Distribution Grid

Model Data

Management:

EPRI Project &

Methodology

Pat Brown, John Simmins,

Steph Amsbary, Randy Rhodes

EPRI

DistribuTECH

January, 2018

Page 2: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

2© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Why

………………………………………………………………………

……………

▪What

………………………………………………………………………

▪How

▪Why EPRI believes a project around network model data

management is so vitally important for the distribution world

today

▪What the EPRI project proposes to do to help the industry

improve its ability to manage network model data

▪How the EPRI project will approach the challenging work of

creating an industry data management architecture

EPRI GIS & Grid Model Data Management projectTopics

Page 3: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

3© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Why EPRI believes a project around network model data

management is so vitally important for the distribution world

today

EPRI GIS & Grid Model Data Management projectTopics

Page 4: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

4© 2017 Electric Power Research Institute, Inc. All rights reserved.

EMS, Markets

DER

Aggregators

Networked

Transmission

Radial

Distribution

Active Customers, Assets, and Dispatchable Generation

Markets

Networked

Transmission

Radial

Distribution

New Expectations

New PlayersNew Grid-

Connected

EquipmentNew

Technologies

▪The Distribution grid is changing

▪Grid planning & operation requires new analytics & simulations

EPRI GIS & Grid Model Data Management projectWhy? It’s not your grandfathers grid.

Page 5: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

5© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Many, many of which execute power flow-based simulations

(network analysis functions)

▪Which require network (grid) models as input

Planning

Models, methods, and tools to

support asset and resource

planning functions to ensure

the safe, reliable, and efficient

modern system.

Operations

Monitoring, controls, automation

technologies and tools to

optimize and ensure the safe,

secure, and reliable operation

of the modern system.

Planning

Models, methods, and tools to

support asset and resource

planning functions to ensure

the safe, reliable, and efficient

modern system.

Operations

Monitoring, controls, automation

technologies and tools to

optimize and ensure the safe,

secure, and reliable operation

of the modern system.DER & LoadForecasting

HostingCapacityAnalysis

ExpansionPlanning

InterconnectionEvaluation

Non-WiresSolution

Evaluation

Protection Design

AdaptiveSettings

OutageManagement& Scheduling

Volt-VArControl

T &DReliabilityPlanning

LoadShedding Demand

Response

DERMonitoring/

Control

FLISR

Short-termDER & LoadForecasting

SituationalAwareness

TrainingSimulator

EPRI GIS & Grid Model Data Management projectWhy? New analytics and simulations.

Page 6: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

6© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Network (grid) model data is

“Data representing a simplified view of the electrical grid,

including equipment, its electrical behavior and its connectivity,

as well as its operating state at a moment in time, that is

sufficient to describe a starting point for network analysis.”

Grid Model Data ManagementWhy? Analytics and simulations need network models.

Page 7: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

7© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Grid model data is complex to manage because it:

– There’s lots of it

– Is made up of different types of data with different update cycles

– Is used to represent one grid past & multiple grid futures

– Has different parts from different sources

– Different studies need different parts

– Typically has a primary source:

▪ With major consistency / completeness issues

▪ That serves primary purposes other than providing grid model data

– Must be assembled into internally consistent, ‘electrically logical’

cases

EPRI GIS & Grid Model Data Management projectWhy? Managing grid model data is challenging.

Page 8: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

8© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪To summarize

– Distribution utilities will deploy new analytics and simulations

– Many of which require accurate grid model data

– That is difficult to manage

– And we have a messy starting point…

EPRI GIS & Grid Model Data Management projectWhy?

Page 9: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

9© 2017 Electric Power Research Institute, Inc. All rights reserved.

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

▪Targets &

Cases

EPRI GIS & Grid Model Data Management projectWhy? A messy application eco-system.

Page 10: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

10© 2017 Electric Power Research Institute, Inc. All rights reserved.

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

Substation Engineering Design Tool

▪Targets &

Cases

▪Sources

EPRI GIS & Grid Model Data Management projectWhy? A messy application eco-system.

Page 11: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

11© 2017 Electric Power Research Institute, Inc. All rights reserved.

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

measurement locations

equipment & line steady state parameters

equipment & line connectivity

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Tool

▪Targets &

Cases

▪Sources

▪Physical

Network

Model Data

EPRI GIS & Grid Model Data Management projectWhy? A messy application eco-system.

Page 12: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

12© 2017 Electric Power Research Institute, Inc. All rights reserved.

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

measurement locations

equipment & line steady state parameters

equipment & line connectivity

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Tool

▪Targets &

Cases

▪Sources

▪Physical

Network

Model Data

▪Case

Assumptions

EPRI GIS & Grid Model Data Management projectWhy? A messy application eco-system.

Page 13: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

13© 2017 Electric Power Research Institute, Inc. All rights reserved.

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

measurement locations

equipment & line steady state parameters

equipment & line connectivity

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

asset nameplate data

line design (conductor & line

detail)

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Toolsubstation

engineering design

▪Targets &

Cases

▪Sources

▪Physical

Network

Model Data

▪Case

Assumptions

▪Engineering

Design

EPRI GIS & Grid Model Data Management projectWhy? A messy application eco-system.

Page 14: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

14© 2017 Electric Power Research Institute, Inc. All rights reserved.

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

(A)DMS

OMS

Planning Tool

Protection Tool

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

measurement locations

equipment & line steady state parameters

equipment & line connectivity

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Tool

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

asset nameplate data

line design (conductor & line

detail)

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Toolsubstation

engineering design

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

asset nameplate data

line design (conductor & line

detail)

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Toolsubstation

engineering design

▪Targets &

Cases

▪Sources

▪Physical

Network

Model Data

▪Case

Assumptions

▪Engineering

Design

▪Data Flows

▪NO Data Management Strategy

EPRI GIS & Grid Model Data Management projectWhy? A messy application eco-system.

Page 15: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

15© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪To summarize

– Distribution utilities will deploy new analytics and simulations

– Many of which require accurate grid model data

– That is difficult to manage

– And we have a messy starting point…

– And drivers that are increasing and increasingly urgent

▪That’s why EPRI believes a project around network model data

management is so vitally important for the distribution world

today

EPRI GIS & Grid Model Data Management projectWhy?

Page 16: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

16© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Why EPRI believes a project around network model data

management is so vitally important for the distribution world

today

▪What the EPRI project proposes to do to help the industry

improve its ability to manage network model data

EPRI GIS & Grid Model Data Management projectTopics

Page 17: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

17© 2017 Electric Power Research Institute, Inc. All rights reserved.

Distribution GIS & Grid Model Data Management project

Goal:

Distribution industry grid model data management architecture

▪vendors to implement reusable product interfaces and

▪utilities to implement effective data management solutions

EPRI GIS & Grid Model Data Management projectWhat? A collaborative project.

Page 18: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

18© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Collaborative – utilities, vendors, consultants

▪Comprehensive – 3-pronged approach

▪Considered – 30 months

Distribution GIS & Grid Model Data Management project

▪Collaborative

▪Comprehensive

▪Considered

EPRI GIS & Grid Model Data Management projectWhat? A collaborative project.

Page 19: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

19© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Participating utilities include

– Arizona Public Service

– Consolidated Edison

– Duke

– ESB (Ireland)

– FirstEnergy

– Great River Energy

– Salt River Project

▪Approach to vendors

– Don’t look to them for funding

– Engage them as much as possible

EPRI GIS & Grid Model Data Management projectWhat? Collaborative.

Page 20: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

20© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪1 - Data management architecture

EPRI GIS & Grid Model Data Management projectWhat? A comprehensive 3-pronged approach.

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

asset nameplate data

line design (conductor & line

detail)

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Toolsubstation

engineering design

Page 21: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

21© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪1 - Data management architecture

▪2 - Improving GIS as a data source

EPRI GIS & Grid Model Data Management projectWhat? A comprehensive 3-pronged approach.

?

oh, here it is…

Page 22: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

22© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪1 - Data management architecture

▪2 - Improving GIS as a data source

▪3 - Enabling data capture and use in the field

EPRI GIS & Grid Model Data Management projectWhat? A comprehensive 3-pronged approach.

Page 23: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

23© 2017 Electric Power Research Institute, Inc. All rights reserved.

Year 2

Year 3

Year 1

GIS Cleanup Technologies

Exploration of GIS cleanup

technologies, population practices

Field Activity Enablement

Alternate solution

architectures & tools

Grid Model Data Management Architecture

Solution demonstrationData

exchange standards

development

Distribution Grid Model

Data Manager Requirements

Project Strategy

Utility deep-diveUtility deep-

diveUtility deep-diveUtility deep-

dive

Launch Meeting

Technology demonstration

Data management architecture development

Monthly Webcasts

Tech Transfer

▪30-month project, coordinated activities

EPRI GIS & Grid Model Data Management projectWhat? Considered.

We are here

Page 24: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

24© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪To summarize

– A collaborative project

– Including utilities, vendors and consultants

– Taking a 3-pronged approach:

▪ Data management architecture

▪ Improving GIS as a data source

▪ Enabling data capture and use in the field

– Over the course of 30 months

▪That’s what the EPRI proposes to do to help the industry

improve its ability to manage network model data

EPRI GIS & Grid Model Data Management projectWhat?

Page 25: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

25© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Why EPRI believes a project around network model data

management is so vitally important for the distribution world

today

▪What the EPRI project proposes to do to help the industry

improve its ability to manage network model data

▪How the EPRI project will approach the challenging work of

creating and industry data management architecture

EPRI GIS & Grid Model Data Management projectTopics

Page 26: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

26© 2017 Electric Power Research Institute, Inc. All rights reserved.

Year 2

Year 3

Year 1

GIS Cleanup Technologies

Exploration of GIS cleanup

technologies, population practices

Field Activity Enablement

Alternate solution

architectures & tools

Grid Model Data Management Architecture

Solution demonstrationData

exchange standards

development

Distribution Grid Model

Data Manager Requirements

Project Strategy

Utility deep-diveUtility deep-

diveUtility deep-diveUtility deep-

dive

Launch Meeting

Technology demonstration

Data management architecture development

Monthly Webcasts

Tech Transfer

EPRI GIS & Grid Model Data Management projectHow?

Grid Model Data Management Architecture

Data exchange standards

development

Distribution Grid Model

Data Manager Requirements

Utility deep-diveUtility deep-

diveUtility deep-diveUtility deep-

dive

Data management architecture development

Page 27: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

27© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? An amazing & diverse project team.

Steph Amsbary, EPRI

Integration architect“TOGAF & Archimate

devotee”

Scott Coe, GridOptimize

Solution designer & implementer

“hammering square DERs into round

markets”

Robert Sarfi,Boreas Group

Solution designer & implementer

“distribution utility junkie”

Randy Rhodes, EPRI

Solution designer & implementer

“distribution application & tool expert”

Pat Brown, EPRI

Solution designer & data modeler

“irrepressible idealist”

Karen George, EPRI

Organizer, project manager & technical

writer “Smart Grid veteran”

John Simmins, EPRI

Integration manager & GIS pundit

“paradigm shifter”

Jay Britton, Britton Consulting

Software and integration designer“grandpa of network

analysis data modeling”

Page 28: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

28© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Among us we have

– over 150 years experience designing or implementing integration

solutions

– degrees in electrical engineering, physics, linguistics, computer

engineering, ceramic science and architecture

– membership in all IEC CIM Common Information Model Working Groups

(WG13 – network models, WG14 – assets, meters, work, WG16 –

markets)

– been employed at 4 utilities and worked for 9 consulting firms

– a significant incidence of missing or greying hair

▪With bench depth from the EPRI Distribution Grid Ops &

Planning (P220) program

– Brian Deaver – Operations

– Jason Taylor – Planning

– Sean McGuinness - Protection

EPRI GIS & Grid Model Data Management projectHow? An amazing & diverse project team.

Page 29: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

29© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? Start with real-world understanding.

Grid Model Data Management Architecture

Data exchange standards

development

Distribution Grid Model

Data Manager Requirements

Utility deep-diveUtility deep-

diveUtility deep-diveUtility deep-

dive

Data management architecture development

▪Real-world grounding from

deep-dives

Page 30: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

30© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Major two-way benefit

– Project gains broad reality-based understanding

– Utility gets solid start on its data management

work

EPRI GIS & Grid Model Data Management projectHow? Start with real-world understanding.

▪5 utilities

– Learn about existing practice

– Test drive the proposed data management architecture

– Provide strategic direction guidance to deep-dive utility

▪Real-world grounding from

deep-dives

Page 31: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

31© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Grounded in real-world

understanding from deep-dives

▪Keeping the goal in mind

▪Define common, appropriately granular data exchanges

▪Standard data exchange definitions on which local

implementations can be based ->Not a local solution

▪Reduce, not eliminate, the ‘distance to integrate’

Application BApplication AShared

data

EPRI GIS & Grid Model Data Management projectData Architecture Approach

Page 32: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

32© 2017 Electric Power Research Institute, Inc. All rights reserved.

GIS

Asset Mgmt

Load & Energy

Forecasting Group

Feeder Engineering Design Tool

MDMS

SCADA

Real-Time Historian

equipment & line connectivitymeasurement

locations

normal operating assumptions

(A)DMS

OMS

Planning Tool

Protection Tool

load forecasts

energy forecasts

historic measurements

real-time measurements

control setting targets operating limits

generation injections

generation injections

equipment & line connectivity

equipment & line steady state parameters

equipment & line short circuit

characteristics

equipment dynamic behavior

characteristics

asset nameplate data

line design (conductor & line

detail)

real-time measurements

monitored loads

measurement locations

operating limits

meter reads

equipment & line steady state parameters

equipment & line connectivity

operating limits

Protection CaseProtection

Case

Planning CasePlanning

CasePlanning Case

(A)DMS As-Built Case

OMS As-Built Case

equipment & line steady state parameters measurement

locations

Substation Engineering Design Toolsubstation

engineering design

EPRI GIS & Grid Model Data Management projectHow? Leverage the CIM’s data organization.

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

Page 33: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

33© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? Capture insights from previous work.

Using the Common Information Model for Network Analysis Data Management: A CIM Primer Series Guide

(Product ID 3002002587)

No Cost to Public

Network Model Manager Technical Market Requirements: The Transmission Perspective

(Product ID 3002003053)

No Cost to Public

▪From▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

Page 34: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

34© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Grounded in real-world

understanding from deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

Identification of GIS Data Dependencies(Product ID 3002001042)

No Cost to Public

▪From

EPRI GIS & Grid Model Data Management projectData Architecture Approach

Page 35: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

35© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? Capture insights from previous work.

Modern Distribution Grid –Decision Guide Volume III

▪From

▪From DOE DSPx

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

Page 36: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

36© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? Capture insights from previous work.

Grid Modernization Initiative –Grid Management System Architecture

▪From

▪From DOE DSPx

▪From SCE

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

Page 37: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

37© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

Summary of Electric Distribution System Analyses with a Focus on DERs

EPRI GIS & Grid Model Data Management projectHow? Capture insights from previous work.

▪From

▪From DOE DSPx

▪From SCE

▪From GMLC

Page 38: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

38© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

EPRI GIS & Grid Model Data Management projectHow? Capture insights from previous work.

▪From

▪From DOE DSPx

▪From SCE

▪From GMLC

▪From the CIM Interface

Reference Model

Page 39: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

39© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

▪Leverage enterprise architecture– for context

– for expression of design

EPRI GIS & Grid Model Data Management projectHow? Leverage enterprise architecture wisdom.

Page 40: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

40© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

▪Leverage enterprise architecture– for context

– for expression of design

EPRI GIS & Grid Model Data Management projectHow? Leverage enterprise architecture wisdom.

Page 41: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

41© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? Leverage enterprise architecture wisdom.

▪Our project focus is herela

ye

rs o

f in

tero

pe

rab

ilit

ydegree of ‘concreteness’

Page 42: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

42© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? Leverage enterprise architecture wisdom.

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

▪Leverage enterprise architecture– for context

– for expression of design

Page 43: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

43© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow? Leverage enterprise architecture wisdom.

▪Design to be expressed in Archimate® (loosely)

Diagram credit:

Mastering ArchiMate Edition III.TCI,

© Gerben Wierda 2017

Page 44: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

44© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

▪Leverage enterprise architecture – for context

– for expression of design

EPRI GIS & Grid Model Data Management projectHow?

Page 45: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

45© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow?

Electric distribution industry grid model data architecture that enables

• vendors to implement reusable product interfaces and

• utilities to implement effective data management solutions

inte

rface

Application B

inte

rface

Application AShared

data

data exchange standard

product-based interface

▪Simple to describe

▪Hard to figure out how to get from here to there

Page 46: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

46© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow?

inte

rface

Application B

inte

rface

Application C

Shared

data

interface

Application A

inte

rface

Shared

data

▪Complexity comes from

– Viewing interfaces in isolation

interface

Page 47: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

47© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Complexity comes from

– Viewing interfaces in isolation

EPRI GIS & Grid Model Data Management projectHow? Use a semantic model solution approach.

inte

rface

Application B

inte

rface

Application C

interface

Application A

inte

rface

describes

Semantic Model

organization

of shared data

Shared

data

Shared

data

interface

EPRI GIS & Grid Model Data Management projectHow?

Page 48: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

48© 2017 Electric Power Research Institute, Inc. All rights reserved.

Application B

Network

Analysis

Application B

▪Complexity comes from

– Viewing interfaces in isolation

– Vendor product overlap

EPRI GIS & Grid Model Data Management projectHow?

inte

rface

Application C

Application AShared

data

Shared

data

interface

Application Y

Application Z

Network model data

Network model data

Network

Model Data

Source A

Network

Analysis

Application C

Page 49: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

49© 2017 Electric Power Research Institute, Inc. All rights reserved.

Network

Analysis

Application B

Network

Model Data

Source A

Network

Analysis

Application C

▪Complexity comes from

– Viewing interfaces in isolation

– Vendor product overlap

– Complexity & variety of network model data

EPRI GIS & Grid Model Data Management projectHow? Use a ‘building block’ design approach.

inte

rface

interface

Network model data

line detail OR electrical behavior?

load curves OR point history?

permanent grid changes OR temporary fixes?

EPRI GIS & Grid Model Data Management projectHow?

Network model data

Page 50: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

50© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Talk in terms of business processes not applications

– For example, not CYME or Synergi, but Expansion Planning, Reliability

Planning or Interconnect Evaluation

▪Decompose business processes to the right level of

granularity, where

– They approach being universal

▪ Most utilities could assemble them to reflect how they use tools

▪ Most vendors could identify which processes their tools support

– They allow unambiguous identification of type of data being exchanged

▪Type of data can be mapped to CIM for further detail

EPRI GIS & Grid Model Data Management projectHow? Use a ‘building block’ design approach.

Page 51: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

51© 2017 Electric Power Research Institute, Inc. All rights reserved.

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Object

Business Object

Business Object

EPRI GIS & Grid Model Data Management projectHow? Use a ‘building block’ design approach.

Page 52: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

52© 2017 Electric Power Research Institute, Inc. All rights reserved.

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Process

Business Object

Business Object

Business Object

EPRI GIS & Grid Model Data Management projectHow? Use a ‘building block’ design approach.

Application

Page 53: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

53© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow?

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

▪Leverage enterprise architecture – for context

– for expression of design

▪semantic model approach

▪business process

decomposition

Page 54: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

54© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow?

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

▪Leverage enterprise architecture – for context

– for expression of design

▪semantic model approach

▪business process

decomposition

▪Vetting by utilities and vendors

Page 55: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

55© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management projectHow?

▪Real-world grounding from

deep-dives

▪Keeping the goal in mind

▪ Informed by the IEC CIM

▪With insight from previous work

▪Leverage enterprise architecture – for context

– for expression of design

▪semantic model approach

▪business process

decomposition

▪Vetting by utilities and vendors

▪Results into IEC CIM

IEC

Common

Information

Model

Page 56: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

56© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪To summarize

– Real-world grounding from deep-dives

– Keeping the goal in mind

– Informed by the IEC CIM

– With insight from previous work

– Leverage enterprise architecture

▪ for context

▪ for expression of design

– semantic model approach

– business process decomposition

– Vetting by utilities and vendors

– Results into IEC CIM

▪That’s how the EPRI project will approach the challenging work

of creating an industry data management architecture

EPRI GIS & Grid Model Data Management projectWhat?

Page 57: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

57© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Why EPRI believes a project around network model data

management is so vitally important for the distribution world

today

▪What the EPRI project proposes to do to help the industry

improve its ability to manage network model data

▪How the EPRI project will approach the challenging work of

creating an industry data management architecture that

enables

• vendors to implement reusable product interfaces and

• utilities to implement effective data management solutions

EPRI GIS & Grid Model Data Management projectSummary

Page 58: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

58© 2017 Electric Power Research Institute, Inc. All rights reserved.

▪Extraordinarily valuable.

▪Entirely possible…

…if we work together.

EPRI GIS & Grid Model Data Management project

“It does not make sense that everybody should duplicate efforts when we could be

working together.”

Theresa May

“If you want to go fast, go alone.If you want to go far, go together.”

African proverb

“The power of one, if fearless and focused, is formidable, but

the power of many working together is better.”

Gloria Macapagal Arroyo

“Alone we can do so little;

together we can do so much.”

Helen Keller

“Growth is never by mere

chance; it is the result of forces

working together.”

James Cash Penney“None of us is as smart

as all of us.”

Ken Blanchard

Page 59: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

59© 2017 Electric Power Research Institute, Inc. All rights reserved.

EPRI GIS & Grid Model Data Management project

▪Core team contact info

– Stephan Amsbary [email protected]

– Pat Brown [email protected]

– Jay Britton [email protected]

– Scott Coe [email protected]

– Karen George [email protected]

– Randy Rhodes [email protected]

– Robert Sarfi [email protected]

– John Simmins [email protected]

▪This sessions slides available at:

http://integratedgrid.com/distribution-gis-and-grid-model-data-management/

Page 60: Distribution Grid Model Data Management: EPRI Project ...integratedgrid.com/wp-content/uploads/2018/03/2018... · © 2017 Electric Power Research Institute, Inc. All rights reserved

60© 2017 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity