DIAMULATOR™ IS AN INDUSTRIAL VALVE MANAGEMENT SYSTEM FOR LIQUID SERVICE VALVE’S THAT INCLUDES: -VALVE SIZING, CAVITATION SIGMA VALUE, PIPE, AND VALVE VELOCITY CALCULATOR.
-CALCULATION AND DATA SHEETS.
-VENDOR MANAGEMENT, EVALUATION SHEETS C/W SUMMARY AND MUCH MORE.
DIAMULATOR™
HOW MUCH IS REAL TIME, ACCURACY AND THE PROPER SELECTION OF CONTROL VALVES IN LIQUID SERVICE WORTH?
DIAMULATOR™
• REAL TIME IS SIGNIFICANT TIME !
• COST OR BENEFIT? IS WHAT IS SPENT ON THE SIZING AND SELECTION OF LIQUID
CONTROL VALVES ?
DESIGN THRU SPECIFICATION
DIAMULATOR™
• Design and specification:
• Budgeting for liquid control valves for either lump sum or feed projects is not without risk.
• Size and body type
• Material
• Trim selection
• Exit valve velocity
• Pipe velocity
VALVE SIZE AND BODY STYLE CHANGE.
DIAMULATOR™
• An increase in body size is a direct increase in cost.
• Possible line size change
• Squad check
• Data sheet & P&ID revision and reissue.
• Body style change requirements is increased cost.
• Angle body
• Expanded outlet valve bodies
• Piping design
• Data Sheet& P&ID revision and reissue
BODY MATERIAL CHANGE.
DIAMULATOR™
• Significant cost is associated with improper body ANSI pressure, temperature rating and body material selection.
• Not meeting Process requirements
• Not meeting the design criteria based on the DBM or line designation table ie: maximum design temperatures and pressures and it’s adverse affect on the proper valve specification
• Flashing service
TRIM TYPE, MATERIAL AND SELECTION.
DIAMULATOR™
• Trim type change can increase cost substantially due to:
• Cavitation severity
• Flashing service
• Velocity
PIPE VELOCITY.
DIAMULATOR™
• Miscalculation can increase cost due to:
• Valve size
• Line size change
• Squad check
• Data sheet & P&Id changes
• Line size and line numbers
• Revise and reissue
REAL TIME PREFORMANCE
DIAMULATOR™
• Controllability, stability and process performance, keeping in mind that the control valve is the final element within the process design criteria :
• Trim damage
• Unscheduled down time
• Production performance, real time, real performance and associated cost
HOW CAN MARGIN OF ERROR ASSOCIATED WITH REAL TIME AND RISK BE ELIMINATED?
DIAMULATOR™
• With the use of a user friendly sizing , specification and selection application specific management system.
• That is safe, secure and not downloadable.
• DIAMULATOR™ is always with you if you have access to the World Wide Web any where anytime.
• No lose paper to loose, confuse, mix up and printable on the spot.
• No IT cost associated with DIAMULATOR™.
• Training and support available.
USERS.
DIAMULATOR™
• Process, Instrumentation engineers and technologists.
• Plant engineers, technologists, field maintenance.
• Project Managers.
• Estimators.