 0.09 MGNREGS MoRD PMKSY MoA&FW

Percolation Tank No. 3 0.011 0 0.12 MGNREGS MoRD PMKSY MoA&FW

Contour trenches Rmt 6020 0.005 0 0.175 MGNREGS MoRD PMKSY MoA&FW

Gabion No. 179 0.1488 8.64 2.463 MGNREGS MoRD PMKSY MoA&FW

LBS No. 121 0 0 0.0642 MGNREGS MoRD PMKSY MoA&FW

Dikes No. 62 0 0 0.175 MGNREGS MoRD PMKSY MoA&FW

Soak Pit No. 304 0 0 0.270 MGNREGS MoRD PMKSY MoA&FW

Dug Well No. 41 0 0 2.42 MGNREGS MoRD PMKSY MoA&FW

Recharge Shaft No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

TOTAL 7195 2.09 432.41 23.62 - - - -

Page 159: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands

Block - Kannod, District –Dewas Component Activity Unit Quantity Water

Storage Capacity in MCM

Irrigation Potential/ Command Area enhanced in Hectares

Estimated Cost Rs in Crore

Main Scheme

Concerned Ministry

Scheme Convergence with Concerned

Ministry

PM

KS

Y M

GN

RE

GS

Co

nverg

ence (R

enovatio

n)

Stop Dam No. 53 0.527 52.32 4.25252 PMKSY MoA & FW

MGNREGS MoRD

Chek Dam No. 5 0.003 1.267 0.029 PMKSY MoA & FW

MGNREGS MoRD

Tank No. 12 0.066 15.04 0.1235 PMKSY MoA & FW

MGNREGS MoRD

TOTAL 70 0.596 68.627 4.40502 - - - -

Page 160: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Khategaon , District –Dewas Compone

nt Activity Unit Quantity Water

Storage Capacity in

MCM

Irrigation Potential/ Command

Area enhanced in Hectares

Estimated Cost Rs in

Crore

Main Scheme

Concerned

Ministry

Scheme Converg

ence with

Concerned Ministry

Stop Dam No. 322 1.7 645 32.2 MGNREGS MoRD PMKSY MoA&FW

PM

KS

Y M

GN

RE

GS

Con

verg

en

ce (N

ew

ly

Stru

ctu

res)

Cheek Dam No. 278 1.1 570 13.9 MGNREGS MoRD PMKSY MoA&FW

Tank No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Sunken Pond No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Farm Pond No. 125 0.3125 360 3.1 MGNREGS MoRD PMKSY MoA&FW

earthen Cheek No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Percolation Tank No. 216 2.1 193 5.4 MGNREGS MoRD PMKSY MoA&FW

Contour trenches Rmt 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Gabion No. 152 0.1488 0 2.9 MGNREGS MoRD PMKSY MoA&FW

LBS No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Dikes No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Soak Pit No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Dug Well No. 42 0.0 0.0 1.2

MGNREGS MoRD PMKSY MoA&FW

Recharge Shaft No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

TOTAL 1135 5.3613 1768 58.7

- - - -

Page 161: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands : Block - Khategaon , District –Dewas

Com

pone

nt

Activity Unit Quantity

Water Storage Capacity in MCM

Irrigation Potential/ Command Area enhanced in Hectares

Estimated Cost Rs in Crore

Main Scheme Concerned Ministry

Scheme Convergence with

Concerned Ministry

PM

KS

Y M

GN

RE

GS

Co

nverg

ence

(Renovatio

n)

Stop Dam No. 68 1.02 48.57 1.02 PMKSY MoA & FW MGNREGS MoRD

Chek Dam No. 4 0.16 2.86 0.06 PMKSY MoA & FW MGNREGS MoRD

Tank No. 31 0.465 22.13 0.465 PMKSY MoA & FW MGNREGS MoRD

TOTAL

103 1.645 73.56 1.545 - - - -

Page 162: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Dewas , District –Dewas

Component Activity Unit Quantity Water Storage Capacit

y in MCM

Irrigation Potential/ Command

Area enhanced

in Hectares

Estimated Cost Rs in Crore

Main Scheme Concerned Ministry

Scheme Convergence

with

Concerned Ministry

Stop Dam No. 90 0.315 290 7 MGNREGS MoRD PMKSY MoA&FW

PM

KS

Y M

GN

RE

GS

Con

verg

en

ce (N

ew

ly

Stru

ctu

res)

Cheek Dam No. 205 0.57 423 10.25 MGNREGS MoRD PMKSY MoA&FW

Tank No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Sunken Pond No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Farm Pond No. 364 0.9 520 5.46 MGNREGS MoRD PMKSY MoA&FW

earthen Cheek No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Percolation Tank No. 15 0.0525 0 0.225 MGNREGS MoRD PMKSY MoA&FW

Contour trenches Rmt 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Gabion No. 671 0.7 0 10.4 MGNREGS MoRD PMKSY MoA&FW

LBS No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Dikes No. 135 0 0 0.43 MGNREGS MoRD PMKSY MoA&FW

Soak Pit No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Dug Well No. 46 0 0 0.51 MGNREGS MoRD PMKSY MoA&FW

Recharge Shaft No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

TOTAL 1526 2.5375 1233 34.275 - - - -

Page 163: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Dewas , District –Dewas

Com

pone

nt

Activity Unit Quantity

Water Storage Capacity in MCM

Irrigation Potential/ Command

Area enhanced

in Hectares

Estimated Cost Rs in Crore

Main Scheme

Concerned Ministry

Scheme Convergence

with

Concerned Ministry

PM

KS

Y M

GN

RE

GS

Converg

ence

(Renovatio

n)

Stop Dam No. 0 0 0 0 PMKSY MoA & FW MGNREGS MoRD

Chek Dam No. 11 0.048 17 0.106 PMKSY MoA & FW MGNREGS

MoRD

TOTAL 49 1.928 677 0.836 - - - -

Page 164: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Sonkatch , District –Dewas Component Activity Unit Quantity Water

Storage Capacity in MCM

Irrigation Potential/ Command

Area enhanced

in Hectares

Estimated Cost Rs in Crore

Main Scheme

Concerned Ministry

Scheme Convergence

with

Concerned Ministry

Stop Dam No. 90 0.27 271 8.5 MGNREGS MoRD PMKSY MoA&FW

PM

KS

Y M

GN

RE

GS

Con

verg

en

ce

(Ne

wly

Stru

ctu

res

)

Cheek Dam No. 110 0.49 239 3.1 MGNREGS MoRD PMKSY MoA&FW

Tank No. 7 0.04 105 0.95 MGNREGS MoRD PMKSY MoA&FW

Sunken Pond No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Farm Pond No. 152 0.29 310 3.9 MGNREGS MoRD PMKSY MoA&FW

earthen Cheek No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Percolation tank No. 19 0.039 97 1.29 MGNREGS MoRD PMKSY MoA&FW

Contour trenches Rmt 3250 0.01 0 0.0325 MGNREGS MoRD PMKSY MoA&FW

Gabion No. 122 0.0366 0 4.12229 MGNREGS MoRD PMKSY MoA&FW

LBS No. 57 0 0 0.3245 MGNREGS MoRD PMKSY MoA&FW

Dikes No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Soak Pit No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Dug Well No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

Recharge Shaft No. 0 0 0 0 MGNREGS MoRD PMKSY MoA&FW

TOTAL 3807 1.1756 1022 22.2193 - - - -

Page 165: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Sonkatch , District –Dewas

Component Activity Unit Quantity

Water

Storage

Capacity

in MCM

Irrigation

Potential/

Command

Area

enhanced

in

Hectares

Estimate

d Cost Rs

in Crore

Main

Scheme

Concerne

d Ministry

Scheme

Convergenc

e with

Concerne

d Ministry

PM

KSY M

GN

REG

S

Converg

ence

(Renovation)

Stop Dam No. 8 0.024 49.27 0.11 PMKSY MoA & FW MGNREGS MoRD

Chek Dam No. 11 0.033 36 0.17 PMKSY MoA & FW MGNREGS MoRD

Tank No. 8 0.04 54 0.14 PMKSY MoA & FW MGNREGS MoRD

TOTAL 27 0.097 139.27 0.42 - - - -

Page 166: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter V: Strategic Action Plan MGNREGA in District under PMSKY:

S. no.

Name of the Block / Sub

Didtricts

Concemed Ministry/

Department Copmonent Activity

Total Number/Capacity/

Cum

Command Area/Irrigation Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in Crore)

1 2 3 4 5 6 7 8 9

1 Dewas DoLR - MoRD PMKSY MGNREGS Cheek Dam 45 93 1 2.250

2 Dewas DoLR - MoRD PMKSY MGNREGS Dikes 35 0 1 0.111

3 Dewas DoLR - MoRD PMKSY MGNREGS Dug Well Kapildhara 10 0 1 0.230

4 Dewas DoLR - MoRD PMKSY MGNREGS Farm Pond 75 107 1 1.125

5 Dewas DoLR - MoRD PMKSY MGNREGS Gabion 140 0 1 2.170

6 Dewas DoLR - MoRD PMKSY MGNREGS Percolation Tank 4 0 1 0.060

7 Dewas DoLR - MoRD PMKSY MGNREGS Stop Dam 20 64 1 1.556

8 Dewas DoLR - MoRD PMKSY MGNREGS Cheek Dam 41 84 2 2.050

9 Dewas DoLR - MoRD PMKSY MGNREGS Dikes 25 0 2 0.080

10 Dewas DoLR - MoRD PMKSY MGNREGS Dug Well Kapildhara 10 0 2 0.230

11 Dewas DoLR - MoRD PMKSY MGNREGS Farm Pond 75 107 2 1.125

12 Dewas DoLR - MoRD PMKSY MGNREGS Gabion 138 0 2 2.139

13 Dewas DoLR - MoRD PMKSY MGNREGS Percolation Tank 3 0 2 0.045

14 Dewas DoLR - MoRD PMKSY MGNREGS Stop Dam 20 64 2 1.556

15 Dewas DoLR - MoRD PMKSY MGNREGS Cheek Dam 50 103 3 2.500

16 Dewas DoLR - MoRD PMKSY MGNREGS Dikes 25 0 3 0.080

17 Dewas DoLR - MoRD PMKSY MGNREGS Dug Well Kapildhara 10 0 3 0.230

18 Dewas DoLR - MoRD PMKSY MGNREGS Farm Pond 75 107 3 1.125

19 Dewas DoLR - MoRD PMKSY MGNREGS Gabion 141 0 3 2.185

Page 167: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

//2//

1 2 3 4 5 6 7 8 9

20 Dewas DoLR - MoRD PMKSY MGNREGS Percolation Tank 3 0 3 0.045

21 Dewas DoLR - MoRD PMKSY MGNREGS Stop Dam 20 64 3 1.556

22 Dewas DoLR - MoRD PMKSY MGNREGS Cheek Dam 39 80 4 1.950

23 Dewas DoLR - MoRD PMKSY MGNREGS Dikes 25 0 4 0.080

24 Dewas DoLR - MoRD PMKSY MGNREGS Dug Well Kapildhara 10 0 4 0.230

25 Dewas DoLR - MoRD PMKSY MGNREGS Farm Pond 75 107 4 1.125

26 Dewas DoLR - MoRD PMKSY MGNREGS Gabion 141 0 4 2.185

27 Dewas DoLR - MoRD PMKSY MGNREGS Percolation Tank 3 0 4 0.045

28 Dewas DoLR - MoRD PMKSY MGNREGS Stop Dam 20 64 4 1.556

29 Dewas DoLR - MoRD PMKSY MGNREGS Cheek Dam 30 62 5 1.500

30 Dewas DoLR - MoRD PMKSY MGNREGS Dikes 25 0 5 0.080

31 Dewas DoLR - MoRD PMKSY MGNREGS Dug Well Kapildhara 6 0 5 0.138

32 Dewas DoLR - MoRD PMKSY MGNREGS Farm Pond 64 92 5 0.960

33 Dewas DoLR - MoRD PMKSY MGNREGS Gabion 111 0 5 1.720

34 Dewas DoLR - MoRD PMKSY MGNREGS Percolation Tank 2 0 5 0.030

35 Dewas DoLR - MoRD PMKSY MGNREGS Stop Dam 10 32 5 0.778

Page 168: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter V: Strategic Action Plan MGNREGA in District under PMSKY:

S.no. Name of the Block / Sub

Didtricts

Concemed Ministry/

Department Copmonent Activity

Total Number/Capacity/Cum

Command Area/Irrigation Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in Rs.)

1 2 3 4 5 6 7 8 9

1 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Cheek Dam 23 36 1 0.765

2 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Cheek Dam 19 29 2 0.632

3 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Cheek Dam 20 31 3 0.665

4 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Cheek Dam 21 32 4 0.699

5 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Cheek Dam 18 28 5 0.599

6 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Contour trenches 1600 0 1 0.160

7 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Contour trenches 1604 0 2 0.160

8 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Contour trenches 1600 0 3 0.160

9 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Contour trenches 1600 0 4 0.160

10 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Contour trenches 1600 0 5 0.160

11 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Dug Well 10 0 1 0.230

12 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Dug Well 10 0 2 0.230

13 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Dug Well 10 0 3 0.230

14 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Dug Well 9 0 4 0.207

15 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Dug Well 6 0 5 0.138

16 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Farm Pond 70 0 1 1.400

17 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Farm Pond 70 0 2 1.400

18 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Farm Pond 70 0 3 1.400

19 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Farm Pond 70 0 4 1.400

20 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Farm Pond 70 0 5 1.400

21 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Gabion 41 0 1 0.841

22 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Gabion 39 0 2 0.800

23 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Gabion 40 0 3 0.820

24 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Gabion 40 0 4 0.820

25 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Gabion 41 0 5 0.841

26 Tonkkhurd DoLR - MoRD PMKSY MGNREGS LBS 12 0 1 0.007

27 Tonkkhurd DoLR - MoRD PMKSY MGNREGS LBS 12 0 2 0.007

28 Tonkkhurd DoLR - MoRD PMKSY MGNREGS LBS 12 0 3 0.007

29 Tonkkhurd DoLR - MoRD PMKSY MGNREGS LBS 12 0 4 0.007

Page 169: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

//2//

1 2 3 4 5 6 7 8 9

30 Tonkkhurd DoLR - MoRD PMKSY MGNREGS LBS 9 0 5 0.005

31 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Percolation tank 6 0 1 0.300

32 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Percolation tank 6 0 2 0.300

33 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Percolation tank 6 0 3 0.300

34 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Percolation tank 6 0 4 0.300

35 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Percolation tank 5 0 5 0.250

36 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Stop Dam 24 54 1 3.600

37 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Stop Dam 25 56 2 3.750

38 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Stop Dam 25 56 3 3.750

39 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Stop Dam 25 56 4 3.750

40 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Stop Dam 24 54 5 3.600

41 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Stop Dam 1 2 1 0.150

42 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Tank 1 23 1 0.280

43 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Tank 1 23 2 0.280

44 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Tank 1 23 3 0.280

45 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Tank 1 23 4 0.280

46 Tonkkhurd DoLR - MoRD PMKSY MGNREGS Tank 1 23 5 0.280

Page 170: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter V: Strategic Action Plan MGNREGA in District under PMSKY:

S.no. Name of the Block / Sub

Didtricts

Concemed Ministry/

Department Copmonent Activity

Total Number/Capacity/Cum

Command Area/Irrigation Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in Crore)

1 2 3 4 5 6 7 8 9

1 Sonkatch DoLR - MoRD PMKSY MGNREGS Cheek Dam 26 56 1 0.780

2 Sonkatch DoLR - MoRD PMKSY MGNREGS Cheek Dam 24 52 2 0.720

3 Sonkatch DoLR - MoRD PMKSY MGNREGS Cheek Dam 24 52 3 0.720

4 Sonkatch DoLR - MoRD PMKSY MGNREGS Cheek Dam 20 43 4 0.600

5 Sonkatch DoLR - MoRD PMKSY MGNREGS Cheek Dam 16 35 5 0.480

6 Sonkatch DoLR - MoRD PMKSY MGNREGS Contour trenches 700 0 1 0.070

7 Sonkatch DoLR - MoRD PMKSY MGNREGS Contour trenches 700 0 2 0.070

8 Sonkatch DoLR - MoRD PMKSY MGNREGS Contour trenches 700 0 3 0.070

9 Sonkatch DoLR - MoRD PMKSY MGNREGS Contour trenches 700 0 4 0.070

10 Sonkatch DoLR - MoRD PMKSY MGNREGS Contour trenches 450 0 5 0.045

11 Sonkatch DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 1 0.322

12 Sonkatch DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 2 0.322

13 Sonkatch DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 3 0.322

14 Sonkatch DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 4 0.322

15 Sonkatch DoLR - MoRD PMKSY MGNREGS Dug Well 11 0 5 0.253

16 Sonkatch DoLR - MoRD PMKSY MGNREGS Farm Pond 30 61 1 9.000

17 Sonkatch DoLR - MoRD PMKSY MGNREGS Farm Pond 30 61 2 9.000

18 Sonkatch DoLR - MoRD PMKSY MGNREGS Farm Pond 30 61 3 9.000

19 Sonkatch DoLR - MoRD PMKSY MGNREGS Farm Pond 31 63 4 9.300

20 Sonkatch DoLR - MoRD PMKSY MGNREGS Farm Pond 31 63 5 9.300

21 Sonkatch DoLR - MoRD PMKSY MGNREGS Gabion 30 0 1 1.014

22 Sonkatch DoLR - MoRD PMKSY MGNREGS Gabion 25 0 2 0.845

23 Sonkatch DoLR - MoRD PMKSY MGNREGS Gabion 25 0 3 0.845

24 Sonkatch DoLR - MoRD PMKSY MGNREGS Gabion 25 0 4 0.845

25 Sonkatch DoLR - MoRD PMKSY MGNREGS Gabion 27 0 5 0.912

26 Sonkatch DoLR - MoRD PMKSY MGNREGS LBS 12 0 1 0.068

27 Sonkatch DoLR - MoRD PMKSY MGNREGS LBS 12 0 2 0.068

28 Sonkatch DoLR - MoRD PMKSY MGNREGS LBS 12 0 3 0.068

29 Sonkatch DoLR - MoRD PMKSY MGNREGS LBS 12 0 4 0.068

Page 171: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

//2//

1 2 3 4 5 6 7 8 9

30 Sonkatch DoLR - MoRD PMKSY MGNREGS LBS 9 0 5 0.051

31 Sonkatch DoLR - MoRD PMKSY MGNREGS Percolation tank 4 20 1 2.800

32 Sonkatch DoLR - MoRD PMKSY MGNREGS Percolation tank 4 20 2 2.800

33 Sonkatch DoLR - MoRD PMKSY MGNREGS Percolation tank 4 20 3 2.800

34 Sonkatch DoLR - MoRD PMKSY MGNREGS Percolation tank 4 20 4 2.800

35 Sonkatch DoLR - MoRD PMKSY MGNREGS Percolation tank 3 15 5 2.100

36 Sonkatch DoLR - MoRD PMKSY MGNREGS Stop Dam 19 57 1 1.710

37 Sonkatch DoLR - MoRD PMKSY MGNREGS Stop Dam 20 60 2 1.800

38 Sonkatch DoLR - MoRD PMKSY MGNREGS Stop Dam 20 60 3 1.800

39 Sonkatch DoLR - MoRD PMKSY MGNREGS Stop Dam 19 57 4 1.710

40 Sonkatch DoLR - MoRD PMKSY MGNREGS Stop Dam 11 33 5 0.990

41 Sonkatch DoLR - MoRD PMKSY MGNREGS Tank 2 30 1 0.280

42 Sonkatch DoLR - MoRD PMKSY MGNREGS Tank 2 30 2 0.280

43 Sonkatch DoLR - MoRD PMKSY MGNREGS Tank 1 15 3 0.140

44 Sonkatch DoLR - MoRD PMKSY MGNREGS Tank 1 15 4 0.140

45 Sonkatch DoLR - MoRD PMKSY MGNREGS Tank 1 15 5 0.140

46 Sonkatch DoLR - MoRD PMKSY MGNREGS Stop Dam 1 3 1 0.090

Page 172: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter V: Strategic Action Plan MGNREGA in District under PMSKY:

S.no. Name of the Block / Sub

Didtricts

Concemed Ministry/

Department Copmonent Activity

Total Number/Capacity/Cum

Command Area/Irrigation Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in Crore)

1 2 3 4 5 6 7 8 9

1 Bagli DoLR - MoRD PMKSY MGNREGS Cheek Dam 70 350 1 2.800

2 Bagli DoLR - MoRD PMKSY MGNREGS Cheek Dam 70 350 2 2.800

3 Bagli DoLR - MoRD PMKSY MGNREGS Cheek Dam 70 350 3 2.800

4 Bagli DoLR - MoRD PMKSY MGNREGS Cheek Dam 70 350 4 2.800

5 Bagli DoLR - MoRD PMKSY MGNREGS Cheek Dam 69 345 5 2.760

6 Bagli DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 1 0.322

7 Bagli DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 2 0.322

8 Bagli DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 3 0.322

9 Bagli DoLR - MoRD PMKSY MGNREGS Dug Well 14 0 4 0.322

10 Bagli DoLR - MoRD PMKSY MGNREGS Dug Well 9 0 5 0.207

11 Bagli DoLR - MoRD PMKSY MGNREGS earthen Cheek 11 0 1 0.550

12 Bagli DoLR - MoRD PMKSY MGNREGS earthen Cheek 11 0 2 0.550

13 Bagli DoLR - MoRD PMKSY MGNREGS earthen Cheek 10 0 3 0.500

14 Bagli DoLR - MoRD PMKSY MGNREGS earthen Cheek 12 0 4 0.600

15 Bagli DoLR - MoRD PMKSY MGNREGS earthen Cheek 10 0 5 0.500

16 Bagli DoLR - MoRD PMKSY MGNREGS Farm Pond 40 0 1 0.800

17 Bagli DoLR - MoRD PMKSY MGNREGS Farm Pond 40 0 2 0.800

18 Bagli DoLR - MoRD PMKSY MGNREGS Farm Pond 40 0 3 0.800

19 Bagli DoLR - MoRD PMKSY MGNREGS Farm Pond 40 0 4 0.800

20 Bagli DoLR - MoRD PMKSY MGNREGS Farm Pond 27 0 5 0.540

21 Bagli DoLR - MoRD PMKSY MGNREGS Gabion 25 0 1 0.750

22 Bagli DoLR - MoRD PMKSY MGNREGS Gabion 25 0 2 0.750

23 Bagli DoLR - MoRD PMKSY MGNREGS Gabion 25 0 3 0.750

24 Bagli DoLR - MoRD PMKSY MGNREGS Gabion 25 0 4 0.750

25 Bagli DoLR - MoRD PMKSY MGNREGS Gabion 17 0 5 0.510

26 Bagli DoLR - MoRD PMKSY MGNREGS Percolation tank 11 22 1 0.440

27 Bagli DoLR - MoRD PMKSY MGNREGS Percolation tank 11 22 2 0.440

28 Bagli DoLR - MoRD PMKSY MGNREGS Percolation tank 11 22 3 0.440

29 Bagli DoLR - MoRD PMKSY MGNREGS Percolation tank 10 20 4 0.400

Page 173: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

//2//

1 2 3 4 5 6 7 8 9

30 Bagli DoLR - MoRD PMKSY MGNREGS Percolation tank 8 16 5 0.320

31 Bagli DoLR - MoRD PMKSY MGNREGS Soak Pit 35 0 1 0.007

32 Bagli DoLR - MoRD PMKSY MGNREGS Soak Pit 35 0 2 0.007

33 Bagli DoLR - MoRD PMKSY MGNREGS Soak Pit 35 0 3 0.007

34 Bagli DoLR - MoRD PMKSY MGNREGS Soak Pit 35 0 4 0.007

35 Bagli DoLR - MoRD PMKSY MGNREGS Soak Pit 13 0 5 0.003

36 Bagli DoLR - MoRD PMKSY MGNREGS Stop Dam 11 0 1 1.870

37 Bagli DoLR - MoRD PMKSY MGNREGS Stop Dam 12 0 2 2.040

38 Bagli DoLR - MoRD PMKSY MGNREGS Stop Dam 12 0 3 2.040

39 Bagli DoLR - MoRD PMKSY MGNREGS Stop Dam 12 0 4 2.040

40 Bagli DoLR - MoRD PMKSY MGNREGS Stop Dam 6 0 5 1.020

41 Bagli DoLR - MoRD PMKSY MGNREGS Tank 25 125 1 9.750

42 Bagli DoLR - MoRD PMKSY MGNREGS Tank 25 125 2 9.750

43 Bagli DoLR - MoRD PMKSY MGNREGS Tank 25 125 3 9.750

44 Bagli DoLR - MoRD PMKSY MGNREGS Tank 25 125 4 9.750

45 Bagli DoLR - MoRD PMKSY MGNREGS Tank 17 85 5 6.630

46 Bagli DoLR - MoRD PMKSY MGNREGS Stop Dam 1 0 1 0.170

Page 174: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter V: Strategic Action Plan MGNREGA in District under PMSKY:

S.no. Name of the Block / Sub

Didtricts

Concemed Ministry/

Department Copmonent Activity

Total Number/Capacity/Cum

Command Area/Irrigation Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in Crore)

1 2 3 4 5 6 7 8 9

1 Kannod DoLR - MoRD PMKSY MGNREGS Cheek Dam 32 16 1 0.640

2 Kannod DoLR - MoRD PMKSY MGNREGS Cheek Dam 32 16 2 0.640

3 Kannod DoLR - MoRD PMKSY MGNREGS Cheek Dam 32 16 3 0.640

4 Kannod DoLR - MoRD PMKSY MGNREGS Cheek Dam 32 16 4 0.640

5 Kannod DoLR - MoRD PMKSY MGNREGS Cheek Dam 28 14 5 0.560

6 Kannod DoLR - MoRD PMKSY MGNREGS Contour trenches 1200 0 1 0.349

7 Kannod DoLR - MoRD PMKSY MGNREGS Contour trenches 1200 0 2 0.349

8 Kannod DoLR - MoRD PMKSY MGNREGS Contour trenches 1200 0 3 0.349

9 Kannod DoLR - MoRD PMKSY MGNREGS Contour trenches 1200 0 4 0.349

10 Kannod DoLR - MoRD PMKSY MGNREGS Contour trenches 1220 0 5 0.355

11 Kannod DoLR - MoRD PMKSY MGNREGS Dikes 13 0 1 0.037

12 Kannod DoLR - MoRD PMKSY MGNREGS Dikes 13 0 2 0.037

13 Kannod DoLR - MoRD PMKSY MGNREGS Dikes 13 0 3 0.037

14 Kannod DoLR - MoRD PMKSY MGNREGS Dikes 13 0 4 0.037

15 Kannod DoLR - MoRD PMKSY MGNREGS Dikes 10 0 5 0.028

16 Kannod DoLR - MoRD PMKSY MGNREGS Dug Well 8 0 1 0.184

17 Kannod DoLR - MoRD PMKSY MGNREGS Dug Well 8 0 2 0.184

18 Kannod DoLR - MoRD PMKSY MGNREGS Dug Well 8 0 3 0.184

19 Kannod DoLR - MoRD PMKSY MGNREGS Dug Well 8 0 4 0.184

20 Kannod DoLR - MoRD PMKSY MGNREGS Dug Well 9 0 5 0.207

21 Kannod DoLR - MoRD PMKSY MGNREGS earthen Cheek 2 1 1 0.020

22 Kannod DoLR - MoRD PMKSY MGNREGS earthen Cheek 2 1 2 0.020

23 Kannod DoLR - MoRD PMKSY MGNREGS earthen Cheek 2 1 3 0.020

24 Kannod DoLR - MoRD PMKSY MGNREGS earthen Cheek 2 1 4 0.020

25 Kannod DoLR - MoRD PMKSY MGNREGS earthen Cheek 1 0 5 0.010

26 Kannod DoLR - MoRD PMKSY MGNREGS Farm Pond 31 37 1 0.620

27 Kannod DoLR - MoRD PMKSY MGNREGS Farm Pond 30 35 2 0.600

28 Kannod DoLR - MoRD PMKSY MGNREGS Farm Pond 31 37 3 0.620

29 Kannod DoLR - MoRD PMKSY MGNREGS Farm Pond 29 34 4 0.580

Page 175: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

//2//

1 2 3 4 5 6 7 8 9

30 Kannod DoLR - MoRD PMKSY MGNREGS Farm Pond 32 38 5 0.640

31 Kannod DoLR - MoRD PMKSY MGNREGS Gabion 36 2 1 0.495

32 Kannod DoLR - MoRD PMKSY MGNREGS Gabion 36 2 2 0.495

33 Kannod DoLR - MoRD PMKSY MGNREGS Gabion 49 2 3 0.674

34 Kannod DoLR - MoRD PMKSY MGNREGS Gabion 34 2 4 0.468

35 Kannod DoLR - MoRD PMKSY MGNREGS Gabion 24 1 5 0.330

36 Kannod DoLR - MoRD PMKSY MGNREGS LBS 25 0 1 0.013

37 Kannod DoLR - MoRD PMKSY MGNREGS LBS 25 0 2 0.013

38 Kannod DoLR - MoRD PMKSY MGNREGS LBS 25 0 3 0.013

39 Kannod DoLR - MoRD PMKSY MGNREGS LBS 25 0 4 0.013

40 Kannod DoLR - MoRD PMKSY MGNREGS LBS 21 0 5 0.011

41 Kannod DoLR - MoRD PMKSY MGNREGS Percolation Tank 3 0 1 0.120

42 Kannod DoLR - MoRD PMKSY MGNREGS Soak Pit 60 0 1 0.054

43 Kannod DoLR - MoRD PMKSY MGNREGS Soak Pit 60 0 2 0.054

44 Kannod DoLR - MoRD PMKSY MGNREGS Soak Pit 60 0 3 0.054

45 Kannod DoLR - MoRD PMKSY MGNREGS Soak Pit 60 0 4 0.054

46 Kannod DoLR - MoRD PMKSY MGNREGS Soak Pit 64 0 5 0.058

47 Kannod DoLR - MoRD PMKSY MGNREGS Stop Dam 29 32 1 2.320

48 Kannod DoLR - MoRD PMKSY MGNREGS Stop Dam 30 33 2 2.400

49 Kannod DoLR - MoRD PMKSY MGNREGS Stop Dam 30 33 3 2.400

50 Kannod DoLR - MoRD PMKSY MGNREGS Stop Dam 30 33 4 2.400

51 Kannod DoLR - MoRD PMKSY MGNREGS Stop Dam 15 17 5 1.200

52 Kannod DoLR - MoRD PMKSY MGNREGS Tank 3 4 1 0.270

53 Kannod DoLR - MoRD PMKSY MGNREGS Tank 3 4 2 0.270

54 Kannod DoLR - MoRD PMKSY MGNREGS Tank 2 3 3 0.180

55 Kannod DoLR - MoRD PMKSY MGNREGS Tank 2 3 4 0.180

56 Kannod DoLR - MoRD PMKSY MGNREGS Tank 2 3 5 0.180

57 Kannod DoLR - MoRD PMKSY MGNREGS Stop Dam 1 1 1 0.080

Page 176: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter V: Strategic Action Plan MGNREGA in District under PMSKY:

S.no. Name of the Block / Sub

Didtricts

Concemed Ministry/

Department Copmonent Activity

Total Number/Capacity/Cum

Command Area/Irrigation Potential (Ha.)

Period of Implementation

(5/7 Year)

Estimated cost ( in Crore)

1 Khategoan DoLR - MoRD PMKSY MGNREGS Cheek Dam 56 118 1 5.600

2 Khategoan DoLR - MoRD PMKSY MGNREGS Cheek Dam 56 118 2 5.600

3 Khategoan DoLR - MoRD PMKSY MGNREGS Cheek Dam 55 116 3 5.500

4 Khategoan DoLR - MoRD PMKSY MGNREGS Cheek Dam 55 116 4 5.500

5 Khategoan DoLR - MoRD PMKSY MGNREGS Cheek Dam 56 118 5 5.600

6 Khategoan DoLR - MoRD PMKSY MGNREGS Dug Well 9 0 1 0.207

7 Khategoan DoLR - MoRD PMKSY MGNREGS Dug Well 9 0 2 0.207

8 Khategoan DoLR - MoRD PMKSY MGNREGS Dug Well 9 0 3 0.207

9 Khategoan DoLR - MoRD PMKSY MGNREGS Dug Well 9 0 4 0.207

10 Khategoan DoLR - MoRD PMKSY MGNREGS Dug Well 6 0 5 0.138

11 Khategoan DoLR - MoRD PMKSY MGNREGS Farm Pond 125 362 1 3.100

12 Khategoan DoLR - MoRD PMKSY MGNREGS Gabion 30 0 1 0.572

13 Khategoan DoLR - MoRD PMKSY MGNREGS Gabion 30 0 2 0.572

14 Khategoan DoLR - MoRD PMKSY MGNREGS Gabion 30 0 3 0.572

15 Khategoan DoLR - MoRD PMKSY MGNREGS Gabion 30 0 4 0.572

16 Khategoan DoLR - MoRD PMKSY MGNREGS Gabion 32 0 5 0.611

17 Khategoan DoLR - MoRD PMKSY MGNREGS Percolation Tank 50 45 1 1.250

18 Khategoan DoLR - MoRD PMKSY MGNREGS Percolation Tank 50 45 2 1.250

19 Khategoan DoLR - MoRD PMKSY MGNREGS Percolation Tank 50 45 3 1.250

20 Khategoan DoLR - MoRD PMKSY MGNREGS Percolation Tank 50 45 4 1.250

21 Khategoan DoLR - MoRD PMKSY MGNREGS Percolation Tank 16 14 5 0.400

22 Khategoan DoLR - MoRD PMKSY MGNREGS Stop Dam 65 130 1 6.500

23 Khategoan DoLR - MoRD PMKSY MGNREGS Stop Dam 65 130 2 6.500

24 Khategoan DoLR - MoRD PMKSY MGNREGS Stop Dam 65 130 3 6.500

25 Khategoan DoLR - MoRD PMKSY MGNREGS Stop Dam 65 130 4 6.500

26 Khategoan DoLR - MoRD PMKSY MGNREGS Stop Dam 62 124 5 6.200

Page 177: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

District - Dewas

Component Activity Unit Quantity

Water Irrigation Estimatied Main Concerned

Ministry

Storage Capacity in

MCM

Potential (ha)

Cost Rs in Crore

Scheme Department

PM

KSY I

WM

P (

Exis

ting P

roje

cts

)

Contour trenches

R Mt. 74345 0.00 0 0.50 IWMP DOLR

LBS Nos 1111 0.00 0 0.62 IWMP DOLR

Gully Plug Nos 78 0.00 0 0.08 IWMP DOLR

Percolation

Tank Nos 0 0.00 0 0.00 IWMP DOLR

Field bund R Mt. 230861 3.38 0 2.31 IWMP DOLR

Tank Nos 45 0.40 134 1.59 IWMP DOLR

Farm Pond Nos 277 1.62 748 5.93 IWMP DOLR

Chek Dam - Stop Dam

Nos 237 0.96 938 10.81 IWMP DOLR

Sunken Pond

Nos 0 0.00 0 0.00 IWMP DOLR

Nala

Deepning R Mt. 9200 0.00 0 0.03 IWMP DOLR

Gabion Nos 189 0.27 0 1.68 IWMP DOLR

Stone outlet Nos 0 0.00 0 0.00 IWMP DOLR

Total 301477 6.55 1608 23.56

Page 178: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block –Dewas, District -Dewas

Component Activity Unit Quantity

Water Irrigation Estimatied Main Concerned

Ministry

Storage Capacity in

MCM

Potential (ha)

Cost Rs in Crore

Scheme / Department

PM

KSY I

WM

P (

Exis

ting P

roje

cts

)

Contour trenches

R Mt. 10845 0.00 0 0.03 IWMP DOLR

LBS Nos 391 0.00 0 0.32 IWMP DOLR

Gully Plug Nos 0 0.00 0 0.00 IWMP DOLR

Percolation Tank Nos 0 0.00 0 0.00 IWMP DOLR

Field bund R Mt. 22300 0.00 0 0.22 IWMP DOLR

Tank Nos 3 0.01 12 0.09 IWMP DOLR

Farm Pond Nos 54 0.07 130 1.14 IWMP DOLR

Chek Dam-

StopDam Nos 46 0.10 191 2.14 IWMP DOLR

Sunken Pond Nos 0 0.00 0 0.00 IWMP DOLR

Nala Deepning R Mt. 0 0.00 0 0.00 IWMP DOLR

Gabion Nos 28 0.00 0 0.23 IWMP DOLR

Stone outlet Nos 0 0.00 0 0.00 IWMP DOLR

Total 33667 0.18 333 4.16

Page 179: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block –Bagli , District - Dewas

Component Activity Unit Quantity

Water Irrigation Estimatied Main Concerned

Ministry

Storage Capacity in

MCM

Potential (ha)

Cost Rs in Crore

Scheme / Department

PM

KSY I

WM

P (

Exis

ting P

roje

cts

)

Contour trenches

R Mt. 51200 0.00 0 0.40 IWMP DOLR

LBS Nos 500 0.00 0 0.22 IWMP DOLR

Gully Plug Nos 0 0.00 0 0.00 IWMP DOLR

Percolation

Tank Nos 0 0.00 0 0.03 IWMP DOLR

Field bund R Mt. 117675 0.00 0 1.45 IWMP DOLR

Tank Nos 32 0.06 73 0.78 IWMP DOLR

Farm Pond Nos 125 0.24 295 2.67 IWMP DOLR

Chek Dam - StopDam

Nos 99 0.49 442 4.20 IWMP DOLR

Sunken Pond Nos 0 0.00 0 0.00 IWMP DOLR

Nala

Deepning R Mt. 0 0.00 0 0.00 IWMP DOLR

Gabion Nos 55 0.00 0 0.42 IWMP DOLR

Stone outlet Nos 0 0.00 0 0.00 IWMP DOLR

Total 154840 0.69 598 10.18

Page 180: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Kannod , District - Dewas

Ccomponent Activity Unit Quantity

Water Irrigation Estimatied Main Concerned

Ministry

Storage Capacity in

MCM

Potential (ha)

Cost Rs in Crore

Scheme / Department

PM

KSY I

WM

P (

Exis

ting P

roje

cts

)

Contour trenches

R Mt. 12300 0.00 0 0.07 IWMP DOLR

LBS Nos 192 0.00 0 0.07 IWMP DOLR

Gully Plug Nos 74 0.00 0 0.08 IWMP DOLR

Percolation

Tank Nos 0 0.00 0 0.00 IWMP DOLR

Field bund R Mt. 82551 3.38 0 0.58 IWMP DOLR

Tank Nos 10 0.33 49 0.72 IWMP DOLR

Farm Pond Nos 69 1.25 213 1.50 IWMP DOLR

Chek Dam - StopDam

Nos 44 0.27 167 2.34 IWMP DOLR

Sunken Pond Nos 0 0.00 0 0.00 IWMP DOLR

Nala Deepning R Mt. 9200 0.00 0 0.03 IWMP DOLR

Gabion Nos 71 0.27 0 0.71 IWMP DOLR

Stone outlet Nos 0 0.00 0 0.00 IWMP DOLR

Total 104511 5.52 429 6.09

Page 181: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Proposed Activities To Meet Out Demands :

Block - Sonkatch, District - Dewas

Component Activity Unit Quantity

Water Irrigation Estimatied Main Concerned

Ministry

Storage Capacity in MCM

Potential (ha)

Cost Rs in Crore

Scheme / Department

PM

KSY I

WM

P (

Exis

ting P

roje

cts

)

Contour trenches

R Mt. 0 0.00 0 0.00 IWMP DOLR

LBS Nos 28 0.00 0 0.01 IWMP DOLR

Gully Plug Nos 4 0.00 0 0.00 IWMP DOLR

Percolation

Tank Nos 0 0.00 0 0.00 IWMP DOLR

Field bund R Mt. 8335 0.00 0 0.06 IWMP DOLR

Tank Nos 0 0.00 0 0.00 IWMP DOLR

Farm Pond Nos 29 0.06 110 0.62 IWMP DOLR

Chek Dam - StopDam

Nos 48 0.10 138 2.13 IWMP DOLR

Sunken

Pond Nos 0 0.00 0 0.00 IWMP DOLR

Nala

Deepning R Mt. 0 0.00 0 0.00 IWMP DOLR

Gabion Nos 35 0.00 0 0.31 IWMP DOLR

Stone outlet Nos 0 0.00 0 0.00 IWMP DOLR

Total 8459 0.15 248 3.13

Page 182: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Chapter V: Strategic Action Plan IWMP in District under PMSKY:

S.

no.

Name of the Block /

Sub Didtricts

Concemed

Ministry/

Department

Copmonent Activity

Total

Number/Capa

city/Cum

Command

Area/Irrigation

Potential (Ha.)

Period of

Implementati

on (5/7 Year)

Estimated

cost ( in

crore Rs.)

1 2 3 4 5 6 7 8 9

1 IWMP-01 DEWAS DoLR-MoRD PMSKY Watershed Farm Ponds 10 1 1st 0.14

2 IWMP-01 DEWAS DoLR-MoRD PMSKY Watershed Check Dams 12 62 1st 0.93

3 IWMP-01 DEWAS DoLR-MoRD PMSKY Watershed Gabian 6 0 1st 0.07

4 IWMP-01 DEWAS DoLR-MoRD PMSKY Watershed loose boulder 9 0 1st 0.02

5 IWMP-01 DEWAS DoLR-MoRD PMSKY Watershed Percolation Tanks 3 8 1st 0.11

6 IWMP-02 BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 15 21 1 st 0.31

7 IWMP-02 BAGLI DoLR-MoRD PMSKY Watershed Stop Dam 13 78 1 st 1.11

8 IWMP-02 BAGLI DoLR-MoRD PMSKY Watershed Nallah Bunds 3 9 1 st 0.13

9 IWMP-0 3 sonkutch DoLR-MoRD PMSKY Watershed check dams 7 24 1 st 0.37

10 IWMP-0 3 sonkutch DoLR-MoRD PMSKY Watershed stop dam 3 14 1 st 0.21

11 IWMP-0 3 sonkutch DoLR-MoRD PMSKY Watershed gabion 2 0 1 st 0.03

12 IWMP-0 3 sonkutch DoLR-MoRD PMSKY Watershed farm ponds 1 2 1 st 0.02

13 IWMP-04 Kannod DoLR-MoRD PMSKY Watershed Farm Ponds 21 32 1 st 0.48

14 IWMP-04 Kannod DoLR-MoRD PMSKY Watershed Check Dams 6 26 1 st 0.40

15 IWMP-04 Kannod DoLR-MoRD PMSKY Watershed Stop Dam 38 210 1 st 3.15

16 IWMP-04 Kannod DoLR-MoRD PMSKY Watershed Gabian 6 0 1 st 0.05

17 IWMP-04 Kannod DoLR-MoRD PMSKY Watershed loose boulder 6 0 1 st 0.17

18 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Farm Ponds 1 2 1 st 0.03

19 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Check Dams 27 60 1 st 0.91

20 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Nallah Bunds 1 1 1 st 0.03

21 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed gabion 5 0 1 st 0.05

22 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Farm Ponds 16 22 2nd 0.34

Page 183: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1 2 3 4 5 6 7 8 9

23 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 29 121 2nd 1.81

24 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Check Dams 8 18 2nd 0.26

25 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Farm Ponds 16 22 2nd 0.34

26 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed gabion 12 0 2nd 0.18

27 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed Farm Ponds 36 51 3rd 0.77

28 IWMP-06 sonkutch DoLR-MoRD PMSKY Watershed gabion 6 0 3rd 0.07

29 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 14 60 1 st 0.90

30 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 14 24 1 st 0.36

31 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed talab 1 11 1 st 0.16

32 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 6 24 2nd 0.35

33 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 9 9 2nd 0.18

34 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 24 79 3rd 1.18

35 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 8 8 3rd 0.16

36 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Nallah Bunds 6 16 3rd 0.25

37 IWMP-07 BAGLI DoLR-MoRD PMSKY Watershed Percolation Tanks 1 3 3rd 0.05

38 IWMP-08 BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 18 18 1 st 0.34

39 IWMP-08 BAGLI DoLR-MoRD PMSKY Watershed Stop Dam 10 45 1 st 0.68

40 IWMP-08 BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 6 9 2 nd

0.13

41 IWMP-08 BAGLI DoLR-MoRD PMSKY Watershed Stop Dam 9 44 2 nd

0.67

42 IWMP-08 BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 4 6 3 rd

0.09

43 IWMP-08 BAGLI DoLR-MoRD PMSKY Watershed Stop Dam 8 44 3 rd

0.66

44 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 17 77 1 st 1.15

45 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Farm Ponds 19 19 1 st 0.38

46 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Stop Dam 7 26 1 st 0.39

47 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed contour trench 1 0 2 nd 0.01

48 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Farm Ponds 13 20 2 nd 0.31

49 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed farm bunding 2 0 2 nd 0.07

Page 184: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

1 2 3 4 5 6 7 8 9

50 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed gabion 2 0 2 nd 0.03

51 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Stop Dam 8 28 2 nd 0.48

52 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Stop Dam 2 7 3 rd 0.12

53 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Farm Ponds 11 18 3 rd 0.26

54 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed Farm Ponds 5 8 4 rth 0.12

55 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed contour trench 1 0 4 rth 0.01

56 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed form bunding 1 0 4 rth 0.05

57 IWMP-09 DEWAS DoLR-MoRD PMSKY Watershed gabion 1 0 4 rth 0.02

58 IWMP 10 / BAGLI DoLR-MoRD PMSKY Watershed Farm Ponds 15 26 1 st 0.39

59 IWMP 10 / BAGLI DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 6 24 1 st 0.36

60 IWMP 10 / BAGLI DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 13 58 2 nd 0.87

61 IWMP 10 / BAGLI DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 9 38 3 rd 0.57

62 IWMP 10 / BAGLI DoLR-MoRD PMSKY Watershed Nallah Bunds 4 10 3 rd 0.15

63 IWMP 10 / BAGLI DoLR-MoRD PMSKY Watershed Nallah Bunds 2 4 4 rth 0.06

64 IWMP 10 / BAGLI DoLR-MoRD PMSKY Watershed Tanks 5 16 4 rth 0.24

65 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 23 103 1 st 1.25

66 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Stop Dam 1 2 1 st 0.03

67 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 14 42 2 nd 0.63

68 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Farm Pond 6 10 2 nd 0.14

69 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Gabion 1 3 2 nd 0.04

70 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 5 19 3 rd 0.28

71 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Farm Pond 10 16 3 rd 0.24

72 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Nallah Bunds 2 5 3 rd 0.08

73 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Check Dam/Stop dam 4 13 4 rth 0.19

74 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Farm Pond 7 12 4 rth 0.18

75 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Gabion 1 5 4 rth 0.08

76 IWMP 12 / KANNOD DoLR-MoRD PMSKY Watershed Tanks 5 16 4 rth 0.24

Page 185: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Strategic Action Plan for Irrigation in District Dewas under PMKSY

S. no.

Concerned

Ministry/

Department

Component & Sub

Component Activity

Total Number/ Capacity (Cum)

Command Area /

Irrigation Potential

(Ha)

Period of Implementation (5/ 7 Year) Estimated cost Year Wise (Rs. in Corer)

Total Estimate

d cost (Rs. in Corer)

Total No. Capacity

(cum) 2016-17 2017-18 2018-19 2019-20 2020-21

2021-22

1 WRD

AIBP NA 0 0 0 0 0 0 0 0 0 0

Sub Total 0 0 0 0 0 0 0 0 0 0

Tank 2 6429000 2250 7.81 28.81 12.5 17.5 7.91 0 74.53

Har Khet Ko Pani

Barrages 25 11887000 4160 10.5 16.53 17.7 7.5 6.5 0 58.73

CADP 1 49130000 9900 0.4 5.4 7.5 8.5 5.2 0 27

Canal Lining Works 37 79920000 14545 7.29 8.26 10.3 5.5 5.1 0 36.45

Sub Total 65 147366000 30855 26.00 59.00 48.00 39.00 24.71 0 196.71

2 RD

IWMP

Farm Pond 246 861000 885 2.80 1.19 1.53 0.43 0 0 5.95

Check Dam /Stop Dam

185 740000 731 12.18 5.06 2.81 0.19 0 0 20.24

Gabiun 42 0 0 0.19 0.25 0.07 0.08 0 0 0.59

Nala bandhan 33 165000 198 0.26 0.00 0.54 0.48 0 0 1.28

Other head works 0 0 0 7.47 4.56 6.19 2.15 2.08 0 22.44

Sub Total 506 1766000 1814 22.901 11.051 11.142 3.329 2.080 0.000 50.50

MGNEREGS

Stop Dam 971 7529800 1845 13.000 18.665 18.729 23.450 20.201 0.000 94.046

Cheek Dam 1239 3639750 3279 8.100 9.506 9.506 9.534 10.885 0.000 47.532

Tank 635 16206400 2122 9.790 13.233 14.315 14.150 14.675 0.000 66.163

Farm Pond 1331 7641700 1370 3.941 4.806 4.600 4.806 5.877 0.000 24.030

earthen Cheek 63 105200 2 0.602 0.602 0.580 0.602 0.624 0.000 3.010

Contour trenches 17274 5000 0 0.056 0.056 0.076 0.056 0.035 0.000 0.278

Gabion 1442 1164200 9 3.750 5.548 5.752 5.548 7.141 0.000 27.738

LBS 235 0 0 0.143 0.143 0.143 0.143 0.143 0.000 0.713

Dikes 197 0 0 0.121 0.121 0.115 0.121 0.127 0.000 0.605

Soak Pit 457 0 0 0.114 0.114 0.124 0.114 0.103 0.000 0.569

Dug Well (Kapildhara)

306 0 0 0.980 1.328 1.200 1.328 1.803 0.000 6.638

Sub Total 24150 36292050 8627 40.595 54.120 55.140 59.850 61.615 0.000 271.320

Page 186: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

S. no.

Concerned

Ministry/

Department

Component & Sub

Component Activity

Total Number/ Capacity (Cum)

Command Area /

Irrigation Potential

(Ha)

Period of Implementation (5/ 7 Year) Estimated cost Year Wise (Rs. in Corer)

Total Estimate

d cost (Rs. in Corer)

Total No. Capacity

(cum) 2016-17 2017-18 2018-19 2019-20 2020-21

2021-22

3

Ho

rtic

ult

ure

Per Drop More Crop

a- Micro Irrigation

DPAP Drip 12675 0 12675 15.000 21.600 21.600 21.600 21.600 0 101.400

Sub Total 12675 0 12675 15.000 21.600 21.600 21.600 21.600 0 101.400

DPAP Drip 4225 0 4225 5.000 7.200 7.200 7.200 7.200 0 33.800

4

Agr

icu

ltu

re

a- Micro Irrigation

DPAP Sprinkler 19300 0 19300 3.750 6.300 6.300 6.300 6.300 0 28.950

Rain Guns 2700 0 2700 0.45 0.900 0.900 0.900 0.900 0 4.050

Sub Total 26225 0 26225 9.200 14.400 14.400 14.400 14.400 0 66.800

b- Other Interwentio

ns

Land Development 183400 0 0 12.500 19.800 19.800 19.800 19.800 0 91.700

Drought proofing

check Dams/ WHS 580 0 1050 11.000 13.200 13.200 13.200 13.200 0 63.800

Secondary Storage Structure

1400 0 1400 2.000 3.000 3.000 3.000 3.000 0 14.000

On farm Development Disel/Ele. pump etc.

33000 0 0 5.300 9.300 9.300 9.300 9.300 0 42.500

Extension Activities

0 0 0 3.160 2.480 2.480 2.480 2.480 0 13.080

Sub Total 218380 0 2450 33.960 47.780 47.780 47.780 47.780 0 225.080

Grand Total

282001 185424050 82646 147.657 207.962 198.060 185.962 172.184 0.000 911.812

DEPUTY DIRECTOR OF AGRICULTURE

FARMER WELFARE & AGRICULTURE DEVELOPMENT DISTT. DEWAS

Page 187: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P
Page 188: District Level Implementation Committee (DLIC), District · District Level Implementation Committee (DLIC), District Irrigation Plan (DIP) District Dewas M.P. S No. ... 11 Dr R P

Expected Outcomes –

• About 410 MCM increase in water availability.

• Cropping Intensity will rise up to 205 Percent.

• Assured crop diversification in about 80000 Hectares.

• Productivity of major crop will enhanced i.e. Wheat by 600 kg and Chick Pea by 300 kg per hectare.

• Increase in area under irrigation about 60 percent to 85 percent.

• Increase in Water table through recharging structures.

• Reduction in soil erosion.

• Enhancement in input use efficiency.

• Promotion of secondary agriculture – processing packaging and marketing of Farm produce.

• Agriculture and allied sector growth will be increase and ultimate socio-economic status of district will be

improved.