Agile Data Center Migration for a Global Life Insurance Provider Cognizant Case Study Business Situation Headquartered in Canada, this client is one of the largest life insurance companies in the world, operating principally in Asia, Canada and the United States. It was one of the first foreign life insurance companies to establish operations in Japan — entering that market in 1901. Today, it provides a wide range of financial-protection and wealth-management products designed to meet the changing needs of customers over the course of their lifetime. The client’s business relies heavily on the Policy Admin System (PAS) Ingenium application to handle policy administra- tion tasks for its individual life line of business. Challenge The client was looking to simultaneously migrate from its existing data center operations and upgrade the technical stacks of the Ingenium application. Management subsequently decided to upgrade the software and hardware envi- ronment supporting the Ingenium system and maintain BAU (business administration unit) operations to make the company’s IT assets more robust, scalable and agile. There were several reasons behind these objectives: The company was aggressively trying to increase its product line; simply adding insurance products to the existing Ingenium application would further degrade the system’s performance. Middleware and database software versions were outdated — hampering alignment with newer technologies, and stalling the implemen- tation of straight-through processing (STP) to accelerate processing time. Batch processing timelines were frequently hitting thresholds and negatively impacting the business. Solution We proposed the development of an innovative, agile data center migration model that would involve a core team of resources with expertise in insurance software products, as well as supporting middleware. During the analysis phase, we proposed setting up a Lab PC (software provided for PC systems) that would install all new versions of the middleware to validate the com- patibility and configuration parameters. Following this process, the requirements for both file system space and targeted software were identified. The PAS application was installed on top of the middleware, and used to test the new software as a “trial and error” method for checking the stability of the client’s insurance application. In the Lab PC approach, initial versions of software are installed; any issues that arose during this initial setup were immediately brought to the attention of corresponding product vendors, and corrective actions taken. In the meantime, we worked with the client on hardware and software specifications for the cognizant case study | june 2014

Upload: others

Post on 14-Jul-2020

24 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Digital Solutions to Advance Your Business | Cognizant - Agile Data Center … · Cognizant Technology Solutions Subject A Canada-based, global life insurance company came to Cognizant

Agile Data Center Migration for a Global Life Insurance Provider

• Cognizant Case Study

Business SituationHeadquartered in Canada, this client is one of the largest life insurance companies in the world, operating principally in Asia, Canada and the United States. It was one of the first foreign life insurance companies to establish operations in Japan — entering that market in 1901. Today, it provides a wide range of financial-protection and wealth-management products designed to meet the changing needs of customers over the course of their lifetime. The client’s business relies heavily on the Policy Admin System (PAS) Ingenium application to handle policy administra-tion tasks for its individual life line of business.

Challenge The client was looking to simultaneously migrate from its existing data center operations and upgrade the technical stacks of the Ingenium application. Management subsequently decided to upgrade the software and hardware envi-ronment supporting the Ingenium system and maintain BAU (business administration unit) operations to make the company’s IT assets more robust, scalable and agile. There were several reasons behind these objectives:

• The company was aggressively trying to increase its product line; simply adding insurance products to the existing Ingenium application would further degrade the system’s performance.

• Middleware and database software versions were outdated — hampering alignment with newer technologies, and stalling the implemen-tation of straight-through processing (STP) to accelerate processing time.

• Batch processing timelines were frequently hitting thresholds and negatively impacting the business.

Solution We proposed the development of an innovative, agile data center migration model that would involve a core team of resources with expertise in insurance software products, as well as supporting middleware. During the analysis phase, we proposed setting up a Lab PC (software provided for PC systems) that would install all new versions of the middleware to validate the com-patibility and configuration parameters. Following this process, the requirements for both file system space and targeted software were identified. The PAS application was installed on top of the middleware, and used to test the new software as a “trial and error” method for checking the stability of the client’s insurance application. In the Lab PC approach, initial versions of software are installed; any issues that arose during this initial setup were immediately brought to the attention of corresponding product vendors, and corrective actions taken.

In the meantime, we worked with the client on hardware and software specifications for the

cognizant case study | june 2014

Page 2: Digital Solutions to Advance Your Business | Cognizant - Agile Data Center … · Cognizant Technology Solutions Subject A Canada-based, global life insurance company came to Cognizant

2cognizant case study

new data center. Procurement instructions were passed to the data center provider. Test servers were built on new hardware. Regression testing was performed, along with parallel testing, to validate and enhance existing and new appli-cations. The client had lined up the launch of a new medical insurance product as part of its BAU operations — leading to additional verification requirements.

We prepared software and storage require-ments for the production server, and provided support for building new production servers during the product testing phase. After the production servers were made fully functional, they underwent user acceptance testing (UAT).

Regression testing was performed on both the old and new servers, and end results compared and verified. Once the results were approved, the old server was shut down and the newly migrated server was made operational.

One month of complete SIT, E2E, UAT and Production Simulation Testing was performed before the actual cutover to the new insurance product on the PAS application in old and new servers. Data center migration and Ingenium products were tested in parallel.

A total of 15 new servers were installed within six months, without affecting any of the company’s business process servers. These included Test,

Figure 1

Customer

Customer

LAB PCNew Test Server

Gathered necessaryfile system build

for Lab PC.

Completion of batch part and testing of the same started.

CognizantProduct vendor

Completion of online part and testing of the same began.

Ex: CICS COBOL bitcompatibilty

Database migrationMicro Focus COBOL

DB2 Application Feature Enhancement

Old server shutdown

Test server shutdown

Production server

FT compares the test cases between old and new test servers.

May - August SeptemberSeptemberMarch - MayMarch

Middlewareissues are raisedto client/vendor

Gathered necessaryfile system build for test server.

Client started on procurement of harddisks and softwarelicenses.

Gathered necessaryfile system build for production server.

Client started on procurement of hard disks and software licenses.

IT IS analysis on target versions DB2 DAD -> XSD

conversion in CognizantPC Gap analysis &

implementation approach.

LAB PC

Test ServerBuild

PProd. ServerBuild

Old server shutdown

A Complete Picture of the Agile Migration Approach

Figure 2

Complete Proposed Versions of the Software StackInitial Version Target Version Initial Version Target Version

AIX V5.3 AIX V7.1 IBM Websphere V6.0 IBM Websphere V7.1 ND

Pathfinder V4.0.2 Pathfinder V4.1.1 IBM HTTP Server V6.0 IBM HTTP Server V7.1

Micro Focus Server Express COBOL V4.0

Micro Focus Server Express COBOL V5.1 IBM DB2 V8.2 IBM DB2 V9.7

IBM Tx Series CICS V6.0 IBM Tx Series CICS V7.1 IBM CTG V6.0 IBM CTG V7.0

Page 3: Digital Solutions to Advance Your Business | Cognizant - Agile Data Center … · Cognizant Technology Solutions Subject A Canada-based, global life insurance company came to Cognizant

About CognizantCognizant (NASDAQ: CTSH) is a leading provider of information technology, consulting, and business process outsourc-ing services, dedicated to helping the world’s leading companies build stronger businesses. Headquartered in Teaneck, New Jersey (U.S.), Cognizant combines a passion for client satisfaction, technology innovation, deep industry and busi-ness process expertise, and a global, collaborative workforce that embodies the future of work. With over 75 develop-ment and delivery centers worldwide and approximately 178,600 employees as of March 31, 2014, Cognizant is a member of the NASDAQ-100, the S&P 500, the Forbes Global 2000, and the Fortune 500 and is ranked among the top performing and fastest growing companies in the world. Visit us online at www.cognizant.com or follow us on Twitter: Cognizant.

World Headquarters500 Frank W. Burr Blvd.Teaneck, NJ 07666 USAPhone: +1 201 801 0233Fax: +1 201 801 0243Toll Free: +1 888 937 3277Email: [email protected]

European Headquarters1 Kingdom StreetPaddington CentralLondon W2 6BDPhone: +44 (0) 20 7297 7600Fax: +44 (0) 20 7121 0102Email: [email protected]

Cognizant Japan KK 2F, Kojimachi Miyuki Building, 3-4 Ni-Bancyo Chiyoda-ku, Tokyo, 102-0084,JapanPhone:+81-3-5216-6888Fax : +81-3-5216-6887

© Copyright 2014, Cognizant. All rights reserved. No part of this document may be reproduced, stored in a retrieval system, transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the express written permission from Cognizant. The information contained herein is subject to change without notice. All other trademarks mentioned herein are the property of their respective owners.

UAT, Model Office and Production servers that were used for the company’s daily core insurance business.

Benefits The data center migration allowed the client and its business users to:

• Continue the transformation journey, and look at more straight-through processing (STP) to cut processing time.

• Utilize a proven approach for upgrading a complete software and hardware environment, which reduced the time of the overall batch cycle.

• Carry forward BAU operations with minimal impact. During these kinds of migrations, most companies would typically freeze all of their systems and projects for six months to a year. In agile migration, new insurance products are launched quickly — even during data center migration.

• Realize monetary benefits from the “on/off” cost model.

• Overcome the time difference between the countries; seamless offshore reinforcement opens an additional support window.

• Identify typical upgrade issues ahead of time and easily implement new features — a dual benefit of the client’s strategy.