dipecho achievements in vietnam (1998 - 2015)

32
DIPECHO PARTNERS IN VIETNAM VIETNAM / DIPECHO 1998-2015

Upload: ly-nguyen

Post on 12-Apr-2017

186 views

Category:

Government & Nonprofit


0 download

TRANSCRIPT

Page 1: DIPECHO achievements in Vietnam (1998 - 2015)

DIPECHO PARTNERS IN VIETNAM

VIETNAM / DIPECHO 1998-2015

Page 2: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

The influence of DIPECHO supported projects in the institutionalization and scaling up at

National level of CBDRM small-scale initiatives and models conducted for many years by NGOs and mass organisations with Dipecho support and other donors support

cannot be underestimated.

Two main achievements in CBDRMhave been : To provide examples of good practices in CBRM and to

advocate for replication and scaling up by the government

Once established by the government to support the CBDRM Program on key components:(1) Disaster Risk Assessment and Disaster Preparedness, and(2) Need assessment and Disaster Response

Community based disaster risk management

Page 3: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

  

Community based disaster risk management

Page 4: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Disaster Risk Assessment and Disaster Preparedness  

Community based disaster risk management

Page 5: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Community based disaster risk management

Working with disability groups during VCA test in Mai Hoa commune, Tuyen Hoa district, 

Quang Binh province

Interview group of school children in Vinh Trung commune, Tinh Bien district, An Giang province

Page 6: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Community based disaster risk management

JANIJoint Advocacy 

Networking Initiative

Page 7: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Community based disaster risk management

PDRT – field exercise on interviewing community

Simulation of CDRT on sea rescue

Page 8: DIPECHO achievements in Vietnam (1998 - 2015)

Community-Based Disaster Risk Management

VIETNAM / DIPECHO 1998-2015

Entry:Pilots projects

Models

National/local level Gradual transfer through the national CBDRM program

Local level replication through institutionalization  (into the National CBDRM program)+ handover process

Dissemination of building blocks & initiation of scaling up

Joint works through JANI

Page 9: DIPECHO achievements in Vietnam (1998 - 2015)

Community-Based Disaster Risk Management

VIETNAM / DIPECHO 1998-2015

Improved institutional capacity, coordination linkages and advocacy

Joint Advocacy Network Initiatives Launched - 2011

Media Orientation Workshop on Media of DRR- 2009

National Workshop on Sharing experience in National CBDRM programme- 2012

Workshop on Development of Joint Advocacy Strategy on DRR and CC- 2011

Page 10: DIPECHO achievements in Vietnam (1998 - 2015)

Community-Based Disaster Risk Management

VIETNAM / DIPECHO 1998-2015

Increased capacity of relevant GoV disaster management agencies at central and provincial level for the roll out of the National

CBDRM programme

•CBDRM rolling out in 10 provinces • Pilot CBDRM educational package in 6 provinces • Documented lesson learned on CBDRM implementation to hand over to DMC• Ongoing improvement of the tools, guidelines and training packages adopted by DMC •Active contribution to the CBDRM /DRM Technical working group (a cross-learning and sharing platform) 

Page 11: DIPECHO achievements in Vietnam (1998 - 2015)

Community-Based Disaster Risk Management

VIETNAM / DIPECHO 1998-2015

Improved Information sharing and public awareness for the general public on DRR and CCA

Page 12: DIPECHO achievements in Vietnam (1998 - 2015)

Community-Based Disaster Risk Management

VIETNAM / DIPECHO 1998-2015

Increased advocacy efforts for the inclusion (children, women, people with disabilities) on CBDRM implementation

Workshop on Introduction of guidelines on gender integrated to DRR & CCA – JANI IV

Children participated in Vulnerability and Capacity Assessment – DIPECHO 8 People with disabilities participated in Vulnerability and

Capacity Assessment – JANI III

Page 13: DIPECHO achievements in Vietnam (1998 - 2015)

Education DRM

VIETNAM / DIPECHO 1998-2015

Coordination

Situation monitoring assessment & response

Capacity Development

Policy Advocacy and Planning

Key results in support to MOET in coordinating DRR and CCA implementation in the education sector

Project implementation in the field

Page 14: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Coordination• Coordination mechanism through strengthened TOR for Coordination Group for DRM and CC in education, and mapping of interventions

• Provide advisory support and guidance to development partners in designing DRR and CCA interventions, to ensure alignment with the sector’s priorities (e.g. curriculum, safe school, assessment and information management system, hazard resistant school design …)

• Enhanced coherence and partnerships in DRR and CC Programming in education, reducing duplication and increasing synergy.  

• Strengthened the sector’s coordination with national CBDRM (Programme #1002)

Education DRM

Page 15: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Education DRM

Situation Monitoring and Response• Emergency Needs Assessment tools available and

timely and quality reporting of impact of emergencies in education

• Timely coordination with Disaster Management Working Group (DMWG); UN Disaster Risk Management Team (UNDRMT) on joint assessment, response, follow up and monitoring

• Provision of emergency assistance for selected provinces through MOET or directly through development projects already in operation in the field

Page 16: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Education DRM

Institutional Capacity Development• Provide training in Education Cluster Coordination,

including preparedness and response plans, INEE Minimum Standards, DRR and Safe School

• Development of training materials and programmes in DRR/CCA education

• Training for provinces in education in emergencies, emergency needs assessment tools and preparedness and response plans, communication

Page 17: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Quản lý rủiro thiên tai trong trường họcEducation DRM

Policy Advocacy and Planning• MOET Action Plan to Implement the National strategy for Prevention

of Natural Disasters as a framework for DRR and CCA education

• Support the development and implementation of Priority projects in line with the MOET Action Plan and Law on Prevention of Natural Disasters.

• Provincial Action Plans and Preparedness and Response Plan in the schools

• Advocacy related to DRR Day, national forum related to DRR/CCA;

• DRR/CC integrated in education sector planning to leverage resources for children

Page 18: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Implementation of project interventions in the field:

• Development partners have had more dialogues with MOET, and agreed on key areas of collaboration

• Sharing experiences, techniques, information and training materials

• Ensure linkages between the work MOET is leading at national level and implementation at sub national level.  

Education DRM

Page 19: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Education DRMProject activities strengthening life-skills to children and awaness raising: • Camping/Contest on the DRR knowledge for students• Evacuation drill in schools• DRR/CCA Children Club promoting child participation• Swimming lessons to children• Students participate to School HVCA and taking part to

school emergency preparedness planning• Knowledge for hygiene promotion in disaster• Provide education kits and floating bag to children• Resue of available

materials in place to make hand-made buoy

Page 20: DIPECHO achievements in Vietnam (1998 - 2015)

SAFE SHELTER

VIETNAM / DIPECHO 1998-2015

Page 21: DIPECHO achievements in Vietnam (1998 - 2015)

Housing strongly impacted by natural disasters

VIETNAM / DIPECHO 1998-2015

Page 22: DIPECHO achievements in Vietnam (1998 - 2015)

22

Wutip & Nari 2013

VIETNAM / DIPECHO 1998-2015

Page 23: DIPECHO achievements in Vietnam (1998 - 2015)

Vulnerability is increasing: more to lose !

VIETNAM / DIPECHO 1998-2015

Page 24: DIPECHO achievements in Vietnam (1998 - 2015)

Precious family investment in the home is at serious risk from annual typhoons and floods.

Unnecessary damage could be avoided.There has been little support and no

recognition of the important contribution families can make to damage prevention.

Rebuilding costs many times more than any support they get from the state.

For families, damage prevention is the best option

Family housing & natural disaster

VIETNAM / DIPECHO 1998-2015

Page 25: DIPECHO achievements in Vietnam (1998 - 2015)

Making new and existing houses strong and safe;

building safer and better

SubsidyLoans

Technical support

Stronger houses

VIETNAM / DIPECHO 1998-2015

Page 26: DIPECHO achievements in Vietnam (1998 - 2015)

Safe people / safe shelterconsider family at the center of the process

VIETNAM / DIPECHO 1998-2015

Page 27: DIPECHO achievements in Vietnam (1998 - 2015)

VIETNAM / DIPECHO 1998-2015

Page 28: DIPECHO achievements in Vietnam (1998 - 2015)

National Programmes for Safe Housing

VIETNAM / DIPECHO 1998-2015

DIPECHO 9 2014-2015

Page 29: DIPECHO achievements in Vietnam (1998 - 2015)

29

VIETNAM / DIPECHO 1998-2015

Page 30: DIPECHO achievements in Vietnam (1998 - 2015)

Safe area for…people and assets…

…and animals

VIETNAM / DIPECHO 1998-2015

Page 31: DIPECHO achievements in Vietnam (1998 - 2015)

31

National Standards for Low Rise Bulding

in Flood and Storm Areas

VIETNAM / DIPECHO 1998-2015

DIPECHO 9 2014-2015

Page 32: DIPECHO achievements in Vietnam (1998 - 2015)

Resistant house, Safe people,

Communities development.

VIETNAM / DIPECHO 1998-2015