Page 1: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

District 1

US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A

Oral Presentation September 20, 2012

Page 2: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

Our Presentation Agenda

• Project Scope• Awareness of Project Issues• Staffing Plan• Approach to Project• Other Considerations• Why WilsonMiller Stantec

Page 3: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Project Scope

US 17 / SR 35 from of Ft Ogden to Nocatee• 5.66 miles from South of SW Collins Street to South

of CR760A

• 600 Calendar days

• Letting in January 2013

• Construction Start April 2013

• 2013 Standard Specifications e-Book

• Information from 90% Resubmittal plans dated July 20, 2011

• Reconstruct from 2-lane rural to 4-lane rural divided

Page 4: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Project Scope

• 11 ponds

• New Northbound lanes east (right) of existing roadway

• Mill, resurface, overbuild and reconstruct existing roadway for new Southbound lanes

• 15,000+ LF of Pipe Culvert

• Embankment berm for future mixed-use path

Typical Section

Page 5: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Project Scope

Utility Construction and Relocation• Desoto County Water Main relocation (in contract)

• Desoto County Force Main construction and removal (in contract)

• FPL Transmission line relocation

• FPL Distribution line relocation

• CenturyLink communications construction and relocation

• Level 3 communications adjustments

Page 6: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Project Scope

Environmental• 9 storm water retention ponds

• 2 flood plain compensation ponds

• Endangered and Protected Species

• SWFWMD permit - ResubmitNorthern Caracara

Gopher Tortoise Scrub Jay

Page 7: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Project Scope

Maintenance of Traffic/Construction Phases• Phase I - new temporary traffic shift at south

FPL construction and relocation Construct ponds Construct Desoto County force main Construct drainage structures and features Construct new Northbound roadway

• Phase II all traffic on new roadway Complete drainage structures and features Reconstruct existing roadway Beard St to Wood

Rd Mill for cross slope correction Overbuild for superelevation Thicket Rd to Beard

St

• Phase III open 4-lane configuration Friction Course, Pavement Marking, Signing

Page 8: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Project Scope

Desoto County Utility Plans • Water and force main

90% plans revised

• Reviewed Signed/Sealed 100% plans provided by County

• Locates performed by Desoto County Utilities personnel

• 75 conflict locations identified and addressed

Page 9: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Utility Adjustments

• Not identified in 90% Plans

• Contacted Greg Coker, FPL Distribution

• FPL Transmission Utility Work Schedule (UWS) not submitted

• Transmission / Distribution joint-use line in conflict from begin project to Thicket Rd

• Distribution line in conflict from Thicket Rd to end project

Page 10: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Utility Adjustments

• Transmission requires 180 days acquisition before construction

• Transmission requires 120 days (estimated) to construct

• Distribution UWS shows 193 days construction

• Distribution not concurrent – follows Transmission

• Demolition 30 days (estimated)

• Nearly one year of work concurrent with Phase I roadway

Page 11: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Utility Adjustments

• FPL obtained Desoto County and CenturyLink plans

• Requested special clearing and grubbing requirements

• Will request special trench box requirements

• Possible Distribution construction north of Thicket Rd to be concurrent with Transmission construction

• CRITICAL PATH

Page 12: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

• We obtained CenturyLink UWS and RGB drawing submittal dated August 24, 2012

• Appears to address all known conflicts

• Construct new fiber optic line prior to construction start

• Remove abandoned fiber optic line

• Adjust lines at west ends of new drainage structures

Utility Adjustments

Page 13: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Level(3) Utility Adjustments

• We contacted Level 3 representative shown in 90% plans

• Contact is not valid

• Alternate contact has not responded

Recommendation: Update Plans to Reflect Correct Contact & Phone Number

Page 14: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Utility Adjustments

• We propose to provide a schedule showing the relationship of the UWS from each utility to the contractor for use in coordinating with utilities and developing the construction schedule.

Page 15: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Right-of-Way

• Existing structures remain in right of way – 5 locations

• Residence south of Wood Road appears occupied

• Right-of-way must be cleared prior to FPL construction

RECOMMENDATION: Advise District Production staff to confirm right-of-way is cleared by letting date.

Page 16: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Pond Construction• Pond Siting Report

indicates poorly drained soils

• High water tables

• FPC ponds were challenging to construct on adjacent project

• Pond excavation provides embankment

RECOMMENDATION: Emphasize Pond Construction Prior to Rainy Season

Page 17: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Storm Water Management

• Existing off-site flow is east to west

• Maintain positive flow of off-site storm water flow through project

• Treat construction runoff

RECOMMENDATION: Utilize ponds for construction stormwater treatment during construction.

Page 18: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Drainage Construction Inspection• 15,000+ feet of new storm sewer

and drains

• Video and laser profile required on all pipe less than 48”

RECOMMENDATION: Schedule meeting with Paul Harkins and drainage contractor to define inspection, reporting and submittal requirements.

RECOMMENDATION: Schedule multiple submittals as each drainage basin is completed.

Page 19: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Plans• Connection of storm sewer to cross drains with collars

• Small pipe connections will be maintenance issue at CD-01 and CD-03

RECOMMENDATION: Use design similar to treatment used at CD-05.

Page 20: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Asphalt MillingERC Comments Indicated Arcadia Maintenance Wants Asphalt Millings

RECOMMENDATION: If this request is honored, a pay item plan note should be added to advise the contractor regarding the disposition of millings so cost is accounted for by contractor when bidding the project.

Page 21: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Understanding of Project Issues

Railroad

• Railroad adjacent to west right of way from begin construction to Thicket Rd.

• Construction limits are well away from rails.

• CSX does not permit equipment to cross rails

RECOMMENDATION: Advise contractor of CSX regulation at preconstruction meeting.

RECOMMENDATION: In the event conditions change, notify Lisa Revell-Petro, GEC Rail Coordinator.

Page 22: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Critical Inspection Guidelines

Environmental Compliance• De-Watering Permit• Commencement/Completion Notices to Agencies• SWPPP/NPDES • Survey of Outfall Structures & Treatment Area Elevations

for As-Builts• Notify District Environmental Administrator

Earthwork• Stockpile/Borrow Pit Approved & Cleared from

Endangered Species & Historical Artifacts• Correct Proctors Used• Limit Ponding on Roadway

Asphalt• Cross Slopes Checked• Compaction Per Rolling Procedures• Drop-Off Requirements Met • Spread Rates Checked for Compliance

Page 23: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Critical Inspection Guidelines

Concrete• Check Tickets Against Design Mix• Verify Counter & Water Meters Work Properly• Verify Sampling & Testing of Structural Concrete

Drainage Installation• Pipe Set to Line & Grade• Joints Wrapped• Plastic & Metal Pipe >36” Tested for Deflection• Pipes < 48” Video Inspected• BackFill Pipe Trench in 4 Zones

MOT• WTS on Site for MOT Setups• Performing Inspections & Noting Deficiencies/Corrections• Install & Maintain TCD’s Properly• Provide Reasonable Safe, Stable Access to

Businesses/Property Owners

Page 24: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

AWARENESS OF PROJECT ISSUES Preparation for Presentation

• Thorough Review of Available Plans

• Complete Field Inspection

• Fully Researched All Issues

• Discussed Adjacent Project with DeSoto County Consultant

• Understand Risks – Have Solutions

• Prepared to Start Project

Page 25: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

RESOURCES & ABILITIES Our Team

Public InformationMedia Relations

Utilities and Inspection Staff

Inspection Staff Asphalt Plant

Inspection

Page 26: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

RESOURCES & ABILITIES Organization of Key Staff

Page 27: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

RESOURCES & ABILITIES Qualified Florida Staff

Page 28: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

RESOURCES & ABILITIES Key Project Experience

SR 64 Design-Build (12th Street East to 15th Street West, Bradenton)

Utility Coordination

Page 29: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

RESOURCES & ABILITIES Key Project Experience

SR 684 (Cortez Road from SR 45 to 44th Avenue East, Bradenton)

Utility Relocation

Page 30: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

RESOURCES & ABILITIES Key Project Experience

SR 80 from CR 78A to Grandma’s Grove, Hendry County

Rural ConstructionPermitted Ponds

Page 31: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

RESOURCES & ABILITIES Key Project Experience

SR 56 & 54 from US 41 to I-75, Pasco County

DrainageTraffic Control

Page 32: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

OTHER CONSIDERATIONS Communications

Communications with Contractor

• Weekly Progress Meetings

• Daily Communication Between PA & Project Manager

• Daily Communication Between Field Staff, PA & Superintendant

• Timely Document & Resolve Issues at Lowest Level – Escalate if Necessary

Page 33: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

OTHER CONSIDERATIONS Communications

Communications with FDOT

• Daily Communication Between PA & CPM - No Surprises!

• Daily Input into SiteManager , LIMS, EDMS

• Timely Respond to FDOT Deadlines

• Track & Advise CPM of CEI Contract Issues as Necessary – 12 Weeks Notice

Page 34: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

OTHER CONSIDERATIONS Communications

Communications with Others

• Utility Relocation/Protection Coordination

• Permit Agency Notifications

Page 35: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

OTHER CONSIDERATIONS Communications

Communications with Others

PIO for Public Inquires/ Road Closures

• Proven experience on over 30 projects with District One

• Proactive approach• Stakeholder database• US 17 Corridor Website• Face-to-face meetings• Project fact sheets• Email notifications

Page 36: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

OTHER CONSIDERATIONS Commitment to Satisfy the Department

FDOT Track Record

• WilsonMiller DBE Grade – A (12.93 % $ to DBEs)

• Most Recent CEI Grade – 3.4 (C8V38)

• Staffing Levels Adjusted to Project Needs

• Long History of Successful CEI Project Closeout

• Team Worked on District 1 Projects for Past 10 Years

Page 37: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 (SR 35) from 0.4 mile South of SW Collins Street to South of CR 760A, DeSoto County

… IN CONCLUSION Commitment to Satisfy the Department

Why Select WilsonMiller Stantec• Proposed Staff is Pro-Active - Knows Major Project

Issues Now

• Potential Concerns & Solutions Identified

• Proposed Staff Worked on Similar FDOT Projects• SR 80 – CR 78A to Grandma’s Grove• SR 684 (Cortez Rd) – US 41 to 44th Ave East• SR 54/56 –US 41 to I-75

• Staff Available for Project Start• Sr. Project Eng. PA, CSS & Sr. Insp. Team over 10 Years

• Excellent Past Working Relationship with FDOT CPM• CPM Well Informed of Project Issues/Progress

• Excellent Past Performance on FDOT District One Projects• No Issues/ Concerns with Project Closeout

Page 38: District 1 District 1 US 17 (SR 35) CEI Services US 17 (SR 35) CEI Services From 0.4 mile South of SW Collins Street to South of CR 760A From 0.4 mile

US 17 CEI Services

Mr. Rick Ward, PESenior Associate, Transportation

6900 Professional Parkway EastSarasota, FL 34240

[email protected]

www.stantec.com