dezvoltarea unui mouse alternativ
DESCRIPTION
proiect mpsTRANSCRIPT
Alternative mouse development
Project management
Andrei CrăciunAn 4 CTI
Contents
Project OverviewProject ResourcesProject Special ResourcesProject ScheduleConstraintsProject StepsDetailed StepsConclusions
Alternative mouse – Overview
This project treats the concept of developing an IT product – an alternative mouse shaped as a glove.
This glove has the main advantage of transforming the normal interaction with the PC into one who is more analog and user-friendly.
One advantage of this product is the wireless connection that will enable a communication with a PC not limited by a certain space or surface.
The mobility of movement will be useful to painters or people who use their hands to create digital art.
Resources
Robe G. – client interactionAndy M. – engineering Serban G. – salesSoso D. – testingLuci P. – design
The members are paid equally: 20$/hour, except for the engineer and the designer: 30$/hour.
Special Resources
Project schedule
Facebook – communication platformmicrochip.compsd.tutsplus.com
26.03.2012 – 23.04.2012
Constraints
The main issue in this project is the cost of the development – the sum of the components prices and the sum of the employee salary
Since this is a product that needs to be developed and then released, another constraint is getting the client happy with it – the acceptance phase must be a success- that’s why we have many steps that need the client’s validation – we must have an agile approach
Project steps
Discutie clientDezvoltarea solutieiPropunerea solutiei clientuluiAchizitionarea componentelorConstruireaTestareaDiscutii clientEfectuare modificari finaleAcceptarea produsului
Detailed project steps (1)
Detailed project steps (2)
Gantt representation
Conclusions
OpenProj is the right tool when we have to deal with a small to medium size project, being simple to learn and efficient to use.
Since this was a medium sized project, with a limited number of people involved in it, OpenProj proved itself useful to learn, and by using its task scheduler and graphical representation, I was able to fully understand how a similar project may develop.