dg & eb check list

Upload: ramesh-mariyappa

Post on 06-Apr-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 DG & EB Check List

    1/43

    Present

    KWH

    Previous

    KWHDiff

    Consumpti

    on in

    KWH/Day

    KVAH

    1

    2

    3

    45

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    MD : 713KVA

    MC: 1000

    CT ratio : 50/5 A

    SIGNDATE MD KVA Remarks

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    CD: 950 KVA

    PF% of

    Demand

    load

    Month : KWH READING OF HT

    Consumption

    RR no : E4HT-348

  • 8/3/2019 DG & EB Check List

    2/43

    DateDiesel in

    tank

    Clean

    Water

    Se arator

    Coolant

    level

    Battery

    Charger

    Engine

    oil level

    Check

    Cracks&

    LooseCon.

    Engine

    sound &

    vibration

    Cummulative

    Hours

    Check for

    Leaks

    Done By

    NameSign

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    1112

    13

    14

    15

    16

    17

    18

    19

    20

    21

    2223

    24

    25

    26

    27

    28

    29

    3031

    Daily PM Check List

    SHAILENDRA TECHNO PARKDG:2

    SUPERVISOR MANAGER

    MONTH:

  • 8/3/2019 DG & EB Check List

    3/43

    DateDiesel in

    tank

    Clean

    Water

    Se arator

    Coolant

    level

    Battery

    Charger

    Engine

    oil level

    Check

    Cracks&

    LooseCon.

    Engine

    sound &

    vibration

    Cummulative

    Hours

    Check for

    Leaks

    Done By

    NameSign

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    1112

    13

    14

    15

    16

    17

    18

    19

    20

    21

    2223

    24

    25

    26

    27

    28

    29

    3031

    SUPERVISOR MANAGER

    SHAILENDRA TECHNO PARKDG:3

    Daily PM Check ListMONTH:

  • 8/3/2019 DG & EB Check List

    4/43

    DG:2 MONTH:

    Clean DG

    Set

    Drain

    Water

    Separator

    Clean

    Air

    Filters

    Check

    Air

    Cleaner

    Check

    Coolant

    Check

    Engine

    oil

    Check

    Belts

    Check

    Loose

    Wires

    Check

    Cracks

    Check

    for

    Leaks

    Engine

    sound &

    vibration

    Battery

    Charger

    Cummula

    tive

    Hours

    Cell No. 1 2 3 4 5 6 7 8 9 10 11 12

    Specipic

    GravityVoltage

    Battery-1 Battery-2

    Engine

    start time

    Clean DG

    Set

    Total hrs

    run

    coolant

    temperat

    ure

    Acuator

    PWM

    percenta

    ge

    Oil

    pressure

    Engine

    speed

    Battery

    voltage

    Power in

    KW

    Power in

    KVA

    Frequenc

    yVoltage Current

    Supervisor

    Rating: 500KVA

    Sign Manager

    Procured Material Any Remarks & Action Taken

    SHAILENDRA TECHNO PARK

    Weekly PM Check List

    PM Dony by Name:

    BATTERY

    Reading

    Total Voltage

  • 8/3/2019 DG & EB Check List

    5/43

    DG:3 MONTH:

    Clean DG

    Set

    Drain

    Water

    Separator

    Clean

    Air

    Filters

    Check

    Air

    Cleaner

    Check

    Coolant

    Check

    Engine

    oil

    Check

    Belts

    Check

    Loose

    Wires

    Check

    Cracks

    Check

    for

    Leaks

    Engine

    sound &

    vibration

    Battery

    Charger

    Cummula

    tive

    Hours

    Cell No. 1 2 3 4 5 6 7 8 9 10 11 12

    Specipic

    GravityVoltage

    Battery-1 Battery-2

    Engine

    start time

    Clean DG

    Set

    Total hrs

    run

    coolant

    temperat

    ure

    Acuator

    PWM

    percenta

    ge

    Oil

    pressure

    Engine

    speed

    Battery

    voltage

    Power in

    KW

    Power in

    KVA

    Frequenc

    yVoltage Current

    Supervisor

    Reading

    Procured Material Any Remarks & Action Taken

    SHAILENDRA TECHNO PARK

    PM Dony by Name:

    Sign

    Rating: 500KVA

    Weekly PM Check List

    BATTERY

    Total Voltage

    Manager

  • 8/3/2019 DG & EB Check List

    6/43

    Month :

    R Y B R Y B

    KVA : 500

    SUPERVISOR Manager

    CLIENT : SHAILENDRA TECHNO PARK-BANGALOREDG READING at Runing

    Make: Powerica cummins

    DG No :

    SignDate

    Engine

    start

    time

    Engine

    stop time

    Sl.

    No.

    Total hrs

    run

    coolant

    temperat

    ure

    Acuator

    PWM %Remarks

    Frequen

    cy

    Oil

    pressure

    Engine

    speed

    Voltage CurrentPower in

    KWPF

  • 8/3/2019 DG & EB Check List

    7/43

    3200A

    R-Y Y-B B-R R Y B

    0:002:004:006:008:00

    10:0012:0014:00

    16:0018:0020:0022:000:002:004:006:008:00

    10:0012:00

    14:0016:0018:0020:0022:000:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

  • 8/3/2019 DG & EB Check List

    8/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:0016:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    9/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:0016:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    10/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:0016:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    11/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:0016:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    12/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    13/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    14/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    15/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    16/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:0014:00

    16:00

    18:00

    20:00

    22:00

    0:00

    2:00

    4:00

    6:00

    8:00

    10:0012:00

    14:00

    16:00

    18:00

    20:00

    22:00

  • 8/3/2019 DG & EB Check List

    17/43

    3200A

    R-Y Y-B B-R R Y B

    Capacity :

    TAP% of loadF HzPFTIMEDATE

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Month : LT READING-LOG SHEET

    KWH/dayEnergy

    Reading in

    KWH

    Power

    (KW)

    Voltage Current AmpsSignRemarks

    0:00

    2:00

    4:00

    6:00

    8:00

    10:00

    12:00

    14:00

    16:00

    18:00

    20:00

    22:00

    Final KWH :

    SUPERVISOR MANAGER

    KWH / month :

    Total Energy consumption in the month :

    Intial KWH : Intial KVAH :

    KVAH/month :

    Final KVAH :

    AVG PF :

  • 8/3/2019 DG & EB Check List

    18/43

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    KWH READING of MAIN PANEL

    13

    12

    11

    10

    9

    8

    6

    7

    5

    4

    3

    2

    1

    DATE TIME

    MLRP UPS INPUT

    MC : 1 MC : 1000

    Month :

  • 8/3/2019 DG & EB Check List

    19/43

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    KWH READING of MAIN PANEL

    AC1 AC2

    MC:1000

    Month :

    13

    11

    12

    2

    4

    5

    6

    7

    10

    9

    8

    3

    MC : 1

    1

    TIMEDATE

  • 8/3/2019 DG & EB Check List

    20/43

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    KWH KWH/day KWH KWH/day KWH KWH/day

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    12

    13

    3

    4

    5

    7

    11

    9

    10

    6

    Month :

    DATE TIME

    DG2ACCP Total EB+DG,KWH/day

    2

    KWH READING of MAIN PANEL

    MC :1000MC :120

    8

    1

    Total EB, KWH/day Total DG, KWH/day

    MC :1000

    EB

  • 8/3/2019 DG & EB Check List

    21/43

    Month :Year :

    1

    2

    3

    4

    5

    6

    ACCP(120)

    AC2(1000)

    AC3(1000)

    CA(1000)

    AC1(1000)

    7

    Sl.No

    Sub Panel Monthly Reading

    Intial EB,KWH Final EB,KWH Final DG,KWH

    Total

    MLRP(1000)

    UPS I/P(1000)

    DG KWH/ MONTH

    DG3(1000)

    Main DG Panel

    DG2(1000)

    Intial DG,KWH

    Supervisor Manager

    1

    2

    Final DG,KWH

    Total EB KWH/ Month

    Total

    Sub LT panel

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    Sl.No Intial DG,KWHEB KWH/ MONTH DG KWH/ MONTH

    Total DG KWH/ Month

    1 EB

  • 8/3/2019 DG & EB Check List

    22/43

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    KWH READING of MAIN PANEL

    28

    26

    27

    25

    24

    23

    MC : 1

    Month :

    17

    22

    18

    19

    20

    21

    DATE TIME

    MLRP UPS INPUT

    16

    MC : 1000

  • 8/3/2019 DG & EB Check List

    23/43

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    KWH READING of MAIN PANEL

    MC:1000MC : 1

    28

    27

    26

    25

    22

    20

    21

    19

    17

    18

    24

    23

    Month :

    DATE

    AC2AC1

    TIME

    16

  • 8/3/2019 DG & EB Check List

    24/43

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    KWH KWH/day KWH KWH/day KWH KWH/day

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    0:00

    8:00

    16:000:00

    8:00

    16:00

    0:00

    8:00

    16:00

    MC :1000

    DG2

    25

    Month :

    16

    21

    22

    23

    24

    DATE TIME

    MC :120

    ACCP

    19

    20

    26

    27

    17

    18

    28

    Total DG, KWH/day

    KWH READING of MAIN PANEL

    Total EB+DG,

    KWH/dayTotal EB, KWH/day

    MC :1000

    EB

  • 8/3/2019 DG & EB Check List

    25/43

  • 8/3/2019 DG & EB Check List

    26/43

    SHAILENDRA TECHNO PARK-BANGALORE

    Date Diesel(ltr) Rate(Rs.) Amount(Rs.) particular ltr Description ltr

    1500 46.08 69120 DG2 418.2 purchase 1500

    DG3 481.7 remained 899.9

    Total 1500 69120 899.9 Total diesel 2399.9

    Description ltr Hour KWH Description ltr Description Unit Rate(Rs.) Amount(Rs.)

    DG2 821.53 12.7 2777.9 Total Diesel 2399.9 KWH 5045.1 14 70631.4

    DG3 683.53 14.6 2267.2 Consumed 1505.1 Litres 1505.06 46.08 70553.1648

    Total 1505.06 27.3 5045.1 Remaining 894.84 Profit 78.2352

    Diesel Consumption, Purchase & Remaining

    Month : Oct 2011

    Diesel purchase Total dieseltotal amount with

    transportation(Rs.)

    69520

    69520

    Diesel consumption Remain diesel Profit

    Average per month

    Description unit

    Avg ltrs / hr 55.1

    Avg KWH / ltr 3.4

    Supervisor Manager

  • 8/3/2019 DG & EB Check List

    27/43

    SHAILENDRA TECHNO PARK-BANGALORE

    SL.No Present Previous DiffConsumption

    (KWH)

    12

    3

    4 Daily

    SL.No Present Previous Diff Consumption(KWH)

    1

    2

    3 Daily

    4

    Daily monthly Daily ltrConsumed Monthly ltrconsumed Remain(ltr)

    5

    Total Energy of thismonth(KWH)

    Remarks

    Diesel Consumption & hrs run

    MLRP(1)

    UPS(1000)

    Avg

    Ltr/Hr

    Description Monthly

    Diesel Generator(DG) Energy & Diesel Consumption

    Description

    DG3

    DG2(1000)

    DG3(1000)

    AC1(1)

    Total submeter(sm) reading

    Total

    Barrel

    Description

    KPIT Energy Consumption(=Total SM-CA)

    Shailendra Techno Park Engy consumtion(CA)

    Diesel Reading

    DG2

    CA(1)

    Total

    AC2(1000)

    AC3(1000)

    SubMeter Reading

    SubMeter Reading

    Monthly

    Daily ReportDate :

    Description

    HT Reading(1000)

    BESCOM Energy Consumption

    Total Energy of this

    month(KWH)

    CA(1000)

    Remarks

    Total submeter(sm) readingACCP(120)

    KPIT Energy Consumption(=Total SM-(CA-ACCP))

    Loss from HT to Sum of SubMeter(=HT-SM)

    Description

    Total loss(=Total SM loss+ACCP)

    Monthly

    Avg

    Kwh/ltr

    Daily Avg

    Kwh/ltr

    Total Hrs

    LT Reading(1)

    MLRP(1000)

    UPS(1000)

    AC1(1000)

    AC2(1000)

    AC3(1000)

    Shailendra techno park Engy consumtion(CA)

    T A Day Caf water, EB & DG consumption details

    Total Energy of this

    EB INCOMER EB INCOMER

    8R x 3 5C x 400Sq mm 8R x 3 5C x 400Sq mm

  • 8/3/2019 DG & EB Check List

    28/43

    DG2 INCOMER DG2 INCOMER3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm

    AYFY Cable AYFY Cable

    DG3 INCOMER DG3 INCOMER

    AYFY Cable AYFY Cable

    3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm

    AYFY Cable AYFY Cable

    DG2 INCOMER DG2 INCOMER

    AYFY Cable AYFY Cable

    DG1 INCOMER DG1 INCOMER

    3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm

    DG2 INCOMER DG2 INCOMER

    3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm

    AYFY Cable AYFY Cable

    3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm

    DG1 INCOMER DG1 INCOMER

    3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm

    DG1 INCOMER DG1 INCOMER

    8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mm

    AYFY Cable AYFY Cable

    EB INCOMER EB INCOMER

    8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mmAYFY Cable AYFY Cable

    8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mm

    AYFY Cable AYFY Cable

    EB INCOMER EB INCOMER

    AYFY Cable AYFY Cable

    AYFY Cable AYFY Cable

    8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mm

    EB INCOMER EB INCOMER

    AYFY Cable AYFY Cable

    2R x 3.5C x 185 Sq.mm 2R x 3.5C x 185 Sq.mm

  • 8/3/2019 DG & EB Check List

    29/43

    AYFY Cable AYFY Cable

    2R x 3.5C x 185 Sq.mm 2R x 3.5C x 185 Sq.mm

    AYFY Cable AYFY Cable

    TO UPS TO UPS

    TO UPS TO UPS3R x 3.5C x 400Sq.mm 3R x 3.5C x 400Sq.mm

    TO AHU PCC1 TO AHU PCC1

    TO UPS TO UPS

    3R x 3.5C x 400Sq.mm 3R x 3.5C x 400Sq.mm

    AYFY Cable AYFY Cable

    AYFY Cable AYFY Cable

    TO MLRP TO MLRP

    3R x 3.5C x 400Sq.mm 3R x 3.5C x 400Sq.mm

    AYFY Cable AYFY Cable

    2R x 3.5C x 185 Sq.mm 2R x 3.5C x 185 Sq.mm

    AYFY Cable AYFY Cable

  • 8/3/2019 DG & EB Check List

    30/43

    AYFY Cable AYFY Cable

    TO APFC TO APFC

    AYFY Cable AYFY Cable

    TO APFC TO APFC

    4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm

    1R x 3.5C x 185 Sq.mm 1R x 3.5C x 185 Sq.mm

    AYFY Cable AYFY Cable

    TO COMMON AREA TO COMMON AREA

    4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm

    TO AHU PCC3 TO AHU PCC3

    AYFY Cable AYFY Cable

    TO AHU PCC3 TO AHU PCC3

    2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm

    AYFY Cable AYFY CableTO COMMON AREA TO COMMON AREA

    2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm

    AYFY Cable AYFY Cable

    1R x 3.5C x 185 Sq.mm 1R x 3.5C x 185 Sq.mm

    2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm

    AYFY Cable AYFY Cable

    TO AHU PCC2 TO AHU PCC2

    TO AHU PCC1 TO AHU PCC1

    2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm

    AYFY Cable AYFY Cable

    TO AHU PCC2 TO AHU PCC2

    Cab e Cab e

    4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm

    AYFY Cable AYFY Cable

  • 8/3/2019 DG & EB Check List

    31/43

    2R x 40mm x 6mm 2R x 40mm x 6mm

    NEUTRAL CU STRIP NEUTRAL CU STRIP

    2R x 40mm x 6mm 2R x 40mm x 6mm

    DG1 DG2

    CU UNARM CABLE CU UNARM CABLE

    24C x 1.5 Sqmm 24C x 1.5 Sqmm

    & 2C x 2 Sqmm & 2C x 2 Sqmm

    DG1 DG2

    DG2 CONTROL & DG2 CONTROL &

    CU UNARM CABLE CU UNARM CABLE

    24C x 1.5 Sqmm 24C x 1.5 Sqmm

    BATTERY CHARGE BATTERY CHARGE

    DG3 CONTROL & DG3 CONTROL &BATTERY CHARGE BATTERY CHARGE

    DG1 CONTROL & DG1 CONTROL &

    BATTERY CHARGE BATTERY CHARGE

    & 2C x 2 Sqmm & 2C x 2 Sqmm

    24C x 1.5 Sqmm 24C x 1.5 Sqmm

    & 2C x 2 Sqmm & 2C x 2 Sqmm

    CU UNARM CABLE CU UNARM CABLE

    BATTERY CHARGE BATTERY CHARGE

    CU UNARM CABLE CU UNARM CABLE

    24C x 1.5 Sqmm 24C x 1.5 Sqmm

    & 2C x 2 Sqmm & 2C x 2 Sqmm

    TO APFC TO APFC

    4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm

    TO APFC TO APFCDG1 CONTROL & DG1 CONTROL &

    AYFY Cable AYFY Cable

  • 8/3/2019 DG & EB Check List

    32/43

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    Remarks :

    HT outgoing & LT Kiosk Panel door should be

    closed

    Oil and Winding Temperature

    HT outgoing panel spring should be in charge

    mode

    Transformer yard no vegetation grown

    Bucholz Relay Status

    Surge arrestor relay status

    SHAILENDRA TECHNO PARKMonth ;

    Control knob should be in remote state

    Transformer Daily PM Check List

    Counter reading of OLTC

    Sound of Transformer

    Descriptions

    Technician sign

    Manager sign

    Sl.no. Date

    Oil level in conservator tank (Main and OLTC)

    Oil leakages if any arrest immediately

    Supervisor sign

    Checking the color of silica gel(in breather)

  • 8/3/2019 DG & EB Check List

    33/43

    1 TF NE1 Transformer yard Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve2 TF NE2 Transformer yard Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve

    3 TF BE1 Outside transformer yard Body Earthing GI Pipe 50x6mm GI strip4 TF BE2 Outside transformer ard Bod Earthin GI Pi e 25x6mm GI stri5 LBS BE1 Outside transformer yard Body Earthing GI Pipe 25x6mm GI strip6 DGLA Transformer yard Lighting Arrestor GI Pipe 25x6mm GI strip7 LTP BE1 Transformer yard Body Earthing GI Pipe 25x6mm GI strip8 RMU BE1 RMU yard Body Earthing GI Pipe 25x6mm GI strip9 RMU BE2 RMU yard Body Earthing GI Pipe 25x6mm GI strip10 MC BE RMU yard Body Earthing GI Pipe 25x6mm GI strip11 BLA1 Left back side of building Lighting Arrestor GI Pipe 50x6mm GI strip12 BLA2 Left back side of building Lighting Arrestor GI Pipe 50x6mm GI strip13 DG2 NE1 Basement entrance Neutral Earthin Co er Plate 40x6mm Cu stri with sleeve

    14 DG2 NE2 Basement entrance Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve15 DG3 NE1 Basement entrance Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve16 DG3 NE2 Basement entrance Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve17 DG2 BE1 DG yard Body Earthing GI Pipe 25x6mm GI strip18 DG2 BE2 DG yard Body Earthing GI Pipe 25x6mm GI strip19 DG3 BE1 DG yard Body Earthing GI Pipe 25x6mm GI strip20 DG3 BE2 DG yard Body Earthing GI Pipe 25x6mm GI strip21 PB1 Left back side of building Body Earthing GI Pipe 50x6mm GI strip22 PB2 Left back side of building Body Earthing GI Pipe 50x6mm GI strip23 PB3 Left back side of building Body Earthing GI Pipe 50x6mm GI strip24 PB4 Left back side of building Body Earthing GI Pipe 50x6mm GI strip25 PB5 Left back side of building Body Earthing GI Pipe 25x6mm GI strip26 PB6 Left back side of building Body Earthing GI Pipe 25x6mm GI strip27 UN1 Left Frontside of building Neutral Earthing Copper Plate 50x6mm Cu strip with sleeve28 UN2 Left Frontside of building Neutral Earthing Copper Plate 50x6mm Cu strip with sleeve29 UN3 Left Frontside of building Neutral Earthing Copper Plate 50x6mm Cu strip with sleeve30 UN4 Right Frontside of building Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve31 UN5 Right Frontside of building Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve

    32 UPB1 Left Frontside of building Body Earthing Copper Plate 25x6mm Cu strip with sleeve

    33 UPB2 Left Frontside of building Body Earthing Copper Plate 25x6mm Cu strip with sleeve

    34 UPB3 Left Frontside of building Body Earthing Copper Plate 25x3mm Cu strip with sleeve

    35 SRE1 Right Frontside of buildingServer racks

    earthingCopper Plate 1Cx25sqmm cu cable

    36 SE1 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable37 SE2 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable38 LBE1 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip39 LBE2 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip40 LBE3 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip Lift 3 Panels, car, etc., Body earthing

    Isolator Transformer 2 (Sub UPS O/P Panel 2)Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub &

    UPS SocketUsed for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub &

    UPS SocketUsed for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub &

    UPS Socket

    Lift 1 Panels, car, etc., Body earthingLift 2 Panels, car, etc., Body earthing

    Used for hub room dedicate earthing, lab tables, etc.,

    Isolator Transformer 1 (Sub UPS O/P Panel 1)

    Isolator Transformer 2 (Sub UPS O/P Panel 2)

    Used for racks, etc.,

    Used for hub room dedicate earthing, lab tables, etc.,

    AHU panel-1,2,3 & ODU Body earthingAHU panel-1,2,3 & ODU Body earthing

    LTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthingLTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthing

    Isolator Transformer 3 (Sub UPS O/P Panel 3)Isolator Transformer 2A & B (Sub UPS O/P Panel 2A & B)

    DG2 Neutral Earthing connected to main DG2 panelDG3 Neutral Earthing connected to main DG3 panelDG3 Neutral Earthing connected to main DG3 panel

    DG2 Body EarthingDG2 Body EarthingDG3 Body EarthingDG3 Body Earthing

    Used for basement main panel Body earthingUsed for basement UPS I/P & APFC panel Body earthing

    Note : UPS Neutral earthing connected to Isolator Transformer to Sub UPS O/P panel 1R x 1C Cables as per SLD

    Type of Conductor & SizeEarth Pit

    No.Location

    Transformer Neutral

    RMU Panel body EarthingMeter Cubical Panel body Earthing

    Building Lighting ArrestorBuilding Lighting Arrestor

    DG2 Neutral Earthing connected to main DG2 panel

    SHAILENDRA TECHNO PARK-BANGALORE

    PurposeType of

    ElectrodeRemarks

    Earthing Details

    Transformer Body EarthingTransformer Body Earthing

    Sl.No.

    Transformer Neutral

    Old LT & STP panel Body EarthingRMU Panel body Earthing

    LBS Body EarthingDG Exhaust Pipe Lighting Arrestor

    SHAILENDRA TECHNO PARK-BANGALORE DEC-2010

  • 8/3/2019 DG & EB Check List

    34/43

    Sl No. Present Previous DiffConsumption

    (KWH)Rate Amount

    1 6

    2 6

    3

    a) 6

    b) 6

    c) 6

    d) 6

    e) 6

    f) 6

    g) 66

    6

    6

    6

    6

    PF

    KVAH

    MD

    PF

    KVAH

    MD

    PF

    KVAH

    MD

    Sl No. Present Previous DiffConsumption

    (KWH)Rate Amount

    1

    14

    14

    2

    14DG2

    DG2

    TOTAL Units

    DG3

    6

    5.6

    loss

    NEW METER

    DG Reading & Charges

    Description Remarks

    Loss

    OLD METER

    CA Energy ChargesDescription

    Units rate Amount

    6

    5%

    5%

    Energy Charges

    Total Amount

    Energy Charges

    Total Amount

    Units

    5.6

    Tax

    rate

    Demand charges 200

    Tax

    Amount

    5%

    6

    Total Amount

    Demand charges

    KPIT Energy Charges

    Description

    200

    Description Units

    Tax

    200

    Common Area(CA)

    rate

    HT Energy Charges

    Demand charges

    Energy Charges

    Amount

    UPS(1000)

    Losses B/W HT to submeter(HT-SM)

    Total Loss (SM+ACCP)

    KPIT Energy

    AC2(1000)

    AC1(1000)

    Remarks

    PF : MD KVA:

    ACCP(120)Total submeter(sm) reading

    SubMeter Reading

    AC3(1000)

    CA(1000)

    LT Reading(1)

    MLRP(1000)

    Monthly ReportDate :

    BESCOM Energy Consumption

    HT Reading(1000)

    Description

    SHAILENDRA TECHNO PARKMonth ;

    Lift NoLift Daily PM Check List

  • 8/3/2019 DG & EB Check List

    35/43

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    1st

    shift

    2nd

    shift

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    7 8 9 104

    Supervisor sign

    Manager sign

    5 6

    Opening & Closing Button

    Status

    All Number buttons Status

    Remarks :

    Switch Status inside car

    Fireman switch

    Lift room tempurature

    Supply Voltage

    Technician sign

    Lift room & car cabin is free

    from dust

    Switches should in be Auto

    status

    Oil level & grease in runing &mechnical parts

    Car Lights Status

    Lift Speed, Door close & open

    speed

    Any abnormal noise during run

    & landing

    Sl.no.Date

    Descriptions

    Car should be match with

    Floor Level during landing

    Car door sensor working

    conditionDisplay Status in all Floor &

    also Inside Car

    Lift No.

    2 31

    SHAILENDRA TECHNO PARKMonth ;

    Lift NoLift Daily PM Check List

  • 8/3/2019 DG & EB Check List

    36/43

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    Supervisor sign

    Manager sign

    Opening & Closing Button

    Status

    All Number buttons Status

    Remarks :

    Switch Status inside car

    Fireman switch

    Lift room tempurature

    Supply Voltage

    Technician sign

    Lift room & car cabin is free

    from dust

    Switches should in be Auto

    status

    Oil level & grease in runing &mechnical parts

    Car Lights Status

    Lift Speed, Door close & open

    speed

    Any abnormal noise during run

    & landing

    Sl.no.Date

    Descriptions

    Car should be match with

    Floor Level during landing

    Car door sensor working

    conditionDisplay Status in all Floor &

    also Inside Car

    Lift No.

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    12 201914 1511 16 17 1813

    SHAILENDRA TECHNO PARKMonth ;

    Lift No.

  • 8/3/2019 DG & EB Check List

    37/43

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    Supervisor sign

    Manager sign

    Opening & Closing Button

    Status

    All Number buttons Status

    Remarks :

    Switch Status inside car

    Fireman switch

    Lift room tempurature

    Supply Voltage

    Technician sign

    Lift room & car cabin is free

    from dust

    Switches should in be Auto

    status

    Oil level & grease in runing &

    mechnical parts

    Car Lights Status

    Lift Speed, Door close & open

    speed

    Any abnormal noise during run

    & landing

    Sl.no.Date

    Descriptions

    Car should be match with

    Floor Level during landing

    Car door sensor working

    conditionDisplay Status in all Floor &

    also Inside Car

    Lift No.

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shift

    2nd

    shift

    1st

    shif

    21 27 28 29 3022 23 24 25 26

    Shailendra Techno Park, BangaloreDaily works list

  • 8/3/2019 DG & EB Check List

    38/43

    1

    12:00 AM

    2 1:00 AM

    3 2:00 AM

    4 3:00 AM5 4:00 AM

    6 5:00 AM

    76:00 AM

    8 7:00 AM

    9 7:30 AM

    10 8:00 AM

    11 9:00 AM

    12 10:00 AM13 11:00 AM

    14 12:00 PM

    15 1:00 PM

    16 1:30 PM17 2:00 PM

    18 3:00 PM

    19 4:00 PM

    20 5:00 PM

    216:00 PM

    22 6:00 PM

    23 7:00 PM

    248:00 PM

    25 8:30 PM

    26 9:00 PM

    27 10:00 PM28 11:00 PM

    Sl No. TimeHT Reading, KWH Reading of Submeter(MLRP, UPS, CA,

    AC1, AC2, AC3 & ACCP; DG Reading(Hrs, Ltrs, KWH); EB

    Reading

    Per Day Consumption Calculation & Daily Report Making.

    Descriptions Remarks

    EB Reading; Switch of all the Lights( stairs, lobby, basement,

    street light).

    Shift handing over

    EB, Submeter & DG KWH Reading, A-Check oF DG'S.

    PM Check of HT yards & Transformer, LT Panels.

    EB Reading & Going for rounds

    Going for rounds

    EB Reading & Going for rounds

    EB Reading & Going for rounds

    Going for Rounds

    Switch ON The street lights, Checking for ligths

    EB, Submeter & DG KWH Reading & Follow UP Works

    EB Reading, Going for Rounds

    Lift room, Lift Car & Terrace AC M/C Check & Follow Up Work

    EB KWH Readings, PM Check of Lifts.

    PM check of STP Plant, Pumps & Motors

    Checking of STP Plants, Pumps & motors & Follow Up works

    EB Reading & Going for rounds; Switch ON all Lights( Stair,

    lobby, Basement lights)

    Shift handing over

    EB Readings, Going for rounds & Follow Up Works.

    Going for rounds & Follow Up Works.

    NOTE : Going for Rounds : checking of Main Panel, RTCC Panel, CA Panel, HT yards, Lifts, Lights,

    etc.,

    EB Reading & Switch OFF the some of lights (Stair, lobby,

    Basement & Street light)

    Going for rounds, Switch OFF the any One Lift & follow Upworks

    EB Readings, Going for rounds & Follow Up Works.

    Follow Up Works

    Shift handing over

    Checking all the lights, Switch ON the Lifts, Going For rounds.

  • 8/3/2019 DG & EB Check List

    39/43

    SL.NO CLEANING 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    1 Clean the Engine fule & Air houses

    2 Clean the Alternator

    3 Clean and Verify cable terminal box (Externaly)

    4 Clean the Air & Fule Filters (Externaly)

    5 Clean the Redator & Cooland pipe Lines

    6 Cleanthe Batteries & Cables

    1 Check the Battery Voltage

    2 Check the specific gravity of Batteries

    3 Check the Battery Electroyte level

    4 Check all house pipes for any leakages & arrest it immedately

    5 Check the Condition of air inlet restriction indicatior

    6 Check oil Engine Lubrication oil level

    7 Check the Abnormal noise & vibraction while taking trial Run

    8 Check the Engine starter motor cable terminals for any looseness

    9 Check the Engine control panels & display working condition

    10 Ensure selector switch poisition in control panel is in auto mode

    11 Check the condition of rediator fan belt and its tension

    12 Drain water from fuel water seperator through drain valve

    13 Check the radiator water level

    14 Check the Diesel level in the Daily fuel tank

    Done By Technician

    SHAILENDRA TECHNO'A' CHECK FOR DG SET

    Make: KVA :

    INSPECTION

  • 8/3/2019 DG & EB Check List

    40/43

    Month :

    Closing(mm)

    Opening(mm)

    DIFF Consumption(Litres)

    Closing(hr)

    Opening(hr)

    DIFF Run/Day (hr) Closing(kwh)

    Opening(kwh)

    DIFF units/Day(kwh)

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    2021

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    ManagerSUPERVISOR

    Sign

    Total Diesel consumption in the month :

    Total units/monthDG

    Sum of Ltrs/month Sum of hrs/month Sum of units/month

    Average

    dieselltrs/hr/day

    Total ltrs / Month

    Total hrs/ month

    Avg lts/hr/month

    Avg kwh/ltr/month

    MC :1000

    KWH Reading

    DG NO ;

    MC :1

    Hours Reading

    TIME : 12:00 AMDIESEL, HOUR & UNITS READING of DG LOG BOOK

    Description

    CLIENT : SHAILENDRA TECHNO PARK-BANGALORE

    MC : 31.1

    Average units

    kwh/ltr/dayDate

    Diesel Reading

  • 8/3/2019 DG & EB Check List

    41/43

    Date :

    1 TF NE1Transformer Neutral

    Earthing

    Copper

    Plate

    2 TF NE2Transformer Neutral

    Earthing

    Copper

    Plate

    3 TF BE1

    Transformer Body

    Earthing GI Pipe

    4 TF BE2Transformer Body

    EarthingGI Pipe

    5 LBS BE1 LBS Body Earthing GI Pipe

    6 DGLA Lighting Arrestor GI Pipe

    7 LTP BE1 Body Earthing GI Pipe

    8 RMU BE1 RMU Body Earthing GI Pipe

    9 RMU BE2 RMU Body Earthing GI Pipe

    10 MC BEMeter cubicle Body

    EarthingGI Pipe

    11 BLA1 Lighting Arrestor GI Pipe

    12 BLA2 Lighting Arrestor GI Pipe

    13 DG2 NE1 DG2 Neutral EarthingCopper

    Plate

    14 DG2 NE2 DG2 Neutral EarthingCopper

    Plate

    15 DG3 NE1 DG3 Neutral EarthingCopper

    Plate

    16 DG3 NE2 DG3 Neutral EarthingCopper

    Plate

    17 DG2 BE1 DG2 Body Earthing GI Pipe

    18 DG2 BE2 DG2 Body Earthing GI Pipe

    19 DG3 BE1 DG3 Body Earthing GI Pipe

    Sl.No. Earthing LocationEarthing

    pit No.

    Client : Shailendra Techno Park Pvt Ltd Srikanth & Ramesh Enterprises

    Earth Test Report

    Tested By :

    Basement entrance

    Basement entrance

    Basement entrance

    DG yard

    DG yard

    DG yard

    RMU yard

    RMU yard

    RMU yard

    Left back side of

    building

    Left back side ofbuilding

    Basement entrance

    Outside transformer

    yard

    Transformer yard

    Transformer yard

    Transformer yard

    Outside transformer

    yard

    Outside transformer

    yard

    Transformer yard

    Value in

    ohmEarthing prupose

    Type of

    electrodeRemarks

  • 8/3/2019 DG & EB Check List

    42/43

    Date :

    Sl.No. Earthing LocationEarthing

    pit No.

    Client : Shailendra Techno Park Pvt Ltd Srikanth & Ramesh Enterprises

    Earth Test Report

    Tested By :

    Value in

    ohmEarthing prupose

    Type of

    electrodeRemarks

    22 PB2Basement Panel Body

    EarthingGI Pipe

    23 PB3Floor Panel Body

    EarthingGI Pipe

    24 PB4

    Floor Panel Body

    Earthing GI Pipe

    25 PB5Floor Panel Body

    EarthingGI Pipe

    26 PB6Floor Panel Body

    EarthingGI Pipe

    27 UN1UPS o/p Panel1

    Neutral Earthing

    Copper

    Plate

    28 UN2UPS o/p Panel2

    Neutral Earthing

    Copper

    Plate

    29 UN3UPS o/p Panel3

    Neutral Earthing

    Copper

    Plate

    30 UN4UPS o/p Panel2&3

    Neutral Earthing

    Copper

    Plate

    31 UN5UPS o/p Panel Neutral

    Earthing

    Copper

    Plate

    32 UPB1UPS o/p Panel1Body

    Earthing

    Copper

    Plate

    33 UPB2 UPS o/p Panel2 BodyEarthing

    CopperPlate

    34 UPB3UPS o/p Panel3 Body

    Earthing

    Copper

    Plate

    35 SRE1 Server racks earthingCopper

    Plate

    36 SE1 Static Earthing GI Pipe

    37 SE2 Static Earthing GI Pipe

    38 LBE1 Lift Body Earthing GI Pipe

    39 LBE2 Lift Body Earthing GI Pipe

    40 LBE3 Lift Body Earthing GI Pipe

    Near Water Sump

    Left Frontside of

    building

    Left Frontside of

    building

    Right Frontside of

    building

    Near Water Sump

    Left Frontside ofbuilding

    Left Frontside of

    building

    Right Frontside of

    building

    Left Frontside of

    building

    Right Frontside of

    building

    Right Frontside of

    building

    Right Frontside of

    building

    Near Water Sump

    Left back side of

    building

    Left back side of

    building

    Left back side of

    building

    Left back side of

    building

    Left Frontside of

    building

    Left back side of

    building

  • 8/3/2019 DG & EB Check List

    43/43

    Month :

    Closing

    (Kwh)

    Opening

    (kwh)DIFF

    units/Day

    (kwh)

    Closing

    (Ltrs)

    Opening

    (Ltrs)DIFF

    Consumption

    /day(ltrs)

    Closing

    (Kwh)

    Opening

    (kwh)DIFF

    units/Day

    (kwh)

    1

    2

    3

    4

    5

    6

    7

    89

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    2930

    31

    Manager

    Total Water

    Consumption/MonthTotal DG/ month

    Date

    SUPERVISOR

    Total EB / Month

    Total Units consumption in the month :

    Description Units(Kwh) Description Litres

    MC : 1 MC :1000 MC :1

    EB Reading Water Consumption(ltrs) Reading DG Reading

    Sign

    Sum of KWH/month Sum of Ltrs/month Sum of Kwh/month

    Remarks

    CLIENT : T-A-Day Caf SHAILENDRA TECHNO PARK-BANGALORE

    EB, DG & Water Consumption Reading of DG LOG BOOK TIME : 12:00 AM