dg & eb check list
TRANSCRIPT
-
8/3/2019 DG & EB Check List
1/43
Present
KWH
Previous
KWHDiff
Consumpti
on in
KWH/Day
KVAH
1
2
3
45
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
MD : 713KVA
MC: 1000
CT ratio : 50/5 A
SIGNDATE MD KVA Remarks
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
CD: 950 KVA
PF% of
Demand
load
Month : KWH READING OF HT
Consumption
RR no : E4HT-348
-
8/3/2019 DG & EB Check List
2/43
DateDiesel in
tank
Clean
Water
Se arator
Coolant
level
Battery
Charger
Engine
oil level
Check
Cracks&
LooseCon.
Engine
sound &
vibration
Cummulative
Hours
Check for
Leaks
Done By
NameSign
1
2
3
4
5
6
7
8
9
10
1112
13
14
15
16
17
18
19
20
21
2223
24
25
26
27
28
29
3031
Daily PM Check List
SHAILENDRA TECHNO PARKDG:2
SUPERVISOR MANAGER
MONTH:
-
8/3/2019 DG & EB Check List
3/43
DateDiesel in
tank
Clean
Water
Se arator
Coolant
level
Battery
Charger
Engine
oil level
Check
Cracks&
LooseCon.
Engine
sound &
vibration
Cummulative
Hours
Check for
Leaks
Done By
NameSign
1
2
3
4
5
6
7
8
9
10
1112
13
14
15
16
17
18
19
20
21
2223
24
25
26
27
28
29
3031
SUPERVISOR MANAGER
SHAILENDRA TECHNO PARKDG:3
Daily PM Check ListMONTH:
-
8/3/2019 DG & EB Check List
4/43
DG:2 MONTH:
Clean DG
Set
Drain
Water
Separator
Clean
Air
Filters
Check
Air
Cleaner
Check
Coolant
Check
Engine
oil
Check
Belts
Check
Loose
Wires
Check
Cracks
Check
for
Leaks
Engine
sound &
vibration
Battery
Charger
Cummula
tive
Hours
Cell No. 1 2 3 4 5 6 7 8 9 10 11 12
Specipic
GravityVoltage
Battery-1 Battery-2
Engine
start time
Clean DG
Set
Total hrs
run
coolant
temperat
ure
Acuator
PWM
percenta
ge
Oil
pressure
Engine
speed
Battery
voltage
Power in
KW
Power in
KVA
Frequenc
yVoltage Current
Supervisor
Rating: 500KVA
Sign Manager
Procured Material Any Remarks & Action Taken
SHAILENDRA TECHNO PARK
Weekly PM Check List
PM Dony by Name:
BATTERY
Reading
Total Voltage
-
8/3/2019 DG & EB Check List
5/43
DG:3 MONTH:
Clean DG
Set
Drain
Water
Separator
Clean
Air
Filters
Check
Air
Cleaner
Check
Coolant
Check
Engine
oil
Check
Belts
Check
Loose
Wires
Check
Cracks
Check
for
Leaks
Engine
sound &
vibration
Battery
Charger
Cummula
tive
Hours
Cell No. 1 2 3 4 5 6 7 8 9 10 11 12
Specipic
GravityVoltage
Battery-1 Battery-2
Engine
start time
Clean DG
Set
Total hrs
run
coolant
temperat
ure
Acuator
PWM
percenta
ge
Oil
pressure
Engine
speed
Battery
voltage
Power in
KW
Power in
KVA
Frequenc
yVoltage Current
Supervisor
Reading
Procured Material Any Remarks & Action Taken
SHAILENDRA TECHNO PARK
PM Dony by Name:
Sign
Rating: 500KVA
Weekly PM Check List
BATTERY
Total Voltage
Manager
-
8/3/2019 DG & EB Check List
6/43
Month :
R Y B R Y B
KVA : 500
SUPERVISOR Manager
CLIENT : SHAILENDRA TECHNO PARK-BANGALOREDG READING at Runing
Make: Powerica cummins
DG No :
SignDate
Engine
start
time
Engine
stop time
Sl.
No.
Total hrs
run
coolant
temperat
ure
Acuator
PWM %Remarks
Frequen
cy
Oil
pressure
Engine
speed
Voltage CurrentPower in
KWPF
-
8/3/2019 DG & EB Check List
7/43
3200A
R-Y Y-B B-R R Y B
0:002:004:006:008:00
10:0012:0014:00
16:0018:0020:0022:000:002:004:006:008:00
10:0012:00
14:0016:0018:0020:0022:000:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
-
8/3/2019 DG & EB Check List
8/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:0016:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
9/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:0016:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
10/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:0016:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
11/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:0016:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
12/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
13/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
14/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
15/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
16/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:00
12:0014:00
16:00
18:00
20:00
22:00
0:00
2:00
4:00
6:00
8:00
10:0012:00
14:00
16:00
18:00
20:00
22:00
-
8/3/2019 DG & EB Check List
17/43
3200A
R-Y Y-B B-R R Y B
Capacity :
TAP% of loadF HzPFTIMEDATE
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Month : LT READING-LOG SHEET
KWH/dayEnergy
Reading in
KWH
Power
(KW)
Voltage Current AmpsSignRemarks
0:00
2:00
4:00
6:00
8:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
Final KWH :
SUPERVISOR MANAGER
KWH / month :
Total Energy consumption in the month :
Intial KWH : Intial KVAH :
KVAH/month :
Final KVAH :
AVG PF :
-
8/3/2019 DG & EB Check List
18/43
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
KWH READING of MAIN PANEL
13
12
11
10
9
8
6
7
5
4
3
2
1
DATE TIME
MLRP UPS INPUT
MC : 1 MC : 1000
Month :
-
8/3/2019 DG & EB Check List
19/43
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
KWH READING of MAIN PANEL
AC1 AC2
MC:1000
Month :
13
11
12
2
4
5
6
7
10
9
8
3
MC : 1
1
TIMEDATE
-
8/3/2019 DG & EB Check List
20/43
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
KWH KWH/day KWH KWH/day KWH KWH/day
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
12
13
3
4
5
7
11
9
10
6
Month :
DATE TIME
DG2ACCP Total EB+DG,KWH/day
2
KWH READING of MAIN PANEL
MC :1000MC :120
8
1
Total EB, KWH/day Total DG, KWH/day
MC :1000
EB
-
8/3/2019 DG & EB Check List
21/43
Month :Year :
1
2
3
4
5
6
ACCP(120)
AC2(1000)
AC3(1000)
CA(1000)
AC1(1000)
7
Sl.No
Sub Panel Monthly Reading
Intial EB,KWH Final EB,KWH Final DG,KWH
Total
MLRP(1000)
UPS I/P(1000)
DG KWH/ MONTH
DG3(1000)
Main DG Panel
DG2(1000)
Intial DG,KWH
Supervisor Manager
1
2
Final DG,KWH
Total EB KWH/ Month
Total
Sub LT panel
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
Sl.No Intial DG,KWHEB KWH/ MONTH DG KWH/ MONTH
Total DG KWH/ Month
1 EB
-
8/3/2019 DG & EB Check List
22/43
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
KWH READING of MAIN PANEL
28
26
27
25
24
23
MC : 1
Month :
17
22
18
19
20
21
DATE TIME
MLRP UPS INPUT
16
MC : 1000
-
8/3/2019 DG & EB Check List
23/43
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH E,KWH/day DG, KWH/day T,KWH/day E,KWH DG,KWH
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:00
0:00
KWH READING of MAIN PANEL
MC:1000MC : 1
28
27
26
25
22
20
21
19
17
18
24
23
Month :
DATE
AC2AC1
TIME
16
-
8/3/2019 DG & EB Check List
24/43
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
KWH KWH/day KWH KWH/day KWH KWH/day
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
0:00
8:00
16:000:00
8:00
16:00
0:00
8:00
16:00
MC :1000
DG2
25
Month :
16
21
22
23
24
DATE TIME
MC :120
ACCP
19
20
26
27
17
18
28
Total DG, KWH/day
KWH READING of MAIN PANEL
Total EB+DG,
KWH/dayTotal EB, KWH/day
MC :1000
EB
-
8/3/2019 DG & EB Check List
25/43
-
8/3/2019 DG & EB Check List
26/43
SHAILENDRA TECHNO PARK-BANGALORE
Date Diesel(ltr) Rate(Rs.) Amount(Rs.) particular ltr Description ltr
1500 46.08 69120 DG2 418.2 purchase 1500
DG3 481.7 remained 899.9
Total 1500 69120 899.9 Total diesel 2399.9
Description ltr Hour KWH Description ltr Description Unit Rate(Rs.) Amount(Rs.)
DG2 821.53 12.7 2777.9 Total Diesel 2399.9 KWH 5045.1 14 70631.4
DG3 683.53 14.6 2267.2 Consumed 1505.1 Litres 1505.06 46.08 70553.1648
Total 1505.06 27.3 5045.1 Remaining 894.84 Profit 78.2352
Diesel Consumption, Purchase & Remaining
Month : Oct 2011
Diesel purchase Total dieseltotal amount with
transportation(Rs.)
69520
69520
Diesel consumption Remain diesel Profit
Average per month
Description unit
Avg ltrs / hr 55.1
Avg KWH / ltr 3.4
Supervisor Manager
-
8/3/2019 DG & EB Check List
27/43
SHAILENDRA TECHNO PARK-BANGALORE
SL.No Present Previous DiffConsumption
(KWH)
12
3
4 Daily
SL.No Present Previous Diff Consumption(KWH)
1
2
3 Daily
4
Daily monthly Daily ltrConsumed Monthly ltrconsumed Remain(ltr)
5
Total Energy of thismonth(KWH)
Remarks
Diesel Consumption & hrs run
MLRP(1)
UPS(1000)
Avg
Ltr/Hr
Description Monthly
Diesel Generator(DG) Energy & Diesel Consumption
Description
DG3
DG2(1000)
DG3(1000)
AC1(1)
Total submeter(sm) reading
Total
Barrel
Description
KPIT Energy Consumption(=Total SM-CA)
Shailendra Techno Park Engy consumtion(CA)
Diesel Reading
DG2
CA(1)
Total
AC2(1000)
AC3(1000)
SubMeter Reading
SubMeter Reading
Monthly
Daily ReportDate :
Description
HT Reading(1000)
BESCOM Energy Consumption
Total Energy of this
month(KWH)
CA(1000)
Remarks
Total submeter(sm) readingACCP(120)
KPIT Energy Consumption(=Total SM-(CA-ACCP))
Loss from HT to Sum of SubMeter(=HT-SM)
Description
Total loss(=Total SM loss+ACCP)
Monthly
Avg
Kwh/ltr
Daily Avg
Kwh/ltr
Total Hrs
LT Reading(1)
MLRP(1000)
UPS(1000)
AC1(1000)
AC2(1000)
AC3(1000)
Shailendra techno park Engy consumtion(CA)
T A Day Caf water, EB & DG consumption details
Total Energy of this
EB INCOMER EB INCOMER
8R x 3 5C x 400Sq mm 8R x 3 5C x 400Sq mm
-
8/3/2019 DG & EB Check List
28/43
DG2 INCOMER DG2 INCOMER3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm
AYFY Cable AYFY Cable
DG3 INCOMER DG3 INCOMER
AYFY Cable AYFY Cable
3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm
AYFY Cable AYFY Cable
DG2 INCOMER DG2 INCOMER
AYFY Cable AYFY Cable
DG1 INCOMER DG1 INCOMER
3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm
DG2 INCOMER DG2 INCOMER
3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm
AYFY Cable AYFY Cable
3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm
DG1 INCOMER DG1 INCOMER
3R x 3.5C x 300Sq.mm 3R x 3.5C x 300Sq.mm
DG1 INCOMER DG1 INCOMER
8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mm
AYFY Cable AYFY Cable
EB INCOMER EB INCOMER
8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mmAYFY Cable AYFY Cable
8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mm
AYFY Cable AYFY Cable
EB INCOMER EB INCOMER
AYFY Cable AYFY Cable
AYFY Cable AYFY Cable
8R x 3.5C x 400Sq.mm 8R x 3.5C x 400Sq.mm
EB INCOMER EB INCOMER
AYFY Cable AYFY Cable
2R x 3.5C x 185 Sq.mm 2R x 3.5C x 185 Sq.mm
-
8/3/2019 DG & EB Check List
29/43
AYFY Cable AYFY Cable
2R x 3.5C x 185 Sq.mm 2R x 3.5C x 185 Sq.mm
AYFY Cable AYFY Cable
TO UPS TO UPS
TO UPS TO UPS3R x 3.5C x 400Sq.mm 3R x 3.5C x 400Sq.mm
TO AHU PCC1 TO AHU PCC1
TO UPS TO UPS
3R x 3.5C x 400Sq.mm 3R x 3.5C x 400Sq.mm
AYFY Cable AYFY Cable
AYFY Cable AYFY Cable
TO MLRP TO MLRP
3R x 3.5C x 400Sq.mm 3R x 3.5C x 400Sq.mm
AYFY Cable AYFY Cable
2R x 3.5C x 185 Sq.mm 2R x 3.5C x 185 Sq.mm
AYFY Cable AYFY Cable
-
8/3/2019 DG & EB Check List
30/43
AYFY Cable AYFY Cable
TO APFC TO APFC
AYFY Cable AYFY Cable
TO APFC TO APFC
4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm
1R x 3.5C x 185 Sq.mm 1R x 3.5C x 185 Sq.mm
AYFY Cable AYFY Cable
TO COMMON AREA TO COMMON AREA
4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm
TO AHU PCC3 TO AHU PCC3
AYFY Cable AYFY Cable
TO AHU PCC3 TO AHU PCC3
2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm
AYFY Cable AYFY CableTO COMMON AREA TO COMMON AREA
2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm
AYFY Cable AYFY Cable
1R x 3.5C x 185 Sq.mm 1R x 3.5C x 185 Sq.mm
2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm
AYFY Cable AYFY Cable
TO AHU PCC2 TO AHU PCC2
TO AHU PCC1 TO AHU PCC1
2R x 3.5C x 240 Sq.mm 2R x 3.5C x 240 Sq.mm
AYFY Cable AYFY Cable
TO AHU PCC2 TO AHU PCC2
Cab e Cab e
4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm
AYFY Cable AYFY Cable
-
8/3/2019 DG & EB Check List
31/43
2R x 40mm x 6mm 2R x 40mm x 6mm
NEUTRAL CU STRIP NEUTRAL CU STRIP
2R x 40mm x 6mm 2R x 40mm x 6mm
DG1 DG2
CU UNARM CABLE CU UNARM CABLE
24C x 1.5 Sqmm 24C x 1.5 Sqmm
& 2C x 2 Sqmm & 2C x 2 Sqmm
DG1 DG2
DG2 CONTROL & DG2 CONTROL &
CU UNARM CABLE CU UNARM CABLE
24C x 1.5 Sqmm 24C x 1.5 Sqmm
BATTERY CHARGE BATTERY CHARGE
DG3 CONTROL & DG3 CONTROL &BATTERY CHARGE BATTERY CHARGE
DG1 CONTROL & DG1 CONTROL &
BATTERY CHARGE BATTERY CHARGE
& 2C x 2 Sqmm & 2C x 2 Sqmm
24C x 1.5 Sqmm 24C x 1.5 Sqmm
& 2C x 2 Sqmm & 2C x 2 Sqmm
CU UNARM CABLE CU UNARM CABLE
BATTERY CHARGE BATTERY CHARGE
CU UNARM CABLE CU UNARM CABLE
24C x 1.5 Sqmm 24C x 1.5 Sqmm
& 2C x 2 Sqmm & 2C x 2 Sqmm
TO APFC TO APFC
4R x 3.5C x 185 Sq.mm 4R x 3.5C x 185 Sq.mm
TO APFC TO APFCDG1 CONTROL & DG1 CONTROL &
AYFY Cable AYFY Cable
-
8/3/2019 DG & EB Check List
32/43
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
1
2
3
4
5
6
7
8
9
10
11
12
Remarks :
HT outgoing & LT Kiosk Panel door should be
closed
Oil and Winding Temperature
HT outgoing panel spring should be in charge
mode
Transformer yard no vegetation grown
Bucholz Relay Status
Surge arrestor relay status
SHAILENDRA TECHNO PARKMonth ;
Control knob should be in remote state
Transformer Daily PM Check List
Counter reading of OLTC
Sound of Transformer
Descriptions
Technician sign
Manager sign
Sl.no. Date
Oil level in conservator tank (Main and OLTC)
Oil leakages if any arrest immediately
Supervisor sign
Checking the color of silica gel(in breather)
-
8/3/2019 DG & EB Check List
33/43
1 TF NE1 Transformer yard Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve2 TF NE2 Transformer yard Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve
3 TF BE1 Outside transformer yard Body Earthing GI Pipe 50x6mm GI strip4 TF BE2 Outside transformer ard Bod Earthin GI Pi e 25x6mm GI stri5 LBS BE1 Outside transformer yard Body Earthing GI Pipe 25x6mm GI strip6 DGLA Transformer yard Lighting Arrestor GI Pipe 25x6mm GI strip7 LTP BE1 Transformer yard Body Earthing GI Pipe 25x6mm GI strip8 RMU BE1 RMU yard Body Earthing GI Pipe 25x6mm GI strip9 RMU BE2 RMU yard Body Earthing GI Pipe 25x6mm GI strip10 MC BE RMU yard Body Earthing GI Pipe 25x6mm GI strip11 BLA1 Left back side of building Lighting Arrestor GI Pipe 50x6mm GI strip12 BLA2 Left back side of building Lighting Arrestor GI Pipe 50x6mm GI strip13 DG2 NE1 Basement entrance Neutral Earthin Co er Plate 40x6mm Cu stri with sleeve
14 DG2 NE2 Basement entrance Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve15 DG3 NE1 Basement entrance Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve16 DG3 NE2 Basement entrance Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve17 DG2 BE1 DG yard Body Earthing GI Pipe 25x6mm GI strip18 DG2 BE2 DG yard Body Earthing GI Pipe 25x6mm GI strip19 DG3 BE1 DG yard Body Earthing GI Pipe 25x6mm GI strip20 DG3 BE2 DG yard Body Earthing GI Pipe 25x6mm GI strip21 PB1 Left back side of building Body Earthing GI Pipe 50x6mm GI strip22 PB2 Left back side of building Body Earthing GI Pipe 50x6mm GI strip23 PB3 Left back side of building Body Earthing GI Pipe 50x6mm GI strip24 PB4 Left back side of building Body Earthing GI Pipe 50x6mm GI strip25 PB5 Left back side of building Body Earthing GI Pipe 25x6mm GI strip26 PB6 Left back side of building Body Earthing GI Pipe 25x6mm GI strip27 UN1 Left Frontside of building Neutral Earthing Copper Plate 50x6mm Cu strip with sleeve28 UN2 Left Frontside of building Neutral Earthing Copper Plate 50x6mm Cu strip with sleeve29 UN3 Left Frontside of building Neutral Earthing Copper Plate 50x6mm Cu strip with sleeve30 UN4 Right Frontside of building Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve31 UN5 Right Frontside of building Neutral Earthing Copper Plate 40x6mm Cu strip with sleeve
32 UPB1 Left Frontside of building Body Earthing Copper Plate 25x6mm Cu strip with sleeve
33 UPB2 Left Frontside of building Body Earthing Copper Plate 25x6mm Cu strip with sleeve
34 UPB3 Left Frontside of building Body Earthing Copper Plate 25x3mm Cu strip with sleeve
35 SRE1 Right Frontside of buildingServer racks
earthingCopper Plate 1Cx25sqmm cu cable
36 SE1 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable37 SE2 Right Frontside of building Static Earthing GI Pipe 1Cx16sqmm cu cable38 LBE1 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip39 LBE2 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip40 LBE3 Near Water Sump Body Earthing GI Pipe 2Rx25x6mm GI strip Lift 3 Panels, car, etc., Body earthing
Isolator Transformer 2 (Sub UPS O/P Panel 2)Used for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub &
UPS SocketUsed for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub &
UPS SocketUsed for UPS panel 1, 2, 2A, 2B,3 & DB's etc., 3rd pin of server/hub &
UPS Socket
Lift 1 Panels, car, etc., Body earthingLift 2 Panels, car, etc., Body earthing
Used for hub room dedicate earthing, lab tables, etc.,
Isolator Transformer 1 (Sub UPS O/P Panel 1)
Isolator Transformer 2 (Sub UPS O/P Panel 2)
Used for racks, etc.,
Used for hub room dedicate earthing, lab tables, etc.,
AHU panel-1,2,3 & ODU Body earthingAHU panel-1,2,3 & ODU Body earthing
LTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthingLTG/RP Panel 1, 2 3 & LTG/RP DB's, AC DB's, Tray Body earthing
Isolator Transformer 3 (Sub UPS O/P Panel 3)Isolator Transformer 2A & B (Sub UPS O/P Panel 2A & B)
DG2 Neutral Earthing connected to main DG2 panelDG3 Neutral Earthing connected to main DG3 panelDG3 Neutral Earthing connected to main DG3 panel
DG2 Body EarthingDG2 Body EarthingDG3 Body EarthingDG3 Body Earthing
Used for basement main panel Body earthingUsed for basement UPS I/P & APFC panel Body earthing
Note : UPS Neutral earthing connected to Isolator Transformer to Sub UPS O/P panel 1R x 1C Cables as per SLD
Type of Conductor & SizeEarth Pit
No.Location
Transformer Neutral
RMU Panel body EarthingMeter Cubical Panel body Earthing
Building Lighting ArrestorBuilding Lighting Arrestor
DG2 Neutral Earthing connected to main DG2 panel
SHAILENDRA TECHNO PARK-BANGALORE
PurposeType of
ElectrodeRemarks
Earthing Details
Transformer Body EarthingTransformer Body Earthing
Sl.No.
Transformer Neutral
Old LT & STP panel Body EarthingRMU Panel body Earthing
LBS Body EarthingDG Exhaust Pipe Lighting Arrestor
SHAILENDRA TECHNO PARK-BANGALORE DEC-2010
-
8/3/2019 DG & EB Check List
34/43
Sl No. Present Previous DiffConsumption
(KWH)Rate Amount
1 6
2 6
3
a) 6
b) 6
c) 6
d) 6
e) 6
f) 6
g) 66
6
6
6
6
PF
KVAH
MD
PF
KVAH
MD
PF
KVAH
MD
Sl No. Present Previous DiffConsumption
(KWH)Rate Amount
1
14
14
2
14DG2
DG2
TOTAL Units
DG3
6
5.6
loss
NEW METER
DG Reading & Charges
Description Remarks
Loss
OLD METER
CA Energy ChargesDescription
Units rate Amount
6
5%
5%
Energy Charges
Total Amount
Energy Charges
Total Amount
Units
5.6
Tax
rate
Demand charges 200
Tax
Amount
5%
6
Total Amount
Demand charges
KPIT Energy Charges
Description
200
Description Units
Tax
200
Common Area(CA)
rate
HT Energy Charges
Demand charges
Energy Charges
Amount
UPS(1000)
Losses B/W HT to submeter(HT-SM)
Total Loss (SM+ACCP)
KPIT Energy
AC2(1000)
AC1(1000)
Remarks
PF : MD KVA:
ACCP(120)Total submeter(sm) reading
SubMeter Reading
AC3(1000)
CA(1000)
LT Reading(1)
MLRP(1000)
Monthly ReportDate :
BESCOM Energy Consumption
HT Reading(1000)
Description
SHAILENDRA TECHNO PARKMonth ;
Lift NoLift Daily PM Check List
-
8/3/2019 DG & EB Check List
35/43
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
1st
shift
2nd
shift
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
7 8 9 104
Supervisor sign
Manager sign
5 6
Opening & Closing Button
Status
All Number buttons Status
Remarks :
Switch Status inside car
Fireman switch
Lift room tempurature
Supply Voltage
Technician sign
Lift room & car cabin is free
from dust
Switches should in be Auto
status
Oil level & grease in runing &mechnical parts
Car Lights Status
Lift Speed, Door close & open
speed
Any abnormal noise during run
& landing
Sl.no.Date
Descriptions
Car should be match with
Floor Level during landing
Car door sensor working
conditionDisplay Status in all Floor &
also Inside Car
Lift No.
2 31
SHAILENDRA TECHNO PARKMonth ;
Lift NoLift Daily PM Check List
-
8/3/2019 DG & EB Check List
36/43
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Supervisor sign
Manager sign
Opening & Closing Button
Status
All Number buttons Status
Remarks :
Switch Status inside car
Fireman switch
Lift room tempurature
Supply Voltage
Technician sign
Lift room & car cabin is free
from dust
Switches should in be Auto
status
Oil level & grease in runing &mechnical parts
Car Lights Status
Lift Speed, Door close & open
speed
Any abnormal noise during run
& landing
Sl.no.Date
Descriptions
Car should be match with
Floor Level during landing
Car door sensor working
conditionDisplay Status in all Floor &
also Inside Car
Lift No.
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
12 201914 1511 16 17 1813
SHAILENDRA TECHNO PARKMonth ;
Lift No.
-
8/3/2019 DG & EB Check List
37/43
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Supervisor sign
Manager sign
Opening & Closing Button
Status
All Number buttons Status
Remarks :
Switch Status inside car
Fireman switch
Lift room tempurature
Supply Voltage
Technician sign
Lift room & car cabin is free
from dust
Switches should in be Auto
status
Oil level & grease in runing &
mechnical parts
Car Lights Status
Lift Speed, Door close & open
speed
Any abnormal noise during run
& landing
Sl.no.Date
Descriptions
Car should be match with
Floor Level during landing
Car door sensor working
conditionDisplay Status in all Floor &
also Inside Car
Lift No.
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shift
2nd
shift
1st
shif
21 27 28 29 3022 23 24 25 26
Shailendra Techno Park, BangaloreDaily works list
-
8/3/2019 DG & EB Check List
38/43
1
12:00 AM
2 1:00 AM
3 2:00 AM
4 3:00 AM5 4:00 AM
6 5:00 AM
76:00 AM
8 7:00 AM
9 7:30 AM
10 8:00 AM
11 9:00 AM
12 10:00 AM13 11:00 AM
14 12:00 PM
15 1:00 PM
16 1:30 PM17 2:00 PM
18 3:00 PM
19 4:00 PM
20 5:00 PM
216:00 PM
22 6:00 PM
23 7:00 PM
248:00 PM
25 8:30 PM
26 9:00 PM
27 10:00 PM28 11:00 PM
Sl No. TimeHT Reading, KWH Reading of Submeter(MLRP, UPS, CA,
AC1, AC2, AC3 & ACCP; DG Reading(Hrs, Ltrs, KWH); EB
Reading
Per Day Consumption Calculation & Daily Report Making.
Descriptions Remarks
EB Reading; Switch of all the Lights( stairs, lobby, basement,
street light).
Shift handing over
EB, Submeter & DG KWH Reading, A-Check oF DG'S.
PM Check of HT yards & Transformer, LT Panels.
EB Reading & Going for rounds
Going for rounds
EB Reading & Going for rounds
EB Reading & Going for rounds
Going for Rounds
Switch ON The street lights, Checking for ligths
EB, Submeter & DG KWH Reading & Follow UP Works
EB Reading, Going for Rounds
Lift room, Lift Car & Terrace AC M/C Check & Follow Up Work
EB KWH Readings, PM Check of Lifts.
PM check of STP Plant, Pumps & Motors
Checking of STP Plants, Pumps & motors & Follow Up works
EB Reading & Going for rounds; Switch ON all Lights( Stair,
lobby, Basement lights)
Shift handing over
EB Readings, Going for rounds & Follow Up Works.
Going for rounds & Follow Up Works.
NOTE : Going for Rounds : checking of Main Panel, RTCC Panel, CA Panel, HT yards, Lifts, Lights,
etc.,
EB Reading & Switch OFF the some of lights (Stair, lobby,
Basement & Street light)
Going for rounds, Switch OFF the any One Lift & follow Upworks
EB Readings, Going for rounds & Follow Up Works.
Follow Up Works
Shift handing over
Checking all the lights, Switch ON the Lifts, Going For rounds.
-
8/3/2019 DG & EB Check List
39/43
SL.NO CLEANING 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 Clean the Engine fule & Air houses
2 Clean the Alternator
3 Clean and Verify cable terminal box (Externaly)
4 Clean the Air & Fule Filters (Externaly)
5 Clean the Redator & Cooland pipe Lines
6 Cleanthe Batteries & Cables
1 Check the Battery Voltage
2 Check the specific gravity of Batteries
3 Check the Battery Electroyte level
4 Check all house pipes for any leakages & arrest it immedately
5 Check the Condition of air inlet restriction indicatior
6 Check oil Engine Lubrication oil level
7 Check the Abnormal noise & vibraction while taking trial Run
8 Check the Engine starter motor cable terminals for any looseness
9 Check the Engine control panels & display working condition
10 Ensure selector switch poisition in control panel is in auto mode
11 Check the condition of rediator fan belt and its tension
12 Drain water from fuel water seperator through drain valve
13 Check the radiator water level
14 Check the Diesel level in the Daily fuel tank
Done By Technician
SHAILENDRA TECHNO'A' CHECK FOR DG SET
Make: KVA :
INSPECTION
-
8/3/2019 DG & EB Check List
40/43
Month :
Closing(mm)
Opening(mm)
DIFF Consumption(Litres)
Closing(hr)
Opening(hr)
DIFF Run/Day (hr) Closing(kwh)
Opening(kwh)
DIFF units/Day(kwh)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2021
22
23
24
25
26
27
28
29
30
31
ManagerSUPERVISOR
Sign
Total Diesel consumption in the month :
Total units/monthDG
Sum of Ltrs/month Sum of hrs/month Sum of units/month
Average
dieselltrs/hr/day
Total ltrs / Month
Total hrs/ month
Avg lts/hr/month
Avg kwh/ltr/month
MC :1000
KWH Reading
DG NO ;
MC :1
Hours Reading
TIME : 12:00 AMDIESEL, HOUR & UNITS READING of DG LOG BOOK
Description
CLIENT : SHAILENDRA TECHNO PARK-BANGALORE
MC : 31.1
Average units
kwh/ltr/dayDate
Diesel Reading
-
8/3/2019 DG & EB Check List
41/43
Date :
1 TF NE1Transformer Neutral
Earthing
Copper
Plate
2 TF NE2Transformer Neutral
Earthing
Copper
Plate
3 TF BE1
Transformer Body
Earthing GI Pipe
4 TF BE2Transformer Body
EarthingGI Pipe
5 LBS BE1 LBS Body Earthing GI Pipe
6 DGLA Lighting Arrestor GI Pipe
7 LTP BE1 Body Earthing GI Pipe
8 RMU BE1 RMU Body Earthing GI Pipe
9 RMU BE2 RMU Body Earthing GI Pipe
10 MC BEMeter cubicle Body
EarthingGI Pipe
11 BLA1 Lighting Arrestor GI Pipe
12 BLA2 Lighting Arrestor GI Pipe
13 DG2 NE1 DG2 Neutral EarthingCopper
Plate
14 DG2 NE2 DG2 Neutral EarthingCopper
Plate
15 DG3 NE1 DG3 Neutral EarthingCopper
Plate
16 DG3 NE2 DG3 Neutral EarthingCopper
Plate
17 DG2 BE1 DG2 Body Earthing GI Pipe
18 DG2 BE2 DG2 Body Earthing GI Pipe
19 DG3 BE1 DG3 Body Earthing GI Pipe
Sl.No. Earthing LocationEarthing
pit No.
Client : Shailendra Techno Park Pvt Ltd Srikanth & Ramesh Enterprises
Earth Test Report
Tested By :
Basement entrance
Basement entrance
Basement entrance
DG yard
DG yard
DG yard
RMU yard
RMU yard
RMU yard
Left back side of
building
Left back side ofbuilding
Basement entrance
Outside transformer
yard
Transformer yard
Transformer yard
Transformer yard
Outside transformer
yard
Outside transformer
yard
Transformer yard
Value in
ohmEarthing prupose
Type of
electrodeRemarks
-
8/3/2019 DG & EB Check List
42/43
Date :
Sl.No. Earthing LocationEarthing
pit No.
Client : Shailendra Techno Park Pvt Ltd Srikanth & Ramesh Enterprises
Earth Test Report
Tested By :
Value in
ohmEarthing prupose
Type of
electrodeRemarks
22 PB2Basement Panel Body
EarthingGI Pipe
23 PB3Floor Panel Body
EarthingGI Pipe
24 PB4
Floor Panel Body
Earthing GI Pipe
25 PB5Floor Panel Body
EarthingGI Pipe
26 PB6Floor Panel Body
EarthingGI Pipe
27 UN1UPS o/p Panel1
Neutral Earthing
Copper
Plate
28 UN2UPS o/p Panel2
Neutral Earthing
Copper
Plate
29 UN3UPS o/p Panel3
Neutral Earthing
Copper
Plate
30 UN4UPS o/p Panel2&3
Neutral Earthing
Copper
Plate
31 UN5UPS o/p Panel Neutral
Earthing
Copper
Plate
32 UPB1UPS o/p Panel1Body
Earthing
Copper
Plate
33 UPB2 UPS o/p Panel2 BodyEarthing
CopperPlate
34 UPB3UPS o/p Panel3 Body
Earthing
Copper
Plate
35 SRE1 Server racks earthingCopper
Plate
36 SE1 Static Earthing GI Pipe
37 SE2 Static Earthing GI Pipe
38 LBE1 Lift Body Earthing GI Pipe
39 LBE2 Lift Body Earthing GI Pipe
40 LBE3 Lift Body Earthing GI Pipe
Near Water Sump
Left Frontside of
building
Left Frontside of
building
Right Frontside of
building
Near Water Sump
Left Frontside ofbuilding
Left Frontside of
building
Right Frontside of
building
Left Frontside of
building
Right Frontside of
building
Right Frontside of
building
Right Frontside of
building
Near Water Sump
Left back side of
building
Left back side of
building
Left back side of
building
Left back side of
building
Left Frontside of
building
Left back side of
building
-
8/3/2019 DG & EB Check List
43/43
Month :
Closing
(Kwh)
Opening
(kwh)DIFF
units/Day
(kwh)
Closing
(Ltrs)
Opening
(Ltrs)DIFF
Consumption
/day(ltrs)
Closing
(Kwh)
Opening
(kwh)DIFF
units/Day
(kwh)
1
2
3
4
5
6
7
89
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2930
31
Manager
Total Water
Consumption/MonthTotal DG/ month
Date
SUPERVISOR
Total EB / Month
Total Units consumption in the month :
Description Units(Kwh) Description Litres
MC : 1 MC :1000 MC :1
EB Reading Water Consumption(ltrs) Reading DG Reading
Sign
Sum of KWH/month Sum of Ltrs/month Sum of Kwh/month
Remarks
CLIENT : T-A-Day Caf SHAILENDRA TECHNO PARK-BANGALORE
EB, DG & Water Consumption Reading of DG LOG BOOK TIME : 12:00 AM