dinesh gupta vice president

12
Dinesh Gupta Vice President

Upload: doane

Post on 19-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

Dinesh Gupta Vice President. Our Strengths. Decades of serving esteemed clients…PSUs, Govt., Banks & corporates Manpower > 2500 in various expertise fields Project management Large Multi-site Secure & confidential data handling Focus on One-stop solution. Name of the Project. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Dinesh Gupta Vice President

Dinesh GuptaVice President

Page 2: Dinesh Gupta Vice President

Our Strengths

• Decades of serving esteemed clients…PSUs, Govt., Banks & corporates

• Manpower > 2500 in various expertise fields

• Project management

• Large

• Multi-site

• Secure & confidential data handling

• Focus on One-stop solution

Page 3: Dinesh Gupta Vice President
Page 4: Dinesh Gupta Vice President

Name of the Project

Location

ProjectDetails

Challenges

Technologies used

Strengthening of Revenue Administration & Updation of Land Records

India-North

Complete DMS

Document Condition: old & brittle

Cbsl –DMS, 15 High resolution Flatbed scanners

Page 5: Dinesh Gupta Vice President

Name of the Project

Location

Project Details

Challenges

Technologies used

Digitisation of Revenue Records for Survey, Settlement & Land Records

13 locations across India-South

Digitisation, Wide-format Printing

Site Setup and LogisticOld age and brittle condition of the documents> 200 staff deployed

Cbsl- DMS, > 50 scanners

Page 6: Dinesh Gupta Vice President

Name of the Project

Location

ProjectDetails

Challenges

Technologies used

Municipal Corporation (Building & TP Department)

India - North

~ 45 lakh file documents and 3 lakh drawings handled> 70 people

•Document condition: old & brittle •Muliple data formats

Cbsl’ DMS, 10 High speed grafter scanners for drawings scanning , 20 flatbed/ADF Scanners

Page 7: Dinesh Gupta Vice President

Landbase data collection & GIS map updation

Details of work done:

• Land base data collection was done by conducing house to house contact survey.

• During survey, maps on scale 1:1000 and data formats were used

• The changes found on the ground were updated in the map as and data sheet.

• The data was quality checked using by internal QC module and one provided by client.

• client also conducted quality check and ground check of data for acceptance

• Our GIS personnel were deployed in the client’s premises and had done online updation of client GIS database.

Page 8: Dinesh Gupta Vice President

Cadastre Mapping for Minor commands

Details of work done:

• Cadastral database of approximately 4000 villages and other feature layers(17 layers) were processed using irrigation minor command boundaries

• Bilingual interface developed

Page 9: Dinesh Gupta Vice President

Cadastre Mapping

Details of work done:

• Processing and creation of GIS Database for 9027 Kulabas using cadastral maps of nearly 4000 villages

• Land use mapping for more than 6000 sq km using cartosat-I satellite data

• Maps were composed on 4000 scale

• Printing more than 10000 maps

Page 10: Dinesh Gupta Vice President

Urban city mapping

Details of work done

• Mapped buildings with Quick bird image on 1:2000 scale

• Land use map was prepared

• Maps 1:1000 scale used for contact survey

• GIS map updation

Page 11: Dinesh Gupta Vice President

Name of the Project

Location

Project Details

Challenges

Technologies used

Leading Bank of India

36 locations across India

Record Management systems as per security and safety guidelines with tracking & retrieval software

Large number of sites

Cbsl’s RMS

Page 12: Dinesh Gupta Vice President

Thank you

Please visit cbsl@Booth #11