![Page 1: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/1.jpg)
Directive 017 Heavy Oil GOR Testing Requirements Colby Ruff, Senior Advisor (Measurement Specialist), Industry Operations
IMG General Meeting, January 10, 2017
![Page 2: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/2.jpg)
AER
Background
Outline: Current Heavy Oil GOR Testing Requirements
Challenges With Current Requirements
Operator Work Undertaken to Date
Possible Next Steps
2
![Page 3: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/3.jpg)
AER
Current Heavy Oil GOR Test Requirements
3
Heavy oil is oil with a density greater than 920 kg/m3 and includes crude bitumen (except mines and in-situ).
Any single stream of produced, flared, or vented gas exceeding 2.0 103 m3/day must be measured.
If the annual average fuel gas usage exceeds 0.5 103 m3/day on a per site basis, the fuel gas must be measured.
![Page 4: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/4.jpg)
AER
4
Current Heavy Oil GOR Test Requirements
Emulsion Tank
Emulsion Trucked toTreatment Facility
Pumping Heavy Oil Well
Vented Tank Vapours(Measured or
Estimated)
Casing GasM
GOR or Hourly Rate Testing
Vent/Flare
FuelM
GOR = (vent/flare volume + fuel volume + tank vapour volume) ÷ oil production
Hourly rate = (vent/flare volume + fuel volume + tank vapour volume) / total test hours
Test Meters
![Page 5: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/5.jpg)
AER
Current Heavy Oil GOR Test Requirements
5
New single well batteries: • Monthly 24 hour tests for six
months or until gas production stabilizes
• If total gas production is > 2.0 103 m3/day then continuous metering is required.
• If total gas production is ≤ 2.0 103 m3/day then GOR test results may be used to determine well gas production
![Page 6: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/6.jpg)
AER
Current Heavy Oil GOR Test Requirements
6
Gas rate (103 m3/d)
Test frequency
≤ 0.1
Once every 3 years
> 0.1 but ≤ 1.0
Annually
> 1.0 but < 2.0
Semiannually
GOR test frequency based on initial GOR test results.
![Page 7: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/7.jpg)
AER
Current Heavy Oil GOR Test Requirements
7
Multiwell proration batteries • Wells with gas production rates >
2.0 103 m3/day must be GOR tested at the same frequency as proration testing unless metered during proration testing.
• If well gas production is ≤ 2.0 103 m3/day then single well GOR test procedures may be used.
Multiwell battery • If gas production at point of
collection is < 2.0 103 m3/day and not metered…facility level GOR may be used.
![Page 8: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/8.jpg)
AER
Gaps in Current GOR Testing Requirements
8
Requirements developed in early 1990s • Vertical wells only so gas response
was more predictable • Horizontal wells equate to larger
drainage areas which results in greater variation in gas response (changing production rates).
• Current testing requirements often do not capture increasing gas rates in a timely fashion.
• GOR testing requirements are viewed as arbitrary & outdated and often are not adhered to.
![Page 9: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/9.jpg)
AER
Operator Work Undertaken to Date
9
No work completed on new GOR testing frequency
Some work undertaken by one operator to better quantify production tank venting rates and methane component.
AER has received requests from two operators for an approach that would better quantify tank venting.
![Page 10: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/10.jpg)
AER
Possible Next Steps
10
Convene a IMG subcommittee to develop new GOR testing requirements. • Testing frequency requirements
that captures gas response in a timely fashion and minimizes “low value” GOR testing.
• Develop a broadly applicable GIS factor to estimate production tank venting.
![Page 11: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/11.jpg)
AER
Possible Next Steps
11
Convene a IMG subcommittee to develop new GOR testing requirements cont. • Assess production, flare and
vent rate thresholds above which metering is required.
• Assess full life cycle costs of GOR testing vs. continuous metering.
![Page 13: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/13.jpg)
AER
Climate Change Methane Emission Reduction Projects Proposed Fuel, Flare, Vent Gas Definitions
13
Fuel Gas: • Natural gas that is combusted in
engines or heaters that are used in the production and processing of oil and gas at upstream oil and gas well sites and facilities.
• Other gas usage scenarios that must be reported as fuel gas include gas combusted in: – Catadyne and other building
heaters. – Sulphur recovery unit reaction
furnaces
![Page 14: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/14.jpg)
AER
Climate Change Methane Emission Reduction Projects Proposed Fuel, Flare, Vent Gas Definitions
14
Flare Gas: • Natural gas that is intentionally
combusted in a flare stack or incinerator at upstream oil and gas well sites and facilities. Gas usage scenarios that must be reported as flare gas include: – Waste gas – Production tank blanket/purge/
sweep gas – Dilution gas mixed with H2S prior
to flaring or incineration.
![Page 15: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/15.jpg)
AER
Climate Change Methane Emission Reduction Projects Proposed Fuel, Flare, Vent Gas Definitions
15
Flare Gas cont. – Make up gas added to a flare gas
stream to increase its’ heating value
– Gas from dehydrator still columns that is flared or incinerated.
![Page 16: Directive 017 Heavy Oil GOR Testing Requirements · Oil GOR Test Requirements 5 New single well batteries: • Monthly 24 hour tests for six months or until gas production stabilizes](https://reader036.vdocuments.site/reader036/viewer/2022071022/5fd6e2ea038fc871021a9019/html5/thumbnails/16.jpg)
AER
Climate Change Methane Emission Reduction Projects Proposed Fuel, Flare, Vent Gas Definitions
16
Vent Gas: • Natural gas that is intentionally
vented to the atmosphere at upstream oil and gas facilities. Vent gas usage scenarios that must be reported as vent gas include: – Waste gas – Gas used to operate pneumatic
devices – Compressor start up or blow down
gas – Fugitive emissions – Vapors off dehydrator still columns.