SERVING FULTON, HENRY, LUCAS, OTTAWA, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES,
Mike DeWine, Ohio Governor | Jack Marchbanks, Ph.D., ODOT Director | Patrick McColley P.E., S.I., District Deputy Director
DISTRICT 22021 CONSTRUCTION GUIDE
Ottawa
Sandusky
SenecaWood
LucasWilliams
Henry
Fulton
BOWLING GREEN
2
Overview
Fulton County Henry County
Lucas County
Ottawa County
Sandusky County
Seneca County Williams County
Wood County Local-Let Projects
.................................................
................................................. ................................................. ................................................. ................................................. .................................................
.................................................
.................................................
.................................................
.................................................
page 3
page 5 page 7 page 9 page 13 page 15
page 17
page 20
page 22
page 24
TABLE OF CONTENTS
2
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
TABLE OF CONTENTS
The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system, including federal and state routes outside of municipalities, and all interstate routes.
Each spring, we shift our priority from snow and ice operations to construction and maintenance investments in our state’s transportation system. Our yearly plans are outlined in our district construction programs.
This construction program outlines plans within ODOT District 2, which serves Fulton, Henry, Lucas, Ottawa, Sandusky, Seneca, Williams, and Wood counties in northwest Ohio. District 2 is responsible for:
ABOUT ODOT PROGRAM KEY
For purposes of brevity, ODOT uses several acronyms throughout this programs. This key defines our abbreviations:
I Interstate
U.S. Federal Route
SR State Route
CR County Rd.
TR Township Rd.
NB Northbound
SB Southbound
EB Eastbound
WB Westbound
PID Project Identification Number
3,833LANE MILES
950BRIDGES
45PROJECTS
3
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
OVERVIEW
This construction program offers baseline information on our plans for the upcoming construction season. For additional information on individual projects, visit our website:
transportation.ohio.gov/projects
Filter the library by the project’s identification number (PID) to find additional information on each project throughout the construction season.
LEARN MORE ONLINE CONTACT
Public Information [email protected] | 419-373-4428
Rebecca Dangelo, Public Information OfficerKelsie Hoagland, Public Information SpecialistRhonda Pees, Northwest Ohio Regional Public Information Officer
@ODOTD2
@ODOT_Toledo
Know Before You Go!www.ohgo.com
CONNECT WITH US
During the construction season, ODOT sends weekly updates on ongoing construction and maintenance projects in each county. To sign up for weekly updates, visit:
public.govdelivery.com/accounts/OHDOT/subscriber/new
Subscriptions can be customized on a regional and county level. Follow the prompts at the link above to personalize your subscription to ODOT communication.
For weekly project updates and traffic impacts, select “Construction Updates and Traffic Advisories” when selecting subscription topics.
RECEIVE WEEKLY UPDATES
4
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
OVERVIEW
2
02
A02
901
021801
02
721
66
2
A02
574
57
08
101213
101295
92361
WAUSEON
SWANTON
METAMORALYONS
FAYETTE
DELTA
ARCHBOLD
NOTLUF
46
A02
90101 8
801
101152
Resurfacing •Intersection/Traffic Signal
5FULTON COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 101295U.S. Route 20AResurface U.S. 20A between SR 109 and CR 3 through Delta.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $2.7 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 109.
PID: 92361State Route 108Resurface SR 108 between Henry County line and Elm St. in Wauseon.Estimated Begin: June 2021Estimated End: September 2021Project Cost: $1.25 millionTraffic Impacts: Lane restrictions are expected.
PID: 101152U.S. Route 20A at State Route 108Upgrade the existing traffic signal at the intersection.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $265,000Traffic Impacts: Lane restrictions at the intersection are expected.
PID: 101295State Route 109Resurface SR 109 in Delta.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $2.7 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on US 20A.
PID: 101213State Route 64Resurface SR 64 between U.S. 20 and the Ohio state line through Metamora.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $1 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 120.
PID: 101213State Route 120Resurface SR 120 between Crockett Hwy. and Maple St. in Metamora.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $1 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 64.
FULTON COUNTY
6
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
FULTON COUNTY
GRAND RAPIDS
NEW BAVARIA
NAPOLEON
MCCLURE
MALINTA
LIBERTY CENTER
HOLGATE
HAMLER
FLORIDA
DESHLER
81
801
801 56
81
901
901
6
65
6
801
182
42
6
90166
6
101274 901
109641
011
22984
EH NRYResurfacing
•Pedestrian Safety
•Intersection/Traffic Signal
7HENRY COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 22984New BridgeConstruct a new bridge across the Maumee River, connecting SR 110 to Industrial Dr. in Napoleon.Construction Began: March 2020Estimated End: June 2022Project Cost: $10.3 million Traffic Impacts: Lane restrictions and closures are expected for the construction of a roundabout, traffic tie-ins, and other related work.
PID: 101274U.S. Route 6Resurface U.S. 6 between the Williams County line and SR 34.Estimated Begin: June 2021Estimated End: October 2021Project Cost: $3 millionTraffic Impacts: Lane restrictions are expected.
PID: 109641State Route 109Install Rectangular Rapid Flashing Beacons (RRFB) and related sidewalk and pavement improvements on SR 109 at Cherry St. in Liberty Center.Estimated Begin: August 2021Estimated End: October 2021Project Cost: $190,000Traffic Impacts: Lane restrictions are expected. Note: PID includes installation of RRFB and related in Seneca Co., SR 67
HENRY COUNTY
8
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
HENRY COUNTY
Resurfacing
•Noise Walls
•Bridge/Culvert Project
•Intersection/Traffic Signal
•Major Reconstruction
9LUCAS COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 93594Interstate 75Reconstruct I-75 between South Avenue and Dorr St. through Downtown Toledo.Construction Began: August 2018Estimated End: Summer 2023Project Cost: $158.7 millionTraffic Impacts: Long-term ramp and lane closures and restrictions are required.Note: Adjacent to Wood County I-75 Reconstruction, PID 93592
PID: 106163Interstate 280Place a concrete overlay on the driving surface of the Veterans’ Glass City Skyway bridge in East Toledo.Construction Began: March 2020Estimated End: October 2021Project Cost: $18 millionTraffic Impacts: Ramp closures and lane restrictions are expected.
PID 88563Interstate 75Resurface I-75 between I-280 and the Michigan state line in North Toledo.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $6.4 millionTraffic Impacts: Lane restrictions are expected.
PID: 113685Interstate 280Apply a micro-surface course to the northbound lanes of I-280 near Pickle Rd. in Northwood.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.Note: PID includes multiple locations in Lucas County.
PID: 113685Interstate 75 to Alexis Rd. RampApply a micro-surface course to the ramp from northbound I-75 to Alexis Rd. (Exit 210) in North Toledo.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.Note: PID includes multiple locations in Lucas County.
PID: 88084Interstate 475Construct a new interchange at Dorr St. and widen I-475 between Central Avenue and Airport Hwy. in Springfield Township.Construction Began: November 2019Estimated End: August 2021Project Cost: $45.3 millionTraffic Impacts: Lane restrictions and closures are expected.
LUCAS COUNTY
10
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
LUCAS COUNTY
PID: 113685Interstate 475 RampApply a micro-surface course to the ramp from westbound to southbound I-475 in Sylvania Township.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.Note: PID includes multiple locations in Lucas County.
PID: 110486U.S. Route 20A safety project to improve the intersection of U.S. 20/Central Ave. & McCord Rd. in Sylvania Twp./Toledo.Estimated Begin: May 2021Estimated End: August 2021Project Cost: $400,000Traffic Impacts: Lane restrictions are expected.
PID: 88563Interstate 475Resurface I-475 between Douglas Road and I-75 in Toledo.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $6.4 millionTraffic Impacts: Lane restrictions are expected.
PID: 110490U.S. Route 20/Reynolds Rd.A safety project to improve the intersection of U.S. 20/Reynolds Rd. and Hill Ave. in Toledo.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $400,000Traffic Impacts: Lane restrictions are expected.
PID: 103647Interstate 475/U.S. Route 23Construct noise walls along I-475 and U.S. 23 in Sylvania/Toledo.Estimated Begin: March 2021Estimated End: August 2021Project Cost: $6.6 millionTraffic Impacts: Shoulder and/or lane restrictions are possible.
PID: 110500U.S. Route 20/Reynolds Rd.A safety project to improve the intersection of U.S. 20/Reynolds Rd. and Heatherdowns Blvd. in Toledo.Estimated Begin: September 2021Estimated End: June 2022Project Cost: $1 millionTraffic Impacts: Lane restrictions are expected.
LUCAS COUNTY
11
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
LUCAS COUNTY
PID: 102928U.S. Route 24 at Fallen Timbers LaneRehabilitate the Fallen Timbers Ln. bridge over U.S. 24. in Maumee.Estimated Begin: February 2021Estimated End: May 2021Project Cost: $1.7 millionTraffic Impacts: Fallen Timbers Ln. closed over U.S. 24 for 90 days. Lane restrictions possible on U.S. 24.
PID: 110068VariousMaintenance of three bridges and four water pump stations.Began: January 2021Estimated End: December 2021Project Cost: $117,400Traffic Impacts: Lane restrictions are possible.Note: PID includes maintenance of bridges in Ottawa County.
PID: 111022U.S. Route 24 at Berdan Ave.Convert Detroit/Berdan/Cherry St. roundabout from a two lane by two lane to a two lane by one lane roundabout in Toledo.Estimated Begin: July 2021Estimated End: October 2021Project Cost: $1.3 millionTraffic Impacts: Overnight and weekend closures, and lane restrictions are expected.
PID: 110071VariousOperation of Craig Memorial Bridge and Port Clinton Lift Bridge.Began: January 2021Estimated End: December 2021Project Cost: $428,600Traffic Impacts: Lane restrictions and bridge closures are possible.Note: PID includes operation of bridge in Ottawa County.
PID: 110495State Route 184A safety project to improve the intersection of SR 184/Alexis Rd. and Lewis Ave. in Toledo.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.
PID: 113269VariousPedestrian safety improvement project for 70 intersections located within the City of Toledo.Estimated Begin: May 2021Estimated End: November 2021Project Cost: $1.3 millionTraffic Impacts: Lane restrictions are expected.
LUCAS COUNTY
12
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
LUCAS COUNTY
2
2
753
361
962
35
35
853
2 91
095
361
15
ROCKY RIDGE
PUT-IN-BAY
PORT CLINTONOAK HARBOR
MARBLEHEAD
GENOA
ELMORE
CLAY CENTER
361
AWATTO
95759
111075
95758
962
975
501
Resurfacing
Geological Repair•
13OTTAWA COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 111075State Route 105Slope repair on SR 105 between S. Elliston Trowbridge Rd. and S. Graytown Rd. in Elmore.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $270,000Traffic Impacts: One 2-week closure is necessary, and lane restrictions are expected.
PID: 110068VariousMaintenance of three bridges and four water pump stations.Began: January 2021Estimated End: December 2021Project Cost: $117,400Traffic Impacts: Lane restrictions are possible.Note: PID includes maintenance of bridges in Lucas County.
PID: 95758State Route 269Resurface SR 269 between SR 2 and SR 163, in Port Clinton/Lakeside Marblehead.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $1.4 millionTraffic Impacts: Lane restrictions are expected.
PID: 110071VariousOperation of Craig Memorial Bridge and Port Clinton Lift Bridge.Began: January 2021Estimated End: December 2021Project Cost: $428,600Traffic Impacts: Lane restrictions and bridge closures are possible.Note: PID includes operation of bridge in Lucas County.
PID: 95759State Route 579Resurface SR 579 in Williston.Began: September 2020Estimated End: June 2021Project Cost: $2.1 millionTraffic Impacts: Lane restrictions are expected.
PID: 105631VariousReplace signs in various locations in Ottawa County, not within municipalities. Estimated Begin: April 2021Estimated End: October 2021Project Cost: $620,000Traffic impacts: Lane and shoulder restrictions are expected.
OTTAWA COUNTY
14
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
OTTAWA COUNTY
101
91
35
101015
214
325
02095536
6
6
003
15
006
50102
08
08
YKSUDNAS
GREEN SPRINGS
WOODVILLE
LINDSEY
HELENA
GIBSONBURG
FREMONT
CLYDE
BURGOON
6
02
32
91
108868
101329
99085
•Bridge/Culvert Project•Geological Repair
15SANDUSKY COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 99085U.S. Route 6/U.S. Route 20Repair a slope on eastbound US 6 east of the US 6/US 20 interchange.Estimated Begin: January 2021Estimated End: September 2021Project Cost: $1.5 millionTraffic Impacts: Lane restrictions are expected.
PID: 108868U.S. Route 6Replace bridge structure over South Creek northeast of Fremont.Estimated Begin: May 2021Estimated End: October 2021Project Cost: $765,000Traffic Impacts: Road closure is required.
PID: 101329State Route 19Replace existing bridge structure between Maple St. and Academy Ln. and perform safety grading, in Green Springs.Estimated Begin: June 2021Estimated End: August 2021Project Cost: $687,000Traffic Impacts: Road closure is required.
SANDUSKY COUNTY
16
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
SANDUSKY COUNTY
422
4
76 001
785
4 785132
35
81
81
26181
422
422
536
35
21
TIFFINREPUBLIC
NEW RIEGEL
GREEN SPRINGS
FOSTORIA
BLOOMVILLE
BETTSVILLE
ATTICA
ACENES
32 91
001
76
91
91
101
101
97424
97424
102934
85264
95778
110482
109641
32
32
Resurfacing •Bridge/Culvert Project •Intersection/Traffic Signal•Pedestrian Safety
17SENECA COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 85264U.S. Route 23Resurface U.S. 23 between the Wyandot County line and Fostoria. Replace bridge over Wolf Creek.Estimated Begin: May 2021Estimated End: October 2021Project Cost: $4.3 millionTraffic Impacts: Road closure is required and lane restrictions are expected.
PID: 97424State Route 19Replace two culverts on SR 19: one north of Republic, and one northeast of Lowell.Estimated Begin: June 2021Estimated End: October 2021Project Cost: $1.1 millionTraffic Impacts: Road closures are required.Note: PID includes work on SR 101.
PID: 110482U.S. Route 224 at State Route 53A safety funded project to upgrade the existing signal, install eastbound and westbound left turn lanes and restripe to create positive offset for left turn lanes, southwest of Tiffin.Estimated Begin: July 2021Estimated End: October 2021Project Cost: $1.4 millionTraffic Impacts: Lane restrictions are expected.
PID: 95778State Route 53Resurface SR 53 in Tiffin.Estimated Begin: June 2021Estimated End: November 2021Project Cost: $3 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 100.
PID: 102934State Route 19Rehabilitate SR 19 bridge structure over Silver Creek, south of Bloomville.Estimated Begin: March 2021Estimated End: August 2021Project Cost: $400,000Traffic Impacts: Road closure is required.
PID: 109641State Route 67Install Rectangular Rapid Flashing Beacons (RRFB) and related sidewalk and pavement improvements on SR 67 near TR 1066 in Melmore.Estimated Begin: August 2021Estimated End: October 2021Project Cost: $190,000Traffic Impacts: Lane restrictions are expected. Note: PID includes installation of RRFB and related on SR 109 in Henry Co.
SENECA COUNTY
18
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
SENECA COUNTY
PID: 95778State Route 100Resurface SR 100 between Crawford County line and Riverside Dr. in Tiffin.Estimated Begin: June 2021Estimated End: November 2021Project Cost: $3 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 53.
PID: 97424State Route 101A culvert replacement and bridge replacement on SR 101, northeast of Lowell.Estimated Begin: June 2021Estimated End: October 2021Project Cost: $1.1 millionTraffic Impacts: Road closures are required.Note: PID includes work on SR 19.
SENECA COUNTY
19
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
SENECA COUNTY
66
2
2
721
51
721 6
576
49
107
02
6
49
191
191
43
2
20
34
721
51
107
675
94
80
A02
A02
80
34
WEST UNITY
STRYKER
PIONEER
MONTPELIER
HOLIDAY CITY
EDON
EDGERTONBRYAN
BLAKESLEE
ALVORDTON
SMAILLIW
675
99575
95998
95996
Resurfacing •Bridge/Culvert Project
20WILLIAMS COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 95998U.S. Route 20AResurface U.S. 20A between U.S. 20 and SR 15. Rehabilitate bridge over St. Joseph RiverEstimated Begin: March 2021Estimated End: October 2021Project Cost: $1.5 millionTraffic Impacts: Road closures and lane restrictions are expected.
PID: 95996State Route 2Paint the structural steel on the SR 2 bridge over the Tiffin River.Estimated Begin: May 2021Estimated End: August 2021Project Cost: $242,000Traffic Impacts: Lane restrictions are expected.
PID: 99575State Route 576Resurface SR 576 between U.S. 20 and the Michigan state line; rehabilitate bridge over Clear Fork Creek, and replace culvert between County Rds. R and S.Estimated Begin: July 2021Estimated End: October 2021Project Cost: $2.2 millionTraffic Impacts: Road closures and lane restrictions are expected.
WILLIAMS COUNTY
21
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
WILLIAMS COUNTY
532
81
6
361
02452
597
02
991
501
285285
46
532
182
182
81
56
32
32
574082
57
9213
3
9580
1
1012
86
1076
13
1029
30
9359
2
57 DO
OW
WE
ST
ON
WE
ST
MIL
LGR
OV
E
WA
YN
E
WA
LBR
IDG
E
TO
NT
OG
AN
Y
RO
SS
FOR
D
RIS
ING
SU
N
PO
RT
AG
E
PE
RR
YS
BU
RG
PE
MB
ER
VIL
LE
NO
RT
HW
OO
D
NO
RT
H B
ALT
IMO
RE
MIL
TO
N C
EN
TE
R
MIL
LBU
RY
LUC
KE
Y
JER
RY
CIT
Y
HO
YT
VIL
LE
HA
SK
INS
CY
GN
ET
CU
ST
AR
BR
AD
NE
R
BO
WLI
NG
GR
EE
N
BLO
OM
DA
LEB
AIR
DS
TO
WN
6
991
991
52
57
Resu
rfac
ing
•Brid
ge/C
ulve
rt P
roje
ct
•Maj
or R
econ
stru
ctio
n
22WOOD COUNTY
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
PID: 93592Interstate 75Reconstruct I-75 between Wales Rd. and South Ave. in Rossford/Northwood/Toledo.Construction Began: August 2018Estimated End: Summer 2023Project Cost: $180 millionTraffic Impacts: Long-term ramp and lane closures and restrictions will be in effect.Note: Adjacent to Lucas County I-75 Reconstruction, PID 93594
PID: 92133State Route 25Reconstruct SR 25 between Cygnet Rd. and U.S. 6 south of Bowling Green, including Portage.Estimated Begin: June 2021Estimated End: October 2022Project Cost: $17.8 millionTraffic Impacts: Lane restrictions are expected.
PID: 102930Interstate 75Rehabilitate Gypsy Ln. bridge over I-75 and Poe Rd. bridge over I-75 in Bowling Green.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $2.8 millionTraffic Impacts: Road closures are required on Gypsy Ln. and Poe Rd. Lane restrictions are expected on I-75.
PID: 101286State Route 199Micro-surface SR 199 between north of Cygnet Rd. to U.S. 6.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $443,100Traffic Impacts: Lane restrictions are expected.
PID: 95801U.S. Route 6Resurface U.S. 6 between SR 235 and Township Rd. 133. Intersection and drainage improvements at U.S. 6 and SR 235.Estimated Begin: August 2020Estimated End: July 2021Project Cost: $3 millionTraffic Impacts: Lane and intersection restrictions are expected.
PID: 107613State Route 199Replace bridge on SR 199 over North Branch Portage River, south of SR 105, west of Pemberville.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $492,000Traffic Impacts: Road closure is required.
WOOD COUNTY
23
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
WOOD COUNTY
LOCAL LET PROJECTS
(PID, Description, Bid Award Date)
FULTON108954 - Pedestrian improvements in Swanton - April 15, 2021110333 - Replace guardrail in various locations - July 30, 2021
LUCAS98909 - Reconstruct Bennett Rd. in Toledo - March 19, 2021103417 - Pave Chessie Cr. Trail between Bowman Park and University Hills - May 14, 2021103758 - Replace Marengo St. bridge - February 5, 2021104417 - Reconstruct Wenz Rd. in Toledo - January 29, 2021104487 - Resurface Holland-Sylvania Rd. between Bancroft St. and Elmer Dr.- March 15, 2021107480 - Construct pedestrian bridge over Main St. in Toledo - December 16, 2020107485 - Construct cycle track along Jefferson Ave. in Toledo - January 15, 2021108444 - Construct turn lanes on SR 64 in Waterville - August 27, 2021108457 - Install architectural signage - April 23, 2021108793 - Resurface Airport Hwy. between Byrne Rd. and South Ave. - April 16, 2021108794 - Resurface Dorr St. between Reynolds Rd. and Byrne Rd. - April 9, 2021109391 - Add bike lanes on Kilburn Rd. - March 5, 2021111374 - Resurface approximately 3/4 mile of King Rd. - March 25, 2021111374 - Resurface approximately 3/4 mile of Stickney Ave. - March 25, 2021113429 - Replace traffic signal head at Indiana Ave. & Washington St. in Toledo - April 14, 2021113677 - Reconstruct traffic signals in Ottawa Hills - June 16, 2021
24
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
LOCAL LET PROJECTS
LOCAL LET PROJECTS
OTTAWA104087 - Replace bridge on Wildacre Rd. over Cedar Creek - February 11, 2021107061 - Construct pile wall prior to pedestrian project in Port Clinton - May 22, 2021110834 - Pedestrian improvements on W. Fremont Rd. from Port Clinton Pointe to Lay Dr. - May 14, 2021111047 - Ferry boat ramp project - February 18, 2021
SANDUSKY108631 - Construct Fremont bike trail - June 22, 2020112062 - Minor roadway and drainage project on US 20 and SR 101 in Clyde - April 14, 2021
WOOD101104 - Resurface SR 64 in Bowling Green - June 4, 2021101863 - Maumee River multi-use path - September 15, 2020104428 - Resurface Oregon Rd. between Ohio Turnpike and Binker Rd. - June 4, 2021104493 - Intersection improvements at SR 25 and Roachton Rd. in Perrysburg - May 28, 2021104496 - Intersection improvements at SR 25 and W. Boundary St. in Perrysburg - April 9, 2021109082 - Replace guardrail on Pemberville Rd. - April 16, 2021109559 - Replace bridge on Stony Ridge Rd. - May 21, 2021109672 - Pavement markings in various locations - March 15, 2021110334 - Replace guardrail in various locations - July 30, 2021111509 - Construct turn lanes on SR 25 near Ft. Meigs in Perrysburg - June 9, 2021112132 - Pedestrian and corridor improvements on SR 65 in Rossford - April 1, 2021
25
DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM
LOCAL LET PROJECTS
OUR M ISS ION
OUR V I S ION
OUR GU ID ING PR INC IPLES
We will serve, innovate, and communicate with purpose.
We will be productive, lean, efficient and effective.
We will utilize the public resources entrusted to us by satisfying the State’s transportation needs.
We will be the standard of excellence for winter maintenance.
We will create a working environment based on trust and mutual respect.
We will value the diversity of all ODOT people.
We will work together - one team; the Ohio Department of Transportation.
A long-term, reliable, professional and highly productive organization.
To provide safe and easy movement of people and goods from place to place, we will:
• Improve safety;
• Take care of what we have;
• Make our system better;
• Enhance capacity.
County Route Section Work Date Description
Wood 6 4.50 April Drainage, 440' of pipe and catch basin replacements
Wood 18 7.18 July / August Ditch enclosure 460" of 60" poly pipe Wood All All Routes Spring Berming all routes, in progress Wood 18 0.0 - 5.55 June Chip Seal Wood 199 21.1 September Ditch enclosure 260" of 42" poly pipe Wood 18 6.8 - 10.6 June / July Paving train / multiple areas Wood 235 0.0 - 1.05 June / July Paving train / multiple areas Wood 281 5.0 - 12.0 June / July Paving train / multiple areas
Ottawa 590 7.00 July Ditch fill Ottawa 53 14.24 October Culvert replacement Ottawa 53 14.84 October Culvert replacement Williams 20A 7.49 May / June Tile and basin installation and ditch fill 750' Williams 127 15.09 May / June Tile and basin installation and ditch fill 1020'
Williams 576 2.96 - 9.77 August / September Chip seal
Williams 191 0.55 Summer Tile and basin install ditch fill 1000' Henry 109 2.78 Summer Ditch Fill Henry 6 9.61 - 16 Summer Paving & deck repairs Henry 24 0 - 20 Fall Berming
ODOT DISTRICT 2 • MAJOR MAINTENANCE PROJECTS
County Route Section Work Date Description
Sandusky 6 23 - 32 Summer Full depth pavement repairs from Erlin to the Erie County line
Sandusky 105 0.0 - 2.14 Summer Full depth pavement repairs from U.S. 23 to Woodville
Sandusky 53 13.45 - 17.5 Summer Full depth pavement repairs from the Ohio Turnpike to the Ottawa County line
Sandusky 510 0.8 - 6.36 Summer Full depth pavement repairs from Clyde to U.S. 6
Sandusky 300 3.51 - 6.33 July Chip seal from Gibsonburg to U.S. 20 Sandusky 53 13.82 Summer Culvert repair Sandusky 6 17.51 Summer Embankment and tile repair Sandusky 635 1.9 - 2.01 June Storm sewer installation
Sandusky 19 1.01 Summer Culvert replacement or improvement at CR 181
Sandusky 6 8.39 Summer Culvert replacement or improvement Sandusky 20 7.42 Spring Culvert replacement under TR 70 Sandusky 6 23.2 Summer Storm sewer installation
Fulton 20 .2 - .5 Summer Storm sewer replacement Fulton 20 0.20 Summer Culvert replacement Fulton 127 3.27 Summer Culvert replacement Seneca 53 15.60 Summer Linear pipe replacement Seneca 587 11.50 Summer Linear pipe replacement Seneca 224 8.27 Summer Culvert replacement Seneca 224 8.35 Summer Culvert replacement Seneca 224 8.76 Summer Culvert replacement Seneca 224 8.84 Summer Culvert replacement
County Route Section Work Date Description
Seneca 19 3.04 Summer Culvert replacement Seneca 162 6.50 Summer Culvert replacement
Seneca 162 8.70 Summer Culvert replacement
Seneca 162 1.10 Summer Culvert replacement Lucas 24 62.48 Summer Concrete pavement repairs Lucas 64 2.17 Summer Concrete pavement repairs Lucas 20 0 - 8.2 Summer Reconditioning shoulders Lucas 64 8.91 - 11.06 Summer Ditch clean out Lucas 295 15.01 - 21.54 Summer Ditch clean out Lucas 23 11.88 Summer Bridge deck repairs
Northwood Outpost 20 4.41 - 11.07 Early Summer Crack seal
Northwood Outpost IR280 3.21 - 8.63 Summer Crack seal
Northwood Outpost IR280 4 - 4.6 Summer Full depth joint repair
Northwood Outpost 420 2.50 Summer Full depth joint repair
Northwood Outpost 20 10.47 Summer Full depth joint repair
Northwood Outpost 579 0 - 3 Late Summer Crack seal
Northwood Outpost 51 Northwood –
Genoa Early Fall Crack seal
Northwood Outpost 795 Lemoyne Road –
SR 51 Fall / Spring Crack seal (in preparation for chip seal in 2022)
County Route Section Work Date Description
Northwood Outpost I-475 EB Exit Ramp at
Secor Road Summer Drainage/embankment repair
Northwood Outpost I-280 NB I-280 to
SB I-75 April Drainage repairs
Northwood Outpost I-75 SB I75 to
Lagrange/Stickney Early Summer Drainage repairs/berming