development of nzeb in china - un escap · 2016-12-15 · changcheng employee tower qingdao...
TRANSCRIPT
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Development of Net (Nearly) Energy Buildings (nZEBs) in China
Gao Caifeng
Institute of Building Environment and Energy
China Academy of Building Research
Bangkok, Thailand, 2016.08.18
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
1. Background
2. Policy, standard and codes
3. Pilot projects
4. Mass market?
Outline
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
1. Background
2. Policy, standard and codes
3. Pilot projects
4. Mass market?
Outline
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Building Energy Conservation
Green Building
Passive Building,
Nearly Zero Energy Building,
net Zero Energy Building
Background
CHANGES Focus on building performance Change of conventional design
method Consider full Life cycle
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Internationally1. nZEBs development
European Union, North America, Other parts of Asia
IN CHINA1. Challenge of building sector
Impact from economy slowing down Construction quality Unsatisfactory performance
2. Improvement of occupant indoor comfort Partial time and space all time and space Heating in east China
3. Environmental concern-blame on district heating?
4. Capping of carbon emission by 2030 or even earlier in China Building sector remains the biggest uncertainty Massive both in new and existing
Background
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
1. Background
2. Pilot projects
3. Policy, standard and codes
4. Mass market?
Outline
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Renewable energy and existing building retrofit pilot projects and pilot city 2005-2014
《Suggestions on accelerating the development of green building [2012]167》April,2012
《General Office of the State Council forward the notice of green building action plan〔2013〕1》January, 2013
《Development plan of green building and green eco-city in the 12th five-year plan》March,2013
Subsidizing of Sponge pilot city in the 13th five-year
Policy, standard and codes – central government
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Shandong:
Three batches of subsidized nZEBs pilot projects
Subsidizing 80%+ of the incremental cost
Residents potentially receives credit in home purchase
Hebei and Jiangsu
Developer receives 20% discount in land acquiring
Developer receives tax credit or FAR compensation
Beijing:
In stage of technological feasibility study, supported by CABR
Compiling own nZEB standard for residential building
BDRC deliberate for launching of 30 pilot projects by 2018 for government
owned public buildings (office, educational, and public service)
Policy, standard and codes – local government
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Policy, standard and codes
Updated energy efficiency design standards for public building and residential
building in different climate zones, tightened averagely 30% in overall performance
Updated <evaluation standard for green building in China>, performance oriented
CHINA nZEB building standards compilation: plan approved, begins in July 2016
First batch of nZEB demonstration projects approved by MoHURD by May, 2016
Governmental subsidy in deliberation, jointly by MoF and MoHURD
Issuing of 《Technical guidance on passive and low energy green building in
China》, November, 2015.
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
10
Preface Chapter 1 – General provision Chapter 2 – Concept Chapter 3 – Mandatory
requirements Chapter 4 – Building design 4.1 Design principle 4.2 Architectural design 4.3 Building envelope 4.4 Energy system
Chapter 5 – Construction 5.1 Insulation and
fenestration 5.2 Thermal bridge 5.3 Air tightness 5.4 Energy system
Chapter 6 Operation and management 6.1 General requirements 6.2 Metering and Monitoring 6.3 Commissioning 6.4 Maintenance 6.5 User requirement
Chapter 7 Evaluation and Labeling 7.1 General requirements 7.2 Design evaluation 7.3 O&M evaluation
Appendix A – Building envelope air tightness testing procedure
Appendix B – Primary energy conversion factor
Appendix C – Technical recommendations
Cited building codes list
Policy, standard and codes – technical guidance
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
1. Background
2. Policy, standard and codes
3. Pilot projects
4. Mass market?
Outline
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Pilot projects
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Sichuan-OfficeCGCEC HQ13,078㎡
Zhejiang-ExibitionMenred Low-Carbon Center480 ㎡
Hebei-ResidentialChangcheng Com120,000㎡
Beijing-OfficeCABR-NZEB4,025㎡
Shandong-SchoolSCCC Training Center20,700㎡
Shandong-MixedEco-Park Demo Ctr.13,769㎡
Guangdong-ExibitionGree nZEB, 650 ㎡
Henan-OfficeHebi VLEB2675 ㎡
Tianjin-ResidentialEco-city pub-house13,000㎡
Jiangsu-OfficeUN-CiFALTraining Center12800㎡
Shandong-OfficeSoccer Training Ctr.13,769㎡
Pilot projects
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
QHD Riverside is the most successfulpassive residential building pilot projects,effectively promoted the development ofpassive building in China.
The project comprehensively display passivebuilding design concepts and technology,Germany construction technology of advancedenergy conservation technologies andproducts have been widely used.
The incremental cost of investment is economically feasible of passive building andlow energy buildings. It provide a good reference for explore the suitability oftechnology roadmap for our country ultra low power architecture which is uitable forChina's national conditions and further improve China's building constructiontechnology, promote the upgrading of energy-saving technology products.
Qinhuangdao-Riverside
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
能耗指标 Energy Consumption Target: 25 kWh/(m2.a)冬季 Winter :采暖不依靠化石能源 zero use offossil fuel for heating
夏 季 Summer : 空 调 能 耗 降 低 50% coolingenergy reduced by 50%
照明:能耗降低7% reduction of lighting energyby 75%
2013年• 项目启动 kick-off
• 设计、优化design/optimization
• 施工启动 construction start
2014年• 主体竣工 Complete
construction• 机电、测量系统调试
commissioning• 制冷工况实验
experiment in Summer
2015年• 制热工况实验
experiment in Winter• 项目运行优化 ongoing
commissioning• 数据监测 data
collection
2016年• 研究工作汇总
research summary• 项目后评估 evaluation
• 后续研究工作 Other research work
竣工 Completion: May,2014
入住 Occupancy: June,2014
调试 Commissioning: Ongoing
自控及计量 BMS & EMS: 100% completed
4025 m2, Beijing, cold climate zone, an office building for CABR.
Integrated platform and testbed for CERC-BEE cutting edge technologies demonstration and
serves as well as the R&D facility for CABR’s products and solutions.
Deep connection with the industry sector and could help raise public awareness from
successful demonstration.
With real-data-based evaluation and its openness to the public, CABR NZEB has become a
signature NZEB project and an education center. It is facilitating strong growth of NZEBs in
China and laying foundation for future development of China’s NZEB standard.
Passive Building Proactive Optimization Economic and Pragmatic
CABR NZEB
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
2016/8/24 16
CABR NZEB
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
CABR NZEB
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
分项能耗Energy consumption by category
空调采暖通风分项能耗HVAC energy consumption
冷机分项能耗HPs energy consumption
CABR NZEB
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Hebei-ResidentialChangcheng Com120,000㎡
Shandong-Mixed useEco-Park Demo Ctr.13,769㎡
Jiangsu-OfficeUN-CiFAL Training Center12800㎡
Shandong-SchoolSCCC Training Center20,700㎡
Other pilot projects
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Pilot projects
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Pilot projects-breakdown
18.18%
4.55%
18.18%
31.82%27.27%
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
BY IMPLEMENTATION STAGEDesign Documents IN Consutrction Construction CompletedIn Operation Construction Documents
Over 71% with floor area of 2000-10000 m2, capital investment?
Over 72% under 6F, indicating low height buildings dominate
45.45% in design and planning stage, 31.82% in operation, and others in construction or operation
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
4.55%
22.73%
4.55%
68.18%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
BY BUILDING CLIMATE ZONEHD1-Extreme Cold HCB CD HD2-Cold
Pilot projects-breakdown
18.18%
40.91%
9.09%
9.09%
9.09%
13.64%
0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% 45.00%
BY BUILDING USE TYPEMixed Hotel Exibitition Education Office Residential
72.73% of the pilot projects lie in heating dominant region – proven success and technological feasibility
22.73% in heating and cooling balanced region - in development
Only 4.55% in cooling dominant region - tryout
Office type dominate, 54.55% Residential: 18.18% Mingled with educational ,
exhibition and hotel
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Pilot projects- application of technologies
0.00% 20.00% 40.00% 60.00% 80.00% 100.00%
Sky-light
Solar tube
Thermal Zoning
Solar HG
Site Veg.
Natural Vent.
Ground Cooling
Sun Shading
50.00%
40.91%
90.91%
90.91%
31.82%
100.00%
59.09%
86.36%
APPLICATION OF PASSIVE TECHNOLOGY
0.00% 20.00% 40.00% 60.00% 80.00% 100.00%
Efficient Lighting
Lighting Control
Efficient Appliance
Load Mng.
Ventilation heat recovery
Disp. Vent.
Radiant Heating
Radiant Cooling
Hot Water Heat Rec.
100.00%
86.36%
95.45%
90.91%
100.00%
13.64%
36.36%
31.82%
13.64%
APPLICATION OF ACTIVE TECHNOLOGY
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Pilot projects-application of technologies
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00%
Solar Thermal
Photovotaic
Biomass
CHP
Wind
Air-S HP
Ground-S HP
68.18%
50.00%
0.00%
0.00%
0.00%
40.91%
50.00%
APPLICATION O RENEWABLE ENERGY
Solar thermal, GSHP/ASHP and PV prevail due to past governmental promotion
Zero use of wind, chp, and biomass in the sample size
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
68%70%70%
65%50%
64%60%
70%60.72%
72%50%
74%58%
50%50%
54.50%81%
60%
Tianjin SSEC PubhouseCABR NZEB
ngdao Soccer Training FacilitySCCC Training Center
UN-CIFAL Training CenterVelux Langfang HQ
Hebi VLEBMenred Low-carbon building
HappinessBurgCGCEC Chengdu Office
Jinglan Hotel
Relative building energy efficiency rate vs. code
Pilot projects-performance
0.180.20
0.10.45
0.150.17
0.150.2
0.140.3
0.150.20.2
0.150.15
0.140.3
0.18
Changcheng Employee TowerQingdao Eco-Park Demo Center
Crystal SchoolTaiyuan SME Imcubator
Xinhua OfficeShunda
Gree nZEBLandsea Brooke
Tianjin SSEC Pubhouse CenterLahsa nZEB
Building external wall u-value
11
0.91.10
0.80.8
10.80.8
1.20.8
10.8
11
0.750.8
1.21.3
0.85
Riverside QHDChangcheng Employee Tower
Qingdao Eco-Park Demo CenterCrystal School
Taiyuan SME ImcubatorXinhua Office
ShundaGree nZEB
Landsea BrookeTianjin SSEC Pubhouse Center
Lahsa nZEB
Building window u-value
650750
6461000
900900
1100845
942980
1200700
8501050
780
500402
Riverside QHD
Changcheng Employee Tower
Qingdao Eco-Park Demo CenterCrystal School
Taiyuan SME Imcubator
Xinhua Office
Shunda
Gree nZEB
Landsea Brooke
Tianjin SSEC Pubhouse Center
Lahsa nZEB
Building incremental cost
Pilot average 0.18 vs. code 0.45-50 Pilot average 0.95 vs. code 2.3
Pilot average ee rate 63% vs. code Pilot average RMB 835/m2
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
1. Background
2. Pilot projects
3. Policy, standard and codes
4. Mass market?
Outline
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
next stage: another 89 projects for best
practice case study, altogether 100+
over 80% for public building
over 73% in heating dominant climate zone
JJJ and Shandong area account for 55%+
Mass market? Maybe not yet, booming for sure
Mass market?
01020304050607080
residential public
NZEB BY Building Type
0 10 20 30 40 50 60 70
HD-1
HD-2
HCB
CD
NZEBs by Climate Zone
0 5 10 15 20 25 30
Shandong
JJJ
SH/JS/ZJ
GD/FJ
Oters
NZEBs BY REGION
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
“CHINA Passive Building Alliance”(in short for CPBA) 200+ enterprises, design firms form the alliance Provide technical and product support
Mass market - CPBA
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
HD1-Extremely Cold
HD2-Cold Region
Feasible technology, moderately promotion
Matured technology,strong promotion
Feasibility TBD, experimental
HCB- Hot Summer Cold Winter
Technological route TBD ,exploratory promotion
未来工作
CD- HotSummer Warm Winter
Mass market?
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Promotion Strategy
Promotion route
1
2
3
Industry developement
NorthernSouthern,ResidentialPublic, Consider local economy difference
Voluntary promotion.
Provide industry incentive and upgrademanufacturing. Accumulate experience and data for future code preparation.
Mass market?
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Baseline 100
GB50189-2005EE 50%
GB50189-2014EE 65%
1980 1985 1995 2005 2010 2015 2020 2025 2030
FutureHistory
50%
65%
75%
82.5%95%
JGJ26-86EE 30%
JGJ26-95EE 50%
30%
JGJ26-2010EE 65%
Cold residential building JGJ26
Public building GB50189
30-30-30!
NZEBs
Concluding remarks
中国建筑科学研究院China Academy of Building Research
建筑环境与节能研究院Institute of Building Environment and Energy Efficiency
Thank You!
Caifeng Gao