09:00 09:15Welcome from PHSS Chairman and UCL Q3P Course Director
James Drinkwater and Professor Duncan Craig, Director UCL School of Pharmacy
09:15 10:00Revision of Annex 1 Manufacture of sterile medicinal products – a GMP inspector’s point of view.
Andrew Hopkins MHRA Senior Inspector
10:00 11:00 Panel Discussion – Annex 1 revision.Discussion panel: MHRA, PHSS, A3P, PDA, ISPE, R3 Nordic and ECA.
11:00 11:45 Coffee and Viewing ExhibitionsBlue Badge - Square LoungeGreen Badge - MLT Exhibition Area
11:45 12:30
Data Integrity: Considering non-conformances, challenges, requirements and impact on product/ batch release.
Di Morris: GSK Global auditor,Ex-MHRA senior inspector.
12:30 13:30 Lunch and Networking
13:30 14:15
Stream 1: Main Lecture TheatreChanges and their impact in revisions of EU GMP Regulations: Orange Guide; chapters 3, 5, 8 and annex 15: Qualification and validation.
Malcolm Holmes: Consultant/ Freelance GMP/ PHSS regulatory update author.
13:30 14:15
Stream 2: Workshop RoomAnnex 16: Certification of a Qualified person and batch release.The impact of the revision and new requirements.
Richard Funnell – Funnell Pharma Consultants Ltd
14:15 14:45 Coffee and Viewing ExhibitionsBlue Badge - MLT Exhibition AreaGreen Badge - Square Lounge
14:45 15:30
Stream 3: Main Lecture TheatreISO 14644 (part 1 & 2) revision update.Key points about the revisions and potential impact on GMP qualification and operations.
Gordon Farquharson: GMP Consultant; Critical systems
14:45 15:30
Stream 4: Workshop RoomImpact of regulations in filling multiple products in the same facility, considering aseptic processing of non-hazardous product, cytotoxic products and biologically hazardous products, including live virus.
James Drinkwater: F Ziel Head of Aseptic processing technologies and GMP compliance.
Please hand in your feedback forms.Course notes will be sent electronically.We would be delighted to welcome your colleagues as members.Thank you for coming.
PHSS Annual Conferencein association with UCL Q3PUCL School of Pharmacy, LondonFriday 11th September 2015
Impact of changes in GMP regulations including Annex 1 & ISO standard revisions.
over 25 years of advancing pharmaceutical and healthcare sciences
Distribution rights are property of the PHSS, permission must be obtained for use.
James Drinkwater
Chairman of PHSS –
Pharmaceutical &
Healthcare Sciences Society
1
Introduction and Welcome
PHSS & UCL QP Annual Conference 2015
UCLQP3
Distribution rights are property of the PHSS, permission must be obtained for use.
UCL School of Pharmacy Welcome
2
General guidance for conference:
Fire exits…. No planned fire alarm tests.
Toilets/ Rest rooms; off stair wells… directions from PHSS/ UCL staff
Blue badge and Green badge coffee break and lunch rota; Exhibitors split between break rooms. Directions from PHSS/ UCL staff.
Blue badge coffee break Square lounge, lunch MLT roomGreen badge coffee break MLT room, lunch Square lounge.
Presentations downloaded via link provided after the conference.
Distribution rights are property of the PHSS, permission must be obtained for use.
Conference Welcome
3
The PHSS wish to thank Dr. Khalid Sheikh,Director, UCL QP Course, Department of Pharmaceutics and his UCL School of Pharmacy colleagues for the collaboration with the PHSS.
Announcement: Kay O’Hagan is to take over as Editor in Chief of the EJPPS: European Journal of Parenteral & Pharmaceutical Sciences from Gordon Farquharson – Our sincere thanks to Gordon for his professionalism and dedication to the role over many years. We also take the opportunity to welcome Professor Bengt Ljungqvist from R3 Nordic to the conference. Bengt is also on the main editorial board of the EJPPS.
Announcement: Jenni Tranter is take over from Kay O’Hagan as the Vice Chairperson of the PHSS. Our good wishes to Jenni in this new role and sincere thanks to Kay who will continue on the PHSS Management team.
A special thank you to Andrew Hopkins, Senior MHRA GMP Inspector, and his colleagues at the MHRA for the continued support of the PHSS.
Thank you to our partners in collaboration, PDA, R3 Nordic, A3P, ISPE and ECA for your contribution to the Annex 1 revision discussion panel.
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel
4
PHSS Moderator: Kay O’Hagan: Senior Qualified person, Hospira UK.
MHRA, EMA: Andrew Hopkins: Senior GMP MHRA Inspector, Head of EMA Annex 1 revision working group.
PDA Worldwide: Richard M. Johnson, President & CEO, microbiologist.PDA UK Chapter President: Dr Siegfried Schmitt Principal Consultant PAREXEL international
PHSS: Di Morris: GSK Compliance Audit Manager, Compliance Audit Group (CAG), Quality Systems and Compliance. PHSS Management team member.PHSS: James Drinkwater: F Ziel GmbH, Head of Aseptic processing Technologies & GMP compliance. Chairman of PHSS.
ISPE/ ISO: Gordon Farquharson: Chair BSI LBI030, Chair CEN TC243, Convenor ISO TC209 wg1, and member ISPE Sterile and HVAC CoP. Consultant Critical systems.
A3P France: Dr Roland Guinet, Ex AFFSAPS GMP Inspector, WHO GMP auditor, GMP Consultant, University Professor of Microbiology, Head of A3P Annex 1 Interest group.
R3 Nordic: Berit Reinmüller, PhD, Associate Professor in Safety Ventilation, Chalmers University of Technology, Gothenburg, Sweden, R3 Nordic journal editor.
ECA (European Compliance Academy): Dr Jean-Denis Mallet, NNE Pharmaplan, Senior Technology Partner, GMP Expertise, QP, Pharmacist. Head of ECA annex 1 comment working group.
Distribution rights are property of the PHSS, permission must be obtained for use.
GMP Change and impact
5
GMP Annex’s
have changed
or are
changing;
Annex 1
Product
profiles are
changing: more
biologicals
ISO 14644‐1&2ISO 14698Revisions
GMP Chapters have
changed
The challenge
of change
through
advancement
Targeted delivery systems &
improved efficacy
Improved efficiencies, cost
reductions and competitiveness
New
Technologies
and practice
IMPACT
Distribution rights are property of the PHSS, permission must be obtained for use.
6
Risk based initiatives –
science based processes
Impact of GMP regulation + ISO Standard revisions
EU GMP
ANNEX 1,
15, 16 Revisions
EU GMP
Orange Guide
Chapter
changes; 3, 5, 8
ISO 14644‐1&2ISO 14698Revisions
Control Strategy for
sterile’s manufactureHolistic EM, Trend
metrics, no averagingMeasurements:
5 Micron & UDF
Process Simulation;
Alternative media Position of final
sterilising filter RMM – Real time
micro cfu vs bio‐counts
Distribution rights are property of the PHSS, permission must be obtained for use.
PHSS Bio‐contamination monograph 20
7
Bio-contamination monograph now published in hard copy and e-book.
The monograph e-copies are free downloads to PHSS members.
R3 Nordic-PHSS Bio-contamination workshop event in Denmark 29 October.
The PHSS are now publishing more on-line GMP regulation change impact statements to support members.
The Risk Management of Contamination (RMC) guidance is under review for update and publication as a PHSS monograph.
Distribution rights are property of the PHSS, permission must be obtained for use.
8
New PHSS guidance:
Worked examples of Risk assessments for EM sample location selection and risk based EM
sampling plan/programs.
Risk based Environmental Contamination Control to follow.
PHSS Bio-contamination Special Interest Group (SIG)
Distribution rights are property of the PHSS, permission must be obtained for use.
9
Andrew Hopkins, MHRA/ Head of EMA Annex 1 revision group.
Ian Symonds, GSK head of Global Aseptic manufacturing Quality – GSK Barnard Castle UK.
Mike Davies, GSK Global quality auditor, GSK Worthing UK QA Director.
Di Morris, Ex‐MHRA, GSK Compliance auditor manager. PHSS management team member.
Una Hearty, Pfizer Grange Castle, Global Quality.
Benoit Ramond, Sanofi France Global Quality, Microbiology
Tim Eaton, Astra Zeneca, Macclesfield, Sterile product manufacturing specialist.
Alan Dillon, Allergan Westport Ireland Filling line project manager.
Seamus Lyons, Amgen Ireland Aseptic processing QA
Tim Sandle, Bio Products Ltd (BPL) Head of microbiology.
Tim Triggs, DOP systems Director, PHSS management team member.
Tim Russel, TSI (RMM) field developer.
David Jones, Rapid Micro Bio‐systems, Director.
John Wallingford, Pharmagraph (EMS systems) Managing Director.
Steven Robbins, NHS (National health service) Blood transfusion service.
Carl McDonald, NHSBT, Head of bacteriology.
Adam Bird, Oxford Biomedica (Biotech), Head of QA.
Tim Sizer, HNS Regional Quality Pharmacist.
Mark Oldcorne, All of Wales Quality Pharmacist.
Adulmajeed Raji, Porton Biopharma, Microbiologist
Patrick Nieuwenhuizen, Genzyme Ireland Manager Quality Control Microbiology
Corinna Maier, F Ziel GmbH Aseptic processing technologies microbiologist.
Jenni Tranter, Business development manager Synergy Health
Kay O’Hagan, Hospira Quality auditor/ QP.
Wenzel Novak, Groninger GmbH Director of research and development
Michael Pratz Head of Bausch & Stroebel Compliance/ training academy
Johannes Rauschnabel GMBH Bosch packaging GMP expert.
Marc Van Laere Mithra Belgium QA Manager,
Distribution rights are property of the PHSS, permission must be obtained for use.
10
PHSS – QP Discussion Forum Brecon, Wales
Next meeting 29 October 2015
PHSS QP Forum meeting 2015
QP presentations, Regulatory updates, compliance scenario discussions
Distribution rights are property of the PHSS, permission must be obtained for use.
James DrinkwaterChairman of PHSS – Pharmaceutical & Healthcare
Sciences Society
F Ziel GmbH Head of Aseptic processing technologies
& GMP compliance.
11
Sterile Medicinal & Therapeutic product manufacturing, filling, packaging &
pharmacy dispensing to GMP
First quarter 2016 ‐
TBA
Next Major PHSS Conference 2016
Distribution rights are property of the PHSS, permission must be obtained for use.
12
Annex 1 Discussion panel
QUESTIONS
PHSS QP UCL Annual Conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Introductions to Discussion panel
13
PHSS Moderator: Kay O’Hagan: Senior Qualified person, Hospira UK.
MHRA, EMA: Andrew Hopkins: Senior GMP MHRA Inspector, Head of EMA Annex 1 revision working group.
PDA Worldwide: Richard M. Johnson, President & CEO, microbiologist.PDA UK Chapter President: Dr Siegfried Schmitt Principal Consultant PAREXEL international
PHSS: Di Morris: GSK Compliance Audit Manager, Compliance Audit Group (CAG), Quality Systems and Compliance. PHSS Management team member.PHSS: James Drinkwater: F Ziel GmbH, Head of Aseptic processing Technologies & GMP compliance. Chairman of PHSS.
ISPE/ ISO: Gordon Farquharson: Chair BSI LBI030, Chair CEN TC243, Convenor ISO TC209 wg1, and member ISPE Sterile and HVAC CoP. Consultant Critical Systems.
A3P France: Dr Roland Guinet, Ex AFFSAPS GMP Inspector, WHO GMP auditor, GMP Consultant, University Professor of Microbiology, Head of A3P Annex 1 Interest group.
R3 Nordic: Berit Reinmüller, PhD, Associate Professor in Safety Ventilation, Chalmers University of Technology, Gothenburg, Sweden, R3 Nordic journal editor.
ECA (European Compliance Academy): Dr Jean-Denis Mallet, NNE Pharmaplan, Senior Technology Partner, GMP Expertise, QP, Pharmacist. Head of ECA annex 1 comment working group.
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
14
General Concept/ Principles questions
Question 1
The Annex 1 revision concept paper considered the revision may cover Sterile and Non-Sterile product manufacturing.
How does the panel think guidance can be differentiated?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
15
General Concept/ Principles questions
Question 2
The PHSS Bio-contamination special interest group prepared a White paper on Control strategy for manufacture of sterile products and drug substances.
Does the panel believe the requirements for a Control strategy for Sterile products should be included in the Annex 1 revision?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
16
General Concept/ Principles questions
Question 3
Considering data trends are a key performance indicators what trend metrics would the panel consider should be covered in Annex 1 revision?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
17
General Concept/ Principles questions
Question 4
Should Annex 1 include more detailed guidance on Aseptic processing with the increase of aseptic processing used in manufacture of biological products that cannot be terminally sterilised?
Considering the FDA guidance to Industry provides specific guidance on Aseptic processing and currently there are just a few paragraphs in Annex 1 on Aseptic preparations.
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
18
General Concept/ Principles questions
Question 5
Concerning the various non-injectable sterile pharmaceutical dosage forms, does the panel consider Annex 1 revision should contain more precise details or dedicated paragraphs?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
19
Question 6 - specifics
Often firms/ end users implement minimum requirements for environmental control, followed by inadequate design layout. Should Annex 1 reinforce the risk based approach over minimum requirements or replace minimum requirements with more specifics?
For example; different processes and barrier technology combinations require different background environments.
Should Annex 1 define when a Grade D (the current minimum) is not considered a suitable background when using Isolator barrier technology in ‘Open system’ Aseptic processing/ manufacturing as defined in the PHSS Bio-contamination monograph 20?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
20
Question 7 - specifics
New technologies including Rapid Micro Methods (RMM) are to be considered in the revision of Annex 1. How can conventional microbiological ‘Not to exceed’ CFU levels detailed in Annex 1 be reconciled with fluorescent based Bio-count levels for GMP compliance?
PHSS comment: It is unlikely there will be widespread adoption of RMM-RT (Real time) methods in Grade A filling zones where environmental data is considered in Batch records and higher recoveries reported as ‘Bio-counts’ will be difficult data to manage without an Annex 1 reference or guidance on correlation with CFUs.
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
21
Question 8 – specifics
In an aseptic processing area what is the expectation for grade A continuity for product contacting parts, components and their primary packaging that are sterilised out of place and then subsequently transferred for aseptic assembly.
Is there an expectation that this can be provided by double wrapping parts or is the use of UDF grade A supply transfer carts recommended?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
22
Question 9 – specifics
Is it expected to review in detail the way Annex 1 is written for years to prevent misinterpretation of some statements?
An example is the following: current paragraph 50 contains a sentence that states:
“Sinks and drains should be prohibited in grade A/B areas used for aseptic manufacture”.
Interpreting this statement a company (or several companies?) considered that it was acceptable to install a Grade B washing room that was not an aseptic manufacturing area but adjacent to a filling suite with direct operator access, therefore, the washing room was constructed with a drain and operators go in and out the washing room and the filling room during production operations?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
23
Question 10 - specifics
With the increased complexity and diversity of aseptic formulations, the classic use of nutrient media to replace the formulation for process simulation trials (PSTs) is not always feasible, or scientifically justifiable.
Alternative approaches based on risk assessment and scientific rationale could be regarded as equivalent to ensure an acceptable level of aseptic assurance. Is this approach consistent with the intent of the revised Annex 1 document?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
24
Question 11 – specifics
Concerning the MAL (Material Airlocks) can it be considered that a “two door” MAL would be sufficient from Grade D to Grade B material transfers providing it is separated with a “line” in the middle and provided the D operators will never cross that line and additionally the B operators will also not cross the same line from the other side?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
25
Question 12 – specifics
When using gamma irradiated single use systems with integrated point of fill filtration is pre use integrity testing appropriate for this set up?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
26
Question 13 – specifics
When factoring a facility upgrade, in terms of dispensary operations is there a regulatory move for these to be carried out as a minimum within a Grade C environment?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1 revision Discussion panel Questions
27
Thank you
The Q&A will be documented and published on the PHSS Website for download
and
shared with our collaboration partnersfor sharing with their association members.
The PHSS will follow the progress of Annex 1 revision to remain engaged with this important development and
advancement
Distribution rights are property of the PHSS, permission must be obtained for use.
Revision of Annex 1 Manufacture of sterile medicinal products – a GMP inspector’s point of view.
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Scope•History and Background•Process of revision•Current Status•Why update•Summary
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
History and Background•The original version was revised in 1996, 2003, 2005, 2007 and 2009 however there has not been a complete review of the document since it was originally issued• Since the original issuance and the revisions there have been changes in technologies and significant changes in GMP consequent to the adoption of the ICH Q9 and Q10 guidelines.
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
History and Background•In 2012 The German Authorities (ZLG) issued a concept statement to the EMA’s IWG proposing revision of the Annex and a subsequent request was made to PIC/S for support in updating•2014 PIC/S Working group was set up and started work in August.•September 2014 a draft concept paper was re- issued to IWG (by the MHRA) supporting the update.
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Process of revision•Combined working group (PIC/S and EMA) with a task of assessing the requirements of revision:
– Update of Question and answer document– Revision of the Annex– Complete re-write
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Process of revision•Combined working group with a task of assessing the requirements of revision:
– Understand Industry concerns– Understand Regulatory concerns
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Process of revision•Draft Concept paper proposed at EMA IWG September 2014•Following regulatory comments and PIC/S input issued for public consultation on 5th February 2015•Deadline for comments was 31st March 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Current Status•Joint working group agreed a new structure•Joint working group commenced work on revision process of content.•Sub groups concentrating on specific areas•Proposing new timelines
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update •New Issues
– QRM– Monograph on WFI– Biofilm
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update - General opinions•Better clarification
– EM how often (especially lower grade areas)– What does “Grade A Air supply” mean
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update - General opinions•Ambiguities?
– Microbiological limits “these are average values”– Freeze Drying Para 34 (Grade A or in sealed
trays under B) conflicts with para 116 (A at all times
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update - General opinionsGeneral points for discussion•ISO 14644 5.0µm or not?•Closed systems •Small batch product such as ATMPS•Facility
– Isolators?– RABS ?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update - General opinionsGeneral points for discussion
•Filter integrity testing pre use post sterilisation•Scope – Also applicable to Non sterile manufacturing?•Bioburden sampling
Distribution rights are property of the PHSS, permission must be obtained for use.
14
Annex 1
Why update - my opinion(what is the target audience?)
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update My opinions•People still don’t understand so need more guidance•QRM ?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update •Losing technical skill level•New and emerging countries where the knowledge has not yet evolved (learning by deficiencies)•New and emerging technologies•Areas not covered
– Media fills, small batches, APIs Campaigns?– New BFS technology– Closed systems
Distribution rights are property of the PHSS, permission must be obtained for use.
17
Annex 1
Why update - my opinion(technical knowledge)
Distribution rights are property of the PHSS, permission must be obtained for use.
18
Annex 1
Why update - my opinion(process design)
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update - My opinions
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Why update - My opinions
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Summary• There are lots of reasons why Annex 1 needs
updating • It is happening• It is a shared project between PICS and EMA
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 1
Thank you for Listening
Any Questions?
Distribution rights are property of the PHSS, permission must be obtained for use.
23
Copyright
All material created by the Medicines and Healthcare products Regulatory Agency, including materials featured within these MHRA presentation notes and delegate pack, is subject to Crown copyright protection. We control the copyright to our work (which includes all information, database rights, logos and visual images), under a delegation of authority from the Controller of Her Majesty’s Stationery Office (HMSO).
The MHRA authorises you to make one free copy, by downloading to printer or to electronic, magnetic or optical storage media, of these presentations for the purposes of private research, study and reference. Any other copy or use of Crown copyright materials featured on this site, in any form or medium is subject to the prior approval of the MHRA.
Further information, including an application form for requests to reproduce our material can be found at www.mhra.gov.uk/crowncopyright
Material from other organisationsThe permission to reproduce Crown copyright protected material does not extend to any
material in this pack which is subject to a separate licence or is the copyright of a third party. Authorisation to reproduce such material must be obtained from the copyright holders concerned.
Distribution rights are property of the PHSS, permission must be obtained for use.
PHSS Annual Conference 2015 – Annex 1 Discussion panel
Final version 8 September 2015
MHRA, EMA: Andrew Hopkins: Senior GMP Inspector Medicines and Healthcare products Regulatory Agency (MHRA), Head of EMA Annex 1 revision working group.
PDA Worldwide: Richard M. Johnson, President & CEO
PDA UK Chapter: Dr Siegfried Schmitt Principal Consultant PAREXEL International
PHSS: Di Morris: GSK Audit Manager, Compliance Audit Group (CAG), Quality Systems and Compliance. PHSS Management team member.
PHSS: James Drinkwater: F Ziel GmbH, Head of Aseptic processing Technologies & GMP compliance. Chairman of PHSS.
ISPE/ ISO: Gordon Farquharson: Chair BSI LBI030, Chair CEN TC243, Convenor ISO TC209 wg1, and member ISPE Sterile and HVAC CoP.
A3P France: Dr Roland Guinet, Ex AFFSAPS GMP Inspector, GMP Consultant.
R3 Nordic: Berit Reinmüller, PhD, Assoc Professor in Safety Ventilation, Chalmers University of Technology, R3 Nordic journal editor. ECA (European Compliance Academy): Dr Jean-Denis Mallet, Senior Technology Partner, GMP Expertise, QP, Pharmacist. Head of ECA annex 1 comment working group.
Distribution rights are property of the PHSS, permission must be obtained for use.
1
PHSS Annual Members Conference 2015
Di Morris
Data Integrity
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity
• Are concerns over data integrity something new?– No
• Is it just an issue for Quality Control– No its all departments in a company
• Is it happening more– No, we are more aware
• Is it always intentional acts– Not always; a lot are due bad GMP practices
2
Distribution rights are property of the PHSS, permission must be obtained for use.
Definitions – Data Integrity
3
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity
• It is all in the GMPs for EU, USA and WHO– Chapter 4– Annex 11– 21CFR211 and Part 11
• Examples– Records include the raw data which is used to generate other records. For
electronic records regulated users should define which data are to be used as
raw data. (Eudralex Vol 4 Ch 4)
– Based on the complexity and reliability of computer systems there must be
procedural controls and technologies to ensure the accuracy and security of
computer systems, electronic records and data. Computer systems
must have
adequate controls to prevent unauthorized access or changes to data,
inadvertent erasures, or loss.(21CFR Part 211.68)
4
Distribution rights are property of the PHSS, permission must be obtained for use.
Definitions – Data Integrity
The Quality, Safety and Efficacy
of the medicines we make is
assured by applying the regulations and best practice
If we don’t......
Would you be happy taking those medicines
5
Distribution rights are property of the PHSS, permission must be obtained for use.
Definitions – Data Integrity
• ALCOA– Attributable– Legible/Permanent
– Contemporaneous
– Original– Accurate
• ALCOA+– Complete
– Consistent– Enduring– Available
Ref MHRA Symposium Dec 2014 and has been used by FDA for many years
This applies to both Paper
and Electronic Systems
The following are examples 6
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Attributable
Paper Record
• Initials• Hand written signature
They have to be equivalent.
Electronic Record
• Log‐on User identification
• Electronic signature
7
Traceable to a UNIQUE person
You should be able to tell who created, modified, or deleted a record. AND, you can judge if that person was appropriately authorized to do it!
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Legible
Paper Record• Legible
• No Pencil
• No Correction Fluid
• Permanent Ink
• Correct Amendment of an Error
• Appropriate Archival
Electronic Record• No data annotation tools enabled
• No Over Writing
• No Deletions
• No Hidden Fields
• Changes captured in Audit Trail
• Back‐up and Archive
• Enforced Saving
8
Readable, Traceable Changes, Permanent
You should be able to read all the entries on the paper record. If a change was made, the original value was crossed out with a single line, and the change was dated and initialled.You should be able to see in an electronic files data changes and deletions. Is it clear what the original value was? When it was created and who created it?
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Contemporaneous
Paper Record• No back‐
dating
• No pre‐completion of a record
• Record the date (and time) of the
activity
Electronic Record• Records saved immediately the
data is entered
• Synchronised clocks
• Locked date and time stamps
9
For a paper record the creation, modification, and deletion of data happens at the right time in the process.For an electronic record when it was created in a process, the audit trail should confirm that.
Record the activity at the time it occurred
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Original
Paper Record
• Original Document –
Manufacturing record;
laboratory record;
Electronic Record
• Original electronic file
including metadata – a UV
spectra, FTIR spectra
10
The first record made by the appropriate person
if not original should be exact copy - Original records and true copies must preserve the integrity (accuracy, completeness, content and meaning) of the record. Exact (true) copies of original records may be retained in place of the original record (e.g. scan of a paper record), provided that a documented system is in place to verify and record the integrity of the copy. You must be able to reconstruct the activity from the data
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity – Certified Copy
• A certified copy is:– Verified by a second person– Compares the copy to the original
– Confirms the copy is accurate and complete
– Documents the verification
– Stamped a ‘true copy’
• What is not a certified copy– A pdf or printout – these are flat files of for example
• A FTIR spectra• A HPLC chromatogram
– They do not preserve the content and meaning
11
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Accurate
• Accurate, consistent and real representation of facts.
• No editing without documented amendments /audit trail
entries by authorised personnel– Make sure of the information that you are recording is correct,
honest and transparent
– Record the data directly into the controlled unique blank record/bound book/electronic programme
– Where possible use automatic data capture
– Are the electronic record the same as the paper record
12
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity – ALCOA+
• Complete– All data from an analysis, from the start of analysis to the end
and any
repeated or reanalysis performed on the sample.
– For electronic systems, the paper output must be linked to the
underlying electronic records used to produce it.
• Consistent– All elements of the analysis, such as the sequence of events, follow on
and data files are date (all processes) and time (when using electronic
systems) stamped in the expected order
• Enduring– Recorded on authorised media e.g. laboratory notebooks, numbered
worksheets, for which there is accountability or electronic media
• Available– The complete collection of records can be accessed or retrieved for
review over the lifetime of the record.13
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity – Data Governance
14
• MHRA Definition:• The sum total of arrangements to ensure that data, irrespective of the format
in which it is generated, is recorded, processed, retained and used to ensure a
complete, consistent and accurate record throughout the data lifecycle.
– It should be integral part of the Pharmaceutical Quality System
– There should be clear Management Responsibilities
IT should be part of Management Reviews/Quality Councils
Everyone should be trained to understand the terms and implications of IT
systems
—
There should be data owners such as process owners in computer
systems
—
There has to be data integrity training
—
There has to be procedures and processes in place
—
Create a blame free, open and transparent culture
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity – Data Definitions
Record Observation Hybrid Electronic
Raw Data
Written record
Electronic files of the
analysis
Electronic files of the
analysis
Metadata
Further written data about
the sample and analysis e.g.
batch, test, analyst, date,
etc.
Electronic Files for control
of the instrument, data
acquisition, interpretation
and reporting of data.
Identification of who tested
the sample, etc.
Audit trail entries of data
changes
Further written data about
the sample and analysis e.g.
batch, test, etc.
Electronic Files for control
of the instrument, data
acquisition, interpretation
and reporting of data.
Identification of who tested
the sample, etc.
Audit trail entries of data
changes
Further written data about
the sample and analysis e.g.
batch, test, etc.
Review
Reportable result
Handwritten signatures of
tester and reviewer
Printout of reportable result
Handwritten signatures of
tester and reviewer
Linkage to underlying
instrument raw data and
spreadsheet file
Reportable Result
Electronic signatures of
tester and reviewer
Linkage to all data and
metadata via application
database
15
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Impact
16
• Access to raw data for staff performing data checking
activities (MHRA)
– This is similar to the FDA GMP requirement for complete
data and for the second person review to see all data
generated in the course of an analysis.
– This means a review of the source data eg electronic HPLC
data
What about QPs certifying for release batches not made on site?
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity
• The MHRA guidance (v1.0) stated that organizations are “not
expected to implement a forensic approach to data checking,
….”.
However the revised version now reads “not expected to
implement a forensic approach to data checking on a routine
basis, ….”
• QPs must ensure systems, procedures, training, culture and
management responsibilities for data integrity are clearly in
place and they have time to do this on all their suppliers to be
able to certify batches
17
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Consequences
• So what does this mean:– What happens when data integrity is breached? The worst
case scenario is impact on patient safety and the loss of lives.
– the recent New England Compounding Pharmacy incident
in the United States can be used as an example of the
consequences of fraudulent activity. Here, 64 patients
died and over 750 were sickened from fungal meningitis as
a result of sterility negligence and data integrity issues. In
this case, a FDA official said pharmacy technicians were
instructed to lie on cleaning logs, showing rooms as being
properly cleaned when they had not been
18
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Consequences
– we have to embed ALCOA+ principles into our ways of working
across the WHOLE
of the business –
Development to
commercial manufacturing
– Data generated in development impacts the Quality attributes
in commercial manufacture – the data has to be trusted
to be
complete and accurate
– Stability data supports product in the market any data integrity
concerns impact the product and may result in recall
– Data Integrity issues can result in loss licence, recalls, loss of jobs and patients not having their medicines
19
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity – Recent Issues
• pH meters and balance printers:– Date and time not locked
– Evidence of data being changed and reprinted– Undated records found in a bin
• Batch record had pre‐populated sections
• Validation protocol had typed in results that had been signed
and dated ‘on the day of the test’
• Reprints of worksheets not tracked and reconciled
20
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity – Recent Issues
• Failure to record activities at the time they are performed and
destruction of original records
• Batch records were completed after the operations had
ended
• Failed to maintain original manufacturing data for critical
steps – had uncontrolled loose paper, unbound, rough notes,
transcribed and then originals destroyed
• Back dated batch records
• Laboratory equipment lacked controls to prevent raw data
from being deleted or altered.
21
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
HPLCs
How do the
Part 11 regulations and "predicate rule requirements" (in 21 CFR
Part 211)
apply to the electronic records created by computerized
laboratory systems
and the
associated printed chromatograms that are used in drug manufacturing and testing?Some in industry misinterpret the following text from “The Guidance for Industry – Part 11,
Electronic Records; Electronic Signatures – Scope and Application”
(Part 11 Guidance; lines 164
to 171) to mean that in all cases paper printouts of electronic records satisfy predicate rule
requirements in 21 CFR Part 211.The printed paper copy of the chromatogram would not be considered a “true copy”
of the entire electronic raw data used to create that chromatogram, as required by 21
CFR 211.180(d). The printed chromatogram would also not be considered an “exact
and complete”
copy of the electronic raw data used to create the chromatogram, as
required by 21 CFR 211.68. The chromatogram does not generally include, for
example, the injection sequence, instrument method, integration method, or the
audit trail, of which all were used to create the chromatogram or are associated with
its validity. Therefore, the printed chromatograms used in drug manufacturing and
testing do not satisfy the predicate rule requirements in 21 CFR
Part 211. The
electronic records created by the computerized laboratory systems must be
maintained under these requirements.
Date: 8/3/2010 22
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
HPLCs
Why do HPLCs attract so much attention?
•Because we don’t use them as they are meant to be used
•We treat them as we did with ‘integrators’
•We should not be running unintegrated chromatograms and
then putting in the processing parameters
•We should be:– Second person checking the sample sequence then locking it
– We should be locking the method and ALL processing parameters
– We should be using the system to generate the data at time of
analysis
– We should be giving sufficient time for the column to equilibrate and
not use ‘trial’
injections
•We should not be manually manipulating certain
chromatograms (assay, dissolution) 23
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Issues
• The computer system access rights
– The system administrator worked in the laboratory
– The administrator must be independent of the department
– The independent department must have appropriate
procedures and controls
– The analyst/operator had the access to modify the
method/recipe
– How to modify was clearly documented in the equipment use
procedure
– Only the administrators procedures should have that level of
detail
24
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Issues
• The HPLC system did not have proper controls in place to prevent
unauthorised manipulation of the laboratories raw electronic data.
• The HPLC systems did not have access controls to prevent
alteration or deletion of data
• The HPLC software lacked an audit trail recording any changes to
the data, including previous entries, who made changes and when
the changes were made
• The laboratory and manufacturing personnel shared common log‐
ins and passwords to access the system
• The Quality Unit was unable to retrieve the original raw electronic
data because the back‐up discs were unreadable/over written
25
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity ‐
Conclusion
• The message for data integrity is clear.
• It’s not a new concept; it’s about getting back to the roots of training all
staff on the importance of data integrity in cGMP documentation and
honesty.
• It is critical to ensure employees understand the accountability
and
traceability requirements for retention of raw data and the consequences
of data manipulation.
• Training operators and analysts to document the performance of a task by
recording what happened at the time it occurs, including information
about the person who performed it along with clearly documenting
and
investigating deviations, is vital for patient safety and product efficacy.
• This is achievable by providing the training and creating a company
culture that promotes and rewards ethical behaviour as a core value from
top to bottom of an organization.
26
Distribution rights are property of the PHSS, permission must be obtained for use.
Data Integrity
Thank you
27
Distribution rights are property of the PHSS, permission must be obtained for use.
Changes in EU GMP / MHRA Orange Guide chapters 3, 5, 8 and annex 15
1Malcolm Holmes ‐
PHSS 2015 members
conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Chapter 3:
Premises and
Equipment
Chapter 5:
Production
Chapter 8:
Complaints,
Quality Defects
and Product
Recalls
Annex 15:
Qualification and
Validation
2Malcolm Holmes ‐
PHSS 2015 members
conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Changes Chapters 3 & 5
Chapter 3 Chapter 5
Malcolm Holmes ‐
PHSS 2015 members
conference3
With transitional arrangement for toxicological evaluation
Distribution rights are property of the PHSS, permission must be obtained for use.
Additional Changes Ch 5
Malcolm Holmes ‐
PHSS 2015 members
conference4
Section
Distribution rights are property of the PHSS, permission must be obtained for use.
Background Need For Dedicated Facilities
5Malcolm Holmes ‐
PHSS 2015 members
conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Why
6Malcolm Holmes ‐
PHSS 2015 members
conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Potential Impact
7Malcolm Holmes ‐
PHSS 2015 members
conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Dedicated Facilities
Regulator positioning ?
• Its a highly potent product
of a type which would
previously have been
manufactured in dedicated
facilities. Therefore that
would appear to be a good
starting point.
Manufacturer positioning ?
• Its a highly potent product
of a type which would
previously have been
manufactured in dedicated
facilities. I want you
“techies”
to find me a way
to safely manufacture it in
shared facilities.
Malcolm Holmes ‐
PHSS 2015 members
conference8
All parties must be very careful not to manipulate their risk
management decisions to facilitate their pre‐determined
desired outcome
Distribution rights are property of the PHSS, permission must be obtained for use.
CH 5 – Reporting Product Shortage Due To Manufacturing Constraints
Malcolm Holmes ‐
PHSS 2015 members
conference9
Distribution rights are property of the PHSS, permission must be obtained for use.
Ch 5 Testing Of Starting Materials
Malcolm Holmes ‐
PHSS 2015 members
conference10
Distribution rights are property of the PHSS, permission must be obtained for use.
Ch 5 Rationale For Outsourcing Of Testing
Malcolm Holmes ‐
PHSS 2015 members
conference11
Distribution rights are property of the PHSS, permission must be obtained for use.
Ch 8 ‐
Complaints, Quality Defects and Product Recalls
Malcolm Holmes ‐
PHSS 2015 members
conference12
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 15: Qualification And Validation
Malcolm Holmes ‐
PHSS 2015 members
conference13
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 15: Some Significant Changes
Malcolm Holmes ‐
PHSS 2015 members
conference14
Distribution rights are property of the PHSS, permission must be obtained for use.
Validation – A State Of Mind
15Malcolm Holmes ‐
PHSS 2015 members
conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Summary
Basics
• In general more detail is
given. New versions
substantially longer than
previous versions
• All based on significant
modernisation of GMP
thinking ‐
ICH Q8, Q9 &
Q10 – Particularly ICH Q9
(Quality Risk Management)
Remember ICH Q9 key principles
Malcolm Holmes ‐
PHSS 2015 members
conference16
Distribution rights are property of the PHSS, permission must be obtained for use.
Culture
Kim Sandell ‐
Pfizer
17Malcolm Holmes ‐
PHSS 2015 members
conference
Distribution rights are property of the PHSS, permission must be obtained for use.
Communication MHRA & Industry
Malcolm Holmes ‐
PHSS 2015 members
conference18
Over last 12 months or so MHRA through
its Innovation Office has published
convincing summaries of how it has been
able to help Industry make appropriate
choices in design of facility/ process /
product.
This is good risk management by both
MHRA and Industry which leads to better
patient safety.
Distribution rights are property of the PHSS, permission must be obtained for use.
Workshop
Malcolm Holmes ‐
PHSS 2015 members
conference19
Distribution rights are property of the PHSS, permission must be obtained for use.
1
PHSS Annual Members Conference in association with UCL Q3P 2015
Richard Funnell
FunnellPharma
ConsultantsLtd
Annex 16:What is changing?
What are the implications?When is it going to happen?
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 16: Introduction
•
Work on revision started 4 years ago!
•
Still not issued.
•
Most recent public draft has moved on.
•
Annex 16 rebuilt and designed to:
–
Reflect increasing supply chain complexity.
–
Include new legislation.–
IMP legislation
–
Falsified Medicines Directive
–
2009 reflection paper on unexpected deviations
–
Increase consistency across the EEA.2
Distribution rights are property of the PHSS, permission must be obtained for use.
Annex 16: Introduction
•
We will:
–
Pick out eleven key points.
–
Examine the controversial areas.
–
See what the practical implications may be.
–
Have some discussion.
3
Distribution rights are property of the PHSS, permission must be obtained for use.
Access to MA
• 3.3. “…
it is expected that the QP has access to the necessary details of the MA…”
Hopefully obvious but now formal. Should help
the QP.
4
Distribution rights are property of the PHSS, permission must be obtained for use.
Shared responsibility
• 3.3. “…responsibility may be shared with other QPs who have confirmed compliance of specified steps in
the manufacture and control of a batch…”
Reflects increased manufacturing across different companies.
Previously implicit?
Legal implications?
5
Distribution rights are property of the PHSS, permission must be obtained for use.
“Virtual”
importers
• 3.4.2. “Importation activities including at least receiving, sampling, storage of the unreleased and
uncertified batch, QC testing, certification and release should be conducted by authorised sites…”
What does “authorised”
mean?
UK currently allows physical receipt at WDA holder (with conditions).
CONTROVERSIAL.
Still not agreed!
6
Distribution rights are property of the PHSS, permission must be obtained for use.
Imported batches –
location of sampling
• 3.4.6. “Samples of imported product should in full be representative of the batch and therefore, be taken
after arrival in the EEA...”
REMAINS CONTROVERSIAL
A 50/50 split across member states:– 50% accept samples being taken at manufacturing site
– 50% require at least some samples to be taken after arrival in EU.
7
Distribution rights are property of the PHSS, permission must be obtained for use.
Location of sampling continued
• A further iteration allowed reliance on samples taken at manufacturing sites but with certain conditions. For
example:• Need a formal risk assessment and study to justify samples
representative (e.g. comparative analysis of samples taken in
both places).
• Review time between sampling and eventual shipment to EU.
• “Random periodic analysis of samples taken after importation...”
Reflects industry desire?
8
Distribution rights are property of the PHSS, permission must be obtained for use.
Location of sampling continued
• 3.4.8. Covers further importation of the same bulk batch.
– Subsequent imported amounts should be subject to ID and assay
within EU.
– Storage and transportation “similar”
on each occasion.
– Samples originally tested should be representative of all
subsequent
batches.
ALSO REMAINS CONTROVERSIAL – PUSH TO RETAIN STATUS QUO
9
Distribution rights are property of the PHSS, permission must be obtained for use.
Allowable QP delegation:
• 3.5. onwards ‐
a short list of what QP must do personally.
• 3.5.4. onwards ‐
a longer list of what QP is responsible for but may delegate.
Clarifies and reflects QP codes of practice (a UK document).
10
Distribution rights are property of the PHSS, permission must be obtained for use.
API responsibilities
• 3.5.5. and 3.5.9. State QP must have supply chain knowledge and responsibility for API GMP and GDP.
– QP should have a documented supply chain available
– QP needs to ensure API manufactured and sourced according to GMP
and GDP.
Now well entrenched. Reflect Falsified Medicines Directive
11
Distribution rights are property of the PHSS, permission must be obtained for use.
Parallel importing
• 3.7. A new section on parallel importation and distribution.
– QP should confirm compliance with national requirements and EU
rules on this.
– “The re‐packager should ensure that product …has been obtained
from the authorised supply chain.”
– “Re‐packager must ensure authenticity by verifying safety features
where applicable.”
Much more common than when original Annex
16 was published.
12
Distribution rights are property of the PHSS, permission must be obtained for use.
Control reports
• 3.8.2. “The control report … or another proof of certification should be made available … for the batch to be exempted from controls when entering
another member state…”
This is an existing legislative requirement.
Therefore difficult to ignore!
Not widely adhered to?
13
Distribution rights are property of the PHSS, permission must be obtained for use.
Audits by third parties:
• Section 4 “Relying on GMP assessments by third parties e.g. audits.”
• Six sub‐points. Quite a bit of detail……..
14
Distribution rights are property of the PHSS, permission must be obtained for use.
Unexpected deviations:
• Section 5: Principle of 2009 reflection paper in Orange Guide but stripped right down.
– API, excipient and FP registered specs no room for manoeuvre–
need
a batch specific variation (in UK).
– The impact of the deviation should be assessed under a quality risk
management process such as described in Part III.
– Evaluate impact on safety, quality and efficacy.
– Consider putting on stability.
15
Distribution rights are property of the PHSS, permission must be obtained for use.
Shipment under quarantine:
• 6.1. “Until a batch is released it should remain at the site of manufacture or be shipped under quarantine
to another authorised site.”
“Authorised”?
Some member states allow shipment under quarantine to a WDA holder.
Others would only allow shipment to an MIA holder.
ALSO CONTROVERSIAL
16
Distribution rights are property of the PHSS, permission must be obtained for use.
The future:
• Final wording still not agreed.• Don’t know when final version will be issued.• Two areas in particular may change.
• Annex 21.
17
Distribution rights are property of the PHSS, permission must be obtained for use.
1
PHSS Annual Members Conference in association with UCL Q3P
News from ISO TC209By Gordon Farquharson
Chair BSI LBI/030; Chair CEN TC243;
Convenor ISO TC209 WG1
September 2015
September 2015 © 2015
2
Revision of BS/EN/ISO 14644-1 & 2
By Gordon Farquharson
Chair BSI LBI/030; Chair CEN TC243;
Convenor ISO TC209 WG1
September 2015
September 2015 © 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Agenda Review of all the standards in the ISO 14644 family Background to why a revision of part 1 & 2 was required. The status of current ISO 14644-1 & 2. The challenge of improving ISO 14644-1:1999 Timeline for the new standards. ISO 14644-1
New – classification by table. New – number of sample locations. Update to sequential sampling procedure. Handling Ultrafine particles – now in Nano-particle monitoring standard. Keeping the concepts of Macro-particles Test methods update.
Revision of ISO 14644-2 Change to a standard for monitoring only. The monitoring plan. Guidance about critical parameter monitoring.
September 2015 © 2015 3
Quick overview of all the ISO ‘Cleanroom’ Standards
© 2015 4September 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Review of all the standards [1]
September 2015 © 2015 5
Review of all the standards [2] 14644-9 – Surface cleanliness classification by particles. (current)
14644-10 – Surface cleanliness classification by chemicals. (current)
14644-12 – Air cleanliness monitoring by nano-particles DIS 1st Qtr 2014 – approved. Being revised for a 2nd DIS as a monitoring
standard. 14644-13 - Cleaning of surfaces
New work in progress – UK has consistently voted against this work.
14644-14 & 15 – Equipment suitability New work recently started. Part 14 DIS passed vote.
14644-16 – Energy considerations New work started 2015, based on BS 8568:2013; Cleanroom energy. Code of
practice for improving energy efficiency in cleanrooms and clean air devices.
14698-1 & 2 – Bio-contamination The 14698 standards are still in place. New standard in ISO TC209 WG2, work stopped– Air and surface cleanliness
by viables. Work taken up by CEN TC243
September 2015 © 2015 6
Distribution rights are property of the PHSS, permission must be obtained for use.
ISO TC209 confirms the essential attribute of a cleanroom “Air cleanliness by particle number concentration”
There has been some confusion !!ISO TC209 standards we have several different cleanliness attributes:
Airborne & surface particles
Airborne & surface chemicals
Airborne & surface micro
Question - Should we be able to designate (classify) a cleanroom by any one of the cleanliness attributes?
In October 2014, ISO TC209 clarified the position
A “cleanroom” must be characterised by air cleanliness class by particles. If other attributes are important for a particular industry or process/product, then we can monitor for these in addition.
© 2015 7September 2015
Revision of ISO 14644-1 & 2
© 2015 8September 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Background to the revisions
© 2015 9September 2015
Why where the revisions to ISO 14644-1:1999 needed?
At the systematic review Vote, P-nations decided they wanted to improve standard.
Reconsider the statistical model– consider removing the need to evaluate the 95% UCL for 2-9 test locations.
When the work started, experts found problems with the existing statistical methods.
There has been 3 years debate over the statistical confidence of finding non-compliant locations when classifying a cleanroom or clean-zone.
September 2015 10© 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Why where the revisions to ISO 14644-2:2000 needed?
September 2015 11© 2015
Status of ISO 14644-1 & 2
© 2015 12September 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
13
Very important !!!!!
Status of ISO 14644-1 & 2The information here is for information only.
Not to be used for classification or monitoring of cleanrooms.
EN/ISO 14644-1:1999 & 14644-2:2000 remain the applicable standard for classification by airborne particles !!!!! No change until replaced by the new standards.
September 2015© 2015
Revision timeline
© 2015 14September 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
ISO TC209 WG1 Timeline (10 years + in the making!) Target publication December 2015
FDIS enquiry vote August 2015 2nd DIS enquiry PASSED vote in November 2014 1st DIS enquiry vote December 2010 CD vote out October 2009 (This stage delayed due to
challenging discussions) NWIP = WD 2 = CD complete Sept 06 4th WG 1 meeting Beijing 6-8 September 06. 3rd WG 1 meeting June 06 Sweden (SIS Stockholm)
Start 12th Nov 2005September 2015 © 2015 15
ISO 14644-1 revisions
© 2015 16September 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
The basis for classification
Change fromClassification by Formula (+ table to illustrate)TOClassification by Table+ Formula for Intermediate Sizes
Keep decimal classes; but now just 0.5 steps (1.5; 2.5; etc)
Remove ≥ 5.0 micron limit for ISO 5 (29) & ISO 5.5
ISO 14644-1Changes
September 2015 17© 2015
ISO Formula ISO Formula –– retained for intermediate retained for intermediate
particle sizes onlyparticle sizes only
ISO Cn = 0.1 2.08 x 10N(class)
D( )
September 2015 18© 2015
For example ≥ 0.4 micron
Distribution rights are property of the PHSS, permission must be obtained for use.
The The formula formula
illustrated illustrated by an by an
Informative Informative TableTable
Existing Existing -- EN/ISO 14644EN/ISO 14644--1:19991:1999Classification by Particles Classification by Particles
September 2015 © 2015 19
20
Proposed - ISO 14644-1 Class TableAnnex 1 EU GMP Annex 1 EU GMP ––Outside Class limitsOutside Class limits
Very Low Very Low values deletedvalues deleted
Low values have Low values have sample size warningsample size warning
September 2015© 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
21
Now closer to OLD US Fed Std 209EClassification by Table (Particles)
No 5.0No 5.0in oldin old
Class 100Class 100September 2015© 2015
Proposed decimal class table
© 2015 22September 2015
Concentration of particles (particles/m3) a
ISO classification number (N) 0,1 0,2 0,3 0,5 1,0 5,0
ISO Class 1,5 [32] b d
d d d e
ISO Class 2,5 316 [75] b [32] bd d e
ISO Class 3,5 3 160 748 322 111d e
ISO Class 4,5 31 600 7 480 3 220 1 110 263e
ISO Class 5,5 316 000 74 800 32 200 11 100 2 630e
ISO Class 6,5 3 160 000 748 000 322 000 111 000 26 300 924
ISO Class 7,5c c c
1 110 000 263 000 9 240
ISO Class 8,5c c c
11 100 000 2 630 000 92 400
Examples of intermediate decimal air cleanliness classes by particle concentration (only 0.5 class steps allowed)
Distribution rights are property of the PHSS, permission must be obtained for use.
This proposed change is not a major impact on the principle of classification .
Helps prevent poor selection of size vs class.
Means Annex 1 Grade A and B ≥5 clearly outside the ISO Class system! Means we will have to use the Macro-particle descriptor (see later).
Major discussions Good science of particle counting removes ≥ 5 micron limit for ISO5
REMEMBER that the table doesn’t represent typical distribution of particles in a cleanroom.
How to deal with Annex 1 or the EU/PIC/S GMP
ISO 14644-1Impact
September 2015 23© 2015
The proposal is to use adapted macro-particle descriptor concept.
EU & PIC/S Annex Impact
September 2015 24© 2015
Class limit of 20 parts ≥5.0 micron is also
outside scope of the standard
Class limit of 29 parts ≥ 5.0 micron outside scope of
standard –≥ 5.0 micron cannot be used
for an ISO5 classification
Distribution rights are property of the PHSS, permission must be obtained for use.
Using the macro-particle descriptor for 5 micron particles GMP should use the macro-particle concept for
Grade A 20 particles/m3 @ ≥ 5.0 micronGrade B “at rest” 29 particles/m3 @ ≥ 5.0 micron
We use this terminologyISO M (20;≥ 5.0); LSAPC
© 2015 25September 2015
M =Macroparticles
20 =Class limit from GMP
5.0 =Considered particle size
LSAPC = Light scattering airborne
particle counter
This is how we would define Annex 1 Grade A & B using ISOAn extrapolation of the Macro-particle concept.
Grade AISO 5; at rest, operational; ≥ 0.5
M (20≥ 5.0); at rest, operational; LSAPC
Grade BISO 5; at rest; ≥ 0.5, and M (29≥ 5.0); at rest, LSAPC.
ISO 7; operational; ≥ 0.5, 5.0 .
© 2015 26September 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Simplification: The 95% UCL Evaluation for 2-9 locations has been removed.
Each sampling location now evaluated separately. All must complyfor room or zone to comply.
There is a Look-up table, based on ensuring 95 % level of confidence that at least 90 % of the cleanroom or clean zone will comply with the class limit.
Will increase the number of locations up to 1000m2.For > 1000m2, very similar to the current Area rule.
Placement of sample points: Even distribution, at representativelocations In N-UDF cleanrooms with non-diffused airflow, avoid placement directly under HEPA filter supply
air terminals.
ISO 14644-1Changes to sampling statistics
September 2015 27© 2015
This is an important change to the basic mechanics of classification.
Organisations will have to redefine their classification sampling plans & data evaluation.
Does not affect Real-time monitoring.
Discussions How to select the locations – can be randomised or fixed.
You can add locations to deal with Risk-Based requirements.
You re-test same locations after a repair or remediation?
Can now better deal with unusually large cleanrooms > 1000 m2
ISO 14644-1Impact
September 2015 28© 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
29September 2015
Required minimum sampling locations
1. Determine the number of sample locations NL from table A1.
2. Distribute the sample locations throughout the cleanroom (or clean air device) at representitive locations (not under undiffused HEPA filter terminals).
3. Take sample at each location (as existing standard)
4. If all measured particle concentrations comply with the class limit, the classification is passed.
5. For larger rooms >1000m2, extrapolate the location density from the 1000m2 requirement.
© 2015
Area of cleanroom (m2) less than
or equal to
Minimum number of sample locations
to be tested (NL)2 14 26 38 4
10 524 628 732 836 952 1056 1164 1268 1372 1476 15104 16108 17116 18148 19156 20192 21232 22276 23352 24436 25636 261000 27
> 1000 See Equation A.1
Table A.1 — Sample locations related to cleanroom area
Sample number comparison
To deal with very large cleanrooms,
extrapolate the location density above 1000 m2
September 2015 30© 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Sequential sampling retained.
Now Annex D
The specification in existing Annex F is difficult to follow and has improved presentation and explanation.
The clarified specification of sequential sampling would assist its use for classification of clean-zones with low particle concentrations limits.
ISO 14644-1Change Impact
September 2015 31© 2015
Ultrafine Descriptor.
Removed to a new standard (ISO 14644-12) dealing with nano-particle cleanliness monitoring in cleanrooms and associated controlled environments.
No impact on life-sciences industry.
Micro-electronics and nano-technology industries need new standards.
ISO 14644-1Change Impact
September 2015 32© 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Test methods & Instruments
ISO TC 209 has decided that each classification standard needs to have its own test method and test instrument guidance on-board.
Better than in a separate standard.
Makes revision of standards easier to keep coordinated.
Annex F imported from ISO 14644-3 with some updating.
Most important reference is ISO 21501-4:2007.
No direct impact on users.
Makes each standard more complete and easier to use.
ISO 14644-3 will now only deal with the support tests for cleanrooms: Filter leak
Airflow velocity and volume
Pressurisation
ISO 21501-4:2007 describes a calibration and verification method for a light scattering airborne particle counter (LSAPC), which is used to measure the size and particle number concentration of particles suspended in air. The light scattering method described in ISO 21501-4:2007 is based on single particle measurements. The typical size range of particles measured by this method is between 0,1 µm and 10 µm in particle size.
ISO 14644-1Change Impact
September 2015 33© 2015
Now on to 14644-2 revision Quick summary in the time available
This standard will now just focussed on MONITORING !
The title has changed:
FromEN ISO 14644-2:2000 Cleanrooms and associated controlled environments
Part 2: Specifications for testing and monitoring to prove continued compliance with ISO 14644-1
ToEN ISO 14644-2:2015 Cleanrooms and associated controlled environments
Part 2: Monitoring to provide evidence of cleanroom performance related to air cleanliness by particle concentration
September 2015 34© 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
Tables of frequency removed; guidance retained in text.
Annual classification required, and after modifications, or after monitoring deviation and rectification.
Annual classification is the default minimum monitoring required, but interval can be extended if automated monitoring system provides satisfactory data.
Monitoring should include: Air cleanliness Pressure differential Airflow velocity in UDF Airflow volume in non-UDF.
This change will make it easier to use RISK BASED decision making about testing frequency.
Means if GMPs need to be specific, they can in the context of the ISO guidance.
e.g. In Pharma sector, US FDA’s 6 monthly leak testing of HEPA filters in the aseptic core.
ISO 14644-2Change Impact
September 2015 35© 2015
ISO 14644-2 Essential principlesNormative
Proposed to be a simpler standard.
The minimum requirement is to undertake annual classification using ISO 14644-1. Frequency can be extended if a real-time monitoring system is used.
Reinforces that “Demonstration of control by monitoring” requires: A documented monitoring plan.
Undertaking the monitoring.
Acting on the results.
September 2015 36© 2015
Distribution rights are property of the PHSS, permission must be obtained for use.
ISO 14644-2 Informative Annexes
Guidance providedAirborne particle monitoring systems.
Pressure differential monitoring systems.
Air velocity and volume monitoring systems.
Generally specifies matters to consider when specifying and configuring such systems.
Not prescriptive or limiting.
September 2015 37© 2015
Conclusion
© 2015 38September 2015
I hope you found this update of ISO standards changes useful.
Look out for the new ISO 14644-1& 2 this year. ISO Classes 1-9 will be defined by a table.There will be changes to the details of undertaking
cleanroom classification.The classes don’t change.The existing standards from 1999 and 2000 apply until
they are superseded.
Distribution rights are property of the PHSS, permission must be obtained for use.
Thanks for your attention Questions?
September 2015 39© 2015
40
This presentation has been preparedand delivered by:-
Gordon J FarquharsonPrincipal
Critical Systems LtdConsulting in Safety & Quality Critical Systems
Guildford, Surrey, GU1 2SY, UKtel +44 (0)1252 703 663
September 2015 © 2015
CRI ICAL
SYSTEMS
CRI ICAL
SYSTEMS
Distribution rights are property of the PHSS, permission must be obtained for use.
1
Filling multiple products in the same facility, considering aseptic processing of non‐hazardous
products, cytotoxic products and biologically hazardous products, including live virus.
James L Drinkwater F Ziel GmbH Head of Aseptic Processing
Technologies & GMP Compliance
Distribution rights are property of the PHSS, permission must be obtained for use.
Amgen FlexPro50V 0.1 I 07/2015 I © FZ 2
Content
Filling Multiple products in the same facility
1.
Risk based initiatives –
overview of requirements in Aseptic
processing.
2.
Environmental zoning related to type of barrier technology
(Isolator or RABS) used in Aseptic processing & Filling.
3.
Risk based process design/ solutions for processing multiple
products in the same facility.
4.
Risk based Environmental monitoring plan and programs
including considerations in applying RT‐RMM: Real time
Rapid Micro methods for critical processes, including Filling.
Distribution rights are property of the PHSS, permission must be obtained for use.
3
cGMP Compliance Risk based
Risk management ICH Q9 – GMP Annex 20
Change & Deviation
management
investigations CAPA
Risk control measures
Organizational
Product and Process Knowledge
from Development phases – Tech
transfer
Understanding CQAs, CPPs &
toxicological and pharmacological
product profiles
Risk factors: Human,
Machine, Environment
Process design,
combining science,
equipment & facilities
QbD – Risk based
Risk control
measures Technical
Risk based
Operations Process
instructions/ SOPs &
Training
Overview of Risk based initiatives Distribution rights are property of the PHSS, permission must be obtained for use.
4
Risk based sterile product manufacturing Control Strategy
Product and process
knowledge: basis of
risk assessment and
risk control measures
Organisational control
measures
Sterile medicinal/
therapeutic Products
derived by chemical or
biological synthesis
Technical control
measures
Distribution rights are property of the PHSS, permission must be obtained for use.
Controlled Zones designation related to type of Barrier
Technology used
38V 1.0 I 06.06.2015 I © FZ Risk Based EM plan
Distribution rights are property of the PHSS, permission must be obtained for use.
Zonation of classified areas
3
Unclassified Areas / zones
Aseptic core EU Grade A
ISO 5 in operation
EU Grade B in operation
ISO7 in operation
EU Grade C in operation
EU Grade D : at Rest ISO8: In Operation
ISO8 in operation
EU Grade C at Rest
ISO7 in operation
Cleanrooms
RABS
Isolators
*BFS* PCCA
Air Flow &
Pressure
Cascade
Distribution rights are property of the PHSS, permission must be obtained for use.
7
Unclassified Areas / zones / PCCA
Isolator +veEU Grade A
ISO 5 in operation
EU Grade C in operation
EU Grade D : at Rest ISO8: In Operation
ISO8 in operation
EU Grade C at Rest
ISO7 in operation
Cleanrooms with Isolator separation barriers operated at a positive pressure differential to minimum background EU Grade D / ISO 8
Isolators positive pressure operation Aseptic processing Zonation
Distribution rights are property of the PHSS, permission must be obtained for use.
8
Unclassified Areas / zones / PCCA
RABS EU Grade A
ISO 5 in operation
EU Grade B in operation
ISO7 in operation
EU Grade C in operation
EU Grade D : at Rest ISO8: In Operation
ISO8 in operation
EU Grade C at Rest
ISO7 in operation
Cleanrooms with RABS Separation Barrier Systems operated at positive pressure to minimum EU Grade B / ISO7 background (in operation).
RABS Zonation – Open system processingDistribution rights are property of the PHSS, permission must be obtained for use.
Process design solutions for filling multiple product types
38V 1.0 I 06.06.2015 I © FZ Risk Based EM plan
Distribution rights are property of the PHSS, permission must be obtained for use.
Balancing Process Design
GMP Annex 1,
Annex 2
Containment
Open
Systems
processing
Closed
Systems
processing
ResourceCosts/ ROI
capacity
efficiency
Risks toQuality Efficacy
Patient safety
Balancing measures:Technical & Organisational
control measures
Process Design: Science and Risk
based combining facility,
equipment, process operations with
GMP
Distribution rights are property of the PHSS, permission must be obtained for use.
11
De‐Lid++
De‐nest++
Formulation
VH
PRapid D
econ
VHP MT change
QC
inspec
t
releas
e
Labelling/
packaging final
product QC and
batch release
De‐Bag
NTT.+RABS
Vial
CappingRABS. +
Stoppers
Caps
Tub‐nest
SUS/ EM/ Rejects/ waste/ tools
Product
White Cart
Grey Cart
SBI+
Grade C Surround
Aseptic Filling RTU containers
with Containment
Through Process design, Project, Qualifications into Process Operations
OEMSFilling/ process Machine
vendors
Isolator/ RABS vendorsEnvironmental monitoring
equipment vendors.
Users are
developing new
products requiring
new process
solutions
Developing process solutionsDistribution rights are property of the PHSS, permission must be obtained for use.
12
Reduced
project time
line.Faster to
market
Flexibility in
Line
configurations
for product
types
Modularity via
pre‐designed
Filler & Isolator
modules
Increasing requirements for process Flexibility
Flexible and Modular Filling systemsDistribution rights are property of the PHSS, permission must be obtained for use.
13
Aseptic processing with Containment Isolation
Aseptic
Processing
Bio‐hazard
products
Aseptic
processing
Toxic products
Aseptic
processing
Non‐Hazardous
products
New products types requiring Contamination control,
Cross contamination control and Operator protection
Distribution rights are property of the PHSS, permission must be obtained for use.
14
Rapid Decon Hatch & stations (VHP) + Material Transfer Chambers,Transfer carts: Cart to Cart transfers or Battery operated UDF carts
Contamination control in material transfers
White Cart
Grey Cart
UDF/ LAF Carts
RTUSUSRTP
Distribution rights are property of the PHSS, permission must be obtained for use.
Sterile Product Transfer into Isolated Filling Lines
Autoclaved ‐
sterilised Product pathways
Gamma –
sterilisedSingle use system (SUS)
Product pathways
Transfer systems – product pathway
Pictures: Sartorius Stedim Biotech
Distribution rights are property of the PHSS, permission must be obtained for use.
16
Aseptic processing with Containment Isolation
Aseptic
processing
Non‐Hazardous
products
New products types requiring Contamination control,
Cross contamination control and Operator protection
Distribution rights are property of the PHSS, permission must be obtained for use.
17
Aseptic Filling of non-hazardous productsPrinciple requirements
• Aseptic processing in Barrier Isolator technology providing Grade A/ ISO5 controlled
environments with integrated risk based environmental monitoring
systems.
• Cleanroom background environment to Isolator barrier: Grade C for ‘Open processing’
of pharmaceutical products. Filling zone positive pressure to surround.
• Cleanroom HVAC configured for part recirculation and fresh air exchange.• Isolator air‐handling system configured for part recirculation and air exchange (that can
take supply from the surrounding environment and discharge back to the same
environment).
• Secure ‘Closed’
material transfer devices required for all process support materials
(including environmental monitoring).
• RTU: pre‐sterilised containers may enter the Grade A Filling environment via de‐bagger/
No‐Touch‐Transfer (NTT) using a combination of barriers, pressure differential and
aerodynamic protection contamination control measures.
• VHP‐H202 surface decontamination to be used for Isolator barrier, non‐contact machine
surfaces, surface sterilisation of stopper bowls/ track ways, packaging materials difficult
to manually disinfect.
Distribution rights are property of the PHSS, permission must be obtained for use.
Formulation
VHP
Rapid Decon
VHP MT change
QC
inspec
t
releas
e
Labelling/
packaging final
product QC and
batch release
De‐Bag
NTT.+RABS
Vial
CappingRABS. +
Stoppers
Caps
Tub-nest
SUS/ EM/ Rejects/ waste/ tools
Product
White Cart
Grey Cart
SBI++
Grade C Surround
VHP Rapid Decon Station (RDS) for SUS/ EM/ Cleaning materials: delivery in RTP canisters plus Cross contamination control decontamination (at material exit from process).
Material/ waste VHP Surface Decon In/Out
Example of a process flow diagram showing areas of interaction
with a Pre‐sterilised Syringe Filling process in an Isolator
Distribution rights are property of the PHSS, permission must be obtained for use.
19
Aseptic processing with Containment Isolation
Aseptic
processing
Toxic products
New products types requiring Contamination control,
Cross contamination control and Operator protection
Distribution rights are property of the PHSS, permission must be obtained for use.
20
• Aseptic processing in Barrier Isolator technology providing Grade A/ ISO5 controlled
environments with integrated risk based environmental monitoring
systems.
• Cleanroom –
Isolator background environment: Grade C for ‘Open processing’
of
pharmaceutical products. Filling zone positive pressure to surround but less positive than
additional adjacent Isolator Grade A modules to provide a containment measure.
• Cleanroom HVAC configured for part recirculation and fresh air exchange.• Isolator air‐handling system configured for part recirculation and air exchange: Air supply
taken supply from surrounding environment and vent discharge ducted to outside via
double HEPA filtration and Bag‐in/Bag‐Out filters on primary containment boundary.
• Secure ‘Closed’
material transfer devices required for all process support materials
(including environmental monitoring).
• Wash/ Decontamination in‐place systems for primary containment boundary.• RTU: pre‐sterilised containers may enter the Grade A Filling environment via de‐bagger/
No‐Touch‐Transfer device via Isolator modules each side of Fill zone to provide a high
pressure barrier so air flows into grade A Fill zone and into de‐bagger (without mixing).
• Active ‘Mouse’
hole and external vial washer/ Decon
may be required.• VHP‐H202 surface decontamination used for Isolator barrier, non‐contact machine
surfaces, surface sterilisation of stopper bowls/ guides, packaging difficult to manually
disinfect.
Aseptic Filling of Toxic (cytotoxic) productsPrinciple requirements
Distribution rights are property of the PHSS, permission must be obtained for use.
De‐Lid++
De‐nest++
21
Process Flows: Aseptic filling hazardous products
Formulation
VH
PRapid D
econ
VHP MT change
QC
inspec
t
releas
e
Labelling/
packaging final
product QC and
batch release
De‐Bag
NTT.+RABS
Vial
CappingRABS. +
Stoppers
Caps
Tub‐nest
SUS/ EM/ Rejects/ waste/ tools
Product
White Cart
Grey Cart
SBI+
Grade C Surround
VHP Rapid Decon Station (RDS)
for SUS/ EM/ Cleaning materials:
delivery in RTP canisters plus
Cross contamination control
decontamination (at material
exit from process).
Material/ waste VHP Surface Decon In/Out
Aseptic‐Toxic design: Room HVAC Recir/exchange + Isolator
air exhaust to outside + safe change primary HEPA filters.
Aseptic‐Bio:Hazard design: Room HVAC Once through +
Isolator air recir and exhaust outside + Safe change exhaust
ULPA filters.
Distribution rights are property of the PHSS, permission must be obtained for use.
22
Aseptic processing with Containment Isolation
Aseptic
Processing
Bio‐hazard
products
New products types requiring Contamination control,
Cross contamination control and Operator protection
Distribution rights are property of the PHSS, permission must be obtained for use.
23
• Aseptic processing in Barrier Isolator technology providing Grade A/ ISO5 controlled
environments with integrated risk based environmental monitoring
systems.• Cleanroom background environment to Isolator barrier: Grade C for ‘Open processing’
of
pharmaceutical products: Best practice cGMP.
• Cleanroom HVAC configured for once through air exchange with terminal HEPA filters at
Cleanroom barrier air supply and double Exhaust filters with primary exhaust barrier filter
of ULPA grade, considering Biological safety (BSL) requirements (balanced with cGMP).
• Isolator air‐handling system configured for part recirculation and air exchange.• Secure ‘Closed’
material transfer devices required for all process support materials
entering/ exiting the Isolator.
• Isolator air supply taken supply from surrounding environment and vent discharge ducted to
outside via double ULPA/HEPA
filtration: Bag‐in/Bag‐Out filters on primary containment
boundary. Clean‐Decon in‐place systems/ spill kit required for primary containment
boundary of Isolator.
• RTU: pre‐sterilised containers may enter the Grade A Filling environment via de‐bagger/
No‐Touch‐Transfer (NTT) device together Isolator modules each side of Fill zone) to provide
a high pressure barrier so air flows into grade A Fill zone and into de‐bagger (without
mixing).
• VHP‐H2O2 surface decontamination to be used for Isolator barrier, non‐contact machine
surfaces, surface sterilisation of stopper bowls/ guides and packaging difficult to manually
disinfect. VHP‐H202 also specified for environmental viral clearance (end of batch/
i )
Aseptic Filling Bio-Hazard (biologic) productsPrinciple requirements
Distribution rights are property of the PHSS, permission must be obtained for use.
24
Multiple products filling facility
QC
MicrobiologyProductio
n office
INChang
e 1
Warehouse
officeQC
VHP
Material
s Out
FormulationClean Wash
areaSterile&
Clean
supplies
Packaging
Waste
Supplies
Non‐hazardous
Racking
FilledProduct
exit
QC
inspec
t
releas
e
Labelling/
packaging final
product QC and
batch release
WasteOut
Materials In
EXITChang
e
INChang
e 2
VHPM
Tchange
Supplies
Hazardous
VHPM
Tchange VHP
M
Tchange VHP
M
Tchange
VHPM
Tchange VHP
M
Tchange VHP
M
Tchange VHP
M
Tchange
Fillin
gFillin
gFillin
gFillin
g
Fillin
gFillin
gFillin
gFillin
g
Decon
Process
support
area
TechnicalPlant
area
Viewing Gallery – Glass walls
STI
MTMaterials IN
Change
OutChange
In
VH
P
Samples
M
T
M
T
Corridor
KeyChange = personal
change rooms.
MT = Material transfer manual disinfection.
VHP = Gaseous surface decontamination
Rapid Decon
Deliveries
Product Release
ThawTemp
contro
l
Aseptic Fill suites – non hazardous products
Aseptic Fill suites –
Toxic/ bio‐
hazardous products
Cold
roo
m
Distribution rights are property of the PHSS, permission must be obtained for use.
Risk based Environmental Monitoring plan and programs
38V 1.0 I 06.06.2015 I © FZ Risk Based EM plan
Distribution rights are property of the PHSS, permission must be obtained for use.
Risk based EM Sampling plan: (4) combined EM programs
EM sampling planQualification stage programs
Characterisation at Start up and
Classification
at rest/ in‐operation (OQ).
Qualification (PQ) in establishing
environmental control: Process simulation /
media fills (PQ). Qualify interventions.
Routine EM in operation risk based sampling
locations environmental monitoring results
and deviation incidence rates trended
End of batch/ campaign EM environmental
monitoring including surface sampling
(Trended)
Taking a risk based approach there an
Environmental monitoring plan
combines different EM sampling
programs at different qualification
stages.
Holistic monitoring (Isolator/ RABS
and Cleanrooms together) provides a
more complete picture of bio‐
contamination control status and
contamination risk escalation to
contaminating A/ISO5 – PHSS
initiative: Risk profiling and proactive
response; RPPR detailed in Technical
monograph 20 refers.
Distribution rights are property of the PHSS, permission must be obtained for use.
Amgen FlexPro50V 0.1 I 07/2015 I © FZ 27
Classification at Start up and at rest (OQ) and characterisation
to study more
of the complete area of the Isolator with more sample locations.
Qualification (PQ) in establishing environmental control: Process simulation /
media fills (PQ)
Routine EM in operation environmental monitoring (Trended data)
End of in Aseptic hold shift/ finish of batch/ campaign end. (Trended data)
Isolator EM sampling Plan – Risk basedDistribution rights are property of the PHSS, permission must be obtained for use.
28V 0.1 I 17/07/2015 I © FZ Isolator EM Risk based Sampling plan
Risk based Environmental Control & monitoringRisk register – for risk assessment: Filling pre-sterilized
containers; Vials, Syringes, Cartridges.
Point of critical risk of contamination Point of inherent risk of contamination
Sterilised product container entry to Isolator Point contacts/ load pattern during VHP
Pathway/ transfers of open product containers EM plate positioning and recovery
Point of Fill –
Contamination risk ‘Hot spot’ Filled product container exit points
Pathway of filled containers until closing Inherent Glove Interventions in‐process
Entry of stoppers/ plugs into Isolator Glove interventions for corrections
Feeder bowls/ path: stoppers to container In‐process glove leak integrity testing
A Glove management rationale is required for the life
cycle
Distribution rights are property of the PHSS, permission must be obtained for use.
Point of critical risk of contamination Point of inherent risk of contamination
Pathway of open product containers EM plate positioning and recovery
Point of Fill Filled product container exit points
Pathway of filled containers until closing Inherent Glove Interventions in‐process
Entry of stoppers/ plugs into Isolator Glove interventions for corrections
Feeder bowls/ path: stoppers to container In‐process glove leak integrity testing
Sterilised product container entry to Isolator Point contacts of load items during VHP
A Glove management rationale is required for the life cycle
Risk based Environmental Control & monitoringRisk register – for risk assessment; Batch filling of Vials
Distribution rights are property of the PHSS, permission must be obtained for use.
Risk based Environmental monitoringConsidering operator interactions and Holistic EM
Product In
Sp
Syr
Product out
RTP Port
Routine EMRisk based
Grade C / ISO8 Background
ActiveSettleParticleContactsSwabs
SWipes S
wabs
Sterile parts
Sterile partsWipes
62
RABS
Pre-sterilized container Filling
Isolator
Monitoring outside the Isolator at Operator interaction points, including gloves
provides information on extent of microbiological challenge to Grade A zones.
Distribution rights are property of the PHSS, permission must be obtained for use.
Amgen FlexPro50V 0.1 I 02/2015 I © FZ 31
Environmental Monitoring (EM) Rapid – Real time Micro MethodsStatus of development and use in GMP/ Aseptic processingRapid – Real Time Environmental monitoring systems are developing and are
increasingly being implemented in Aseptic processing, currently in support areas
(outside grade A) and for root cause investigations
These technologies employ fluorescence based analytical systems that are
‘intervention free’
(no need to position a sample plate) with Real time feed back
in detection/ warning of Bio‐counts that are above alert and action levels hence a
change in the control state.
Conventional microbiological monitoring employs growth based systems with
inherent low recoveries. Not to exceed cfu levels/ limits defined in EU GMP
Annex 1 and FDA Guide to Industry for Aseptic processing are based on cfu’s.
RMM – RT measurements in bio‐counts are more sensitive with higher recovery
(from air samples) and subject to ‘false positives’
as a result of measuring non‐
biological fluorescing molecules e.g. cellulose.
Until EU GMP Annex 1 and PICS (FDA aligned) recognise the difference in cfu
and bio‐counts there will be limited implementation for Grade A/ ISO5
manufacturing areas where the EM data is considered in Batch release/ part of
Batch records.
Distribution rights are property of the PHSS, permission must be obtained for use.
32
New PHSS guidance:
Worked examples of Risk assessments for EM sample location selection and risk based EM
sampling plan/programs.
Risk based Environmental Contamination Control to follow.
PHSS Bio‐contamination Special Interest Group (SIG)
Distribution rights are property of the PHSS, permission must be obtained for use.
33
Andrew Hopkins, MHRA/ Head of EMA Annex 1 revision group.
Ian Symonds, GSK head of Global Aseptic manufacturing Quality – GSK Barnard Castle UK.
Mike Davies, GSK Global quality auditor, GSK Worthing UK QA Director.
Di Morris, Ex‐MHRA, GSK Compliance auditor manager. PHSS management team member.
Una Hearty, Pfizer Grange Castle, Global Quality.
Benoit Ramond, Sanofi France Global Quality, Microbiology
Tim Eaton, Astra Zeneca, Macclesfield, Sterile product manufacturing specialist.
Alan Dillon, Allergan Westport Ireland Filling line project manager.
Seamus Lyons, Amgen Ireland Aseptic processing QA
Tim Sandle, Bio Products Ltd (BPL) Head of microbiology.
Tim Triggs, DOP systems Director, PHSS management team member.
Tim Russel, TSI (RMM) field developer.
David Jones, Rapid Micro Bio‐systems, Director.
John Wallingford, Pharmagraph (EMS systems) Managing Director.
Steven Robbins, NHS (National health service) Blood transfusion service.
Carl McDonald, NHSBT, Head of bacteriology.
Adam Bird, Oxford Biomedica (Biotech), Head of QA.
Tim Sizer, HNS Regional Quality Pharmacist.
Mark Oldcorne, All of Wales Quality Pharmacist.
Adulmajeed Raji, Porton Biopharma, Microbiologist
Patrick Nieuwenhuizen, Genzyme Ireland Manager Quality Control Microbiology
Corinna Maier, F Ziel GmbH Aseptic processing technologies microbiologist.
Jenni Tranter, Business development manager Synergy Health
Kay O’Hagan, Hospira Quality auditor/ QP.
Wenzel Novak, Groninger GmbH Director of research and development
Michael Pratz Head of Bausch & Stroebel Compliance/ training academy
Johannes Rauschnabel GMBH Bosch packaging GMP expert.
Marc Van Laere Mithra Belgium QA Manager,
Distribution rights are property of the PHSS, permission must be obtained for use.
34
James L Drinkwater F Ziel
Head of Aseptic processing Technologies & GMP Compliance
Risk Based process solutions in Environmental Control and Monitoring for
Aseptic processing and Filling
Distribution rights are property of the PHSS, permission must be obtained for use.
over 25 years of advancing pharmaceutical and healthcare sciences
PHSS Annual Conference in association with UCL Q3P
Meet Your Exhibitors
Biomerieux Antoine Bloch [email protected]
Christie Downing-Kay Industry Product Manager M: +44 (0) 776 416 [email protected]
Charles River Matthew Reynolds M: +44 (0) 7717 [email protected]
Cherwell Labs Andrew Barrow [email protected]
Sandra [email protected]
Contec Alison Livsey Product ManagerT: +44 (0) 7500 667556 [email protected]
Karen Rossington Marketing Manager
DOP Solutions Tim Triggs DirectorM: +44 (0) 7809 868444 [email protected]
Andy WorsickUK Sales Manager M: +44 (0) 7715 425368 [email protected]
EMS Les Dodd Business Development Manager T: +44 (0) 7825 [email protected]
Dave Nolan [email protected]
John Chapman [email protected]
Franz Ziel GmbH Olaf Ziel (49) 254312335 [email protected]
James Drinkwater T: +44 (0) 7557 [email protected]
Distribution rights are property of the PHSS, permission must be obtained for use.
Helapet Tony Phelps M: +44 (0) 7970 090228 [email protected]
Sam ByottM: +44 (0) 7500 944882 [email protected]
ILS Limited Stewart Neithercut Head of Business [email protected]
Rutjit Durve Pharmaceutical Chemistry Laboratory [email protected]
Ravinder Nizzer Pharmaceutical Chemistry Laboratory [email protected]
Micronclean Sian Lovatt M: +44 (0) 7584 [email protected]
Jenny [email protected]
Morris [email protected]
Pharmagraph Janice Wallace M: +44 (0) 7730 [email protected]
John Goodchild [email protected]
PMT GB Limited / TSI Peter Knott [email protected]
Tim Russell Field Market Developer [email protected]: +44 (0) 7715 488537
SGL – Southern Group Laboratory Tony Crawley National Sales Manager M: +44 (0) 7841 [email protected]
Steris Murray NicholsonM: +44 (0) 777 564 [email protected]
Kingslea GabbottM: +44 (0) 7711 [email protected]
Mike CurtisM: +44 (0) 7769 [email protected]
Andy [email protected]
Tristel Rob LewisM: +44 (0) 7827 [email protected]
Validair Dave Sears Tel: +44 (0) 1732 882984 [email protected]
Andy Dines [email protected]
Veltek Elaine Fraser M: +44 (0) 7768 970281 [email protected]