diamond wy diamond wy diamond wy ayca-3qaoui … · wd revdate description signature date it should...
TRANSCRIPT
ACCURATE OR COMPLETE.
DRAWING TITLE:
PROJECT No:
SCALE SHEET No. REV.
QUALITY RECORD :
APPROVED
NBNCO APPROVAL RECORD:
DD
AB
WD
REV DATE DESCRIPTION
SIGNATURE DATE
IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS.
USE OF NBNCO LIMITED (ABN 86 136 533 741)THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE
NBNCO DISCLAIMER
NO WARRANTY IS GIVEN THAT THE INFORMATION IS
FOR USE IN MAINTAINING NBNCO FACILITIES.IT HAS NOT BEEN CREATED FOR ANY OTHER USE.
CADREF No:
NN KEY PLAN
OF
FSA:
STATE: REGION:
FSAM:
DRAFTER
FDA:
MAP1
MAP3 MAP4
MAP2
SHEET1
CONTRACTOR LOGO
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
NBN Co. PIT & PIPE INFRASTRUCTURETO PROPOSED SUBDIVISION7001 BERRIGAN STREET STAGES 2 & 3REDBANK PLAINS
QLD
AYCA-3QAOUI
E16-D15914N
N/A 1 3 B
APPLY TO OTHER TYPE OF METERING POINT ( any service)
BANDSTAND / ROTUNDA / SPORTS FIELD STANDS /OTHER PARK BUILDING
Fibre Distribution Hub-FDH Cabinet with Cabinet ID shown
Splice Joint on a Transit Cable (TJL)
Splice Joint on a Local Cable (LJL)
Network Access Point (NAP)
Multiport (MPT)n is the number of ports (eg 4,6,8,12)
Traffic Lights / Traffic Light Controller /Variable Speed Sign / Traffic Signal
Public Transport (bus stop, tram stop, railway station, taxi rank, ferry wharf)
Transformer / Kiosk / Pad Mount Sub-station / Pole Mount Transformer
Links / Link Pole / MV / HV Links / ABC Links / Dynamic Switch / Airbrake Switch / Isolator
Water Infrastructure (storage, pumps, valves water supply, waste water, sewerage stations)
Natural Gas Infrastructure
Camera (security / traffic)
Bridge control, swing bridge, traffic control gates, railway boom gates)
Mobile Phone Tower / radio antenna
Street Lighting Pole / street light controller
Unmanned (council) car park
POINT OF SALE DEVICE (vending machine, ticket machine)
Zone Terminal / Splice Joint (AJL)
Symbol to be used when replacing/removing existing network
Splice Joint on a Distribution Cable (DJL)
ATMATM
Multiport (MPT)
FAN
DEPTHALIGN
FSA Boundary
FSAM Boundary
FDA Boundary
CABLE CONFIGURATIONCABLE TYPE:
CABLES DIVIDE INTO FOLLOWING CATEGORIES AND ARECOLOUR CODED:TRANSIT CABLESDISTRIBUTION CABLESLOCAL CABLESTETHER CABLESLEAD IN (DROP) CABLES
CABLE SIZE:
CABLE SIZE IS THE TOTAL NUMBER OF OPTICFIBRES IN THE CABLE AND IS DETERMINED BY ANUMBER FOLLOWED BY F (FIBRE) OR R (RIBBON) IN THE MIDDLEOF THE LINE TYPE
CABLE LOCATION:CABLE LOCATIONS DETERMINES WHERE THECABLE IS USED AS PER BELOW:
IN-CONDUITAERIALBURIED
EXAMPLE:
144 FIBRE AERIAL LOCAL CABLE1 FIBRE BURIED DROP CABLE432 FIBRE IN-CONDUIT TRANSIT CABLE
LINE TYPES ARE CATEGORIZED INTO 3 TYPES:
1- IN-CONDUIT: (XXXF) 312F , ...
2- AERIAL: (XXXF_A) 144_A , ...
3- BURIED: (XXXF_B) 12_B , ...
COLOUR NO: 1COLOUR NO: 190COLOUR NO: 4COLOUR NO: 3COLOUR NO: 5
312F288F144F12F
1F
288F144F
96F
144F1F 1F
48F
576F
LASER BEAM
DANGER
CONDUITS AND DUCTS ARE IN LAYER :< L460 NBN Support - Underground >AND TERMINOLOGY CATEGORIZED INTO TWO GROUPS INTHE DRAWING AS PER BELOW:1- DUCT USED WITH LOCAL NETWORK
2-CONDUIT USED WITH LEAD-IN DROPSATTRIBUTES ATTACHED ARE AS SHOWN
CONDUIT SIZE CONDUIT LENGTH
CONDUIT CONFIGURATION
Multi Dwelling Unit (MDU)
Fan Access Node site (FAN)
Pole (showing pole identity)
Premise Connection Device (PCD)
Example of descriptor box that will show thetype of work and the quantity involved
Existing Telstra manhole
Existing Telstra Pit ( 2,3,4,5,6,7,8,9 )
Example of Telstra Major Conduit Layout withProposed duct marked to be used by NBN
Telstra exchange
NBN MARKER POSTMARKER POST TO BE NUMBERED
RCXX138A
DEPTH OVER ALIGNMENT SYMBOL TO BE USED WITH EVERY MARKER POST
Splice Joint on a Tether Cable (MJL)
ASSISTANCE TELEPHONES (EG ELEVATOR AND ROADSIDE PHONES)
PRIVATELY OPERATED PAYPHONESPOP
FDH-ID
APS
MJL-ID
26.5P100
--
< _>
MPT-IDN
NAP-ID
DESQTY
5
AAAA
POLE-ID
PIT-ID9
PIT-ID5
PIT-ID2
AJL-ID
LJL-ID
DJL-ID
TJL-ID
CAR
LIT
MOB
CTL
CAM
GAS
WAT
SWT
PBT
TRF
PSD
PRK
ATM
MET
N
Service Drop Access Pit
Network Boundary/Local Network Pit (Single Lid)
Fibre Distribution Hub (FDH) Pit
Distribution/Local Network Connection PitPIT-ID8
CABLE TRAY:
(650mmX280mmX565mm)
(700mmX450mmX650mm)
(1360mmX555mmX860mm)
(2000mmX555mmX900mm)
PIT-ID9
PIT-ID5
- 05-10-16 B.HEMPHILL ORIGINAL ISSUE
Steve Harte
COLANE ST
APAR
A ST
BERR
IGAN
ST
KEIDGE
S RD
PURSER RD
DIAMOND WY
SAPPHIRE CR
BERRIG
AN ST
SAPP
HIRE
CR
SAPP
HIRE
CR
DIAMOND WYDIAMO
ND WY
A 20-01-17 S.H./B.H. ISSUED FOR CONSTRUCTION
B 18-04-17 P.H./I.T.J. AS CONSTRUCTED
COLANE ST
BERR
IGAN
ST
PWR
DIAMOND WY
SAPPHIRE CR
10
11 12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
2728
2930
3132
3334
35
36
37
38
39
40
41
42
43
PIT-0015
PIT-0025
PIT-0035
PIT-0045
PIT-0055
PIT-0065
PIT-0075
PIT-0085
PIT-0098
PIT-0105
PIT-0118
PIT-0128
PIT-0135
PIT-0159
PIT-0168
P100
26.7
P100
26.7
P100
61.9
P100FDH-
XXX
P202
P502
P202
P202
P202
P202
P202
P202
P100
66.6
P202 P202P202 P202
P202 P202P202 P202
P202
P202
P202
P202
P202
P202
P202
P502
PIT-0
015
PIT-0
025
PIT-0
035
P100
P100
PIT-0
04 5
P100
P100
P100
P50
P50
P50
P100
P100
P100
P100
P100
8
5
5
5
5
PIT-0172
PIT-0
182
PIT-0
192
PIT-0
205
P50
20
P100
60.9
P50
46.2
P5021.5
P5021.7
P50
41.3
P202
P202
P202
P202
P202
P202
P202
PIT-0215
P50
2
SAPP
HIRE
CR
P202
P5017.5
P50
38.7
SAPP
HIRE
CR
P50 17.5
15m
P1002
P100
47.7
P100
52.6
P209
P209
8m
44
P100
P100
55.2
P100
27.5
P5017
P50
18.7
P10016.4
P100
26.7 P10025.4
P100
30.1
P100
36.9
P100
26.1
P100
29.5
P10022.2
ACCURATE OR COMPLETE.
DRAWING TITLE:
PROJECT No:
SCALE SHEET No. REV.
QUALITY RECORD :
APPROVED
NBNCO APPROVAL RECORD:
DD
AB
WD
REV DATE DESCRIPTION
SIGNATURE DATE
IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS.
USE OF NBNCO LIMITED (ABN 86 136 533 741)THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE
NBNCO DISCLAIMER
NO WARRANTY IS GIVEN THAT THE INFORMATION IS
FOR USE IN MAINTAINING NBNCO FACILITIES.IT HAS NOT BEEN CREATED FOR ANY OTHER USE.
CADREF No:
NN KEY PLAN
OF
FSA:
STATE: REGION:
FSAM:
DRAFTER
FDA:
MAP1
MAP3 MAP4
MAP2
SHEET1
CONTRACTOR LOGO
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
NBN Co. PIT & PIPE INFRASTRUCTURETO PROPOSED SUBDIVISION7001 BERRIGAN STREET STAGES 2 & 3REDBANK PLAINS
QLD
AYCA-3QAOUI
E16-D15914N
1:500 @ A1 2 3 B
- 05-10-16 B.HEMPHILL ORIGINAL ISSUE
A 20-01-17 S.H./B.H. ISSUED FOR CONSTRUCTION
B 18-04-17 P.H./I.T.J. AS CONSTRUCTED
CANCELLING LOT 608 ON SP137006, LOT 60 ON SP291572 & 62 ON SP291573PROPOSED LOTS 10-44 & 61
PROPOSED SUBDIVISION
CIVIL CONSULTANT - CIVIL & PROPERTY DEVELOPMENT CONSULTING - CRAIG SMERDON - 0437 376 600SURVEYOR - K J PACKER CONSULTING - KENNETH PACKER - 3374 3233
- (CONSTRUCTION) - PETER HARLEY - 3271 2911- (DESIGNER) - BYRON HEMPHILL - 3271 2911
GAS - APA GROUP - SILVIA HART - 3215 6655
No OF LOTS:- 36
TARGET DATES
ON SITE CHECKS OF EXISTING SERVICES SHOULD BE
MATERIALS REQ'D - OCTOBER 2016INSTALLATION REQ'D - OCTOBER 2016
ON SITE SERVICE CHECKS
NBN - WORKS CO-ORDINATOR - WARREN SMITH - 0408 469 685J&P RICHARDSON
COUNCIL - DIAL BEFORE YOU DIG - 1100DIAL BEFORE YOU DIG - 1100
ARRANGED WITH THE RELEVANT AUTHORITIES LISTED BELOW.
* NBN Co. GUIDELINES FOR DEVELOPERS: NBN-TE-CTO-194 V6.0
THIS WORKS PLAN IS TO BE READ IN CONJUNCTION WITHTHE FOLLOWING NBN Co. MANUAL AND SPECIFICATIONS:
SPECIFICATIONS
1.
4.
NEW RESIDENTIAL SUBDIVISIONORIGIN:NOTES:
P100 TO BE INSTALLED TO BOUNDARY OF DEVELOPMENT AND CAPPED FOR FUTURE STAGE EXTENSION.
P100 TO BE INSTALLED UP TO BUT NOT CONNECTED INTO
INTERCONNECTION BETWEEN PROPOSED NBN CO. NETWORK AND THE EXISTING
SUGGESTED FDH CABINET LOCATION NEAR STATION 10L
THE EXISTING INFRASTRUCTURE AT STATION 16 & 21.
NETWORK TO BE ORGANISED AND CARRIED OUT BY NBN. CO.3.
A 2m P100 CONDUIT STUB & BEND WILL BE INSTALLED FROM THE FDH PIT TO THE PROPOSED FDH CABINET LOCATION CAPPED AT THE FINISHED SURFACE LEVEL.
2.
IN OPEN SPACE ON DIAMOND WY AS SHOWN.
SOURCE DOCUMENTSDRG. No.AUTHOR REV. No. DATE0093 X BASE BERRIGAN STREET - NEW.DWG
----
C & P
----
------
22-07-16
----
INTERNALSTEPD
L W
Steve Harte5
2
P100 P100
P50
COLANE ST
APAR
A ST
BERR
IGAN
ST
KEIDGE
S RD
PURSER RD
DIAMOND WY
SAPPHIRE CR
BERRIG
AN ST
SAPP
HIRE
CR
SAPP
HIRE
CR
DIAMOND WYDIAMO
ND WY
MGAdatumBerriganStLayout.dwgK J PACKER CONSULTING 17-06-16
KEIDGE
S RD
3334
35
36
37
38
39
40
41
PIT-0085
PIT-0098
PIT-0105
PIT-0118
PIT-0128
PIT-0135
PIT-0148
P100
61.9
P100
63.3
P100 38.9
P202 P202
P202
P202
P202
P202
P202
P202
P202
P502
P5021.7
P50
41.3
DIAMOND WY
SAPP
HIRE
CR
3
3
P50
P50
MC
P5017.5
P50
38.7
DRAINAGERESERVE
P50 17.5
PIT-0228
44
P100
18.5
P502
P100
51.8
P202
61
FUTURE
P100
30.1
P100
36.9
26.1
P100
29.5
P10022.2
P100
38.5
Development InformationDevelopment Name: Developer Company:
Authorised Rep:
Development Address:
CRM ID: Stage Number:
Phone:E-Mail:
KEIDGES RD STAGE 2 & 3 CHE CHE HOLDINGS PTY LTD
7001 BERRIGAN ST REDBANK PLAINS
AYCA-34C0FT 2 & 3
BYRON HEMPHILL3271 [email protected]
BILL OF MATERIAL
PITSSIZE2589
QTYDUCTS
SIZE QTY MTRSP100P50P23
TOTAL NUMBER OF PITS:TOTAL NUMBER OF CONDUITS:TOTAL LENGTH OF CONDUITS:
NO OF LOTS:
31261
24 851.213 251.132 78
22691180.3
36
ACCURATE OR COMPLETE.
DRAWING TITLE:
PROJECT No:
SCALE SHEET No. REV.
QUALITY RECORD :
APPROVED
NBNCO APPROVAL RECORD:
DD
AB
WD
REV DATE DESCRIPTION
SIGNATURE DATE
IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS.
USE OF NBNCO LIMITED (ABN 86 136 533 741)THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE
NBNCO DISCLAIMER
NO WARRANTY IS GIVEN THAT THE INFORMATION IS
FOR USE IN MAINTAINING NBNCO FACILITIES.IT HAS NOT BEEN CREATED FOR ANY OTHER USE.
CADREF No:
NN KEY PLAN
OF
FSA:
STATE: REGION:
FSAM:
DRAFTER
FDA:
MAP1
MAP3 MAP4
MAP2
SHEET1
CONTRACTOR LOGO
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
NBN Co. PIT & PIPE INFRASTRUCTURETO PROPOSED SUBDIVISION7001 BERRIGAN STREET STAGES 2 & 3REDBANK PLAINS
QLD
AYCA-3QAOUI
E16-D15914N
1:500 @ A1 3 3 B
- 05-10-16 B.HEMPHILL ORIGINAL ISSUE
A 20-01-17 S.H./B.H. ISSUED FOR CONSTRUCTION
B 18-04-17 P.H./I.T.J. AS CONSTRUCTED
SOURCE DOCUMENTSDRG. No.AUTHOR REV. No. DATE
----
C & P
----
------
----
Steve Harte
COLANE ST
APAR
A ST
BERR
IGAN
ST
KEIDGE
S RD
PURSER RD
DIAMOND WY
SAPPHIRE CR
BERRIG
AN ST
SAPP
HIRE
CR
SAPP
HIRE
CR
DIAMOND WYDIAMO
ND WY
0093 X BASE BERRIGAN STREET - NEW.DWG 22-07-16MGAdatumBerriganStLayout.dwgK J PACKER CONSULTING 17-06-16