10 Luglio 2008 Consiglio di Sezione Anna Di Ciaccio 1 Diameter 25 m Barrel toroid length 26 m End-cap end-wall chamber span 46 m Overall weight 7000 Tons L’esperimento ATLAS ad LHC LAS superimposed to e 5 floors of building 40 2007-Luglio 2008: Fine Installazione e Commissioning dei rivelatori con i raggi cosmici Settembre-novembre 2008: Prime Collisioni ad LHC, inizio presa dati Huge experiment

Upload: kylie-alvarado

Post on 31-Dec-2015

21 views

Category:

Documents


0 download

DESCRIPTION

L’esperimento ATLAS ad LHC. 2007-Luglio 2008 : Fine Installazione e Commissioning dei rivelatori con i raggi cosmici Settembre-novembre 2008 : Prime Collisioni ad LHC, inizio presa dati. ATLAS superimposed to the 5 floors of building 40. Diameter25 m Barrel toroid length26 m - PowerPoint PPT Presentation

TRANSCRIPT

10 Luglio 2008Consiglio di Sezione

Anna Di Ciaccio 1

Diameter 25 mBarrel toroid length 26 mEnd-cap end-wall chamber span 46 mOverall weight 7000 Tons

L’esperimento ATLAS ad LHC

ATLAS superimposed tothe 5 floors of building 40

2007-Luglio 2008: Fine Installazione e Commissioning dei rivelatori con i raggi cosmici

Settembre-novembre 2008: Prime Collisioni ad LHC, inizio presa dati

2007-Luglio 2008: Fine Installazione e Commissioning dei rivelatori con i raggi cosmici

Settembre-novembre 2008: Prime Collisioni ad LHC, inizio presa dati

Huge experiment

10 Luglio 2008Consiglio di Sezione

Anna Di Ciaccio 2

A Toroidal LHC AppartuS (ATLAS) DETECTOR

EM Calorimeters

/E 10%/E(GeV) 0.7%

Inner Detector: Si Pixel and strips (SCT) &

Transition radiation tracker (TRT)

/pT 5 10-4 pT (GeV) 0.001

Good impact parameter res.

(d0)=15m@20GeV

4 Magnets: solenoid (Inner Detector) 2T, 3 air-core toroids (Muon Spectrometer) ~0.5T

Full coverage for ||<2.5

35

Stand-alone Muon Spectrometer,

/pT 10% at 1 TeV/c

Hadron Calorimeters,

/E 50% / E(GeV) 3%

SEGUONO ALCUNE FOTO .. L’ESPERIMENTO DOPO LA CHIUSURA NON SI POTRA’ PIU VISITARE ...

Consiglio di Sezione Anna Di Ciaccio 3

Consiglio di Sezione Anna Di Ciaccio 4

2007: ATLAS side A (with the calorimeter end-cap fully retracted)

Barrel Toroid+Calorimetry+Inner detector

Forward Calorimetry

Consiglio di Sezione Anna Di Ciaccio 5

June 28 2007:installation of the pixel detector with central beam-pipe

Consiglio di Sezione Anna Di Ciaccio 6

Inner detector: TRT drift tubes+Silicon tracker+Pixel detector

TODAY detector status (central)

7

Endcap Toroid

Endcap Toroid

Endcap CaloEndcap Calo

Barrel CaloBarrel Calo

Small WheelSmall Wheel

Beam PipeBeam Pipe

2008: Center of activities (ATLAS control room) The control room is operational and used during the cosmic ray commissioning runs

Steinar Stapnes 8

Consiglio di Sezione Anna Di Ciaccio 9

2008 :Detector commissioning using cosmic rays

Commissioning:from “just installed” to “ready for physics” using cosmic raysmake the detector running:

from low-level (finding dead/hot channels, mapping mistakes, cabling problems) to high-level (integration of sub-detectors into global ATLAS DAQ)

understand the detector:from alignment and

calibration to debugging offline reconstruction software and simulation

A cosmic ray through the barrel muon system

Steinar Stapnes 10

Purple crosses: RPC trigger hits

Red dots : MDT precision measurement

An other cosmic ray through the barrel muon system

Commissioning with Cosmic Rays :Good quality data from MDT muon precision chambers

12

MDT very good track quality:

- 6 hits per track- Residuals centered at 0- Residuals RMS ~160 m

13

RPC and LVL1 monitoring with cosmicsN° of hits per events Cluster Size distribution per phi and eta panels

Time-Trigger Time w.r.t. strip along sector Trigger Road in Phi view

Anagrafica ATLAS 2007> sostituire con la nuova anagrafica

Consiglio di Sezione Anna Di Ciaccio 14

Roberto Di Nardo dott 100Andrea Di Simone AssRic 100

9.007.1

Consiglio di Sezione Anna Di Ciaccio 15

Richieste ATLAS ... Dal DB dei preventivi

Consiglio di Sezione Anna Di Ciaccio 16

Attivita’ Gruppo Roma2 nel 2009

Nel 2009 il gruppo di Roma2 sara' impegnato nelle seguenti attivita' Completamente Commissioning degli RPC in caverna durante lo

shutdown gennaio- marzo 2009 Analisi dei primi dati raccolti in settembre – novembre 2008

Fisica Standard Model (misura sezione d’urto W,Z) 1 tesi di laurea specialistica

Ricerca del bosone di Higgs4 leptoni -> 1 tesi di dottorato

Goal di fisica di ATLAS per il 2009 Migliore comprenzione della calibrazione dei rivelatori attraverso

misure di processi di Standard Model noti Zll,W->lv,ttbar, jets etc

Ricerca di nuova fisica

Consiglio di Sezione Anna Di Ciaccio 17

Farm INFN-GRID ROMA Tor Vergata

L`architettura della Farm è quella di un cluster di macchine eterogenee:

1 Computing Node: Dual Xeon 2.4Ghz, 512Mb Ram, 36Gb Linux Raid 1 SCSI 1 Storage Node: Dual Xeon 2.4 Ghz, 512Mb Ram, 36Gb Linux Raid 1 SCSI 1 Worker Node: Dual Xeon 2.4 Ghz, 512Mb Ram, 100Gb Linux Raid 0 SCSI 5 Worker Nodes: Dual Xeon 2.4 Ghz, 1000Mb Ram, 110Gb SCSI 5 Worker Nodes: Dual Xeon 3.2 Ghz, 4000Mb Ram, 180Gb SATA 1 Worker Node: Dual Xeon 3.0 Ghz, 2000Mb Ram, 140Gb SATA 1 Worker Node: Opteron 2.4 Ghz, 3000Mb Ram, 160Gb SATA 1 Worker Node: WoodCrest 2.0 Ghz, 4000Mb Ram, 150Gb SATA 1 Network Attached Storage Opteron: 1,9TB Raid5 with Spare 2 Gigabit switch, ZyXEL, 16 ports + 1 Gigabit switch, D-Link, 8 ports, No

Rack Mount ( tot:40 ports Gigabit ). 3 KVM switch 8 ports: ( tot: 24 ports ) D-Link. 5 UPS APC Smart-UPS 750 Rack Mount for Power Supply Protection.

Totale di “core” ( 1 Node ~ 4 core ) per calcolo = 54 Totale della capacità disco sicuro =1.9 TB.

Nel 2009 si chiedono altri 2 biprocessori (rinnovo vecchio hardware) e 1TB di spazio disco

Consiglio di Sezione Anna Di Ciaccio 18

INFN-Roma2-GRID dal DB dei preventivi