diamond mining project, panna(m.p.)
TRANSCRIPT
A VOCATION TRAINING REPORT
ONDIAMOND MINING PROJECT,
PANNA (M.P.)
PRESENTED BY:-ASHISH KU.VISHWAKARMA
CONTENTS• 1. INTRODUCTION• 2. HOW TO REACH MINE• 3. MINE PROFILE• 4. geology• 5. SURVEY • 6. MINE PLAN• 7. unit operation of mines • 8. processing plant • 9. civil work• 10. environmental work• 11. SAFETY FEATURE• 12. accidental case• 13. reference
INTRODUCTION
DIAMOND MINING PROJECT
MAJHGAWAN, PANNA IS A PROJECT OF NATIONAL MINERAL DEVELOPMENT CORPORATION (NMDC)
HOW TO REACH THE MINES
MINE PROFILE• year OF OPENING • NUMBER OF BENCHES• LEASeHOLD AREA• RL OF SURFACE• RL OF BOTTOM• WIDTH OF BENCHES• HEIGHT OF BENCHES• DEPTH OF MINES• INCIDENCE OF DIAMOND• TYPE OF DIAMOND• BLASTING PATTERN• EXPLOSIVE USED• PER BLASTING COAL PRODUCED• TYPE OF MACHINE USED
GEOLOGY• Main intact-• Type of Deposit• Type of material• Overburden• Super group
SURVEY• RL.• BENCHES• DEPTH• INSTRUMENT USED• SHAFT INFORMATION
MINE PLAN• Tailing dump• Stock piles• Scale of mine plan• Mining lease• Other neccesary things
UNIT OPERATION OF MINES• DRILLLING• BLASTING• LOADING• HAULING
DRILLING
•Drill machine.•Depth of drilling.•Burden & spacing.•Diameter of holes.•Time required for one hole.
BLASTING• Types of explosive used.
• Stemming.
• Connection
LOADING• Shovel 1.No of shovel 2.Capacity of shovel 3. Operation• Loader 1.No of loader 2.Capacity of shovel 3.Operation
HAULING• DUMPER 1.No of dumper 2.Capacity of dumper 3. Types of brake
PROCESSING PLANT
CIVIL WORK
ENVIRONMENTAL WORK • Panna tiger reserve• Three test are conducted 1.Ground water monitoring 2.water quality 3.Environmental quality monitoring a.Noise b.Surface water quality c.Ambient air quality
ACCIDENTAL ANALYSISS.N YEAR FATAL SERIOUS REPORTABLE
01. 2011 - - -
02. 2012 - - -
03. 2013 - - -
04. 2014 - - -
05. 2015 - - -
06. 2016 - - -
THANKING YOU