BERDASARKAN MATERI SAFETY PRE – CONSTRUCTION PROYEK KAJIMA INDONESIA TAHUN 2018 DISKUSI PUBLIK GNKK “MEMBANGUN INFRASTRUKTUR TANPA KECELAKAAN KONSTRUKSI” PRAKTIK BAIK PENGELOLAAN KESELAMATAN KONSTRUKSI OLEH: GUNAWAN PURYATAMA HSE MANAGER PT KAJIMA INDONESIA Makassar, 23 April 2018

Upload: vuongquynh

Post on 03-Mar-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

BERDASARKAN MATERI SAFETY PRE – CONSTRUCTION PROYEK KAJIMA INDONESIA TAHUN 2018

DISKUSI PUBLIK GNKK “MEMBANGUN INFRASTRUKTUR TANPA KECELAKAAN KONSTRUKSI”

PRAKTIK BAIK PENGELOLAAN KESELAMATAN KONSTRUKSI OLEH: GUNAWAN PURYATAMA HSE MANAGER PT KAJIMA INDONESIA Makassar, 23 April 2018

Page 2: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

All safety rules are written in blood

SEMAKIN SERING BICARA SAFETY, SEMAKIN AMAN

Page 3: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

SAFETY WORK CYCLE

SIKLUS HARIAN K3L

- Morning Assembly

- Kiken Yochi Meeting

- Pre- operation

Inspection

- HSE Induction

- Daily Patrol

- Daily permit to Work

- JSA

MORNING ASSEMBLY & CHECK PPE dilakukan setiap shift kerja. Supervisor/ Pelaksana memaparkan rencana kerja, potensi bahaya dan pengendaliannya. Safety Officer menyampaikan temuan Daily Patrol kemarin dan tindakan perbaikannya.

KIKEN YOCHI MEETING Ada 3 level KY Meeting (TBM) 1. Supervisor / SO berbicara di tengah lingkaran, menyampaikan potensi bahaya dari

pekerjaan yang akan dilakukan secara umum 2. Dalam 1 lingkaran (max. 20 orang), Leader (bisa Spv atau Foreman), menunjuk

random anggotanya, pekerja yang ditunjuk harus bisa menyampaikan : pekerjaan yang akan dia dilakukan, material dan alat yang akan digunakan, bahaya dari pekerjaan dan pengendaliannya

3. Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi Papan KYM

Page 4: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

SAFETY WORK CYCLE

SIKLUS MINGGUAN K3L

- Safety Talk

- General Cleaning

- Joint Weekly Site

Patrol & Meeting

- Blood Pressure

Checking

- Weekly Inspection

SAFETY TALK Bentuk kegiatan hampir sama dengan morning assembly, ditambah dengan penyampaian terkait pencapaian kinerja K3L, safety alert dan isu K3L. Bertujuan menumbuhkan kesadaran pekerja untuk turut mencapai target K3L proyek

SIKLUS BULANAN DAN TAHUNAN K3L

Weekly Patrol Weekly Meeting Blood Pressure Checking Weekly Inspection

- Safety Campaign

- Medical Check Up

- Emergency Drill

- Color Coding

Inspection

- P2K3 Inspection &

Meeting

- Management Tour REWARD SAFETY CAMPAIGN

Page 5: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

SAFETY CROSS INSPECTION Patrol dan Inspeksi K3L di salah satu proyek yang dihadiri oleh perwakilan HSE Coordinator / HSE Manager proyek lainnya

HSE PRE – CONSTRUCTION MEETING Membahas control dari method yang akan dilaksanakan, dihadiri oleh PM, Spv, dan HSE proyek lain. Bisa dilaksanakan beberapa kali sesuai progress

CSMS dan KICK OF MEETING SUBKONTRAKTOR Menyampaikan persyaratan kerja di Kajima

Workplace Measurement

Weekly dan Monthly Inspection Lifting equipment Emergency Drill

CONTROL

Page 6: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

BASIC TRAINING

1. OHSAS 18001:2007 & ISO

14001:2015 recognition

2. SMK3 (PP No. 50 / 2012)

3. Behavior-Based Safety

4. Mobile Crane & Excavator

Operation

5. Office safety

6. Working at height

7. Job safety analysis

8. Scaffolding

9. Electrical safety

10. Hot work practice

11. Incident & investigation report

12. Fire Fighting

13. Lifting and Rigging Plan

14. Site Security

15. Tool Box Meeting / Kiken

Yochi

16. Work Permit

17. Heavy Equipment inspection

18. Safety & Environment

Awareness

TRAINING

TRAINING

Training Documentation

SPECIFIC TRAINING

1. Foundation Work

2. Excavation Work

3. Install dan Dismantling

Perancah Formwork

4. Re-Bar Work

5. Steel Structure work

6. Dstnya sesuai dengan

metode kerja yang akan

dilaksanakan (Based on

progress)

Semua training di ikuti oleh SM,

Supervisor , Foreman dan

Subkont.

Materi berdasarkan Method

Statement (termasuk dari

Subkont), yang di review oleh

Safety Engineer menjadi materi

Training dan Checklist Pekerjaan

(Integrated QSE Checklist)

Page 7: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

SITE SAFETY ENGINEERING

Page 8: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Pre mobilization Inspection Form Pre-use Inspection

Mobile Crane

Weekly/ Monthly Inspection Mobile Crane

Wire Rope

Inspection Form

Crane Operation

Permit

Crane Government

Certification Riksa Uji

Crane Operator License

& SIMPER

A. Crane Operation – Administration Control

1 2 3

4 5 6 7

Site Safety Engineering (Lifting Plan)

Page 9: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

RING ON SIRINE

APPROVAL OF CRANE OPERATION PERMIT Contents:

1. 3.3.3 Method poster

2. Daily Pre Operation Inspection

3. SWL table

4. Boom Chart

5. Calculation of load

6. PIC

Submitted min.

a day before

Crane Operation – Daily

Site Safety Engineering

Page 10: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Auxiliary & Main Hoist Drum

Hook Clutch Anti two

block

Water pass (outrigger)

Outrigger Lock

Load Display

Moment Limiter Indicator lamp Angle Detector

Wire rope Measurement for

Auxiliary & Main

Boom Limit

1

2

3

4

5

6

7

8

9

Crane Inspection

Site Safety Engineering

Page 11: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

TOTAL LOAD

1.Steel Truss (TR1) = 4,28 Ton

2.Spreader beam = 1,2 Ton

3.Hook Weight = 1,3 Ton

Total = 6.78 Ton

==================================

SWL = 14.2 TON x 80% = 11,36 TON

==================================

SWL (11,36 TON) > TOTAL LOAD (6.78 TON)

SAFE

1.Radius = 30 m

2.Height Level = 61 m

3.Boom Length = 51,8 m

4.Boom Angle = 61°

Hoisting Main Truss Sequence – Crawler Crane Load Calculation

Site Safety Engineering

Page 12: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

- Radius 30 m = 14.2 ton

- SWL Radius 30 m = 14.2 ton x 80% = 11.36 Ton

Hoisting Main Truss Sequence – Crawler Crane Load Calculation (Cont’d)

Site Safety Engineering

Page 13: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

9 m

Height Level = 61 meter

61O

Hoisting Main Truss Sequence – Crawler Crane Load Calculation (Cont’d)

Site Safety Engineeting

Page 14: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

RESULT OF EXCAVATION

CALCULATION HOISTING IS WORK LOAD < SWL

SAFE

Site Safety Engineeting

IDENTIFIKASI TOTAL BEBAN YANG DIANGKAT

PASTIKAN TOTAL BEBAN YANG

DIANGKAT, TERMASUK JIKA ADA

PENGANGKATAN YANG ABNORMAL/

DILUAR KEBIASAAN/ DI LUAR STANDAR

YANG DIMILIKI, SUDAH TERIDENTIFIKASI

DAN DILAKUKAN KALKULASI dan

DIREVIEW OLEH SAFETY ENGINEER &

APPROVED PM

Page 15: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Site Safety Engineeting

Page 16: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Kriteria Umum Critical Lifting: 1. Total beban yg diangkat melebihi ambang batas standar . Contoh angkatan > 80% dari

SWL load chart. 2. Pengangkatan orang 3. Material khusus/ Abnormal Size 4. Pengangkatan menggunakan dua crane atau lebih 5. Pengangkatan material yg khusus, mudah rusak, dan bila rusak tidak bisa diperbaiki,

mengganggu proses kerja, dll. 6. Pengangkatan material yg akan dibongkar/demolish, ketidaktahuan berat beban yg

akan diangkat 7. Pengangkatan di area power lines, over active work areas, occupied buildings, public

roadways, transportation systems, etc. 8. Operasional pengangkatan di area terbatas (confined space), keterbatasan ketinggian

boom, dll.

Critical Lifting

CRITICAL LIFTING

LIFTING PLAN (diperiksa oleh Safety Engineer)

lifting plan approval oleh Top Site Management

Pre-lifting meeting (Precons

& Training)

ALUR KERJA UNTUK AKTIVITAS CRITICAL LIFTING

*Safety Engineering melakukan review pada lifting plan yang diajukan, memastikan lifting plan memenuhi standar atau merekomendasikan standar adopsi standar baru jika perusahaan/ proyek yang bersangkutan belum memiliki acuan terkait pekerjaan baru/ abnormal activity

Page 17: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Sequence 6 (Superstructure ) – 2FL Beam & Slab

MAIN PROGRESS

1. INSTALL SCAFFOLDING FOR SUPPORT 2ND BEAM & SLAB

2. INSTALL FORMWORK BEAM & SLAB 2ND

3. INSTALL REINFORCEMENT BEAM & SLAB 2ND

4. CONCRETING BEAM & SLAB 2ND FLOOR

Site Safety Engineering (PERANCAH)

Page 18: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Scaffolding Load Calculation for Middle Beam

Calculation with Frame Distance 900mm

CONSTANTA

• Concrete and rebar Dead Load : 24 kN/m3 = 2400 kg

• Formwork Dead Load : 0.4 kN/m3 = 40 kg/m2

• Life Load : 1.5 kN/m2 = 150

kg/m2

SAFETY FACTOR

• Dead Load (DL) = DL x 1.2

• Life Load (LL) = LL x 1.6

Sequence 6 (Superstructure ) – 2FL Beam & Slab

SLAB Thickness (150 mm)

SCAFFOLD CONFIGURATION SINGLE (1.8 m)

DOUBLE (0.9 m)

TRIPLE (0.6 m)

p (m) 1.658 1.658 1.658

l (m) 0.15 0.15 0.15

DL Concrete (Constanta: 2400 Kg/m3) 596.88 298.44 198.96

DL Formwork (Constanta: 40 Kg/m2) 9.948 4.974 3.316

Total DL x Safety Factor 728.1936 364.0968 242.7312

LL (Constanta 150 Kg/m2) x Safety Factor 716.256 716.256 716.256

Total Load 1444.45 1080.353 958.9872

Total Load Per Leg 722.2248 540.1764 479.4936

Maksimum Load Scaffold Per Leg 1500 1500 1500

Status SAFE SAFE SAFE

TYPE OF BEAM : 500 x 1500 mm

SCAFFOLD CONFIGURATION SINGLE (1.8 m)

DOUBLE (0.9 m)

TRIPLE (0.6 m)

p (m) 0.5 0.5 0.5

l (m) 1.5 1.5 1.5

DL Concrete (Constanta: 2400 Kg/m3) 1800 900 600

DL Formwork (Constanta: 40 Kg/m2) 30 15 10

Total DL x Safety Factor 2196 1098 732

LL (Constanta 150 Kg/m2) x Safety Factor 216 216 216

Total Load 2412 1314 948

Total Load Per Leg 1206 657 474

Maksimum Load Scaffold Per Leg 1500 1500 1500

Status SAFE SAFE SAFE

Site Safety Engineering

Page 19: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Typical Floor Formwork Conventional Calculation / RC Works

600 Kg / m2 X 1.219 m X 0.914 m

668.5 Kg

25 kN = 2509 Kg 0.68 T < 2.5 T ( SAFE )

600 Kg beban /m2 dari struktur diatas scaffolding

1.219 M = Lebar Scaffolding 0.914 = ½ Lebar Scaffolding

600 Kg / m2 X 1.2 m X 1.875 m

= 1350 Kg

0.13 T < 2.5 T ( SAFE )

Site Safety Engineering

Page 20: DISKUSI PUBLIK GNKK “MEMANGUN INFRASTRUKTUR …sibima.pu.go.id/pluginfile.php/44853/mod_resource/content/1/... · Memberi tepukan psikologis dan membuat Laporan KYM dan Leader mengisi

Typical Floor Formwork Conventional Calculation 400 X 700 Typical Floor Formwork Conventional Calculation 450 X 900

1876 kg/m2 X 0.4 X 0.61

= 230 Kg

0.23 T < 1.5 T 25 kN = 2509 Kg

2358.5 kg /m2 X 0.45 X 1.524

807.9 Kg

25 kN = 2509 Kg 0.80 < 1.5 T

Site Safety Engineering