directions to emirates steel · esnaad abu dhabi paper mill company ascorp icad gate phase 2 gate...

3
Strategically located in the Industrial City of Abu Dhabi, some 35 kilometers away from the heart of the city of Abu Dhabi, Emirates Steel is the only integrated steel plant in the UAE, utilizing the latest rolling mill technology to produce rebar, wire rod and heavy sections. Established in 1998, Emirates Steel grew in a relatively short period of time from a simple re-roller of imported steel billets to a complex integrated manufacturing plant, using modern solutions to tackle traditional industrial problems to generate value for its various stakeholders. In 2012, the Company began producing at a capacity of 3.5 million MTPA, following two expansions and the investment of AED 11 billion (US$ 3 billion). Directions to Emirates Steel

Upload: others

Post on 15-May-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Strategically located in the Industrial City of Abu Dhabi, some 35 kilometers away from the heart of the city of Abu Dhabi, Emirates Steel is the only integrated steel plant in the UAE, utilizing the latest rolling mill technology to produce rebar, wire rod and heavy sections. Established in 1998, Emirates Steel grew in a relatively short period of time from a simple re-roller of imported steel billets to a complex integrated manufacturing plant, using modern solutions to tackle traditional industrial problems to generate value for its various stakeholders. In 2012, the Company began producing at a capacity of 3.5 million MTPA, following two expansions and the investment of AED 11 billion (US$ 3 billion).

Directions to Emirates Steel

1

THE PREVENTIVE

MEDICINE DEPARTMENT,

MUSSAFAH BRANCH

WAY

TO

ESTO ABU DHABI

MUSSAFAH BRIDGE

MAQTA BRIDGE

SECOND BRIDGE

FIRST BRIDGE

FGB

ADNOC

WAY TO ES

MERCEDES

BENZ

GMG

WAY

TO

ES

WAY

TO

ES

TO ABU DHABI

WAY TO ES

WAY TO ES

WAY TO ES

BMW

ADNOC

DELMA MALL

ADNOC

THIRD BRIDGE

Way to Emirates Steel:- Stay on the E30 till Delma Mall is on your right.- Take the first right after Delma Mall before the third bridge.- Access ICAD 1 and keep going straight.- After crossing five roundabouts you will see Emirates Steel right in front of you.

ROUTE MAP TO EMIRATES STEEL (ES) ICAD MUSSAFAH FACILITIES

Emirates Steel, PO Box 9022, Mussafah, Abu Dhabi, UAE, Tel: +971 2 551 1187 Fax: +971 2 507 2181 www.emiratessteel.com

ABU DHABI- MUSSAFAH HIGHWAY

E 30

ADNOCFUEL STATION

HUMP HUMP

EMIRATESSTEEL PHASE 2

OFFICE

ICAD GATE 1NEO PHARMA

ESNAAD

ABU DHABIPAPER MILLCOMPANY

ASCORP

ICADGATE

PHASE 2GATE

NDMC

EMIRATES STEEL PHASE 1

EMIR

ATES

STE

ELPH

ASE 2

EMIRATESIRON ANDSTEEL COMPANY LLC

ROUTE MAP TO EMIRATES STEEL PHASE 2

Emirates Steel, PO Box 9022, Mussafah, Abu Dhabi, UAE, Tel: +971 2 551 1187 Fax: +971 2 507 2181 www.emiratessteel.com

Way to Emirates Steel Phase 2:- Stay on the E30 till Delma Mall is on your right.- Take the first right after Delma Mall before the third bridge.- Access ICAD 1 and keep going straight.- After crossing five roundabouts you will see Emirates Steel Phase 1 right in front of you.- Go right and after you cross three round abouts go left, then left and all the way till you reach the Phase 2 gate.

Alternatively:- Go right before the second bridge.- Complete six roundabouts before you go left.- When you reach the first roundabout take right then follow the road till you reach the Phase 2 gate.

II BRIDGE

III BRIDGE

sign board esi

ADNOCFUEL STATION

Main Administration Building

2