discussion topics
DESCRIPTION
Discussion Topics. What is Teamcenter? Teamcenter Features CAD at Fermilab Teamcenter at Fermilab Who is Involved Architecture Licensing Implementation Status Obstacles and Opportunities Computing Division’s Role Questions, Comments and Next Steps. What is Teamcenter?. - PowerPoint PPT PresentationTRANSCRIPT
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 1
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 2
Discussion Topics
What is Teamcenter?Teamcenter FeaturesCAD at Fermilab
Teamcenter at FermilabWho is InvolvedArchitectureLicensing Implementation Status
Obstacles and OpportunitiesComputing Division’s RoleQuestions, Comments and Next Steps
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 3
What is Teamcenter?
Teamcenter Features:Data Management for Engineering Documents
CAD Models, Drawing, AssembliesEngineering CalculationsSafety DocumentsManufacturing Documents
RevisioningRelease StatusBill of MaterialsChange ManagementVisualizationWorkflow
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 4
What is Teamcenter?
Teamcenter Features:
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 5
What is Teamcenter?
CAD/CAM/CAE at Fermilab:Mechanical Analysis
ANSYS12 Mechanical Licenses; 1 Multiphysics Licence3 Design Modeler
NASTRAN8 NX NASTRAN Licenses
Mechanical Design/DraftingIDEAS
65 Drafting Licenses30 Modeling Licenses23 Assembly Licenses
ManufacturingNX
5 Manufacturing Licenses
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 6
What is Teamcenter?
CAD/CAM/CAE at Fermilab:FESS
AutoCAD - ~40 Licenses (~15 Used at one time)Electrical
AutoCAD - Few Licenses for power line drawingsOrCAD – 19 LicensesMentor Graphics – 15 LicensesAltium – 6 Licenses
Other SystemsSolid Edge
6 Licenses (ADMS)Solid Works
5 Licenses (TD)1 License (ADMS)
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 7
Teamcenter at Fermilab
Who is Involved:
Tony Metz – CAD ManagerTony Parker – ADMS Design/Drafting SupervisorJohn Rauch – PPD Design/Drafting SupervisorDon Mitchell – TD Design/Drafting SupervisorPaula Lambertz – ADCS Lead Designer
Rich Stanek – Directorate
Julie Trumbo – CD – TC InfrastructureArkadiy Klebaner – Cryogenic Safety SubcommitteeMichael Geynisman – Cryogenic Safety SubcommitteeTom Page – Mechanical Safety SubcommitteeNancy Grossman – ES&H
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 8
Teamcenter at Fermilab
Architecture:Database Management System
Team Data Management (TDM) 5 unique databases FERMI – Common TDMTD, PPD, ADCS, ADMS - Departments
~200K items ~150K Unique …~75K external DCS items (IDEAS dwg, ACAD, text)~100K Scanned TIFF Files~375K Total
(DCS – document control system)
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 9
Current Situation
CAD/CAM/CAE at Fermilab:
[Picture of Lab architecture]
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 10
Current Situation
CAD/CAM/CAE at Fermilab:
[Picture of Lab architecture]
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 11
Teamcenter at Fermilab
CAD/CAM/CAE at Fermilab:
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 12
Teamcenter at Fermilab
Architecture:
Existing 2 tier ArchitectureDatabase Servers – SUN/UNIX/Oracle/3 Par SANVolumes – Windows Servers/BlueArc NASClients – Windows Based (Rich Client)Future:
4 Tier – Collaborate with other labs and vendorsWeb Tier – Thin ClientMS Office IntegrationETS ServerUpdate from Engineering to Unified
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 13
Current Situation
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 14
Current Situation
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 15
Teamcenter at Fermilab
Architecture:
Software:Teamcenter Engineering 2007 a1Rich Client
WIP:Web Tier (WebDAV for MS Office Integration)
Future:Engineering to UnifiedETS ServerThin ClientCustomization for migration of Legacy Data
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 16
Teamcenter at Fermilab
Architecture:
Configuration:People, Users, Groups, Roles, VolumesGeneral Engineering DocumentsSafety Item
ES&H Engineering DocumentsJob RequestProjectsDesign Item
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 17
Teamcenter at Fermilab
Architecture:
WIP:Migrate IDEAS Test DataManufacturing ItemBeta Test DesignItem
Future:Analysis ItemQuality ItemMaintenance ItemRequirements Item
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 18
Teamcenter at Fermilab
Licensing:
Author – Read and WriteConsumer – Read with Approve and ReleaseCommunity – SharePoint plug-in to TC
Originally - 101 Author Licenses
TeamStanek, Metz, Parker, Andree, Borowski, Bruce, Koncelik, Kaletka
Costs Orig. – $1.3M for 500 seats
Costs Now – $425K for 1200 Author, 600 Consumer, 300 Community
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 19
Teamcenter at Fermilab
Licensing:
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 20
Teamcenter at Fermilab
Implementation Status - Match Teamcenter with Engineering Process:
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 21
Teamcenter at Fermilab
Implementation Status:
One Lab Wide Data VaultOne set of workflowsRevisioningRelease Status
~100 milestones
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 22
Teamcenter at Fermilab
SafetyItem:
ES&H DocumentsFMEAHazard Analysis
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 23
Teamcenter at Fermilab
JobRequest:
Design Authorization
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 24
Teamcenter at Fermilab
DesignItem:
CAD ModelCAD DrawingCAD Assembly
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 25
Teamcenter at Fermilab
DesignItem:
CAD ModelCAD DrawingCAD Assembly
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 26
Teamcenter at Fermilab
MfgItem:
CAM Model (Wave Linked CAD Model)Tool PathsTool ListsTool SetupM&G Codes
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 27
Teamcenter at Fermilab
Items to be Developed:
Requirements ItemRequirements Specifications
Analysis ItemANSYS ResultsReportsEngineering CalculationsTechnical SpecificationsPosters
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 28
Teamcenter at Fermilab
Items to be Developed:
Quality ItemTravelers Inspection DataTesting ProceduresAssembly ProceduresMaterial Specifications
Maintenance ItemOperating ProceduresOperating ManualsMaintenance Records
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 29
Obstacles and Opportunities
Obstacles:
Directorate SupportDivision ResourcesConsulting Money
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 30
Obstacles and Opportunities
Obstacles:
Directorate SupportRequire push from top to move culture
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 31
Obstacles and Opportunities
Obstacles:
Division ResourcesNeed subject matter experts from each division to:
Remove unneeded dataClean old dataHelp in migration processAgree on common workflow processes
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 32
Obstacles and Opportunities
Obstacles:
Consulting MoneyTimely implementation will require consulting servicesSecond set of eyes to make sure we are implementing correctly
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 33
Obstacles and Opportunities
Obstacles - Consulting:
Evaluate current configuration and Items prior to productionDesignItem Evaluation
Legacy pseudo-folder in Item MasterETS Installation
JT – Released ModelsCGM – Released DrawingsPDF – Released Drawings (2D Drawings, 3D Models)IGES/STEP – Released Models (Future)
Migration Strategy – IDEAS/DCS2 tier to 4 tier upgradeEngineering to Unified upgrade
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 34
Obstacles and Opportunities
Obstacles - Consulting:Legacy Data Folder
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 35
Obstacles and Opportunities
Obstacles – Consulting Expectations:Experiences in
TeamcenterIDEAS IntegrationNX
Schedule FlexibilityLocal OfficesImplementation Experiences
ETSCustom Programming2 Tier to 4 TierEngineering to Unified
Part of Licensing Deal; 80-120 hours of Siemens consulting
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 36
Obstacles and Opportunities
Opportunities:
New Look at HardwareSharePoint InterfaceClient Performance (Workstation speed, LAN,…)4-Tier – WAN PerformanceRecord EDMSLDAP
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 37
Computing Division Role
CD’s Role:
Purchased licensing - KaletkaSite wide software (100 vs 1000 licenses)Expand teamRevisit existing plan and make adjustmentsPolicy statement
Teamcenter – Overview
200911 Teamcenter - Lab Wide EDMS 38
Questions, Comments, Next Steps
Questions/Comments:
Next Steps:CD
Intro. MeetingOther…
Tony Updating Implementation PlanPolicy StatementBeta Test for DesignItemUpdate Experimental system to Unified
RichMeet with Vicky