discussion topics

38
Teamcenter – Overview 200911 Teamcenter - Lab Wide EDMS 1

Upload: juliet

Post on 05-Feb-2016

115 views

Category:

Documents


0 download

DESCRIPTION

Discussion Topics. What is Teamcenter? Teamcenter Features CAD at Fermilab Teamcenter at Fermilab Who is Involved Architecture Licensing Implementation Status Obstacles and Opportunities Computing Division’s Role Questions, Comments and Next Steps. What is Teamcenter?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 1

Page 2: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 2

Discussion Topics

What is Teamcenter?Teamcenter FeaturesCAD at Fermilab

Teamcenter at FermilabWho is InvolvedArchitectureLicensing Implementation Status

Obstacles and OpportunitiesComputing Division’s RoleQuestions, Comments and Next Steps

Page 3: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 3

What is Teamcenter?

Teamcenter Features:Data Management for Engineering Documents

CAD Models, Drawing, AssembliesEngineering CalculationsSafety DocumentsManufacturing Documents

RevisioningRelease StatusBill of MaterialsChange ManagementVisualizationWorkflow

Page 4: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 4

What is Teamcenter?

Teamcenter Features:

Page 5: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 5

What is Teamcenter?

CAD/CAM/CAE at Fermilab:Mechanical Analysis

ANSYS12 Mechanical Licenses; 1 Multiphysics Licence3 Design Modeler

NASTRAN8 NX NASTRAN Licenses

Mechanical Design/DraftingIDEAS

65 Drafting Licenses30 Modeling Licenses23 Assembly Licenses

ManufacturingNX

5 Manufacturing Licenses

Page 6: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 6

What is Teamcenter?

CAD/CAM/CAE at Fermilab:FESS

AutoCAD - ~40 Licenses (~15 Used at one time)Electrical

AutoCAD - Few Licenses for power line drawingsOrCAD – 19 LicensesMentor Graphics – 15 LicensesAltium – 6 Licenses

Other SystemsSolid Edge

6 Licenses (ADMS)Solid Works

5 Licenses (TD)1 License (ADMS)

Page 7: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 7

Teamcenter at Fermilab

Who is Involved:

Tony Metz – CAD ManagerTony Parker – ADMS Design/Drafting SupervisorJohn Rauch – PPD Design/Drafting SupervisorDon Mitchell – TD Design/Drafting SupervisorPaula Lambertz – ADCS Lead Designer

Rich Stanek – Directorate

Julie Trumbo – CD – TC InfrastructureArkadiy Klebaner – Cryogenic Safety SubcommitteeMichael Geynisman – Cryogenic Safety SubcommitteeTom Page – Mechanical Safety SubcommitteeNancy Grossman – ES&H

Page 8: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 8

Teamcenter at Fermilab

Architecture:Database Management System

Team Data Management (TDM) 5 unique databases FERMI – Common TDMTD, PPD, ADCS, ADMS - Departments

~200K items ~150K Unique …~75K external DCS items (IDEAS dwg, ACAD, text)~100K Scanned TIFF Files~375K Total

(DCS – document control system)

Page 9: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 9

Current Situation

CAD/CAM/CAE at Fermilab:

[Picture of Lab architecture]

Page 10: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 10

Current Situation

CAD/CAM/CAE at Fermilab:

[Picture of Lab architecture]

Page 11: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 11

Teamcenter at Fermilab

CAD/CAM/CAE at Fermilab:

Page 12: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 12

Teamcenter at Fermilab

Architecture:

Existing 2 tier ArchitectureDatabase Servers – SUN/UNIX/Oracle/3 Par SANVolumes – Windows Servers/BlueArc NASClients – Windows Based (Rich Client)Future:

4 Tier – Collaborate with other labs and vendorsWeb Tier – Thin ClientMS Office IntegrationETS ServerUpdate from Engineering to Unified

Page 13: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 13

Current Situation

Page 14: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 14

Current Situation

Page 15: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 15

Teamcenter at Fermilab

Architecture:

Software:Teamcenter Engineering 2007 a1Rich Client

WIP:Web Tier (WebDAV for MS Office Integration)

Future:Engineering to UnifiedETS ServerThin ClientCustomization for migration of Legacy Data

Page 16: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 16

Teamcenter at Fermilab

Architecture:

Configuration:People, Users, Groups, Roles, VolumesGeneral Engineering DocumentsSafety Item

ES&H Engineering DocumentsJob RequestProjectsDesign Item

Page 17: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 17

Teamcenter at Fermilab

Architecture:

WIP:Migrate IDEAS Test DataManufacturing ItemBeta Test DesignItem

Future:Analysis ItemQuality ItemMaintenance ItemRequirements Item

Page 18: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 18

Teamcenter at Fermilab

Licensing:

Author – Read and WriteConsumer – Read with Approve and ReleaseCommunity – SharePoint plug-in to TC

Originally - 101 Author Licenses

TeamStanek, Metz, Parker, Andree, Borowski, Bruce, Koncelik, Kaletka

Costs Orig. – $1.3M for 500 seats

Costs Now – $425K for 1200 Author, 600 Consumer, 300 Community

Page 19: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 19

Teamcenter at Fermilab

Licensing:

Page 20: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 20

Teamcenter at Fermilab

Implementation Status - Match Teamcenter with Engineering Process:

Page 21: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 21

Teamcenter at Fermilab

Implementation Status:

One Lab Wide Data VaultOne set of workflowsRevisioningRelease Status

~100 milestones

Page 22: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 22

Teamcenter at Fermilab

SafetyItem:

ES&H DocumentsFMEAHazard Analysis

Page 23: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 23

Teamcenter at Fermilab

JobRequest:

Design Authorization

Page 24: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 24

Teamcenter at Fermilab

DesignItem:

CAD ModelCAD DrawingCAD Assembly

Page 25: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 25

Teamcenter at Fermilab

DesignItem:

CAD ModelCAD DrawingCAD Assembly

Page 26: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 26

Teamcenter at Fermilab

MfgItem:

CAM Model (Wave Linked CAD Model)Tool PathsTool ListsTool SetupM&G Codes

Page 27: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 27

Teamcenter at Fermilab

Items to be Developed:

Requirements ItemRequirements Specifications

Analysis ItemANSYS ResultsReportsEngineering CalculationsTechnical SpecificationsPosters

Page 28: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 28

Teamcenter at Fermilab

Items to be Developed:

Quality ItemTravelers Inspection DataTesting ProceduresAssembly ProceduresMaterial Specifications

Maintenance ItemOperating ProceduresOperating ManualsMaintenance Records

Page 29: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 29

Obstacles and Opportunities

Obstacles:

Directorate SupportDivision ResourcesConsulting Money

Page 30: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 30

Obstacles and Opportunities

Obstacles:

Directorate SupportRequire push from top to move culture

Page 31: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 31

Obstacles and Opportunities

Obstacles:

Division ResourcesNeed subject matter experts from each division to:

Remove unneeded dataClean old dataHelp in migration processAgree on common workflow processes

Page 32: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 32

Obstacles and Opportunities

Obstacles:

Consulting MoneyTimely implementation will require consulting servicesSecond set of eyes to make sure we are implementing correctly

Page 33: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 33

Obstacles and Opportunities

Obstacles - Consulting:

Evaluate current configuration and Items prior to productionDesignItem Evaluation

Legacy pseudo-folder in Item MasterETS Installation

JT – Released ModelsCGM – Released DrawingsPDF – Released Drawings (2D Drawings, 3D Models)IGES/STEP – Released Models (Future)

Migration Strategy – IDEAS/DCS2 tier to 4 tier upgradeEngineering to Unified upgrade

Page 34: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 34

Obstacles and Opportunities

Obstacles - Consulting:Legacy Data Folder

Page 35: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 35

Obstacles and Opportunities

Obstacles – Consulting Expectations:Experiences in

TeamcenterIDEAS IntegrationNX

Schedule FlexibilityLocal OfficesImplementation Experiences

ETSCustom Programming2 Tier to 4 TierEngineering to Unified

Part of Licensing Deal; 80-120 hours of Siemens consulting

Page 36: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 36

Obstacles and Opportunities

Opportunities:

New Look at HardwareSharePoint InterfaceClient Performance (Workstation speed, LAN,…)4-Tier – WAN PerformanceRecord EDMSLDAP

Page 37: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 37

Computing Division Role

CD’s Role:

Purchased licensing - KaletkaSite wide software (100 vs 1000 licenses)Expand teamRevisit existing plan and make adjustmentsPolicy statement

Page 38: Discussion Topics

Teamcenter – Overview

200911 Teamcenter - Lab Wide EDMS 38

Questions, Comments, Next Steps

Questions/Comments:

Next Steps:CD

Intro. MeetingOther…

Tony Updating Implementation PlanPolicy StatementBeta Test for DesignItemUpdate Experimental system to Unified

RichMeet with Vicky