2/15
Reduced inventory due to single piece o! Reduction in cycle times Room for continuous improvement
Reduction in variability
"le#ibility of product mi#
Why reduce setup time?
$e % $o&' ts
&(cs&)*s' (*s-+,)*s
&,
-
8/20/2019 Development of a Teaching Tool for Setup Time
3/15
ttp.))!!!/slidesare/net)anandsubramaniam)set-up-reduction
-
8/20/2019 Development of a Teaching Tool for Setup Time
4/15
Identify elements(Internal and E#ternal, and!aste
Incorporate Automation
Eliminate adustment Eliminate use of tools Incorporate modular design Incorporate 1uic2 action mecanisms
Ways to reduce setup time
-
8/20/2019 Development of a Teaching Tool for Setup Time
5/15
3e Seven 4astes of ean Manufacturing are6 3ransport Inventory
Motion 4aiting 7ver-Processing 7verproduction 8efects
Wastes
-
8/20/2019 Development of a Teaching Tool for Setup Time
6/15
Identifying wastes in the oldsetup
Activity Analysis
Removing and boltingon ne! die
9se of non standardbolting: loo2ing for tools
Installing ne! punc Adustment oforientation and bolting
"eeder Adusting according tone! incoming strip!idt: scre!ing
-
8/20/2019 Development of a Teaching Tool for Setup Time
7/15
Incorporation of changes
Punc adustment andbolting eliminated
-
8/20/2019 Development of a Teaching Tool for Setup Time
8/15
oss of !asers and need for
!renc eliminated
-
8/20/2019 Development of a Teaching Tool for Setup Time
9/15
Adustment and need for scre!driver eliminated
-
8/20/2019 Development of a Teaching Tool for Setup Time
10/15
1uic2 cangeover
-
8/20/2019 Development of a Teaching Tool for Setup Time
11/15
Eliminates 3ools: free to use bot ands insetup
Standardised modular design
1uic2 action clamping and bolting "ast cangeover Eliminates feeder adustment
Salient features
-
8/20/2019 Development of a Teaching Tool for Setup Time
12/15
Activity Time taen
Removing nuts and die &m+5s';0s%&m55s
"i#ing ne! die and bolt +
-
8/20/2019 Development of a Teaching Tool for Setup Time
13/15
Activity Time taen
Removing die and fasteners &+s';;s%+m5s
"i#ing die and fasteners &0s'+5s%?5s
Punc removal and installation &s'&s%;s
"eeder adust(remove and @#, +
-
8/20/2019 Development of a Teaching Tool for Setup Time
14/15
3e time study conducted on te variouselements reveals tat te average timereduces by =? by incorporating eanPrinciples/
3ere is al!ays room for continuousimprovement/
&onclusion
-