    Section 1 - General InformationAll Supplier related transactions are through SAP, Single server environment.

    Suppliers are provided with free connectivity through intranet services SRM (Supplier

    Relation Management), which is compatible to SAP. Suppliers can view Purchase Order

    details, schedules for the delivery of goods, status of their quality acceptance of

    supplies, payments. The quarterly feedback on Supplier Rating and Tata motors

    standards which are to be followed at their end can also be viewed through SRM.

    Periodic supplier meets are conducted to provide a forum for the Suppliers to meet

    Senior Officers of the organization, and have formal communication on matters of

    mutual interest.

    Suppliers are requested to contact the representatives of the following functions for

    queries, if any, during the course of supplies.

    a) Issues on items under development with Purchase organization

    Ancillary Development Department (ADD),

    b) Issues regarding POs and schedules on items with Purchase organization

    - Auto Materials and concerned Factory Logistic Group (FLG).

    c) Issues regarding quality, primary rejection, line rejection, rejection disposal, warranty

    complaint, debit due to quality issues, Self Certification-- Quality Assurance

    Department.

    d) Issues regarding payment -- Finance Department.

    Section 2: Quality systems at Tata Motors

    2.1 Quality System Requirements

    The supplier has to demonstrate the ability to establish, document and implement an

    effective quality system that complies with all applicable elements of ISO/TS16949-2002

    standards. Apart from this suppliers management has to ensure that supplier quality

    policy is understood and maintained, and continuous improvement of the quality system

    is followed.

  • 7/28/2019 development of automotive components

    2/21

    2.2 Quality System Development and Audits

    Tata Motors may require a formal assessment of the suppliers quality system at

    any time. The type of audit done is based on the following requirements .

    At the suppliers and/or customers request to provide guidance for

    verification of quality system improvements

    Supplier does not meet acceptable standards of performance

    Potential or Strategic Supplier to Tata Motors.

    Manufacturing of new type of item

    Periodic quality audit

    2.3 Quality Planning

    The purpose of having a quality plan is to set direction, action plans and measurements

    needed to accomplish stated objectives and plans. To meet the objectives of the

    development suppliers us To this end, suppliers shall use some form of systematic

    planning and review for new products and product changes. APQP is the minimum

    acceptable route for this purpose. Quality development and control activities require

    planning to be effective and economical. The quality planning process shall emphasize

    problem prevention rather than detection, and support a continual quality improvementphilosophy. This results into increased productivity, efficiency and profits by reducing

    waste, scrap, rework and customer complaints when quality planning is properly

    performed. Tata Motors requires that its suppliers plan for quality. Supplier may refer to

    Tata Motors PPAP process for additional information (Details of PPAP enclosed in

    Appendices). The quality planning activity shall be a regularly scheduled, cross-

    functional process, involving all departments with goals and objectives supporting the

    quality system. Each supplier is responsible for the quality of its own products. The

    suppliers failure to provide Tata Motors with quality goods may result in Tata Motors

    claims for machining, assembly, sorting and/or administrative costs due to poor quality,

    late delivery and other nonconforming conditions.

    The quality planning methods and documentation are suggested as per list of PPAP

    requirement.

  • 7/28/2019 development of automotive components

    3/21

    2.4 Production Part Approval Process (PPAP)

    Suppliers shall fully comply with all requirements of Production Part Approval

    Process when doing business with Tata Motors. Before making a shipment to

    Tata Motors, the supplier shall meet all of the purchase order requirements and

    shall ensure that all parts conform to Tata Motors engineering and quality

    specifications. This includes the submission of PPAP for conditions/ situations

    listed in Tata Motors PPAP process and as mentioned below, unless it is waived.

    .

    All Tata Motors suppliers are required to submit a PPAP in case of Major /

    Significant process changes.

    2.4.1 PPAP Submissions / Retentions and records.

    Suppliers are responsible for retaining a complete record of all PPAP

    submissions. The records shall show conformance to all dimensional, chemical,

    metallurgical, physical, performance and other test specifications. Please refer

    PPAP process of Tata Motors.

    Suppliers shall have a system to control the updating, distribution, storage and

    disposal of engineering drawings, specifications, control plans, FMEAs,

    procedures, work instructions, forms, etc.

    2.4.2 PPAP Status

    The following dispositions will be used: Accept

    Reject - The supplier must correct and resubmit the PPAP package. Only

    those characteristics affected by the changes to the tooling and/or process

    need to be addressed in the resubmission. If the PPAP was rejected

    because of missing documentation, the documentation must be included

    with the resubmission. The supplier must not ship production quantities

    while the status of the PPAP is "Reject" unless a deviation is granted for

    all characteristics contributing to the rejection. If the suppliers PPAP is

    rejected, the product shall be corrected and PPAP resubmitted for

    approval.

    Other- This status may be applied to product that has been accepted for

    all dimensional and material requirements, but will require subsequent

  • 7/28/2019 development of automotive components

    4/21

    manufacturing evaluation to determine acceptability. When a PPAP

    receives this disposition, the supplier is required to submit a small

    production lot of product for evaluation. Accept status is granted if no

    TATA MOTORS LIMITED

    product-related problems are encountered during testing. If problems are

    encountered, the status becomes Reject and the supplier must resubmit

    based on the feedback they are given.

    After PPAP approval has been granted, suppliers are responsible for seeing that

    future production continues to meet all customer requirements.

    2. 4. 3 Out-of-tolerance Conditions on PPAP Samples

    The supplier shall make every reasonable effort to correct any discrepancies

    discovered when parts are being evaluated for a PPAP. If, for any reason, the

    samples inspected for the PPAP do not conform to all requirements and the

    supplier is unable to correct the discrepancy, the supplier must notify the

    appropriate Tata Motors contact prior to submitting the PPAP. This will allow for

    remediation if needed.

    2. 4. 4 Ongoing PPAP Maintenance

    The supplier shall carry out audit for product and process at regular intervals

    (including complete dimensional, material and performance evaluation) as a part

    of internal control and corrective action plan to be implemented wherever

    necessary.

    2.5 Subcontracted Parts and Services

    If a part or service is subcontracted by a primary supplier, the primary supplier

    assumes responsibility for the quality of that part or service unless Tata Motors

    specifically releases the supplier from that responsibility in writing. Materials

    purchased by Tata Motors and consigned to a primary supplier are not

    considered subcontracted. The primary supplier is responsible for the quality of

    all subcontracted materials, components or services. Parts or services cannot be

    subcontracted without prior consent from a Tata Motors representative in writing.

    Any materials, components or services purchased by the supplier for use in Tata

    Motors products must be adequately inspected and/or tested to assure

    conformance to the applicable engineering drawings and specifications. This

  • 7/28/2019 development of automotive components

    5/21

    applies whether the materials/components are Tata Motors designed or are

    specified by reference to a particular industry specification or manufacturer's part

    number.

    Whenever the primary supplier subcontracts a service (e.g., heat treating,

    machining, assembly, inspection), it must assure that the results conform to all

    applicable specifications. Any characteristics produced or affected by

    subcontracted services are to be treated in the same manner as on Tata Motors

    designed materials components.

    For materials or components that are Tata Motors -specified, but do not have

    dimensional, physical, material or aesthetic characteristics specifically indicated

    (such as off-the-shelf or catalog items), the supplier must provide the sub

    suppliers name and address and the part number and/or name of the

    TATA MOTORS LIMITED

    subcontracted item with the PPAP documentation. Whenever specified by Tata

    Motors, only Tata Motors -approved sources may be used for supplier-procured

    subcomponents.

    2.6 Special Characteristics

    Some Tata Motors products will have features, which are designated as Special

    (key, significant, critical, etc.) characteristics on the drawing. When a special

    characteristic is shown on a drawing, the supplier shall comply with the

    description. It is the suppliers responsibility to understand all special

    characteristics on the part drawing, and to notify the division-purchasing

    associate when more information is required.

    2.7 Material Certifications

    The supplier shall ensure that the product supplied to Tata Motors is in

    compliance with all material specifications on the product drawing and/or

    purchase order. Material certifications containing actual measured results are

    required at PPAP and during normal production on an as needed basis, as

    designated by Tata Motors.

    2.8 Restricted Substances

    Tata Motors is concerned for the safety of its employees, customers and society

    at large. Suppliers must assure compliance with all governmental and safety

  • 7/28/2019 development of automotive components

    6/21

    requirements on restricted, toxic and hazardous substances used in the

    manufacture of products delivered to us. When applicable, Material Safety Data

    Sheets are to be sent to the attention of the Environmental Health and Safety

    Officer at the Tata Motors prior to the first production shipment and upon request.

    Suppliers are required to report any hazardous materials contained in any part of

    the product shipped (including coatings, etc) to Tata Motors . (Refer annexure for

    restricted substances)

    2.9 Statistical and Analytical Techniques

    Statistical and analytical techniques may be used by the supplier to measure and

    improve process capability, efficiency, and quality of the product. Supplier may

    use various types techniques like Design of experiment, X bar & R chart etc.

    The supplier must develop a system which documents responsibilities,

    involvement, plans and criteria for implementing statistical and analytical

    methods. The supplier is responsible for ensuring that tooling, equipment, and

    processes used to demonstrate the capability to consistently produce quality

    parts with minimum variation. The special characteristics identified on customer

    prints will require a minimum of 1.33 CpK. All critical and major dimensions on

    the drawing shall demonstrate statistical process control at time of PPAP.

    2.10 Internal Supplier Product/Process Audits

    The supplier shall have an internal process for the routine audit of product and

    process quality. The supplier shall perform internal quality audits scheduled on a

    TATA MOTORS LIMITED

    regular basis to set a benchmark for continual improvement of their quality

    systems and to demonstrate compliance with existing elements of this manual.

    The results of the internal audits shall be distributed to the appropriate personnel;

    action plans shall be developed, tracked and documented for all areas that are

    found to be in noncompliance.

    The objectives are to:

    Assess the effectiveness of the control plan in assuring conformance to

    the requirements.

    To evaluate as delivered product quality.

    To provide a basis for the improvement of the control plans.

  • 7/28/2019 development of automotive components

    7/21

    To provide additional assurance of product quality.

    Assessments of dimensional, functional and/or cosmetic features may be

    required to adequately evaluate the part or process to Tata Motors requirements.

    2.11 Calibration

    The supplier shall establish a calibration system that will track and account for

    each gauge and measuring instrument individually. Established calibration

    intervals shall be documented, and each instrument shall be traceable to its last

    calibration date. Documentation shall include the actual quantitative

    measurements taken during the calibration, in order to monitor long term

    performance. All gauges used in evaluating process potential shall be in

    compliance with Quality System requirements. Copies of the Gauge R&R study

    data and results must accompany the process potential study information.

    All calibration must be traceable to National Laboratory or an industry recognized

    standards/accreditation authority. Outside calibration services must be accredited

    to ISO/ IEC17025. These calibration records shall be retained for verification

    purposes. Employees involved in using calibration equipment should have

    documented training on the instruments they use. Documentation of training

    records shall be retained for verification purposes.

    2.12 Gauge R&R

    The supplier shall conduct Gauge R&R studies upon receipt of new or repaired

    measuring equipment. Documented action plans shall be completed for

    completion of Gauge R&R studies on existing equipment. After the initial studies,

    established intervals for repeat verification, Gauge R&R studies shall be

    documented, traceable to the last date of evaluation, and include all significant

    study information. These repeat studies are necessary on a regular basis to

    assure continued suitability to the application. Gauge R&R studies shall be

    conducted under actual operating conditions. Gauge R&R studies shall be

    included with each PPAP package.

    TATA MOTORS LIMITED

    Guide lines for acceptance of Gauge R & R

    If GRR as a % of tolerance is 0-20% , it is acceptable for measuringCritical , Major and Minor characteristics

  • 7/28/2019 development of automotive components

    8/21

    If GRR as a % of tolerance is 20-30% , it is acceptable for measuring ,Major and Minor characteristics only.

    If GRR as a % of tolerance is greater than 30% , it is not acceptable formeasuring any type of characteristics and measurement system

    should be improved

    2.13 Notification of and Control of Nonconforming Material

    All suspect material shall be properly contained at the suppliers facility. All

    suspect nonconforming material shall be quarantined in a segregated area,

    designated for that purpose only. An effective system is required for proper

    identification and timely disposition of nonconforming material. The supplier is

    responsible for maintaining and analyzing data for those non-conformances.

    Supplier shall take necessary action to avoid shipment of such material to Tata

    Motors. If such material is shipped to Tata Motors, Supplier shall be responsible

    for all the liabilities arising due to this. Suspect material (material whose

    inspection/test status is not known) and obsolete material shall be treated at par

    with Non-conforming material.

    2.14 Preventive/Corrective Action and Problem Resolution

    The supplier shall establish systems to document and track corrective actions.

    Corrective actions could be referred to as Non-conforming Material Reports

    (NCMRs), Corrective Action Reports or Defective Material Reports. Results must

    be traceable to the initial reason for the corrective action request. The format

    used must drive towards root cause analysis and implementation and

    effectiveness of permanent action to eliminate the problem and the possibility for

    recurrence. Analysis of actions taken and results shall verify the effectiveness of

    the solution.

    If containment is needed, it shall include:

    Method of containment,

    How new product is identified, and

    Containment plan for product in transit or at Tata Motors.

    The permanent corrective action or an action plan shall be issued to the Tata

    Motors within 7 working days of notification of the occurrence.

    TATA MOTORS LIMITED

  • 7/28/2019 development of automotive components

    9/21

    This shall include:

    Root Cause analysis,

    Verification of corrective action, and

    Dates and Responsibilities for actions not complete.

    All corrective action responses are to be closed out in a timely and

    expeditious manner, with a maximum target closure date of thirty days.

    Corrective action requiring more than 30 days requires written approval

    from Tata Motors.

    To end this, the suppliers system shall contain a mechanism for escalating

    unresolved problems to the suppliers executive management to ensure action is

    taken and to enable an understanding of any strategic implications.

    The supplier shall develop a method for assessing the responsiveness and

    effectiveness of their problem resolution process.

    During specific instances Tata Motors supplier may be requested to attend a

    Quality meeting. A targeted supplier may be one with a high PPM or one with

    chronic repetitiveness of bad quality.

    2.15 Traceability

    Unless otherwise agreed to, the supplier shall maintain the ability to trace their

    product from the lot identification as shipped to Tata Motors, back through theirmanufacturing system to the raw material source.

    2.16 Manufacturing Capabilities

    Suppliers shall establish systems and procedures, which seek to continually

    optimize the efficiency and productivity of its manufacturing capabilities. These

    efforts are directed at such activities as minimization of floor space, inventory,

    cycle time, manpower, and use of other resources in all aspects of the

    manufacturing process. Suppliers shall ensure that cross-functional teams are

    established to develop methods to optimize process effectiveness using Kaizen,

    mistake proofing, and/or other proven methods. Objective evidence of these

    methods must be evidenced during the Preventive and Corrective Action stage of

    the process.

    2.17 Specific Requirements

    In many cases, this manual will not sufficiently describe all of the specific

  • 7/28/2019 development of automotive components

    10/21

    requirements of Tata Motors or particular customer. The Tata Motors specific

    requirements shall be identified during the Advanced Product Quality Planning

    (APQP) activities. If there are any questions regarding these specific

    requirements, the supplier shall contact the respective Purchasing Department of

    Tata Motors.

    TATA MOTORS LIMITED

    Product-specific requirements may include but not be limited to the following:

    Special characteristics.

    Testing.

    Special handling.

    Customer-specific requirements may include but not be limited to the following:

    Quality management systems.

    Process techniques and process controls.

    Identification and processing of critical parts and features.

    Certification.

    2.18 Economic-Considerations of Quality-Related Costs

    The suppliers management shall define and document a comprehensive quality

    cost management system and facilitate quality improvement efforts that will lead

    to operating cost reduction opportunities. Tata Motors believes that when quality

    costs can be measured and related to an area where basic quality performance

    data exists, the quality improvement process can begin.

    An effective quality cost program consists of the following steps:

    Establish a quality cost measurement system.

    Develop a suitable long-range trend analysis.

    Establish annual improvement goals for total quality costs.

    Develop short-range trend analysis with individual targets, which

    collectively add up to the incremental demands of the annual improvement

    goal.

    Monitor progress against each short-range target and take appropriate corrective

    action when targets are not being achieved.

    2.19 Product Safety and Product Liability

    The safety aspects of product quality shall be identified with the aim of enhancing

  • 7/28/2019 development of automotive components

    11/21

    product safety and minimizing the potential consequences of product liability. The

    company and its employees must be aware of its potential consequences.

    2.20 Housekeeping

    The supplier shall have a documented system to ensure their facility is clean and

    orderly. This verification shall be a part of their internal quality audits. Tata

    Motors strongly feels that a supplier with an effective Housekeeping process

    allows itself to present well to its customers and employees

    2.21 Tooling Management

    The supplier shall establish and implement a system for tool control. This

    includes items manufactured from stampings, injection molding, template

    cutouts, etc. Formal procedures addressing tooling handling, storage,

    modification, setup, design, preventive maintenance and calibration shall be

    maintained and shall be followed. All tooling purchased, loaned or financed by

    TATA MOTORS LIMITED

    Tata Motors shall remain the property of Tata Motors. Normal storage,

    maintenance, repair and calibration of own and Tata Motors tooling, unless

    otherwise negotiated, is the responsibility of the supplier, such as expected tool

    life will be achieved and conforming parts are produced.

    2.22 Control of Special Process

    The supplier must have an approved system in place to validate, revalidate and

    to perform special processes such as a) Plating, b)Heat treating, c) Welding, d)

    Surface finish / coating / treatment (painting and plating), and others that require

    approval certification of the process equipment and procedures. Please refer to

    Appendices for the list of current sources approved by Tata Motors for special

    processes. Supplier shall take approval for a new sub contractor for special

    processes from Tata Motors before starting the development. The requirements

    for any qualification of process operations, including associated personnel and

    equipment shall be documented.

    2.23 Inventory Age Control

    The supplier shall have an effective system for age control within their inventory

    for items whose acceptability is limited by age of the item. The system must

    include a method of identifying the age of such items and provision for the

  • 7/28/2019 development of automotive components

    12/21

  • 7/28/2019 development of automotive components

    13/21

    in the supply chain. Cost reduction proposals may include ideas, which involve

    but are not limited to:

    Component Design

    Material Type

    Packaging Requirements

    Logistics

    Process Standards

    Cycle Time Reduction

    Workplace Organization

    Value Analysis/Value Engineering

    Validation Test Requirements

    Certification Methods

    3.3 Cost Control and Reduction

    The supplier shall have a process that ensures:

    All costs are controlled during the life of the products.

    All potential cost reduction opportunities are clearly identified.

    As part of this process, the supplier shall establish and maintain documented

    records of all criteria that may influence the cost of their products. This

    information shall primarily be used to manage and control cost, and to ensure theimpact of economic factors and market fluctuations are minimized. This

    information shall also be used to highlight opportunities for cost improvement.

    The supplier shall compile and maintain a document of continual

    improvement/cost reduction ideas for submission to the customer. The continual

    improvement ideas shall be frequently reviewed with the appropriate purchasing

    agency to maximize the effect of potential cost improvements.

    TATA MOTORS LIMITED

    3.4 Commercial Agreements

    General RequirementThe supplier must comply with Tata Motors standard Purchase Order terms and

    conditions. The suppliers must sign the Purchasing Agreement with Tata Motors

    and should follow the same during the entire contract period of Purchase Orders.

    3.5 Warranty

    The supplier shall commit to the terms and conditions of warranty in the

  • 7/28/2019 development of automotive components

    14/21

    Purchase Order / Purchasing Agreement.

    3.6 Non-Conforming Materials

    Non Conforming Materials affect the quality of final products, and hence the

    suppliers shall ensure that these are not getting mixed with their normal supplies

    .Non Conforming Material Report (NCMR) may also be referred to as a rejection

    report.

    Tata Motors may recover an administration fee for each non conforming material.

    A late charge will be issued if an initial response is not received within

    appropriate time of notification of an NCMR. Suppliers are requested to

    communicate the same to QA and Purchasing Agency.

    A late charge will be issued if a permanent corrective action or an action plan

    showing responsibilities and due dates is not received within 7 working days of

    notification of the occurrence. Suppliers are requested to communicate the same

    to QA and Purchasing Agency.

    Any and all costs related to the NCMR incurred by a Tata Motors facility will also

    be charged back to the supplier. These costs may include:

    Down time

    Sorting

    Scrap Supervision

    Rework

    Premium Freight

    TATA MOTORS LIMITED

    Section 4 : Delivery4.1 Logistics PlanningGeneral Requirements

    The supplier shall ensure that logistics development activities are planned for

    and carried out at an appropriate stage in a products development & life cycle.

    All logistic planning and development activities shall be carried out according to

    the requirements of Tata Motors.

    Delivery requirements:

    100% On Time delivery is requiredIf a supplier does not meet our 100% target,

    the supplier may be requested to provide action plans to address the causes.

  • 7/28/2019 development of automotive components

    15/21

    On-time delivery must contain the complete quantity of parts scheduled and meet

    specification.

    Any cost incurred due to late delivery will be charged back to the supplier. This

    includes:

    Late PPAP submissions

    Late/missing/incorrect documentation

    Any extra cost, associated with a suppliers lack of meeting Tata Motors delivery

    and quality requirements will be debited back to the supplier. This cost would

    include premium freight, machine downtime, etc.

    Suppliers should track all premium freight within their system as a quality

    requirement. Tata Motors requires suppliers to be SRM compliant. The supplier

    shall identify personnel responsible for the support of product delivery to the Tata

    Motors during all hours of operation. This information should be provided to your

    Tata Motors contact.

    4.2 Design for Logistics

    The supplier shall ensure that logistics issues are given due consideration, at an

    appropriate stage of product development, to enable the following:

    Optimal design to reduce packaging complexity.

    Optimal design to improve ease of handling. Optimal design to reduce the likelihood of product damage.

    Damage to environment.

    Tata Motors encourages use of recyclable cartoon boxes.

    4.3 Delivery Process

    The supplier shall develop a delivery plan that identifies the most appropriate

    process for the delivery of their product to support a daily production requirement

    at Tata Motors. In doing so, the supplier should consider the following:

    Supply routing for transportation.

    Warehousing (size, storage specifications, shelf life).

    Any requirement for sequenced delivery product Traceability.

    TATA MOTORS LIMITED

    Where transportation is provided by Tata Motors (Milk route suppliers), the

    supplier must ensure that products, together with an appropriate means of

  • 7/28/2019 development of automotive components

    16/21

    loading, are available at the required times.

    Where transportation is the responsibility of the supplier:

    The supplier shall have an effective transportation policy. The policy shall

    be regularly reviewed for cost effectiveness and success in meeting

    customer requirements.

    The supplier shall measure transportation performance for identifying

    further opportunities for delivery performance improvement.

    The supplier should ensure that a deviation form accompanies any

    material that is not to specification.

    The supplier shall have a process for the measurement and review of

    logistics management performance. This review should be conducted at

    the executive level of the organization.

    4.4 Supply Chain Flexibility

    Externally, the supplier shall complete an analysis of the effectiveness of the

    planned supply chain and its associated processes for each commodity at the

    suppliers manufacturing site. Each supplier shall be responsible for managing

    its own supply chain. Internally, the supplier shall identify any constraints that

    prevent a free supply of components and assemblies through the manufacturing

    process. Areas of inflexibility shall be investigated so that they can be eliminatedor managed. Details of flexibility must be made available to the Tata Motors on

    request.

    4.5 Labeling Standards

    Suppliers shall ensure to attach identification tag on all consignments supplied to

    Tata Motors giving complete details. Any deviations from the requested standard

    must be provided in writing from the Tata Motors location receiving product.

    4.6 Premium Freight

    The supplier will be held liable for additional freight cost incurred because ofsuppliers lack of quality and delivery performance. Any premium freight

    incidences and their cost must be tracked at the suppliers location as a quality

    requirement.

  • 7/28/2019 development of automotive components

    17/21

    Section 5 : Support5.1 Risk Assessment

    The supplier must have a process for the identification and management of

    potential risks to ensure proper supply of parts and materials to Tata Motors. The

    intent of this process is to proactively address contingencies and risk. The

    supplier shall inform Tata Motors about the action plan to encounter the

    contingencies and risk.

    The suppliers Risk Assessment process shall include a periodic assessment and

    review of all possible risks. The process shall analyze risks associated with both

    facilities and personnel, considering issues such as:

    Product, facility or individual skill uniqueness.

    Critical process element susceptibility to disruptive damage.

    Susceptibility to natural phenomena (i.e. flood and earthquake).

    Labor Unrest

    Second tier supplier related issues.

    Hazardous Material Reporting (i.e. End of Vehicle Life requirements,

    Cadmium, Mercury, Hexavalent Chromium).

    Change in legislation, which may affect the Suppliers business or QMS.

    The output of this assessment shall be used to identify where action is required,

    if economically feasible, to remove or reduce the likelihood of these problems

    occurring. The assessment shall also include an estimation of potential downtime

    in a major catastrophe. The supplier shall inform Tata Motors about occurrence

    of such incidence and work-out a joint action plan.

    5.2 Continual Improvement

    The supplier shall demonstrate the effective deployment of a comprehensive

    continual improvement plan across the whole organization. The objective of

    continual improvement is to deliver real improvements in customer satisfaction

    and business performance, thus maintaining and strengthening the

    organizations competitive advantage, and that of the whole supply chain.

    The supplier shall ensure that continual improvement activities are focused on

    those businesses and manufacturing processes that have the greatest influence

  • 7/28/2019 development of automotive components

    18/21

  • 7/28/2019 development of automotive components

    19/21

    improvement and work out action plans for improvement in the performance of

    the Supplier. The Suppliers shall also be ranked according to their scores in

    rating according to the system. While high performing Suppliers shall be given

    preferred treatment regarding new developments, those showing no

    improvements despite efforts may be considered for deselection.

    The Supplier can access the feed back through our network, SRM being

    provided to the approved vendors free of any charge. For any queries, the

    Supplier is to contact the related Development, Purchasing agency or Quality

    Assurance Division.

    Rating System Profile :

    Following are the details of Tata Motors Supplier Rating System:

    The system has been configured in our ERP system, SAP 4.6c.

    Suppliers are rated on the overall scale of 1 to 100 in this comprehensive

    system. The supplies of the items under development are excluded from the

    scope to avoid influence of iterations during development.

    The overall score is arrived at by aggregation of the scores on five Main Criteria:

    1 Quality

    2 Price

    3 Delivery4 Design and Development Capability

    5 Management Systems

    Each of these Main Criteria has the scale of 1 to 100 .

    Current weightage to each of these Main Criteria is :

    1 Quality 50%

    2 Price 20%

    3 Delivery 20%

    4 Design and Development 5%

    5 Management System 5%

    TATA MOTORS LIMITED

    Tata Motors may revise the weightage of these Main criteria according the

    relative importance of the same to Tata Motors from time to time .

  • 7/28/2019 development of automotive components

    20/21

    Each of these Main Criteria has been further drilled down in to constituent sub

    criteria elements. While the scores on these sub criteria are mainly arrived at

    through transactional details of the supplies made by the Supplier through the

    system, officers from the related development / purchasing / quality assurance

    divisions allot scores to the Suppliers on others.

    Sub Criteria and their weightages and method of scoring are as follows:

    Quality :Parameter Vendors with WarrantyImpact (Proprietary)Vendors with no WarrantyImpact (Sheetmetal,machining)Incoming inspection 10 10

    Line rejection 25 35Audit - 10Quality systema) Quality certification 10 10b) Audit at vendor 15 15Warranty 30 -PPM* 10 20

    PPM PPM score

    Below 200 100

    201 -500 75

    501-1000 50

    1001 & Above 1Price :

    1Price Level 70% Through system

    2Price Behavior 30% Through system based on the

    price revisions

    Delivery:

    Till MRP functionality in SAP goes live , this score shall be updated by

    concerned officers .

    1 On time Delivery 70%

    2 Quantity Reliability 30%

    Design and Development Effort: 5% Updated by concerned officers

    TATA MOTORS LIMITED

    Management System 5% Updated by concerned officers

    Currently the frequency of the feed back to the Suppliers through this system is

  • 7/28/2019 development of automotive components

    21/21

    once every quarter.

    Sample of the Supplier Rating System:

    If Supplier scores as follows:

    1 Quality : 90

    2 Price: 80

    3 Delivery: 80

    4 Design and Development: 60

    5 Management System 80

    Then the overall score is worked out by taking the weighted average as follows :

    Overall score ={ Sum of the (Weightage of the Main Criteria * Score for that Main

    Criterion) }.

    Overall Score in the example ={ ( 0.5*90 ) + ( 0.2*80 ) + (0.2*80 )+ (0.05*60 ) + (

    0.05*80 ) } = 83 .