Hillborough, Herne BayAugust 2009
Proposed Sustainable Urban Extension
DEVELOPMENT FRAMEWORK DOCUMENT
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 2/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
2
PrEPArED by
bArton WillmorE
35 Kgs H AveueKgs H
Wes mag
Ke
mE19 4bW
t: 01732 845845
F: 01732 223808
Cpgh. the ces f hs dcue us e epduced whe pa whu p we cse f ba We.
A odace Suves aps epduced wh he pess f he Ce f HmSo.
Cw Cpgh reseved. lcece n. Ar 152684.
17827. FinAl. 11.08.09
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 3/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
Contents
1.0 Introduction and Background 4
2.0 Planning Context 6
3.0 Why Hillborough/Herne Bay? 10
4.0 The Options for Herne Bay 14
5.0 Technical Studies & Consultation Responses 18
6.0 Design Principles and Masterplan 20
7.0 Deliverability of the Site 24
8.0 The Way Forward 25
D E V E L O P M E N T F R A M E W O R K D O C U M E N T
T E C H N I C A L A P P E N D I C E S
APPeNdIX 1. Preliminary (Highways) Appraisal, June 2009 - Colin Buchanan
APPeNdIX 2. Ecology and Development, September 2009 - Tom La Dell
APPeNdIX 3. Quantitative Employment Land Assessment, June 2009 - Colin Buchanan
APPeNdIX 4. Archaeological Desk Based Assessment - Swale and Thames Archaeological Survey Company
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 4/26
4
1.0 Introduction and Background
This document has been prepared on behalf of Kitewood Investments Ltd, and sets out the principles behind the promotion of a
sustainable urban extension at Hillborough, Herne Bay.
Canterbury City Council is presently in the process of preparing its Local Development Framework including its CoreStrategy. This document seeks to inform that process and demonstrates the suitability of the site as a strategic
development opportunity at Herne Bay. The site will contribute and deliver signicant benets to Herne
Bay and contribute towards delivering Canterbury City Council’s housing requirement and employment
needs to 2026.
Herne Bay is a sustainable and attractive coastal settlement to live and work, and is second
only in size to Canterbury within the District. Whilst Canterbury is acknowledged as being the
principal location for future development, Herne Bay, and to a lesser extent Whitstable play an
important and vital role in supporting the delivery of housing in the District. Strategic development
is necessary in sustainable settlements within the District in addition to Canterbury, to meet the
needs of those settlements and provide a suitable spatial distribution of housing. In order to
demonstrate this, the document uses data that has been extrapolated from Experian which
utilises ONS data. Experian is a global leader in providing value-added information solutions to
organisations and consumers. Experian provides information, analytics, decision-making solutions
and processing services.
The site is approximately 77ha and was previously promoted in the Canterbury Local Plan (July 2006)
review process and has historically been promoted as far back as 1991 where it was considered by the District
Council as a potential mixed-use development allocation. Since that time, a number of nearby sites have comeforward for development either as employment or residential sites. These developments demonstrate the potential
for the Hillborough area in delivering further mixed-use development at Herne Bay.
The site continues to represent a potential sustainable urban extension on the edge of an existing
urban boundary. The site will contribute signicantly to:
• Meeting the strategic employment and housing requirements in Herne Bay specically and the District generally;
• Provide for much needed Affordable Housing in Herne Bay and a range in house types;
• Provision of enhanced social and recreational opportunities including bringing into public use a currently private space;
• Potential improvement to Public Transport including new bus route;
• Improvements to existing Rail Bridges;
• A new neighbourhood centre including retail and community uses;
• A site for a new school;
• Enhancing the vitality and viability of the town itself; and
• Reducing the pressure of development on the edge of Canterbury.
The site is suitable for a mixed-use allocation in the emerging Core Strategy and presents a good opportunity to provide for a
sustainable development to support the wider objectives of the Development Plan in Canterbury.
The ProPosed New CommUNITy
South of Hillborough, Herne Bay
s I T e C o N T e X T P L A N
• Site location - eastern side of Herne Bay
• 2.5km from town centre/retail core (13 min cycle and 31 min walk)*
• 3km from railway station (15 min cycle and 38 min walk)*
• Within 1km from coast, local centre, local health centre and primary
school (5 min cycle and 13 min walk)*
• Enclosed by residential development to north and east, by employment
to south east and A299 Thanet Way to south
• Close to two junctions of A299
• Integration with existing community
* distances are approximate and have been measured from the centre of the Site (the Kent
Design Guide: “1km equates to 5 minutes cycling and a 12.5 minute walk)
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 5/26
5
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
1.0 Introduction and Background
A E R I A L P H O T O G R A P H O F T H E S I T E
Altia Buin Pak Altia Buin Pak
Tn CntTn Cnt
r a i l w a y L i n e
r a i l w a y L i n e
hillbughillbug
A299 Tant waA299 Tant wa
sag wksag wk
sweechbridge Lanesweechbridge Lane
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 6/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
6
2.0 Planning Context
IntroductionThe Development Plan for the site comprises the South East Plan (May 2009) and Canterbury District Local Plan First
Review (July 2006). The South East Plan has replaced RPG9 and the Kent and Medway Structure Plan.Canterbury City Council’s emerging Local Development Framework (and associated documents), and Canterbury
District’s housing land supply position are also r eviewed in this section. Finally this section summarises the implications
of adopted and emerging planning policy and the housing land supply position on the Hillborough site.
National Planning Guidance
PPS1 and PPS3 emphasise the Government’s objectives in seeking to achieve a step-change in terms of housing
delivery, and Draft PPS4 continues such objectives in respect of economic prosperity and the role of mixed-use
developments as part of a holistic approach to delivering sustainable development. PPS12 sets out what Spatial
Planning is, and how LPA’s should implement the Local Development Framework System. A key requirement and
theme throughout PPS12 is the need for LPA’s to focus on housing delivery.
PPs1: dliving sutainabl dvlpnt (Janua 2005)
PPS1 provides an overview and general statement of the Government’s objectives for the planning system and
outlines sustainable development as the core principle underpinning planning. It emphasises that planning should
facilitate and promote sustainable and inclusive patterns of urban and rural development by:
• Making suitable land available for development in line with economic, social and environmental objectives to
improve people’s quality of life;
• Contributing to sustainable economic development;
• Ensuring that development supports existing communities and contributes to the creation of safe, sustainable,
liveable and mixed communities with good access to jobs and key services for all members of the community;
• create high quality and new opportunities for people, especially via mixed-use developments in locations where
the linkages between different uses can create more vibrant places;
• provide for improved access to jobs, health, education, shops and open space;
• bring forward sufcient land, of suitable quality in appropriate locations, to meet the expected needs of
housing and commercial developments – whilst having regard to accessibility, sustainability and infrastructure
requirements.
PPs3: huing (Nvb 2006)
PPS3 sets out the Government’s objective towards the provision of housing and seeks to ensure that everyone has
the opportunity of a decent home (para 9). PPS3 encourages local planning authorities to provide wider housing
opportunities and choice, and a better mix i n the size, type and location of housing than is currently available, with
good access to jobs, key services and infrastructure (para 10).
In seeking to identify suitable locations for development, para 36 indicates that the Government’s policy is:
• to nd sites that have good access to jobs and key services;
• make efcient use of land, infrastructure and available public and private investment;
Paragraph 38 of PPS3 states that ‘LDD’s should set out a strategy for the planned location of new housing which
contributes to the achievement of sustainable development’. Criteria for broad locations and site specic include:
• The spatial vision for the area;
• Evidence of current and future levels of need and demand for housing and availability of sites;
• Contribution to cutting carbon emissions by focusing new development in sustainable locations with good
access to public transport;
• Options for accommodating new growth taking into account opportunities and constraints;
• Accessibility to local facilities, infrastructure and services; and,
• The need to develop mixed, sustainable communities across the wider Local Authority area as well as at
neighbourhood level.
daft PPs4: Planning f Ppu ecni (ma 2009)
Draft PPS4 was published in May 2009 and seeks to combine various strands of planning policy related to the economy
into one document, bringing together PPS4, PPS5, PPS6 and parts of PPS7. The draft PPS focuses on the need to
prepare an evidence base to understand and respond to existing business, leisure and retail needs and to prepare
Local Economic Assessments. This evidence base should underpin development plans and should understand the
economic markets, the broad need for land for economic development and taking account of areas of deprivation
and deciencies.
The objectives of draft PPS4, are set out as to:
• achieve sustainable growth;
• deliver more sustainable patterns of development and respond to climate change;
• promote high quality and inclusive design, improving the quality of the public realm and open spaces;
• improve accessibility and provide alternatives to car use; and,
• promote the vitality and viability town and other centres as important places for communities and ensure that
they are economically successful recognising that they are important drivers for regional, sub-regional and local
economies.
PPs12: Lcal spatial Planning (Jun 2008)
PPS12 sets out what spatial planning is, how it benets communities and identies the key ingredients of spatial plans.
One of the key messages taken from PPS12 is the requirement for LPA’s to focus on the need for housing delivery. In
relation to housing, PPS12;
• ensures that the necessary land is available at the right time and in the right place to deliver the new housing
required;
• orchestrates the necessary social, physical and green infrastructure to ensure sustainable communities aredelivered; and
• provides the basis for the private sector facilitating of affordable housing.
Spatial planning is also critical in relation to economic growth and regeneration by:
• providing a exible supply of land for business and identifying suitable locations;
• ensuring business is drawn to the area by providing an attractive environment and a sufcient workforce well
housed and able to access employment opportunities easily and sustainably;
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 7/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
7
Sub Regional Policy eKA4: Uban rnaianc f t Catal Tn states in part:
Supporting paragraphs 18.33 and 18.34 of the SEP relate to employment Policy EKA6. The paragraphs summarise
that ‘the amount of employment land provided in East Kent should be generous where growth is concentrated and
where the local economy is most urgently in need of regeneration’. The paragraphs continue that ‘some major sites
in East Kent and Ashford have been slow to develop and that recent business investment has been by established
rms that are not located on major business sites. There is therefore a need to consider not only land primarily for
business use, but to provide more widely for new employment locations’.
The site is considered to fully accord with the SEP’s objectives in seeking a commensurate level of residentialdevelopment in Herne Bay whilst also providing for a strategic employment location. The increase in Altira Business
Park would support the increase in residential growth of Herne Bay and deliver employment opportunities to support
the towns viability and vitality. The level of residential and employment growth proposed is considered suitable for
Herne Bay and would support the role of Canterbury as the Regional Hub.
The Kent & Medway Structure Plan 2006
The Kent & Medway Structure Plan (KMSP) has been superseded by the South East Plan.
Canterbury District Local Plan First Review
Herne Bay is shown at inset 3 of the Proposals Map. The strategic site at Hillborough is outside, but immediately
adjoins, the Urban Area Boundary. The site is white land, i.e. it is not subject to any specic designation. Unlike other
areas adjoining Herne Bay, the site is not shown to be at risk from ooding or designated as green gap.
The Local Plan seeks to focus housing development on allocated sites and on other non identied previously
developed land within urban areas. A reserve housing site on land adjoining Richmond Drive, Beltinge (Herne Bay)for 40 dwellings up to 2011 is allocated, but is only to be released if required. This site lies immediately to the north of
the Hillborough site and is controlled by Kitewood.
There are other allocated sites in close proximity to the Hillborough site, including at Hillborough Farm/Metric both
of which are being developed by Kitewood’s housing company ‘Octave Homes’. The completed development will
provide a bypass for Hillborough village.
• bringing in private funds through incentivising, promoting and coordinating investment by the private sector;
• providing a robust basis for making bids for public funds and for assembling land for projects; and
• providing a robust basis for assessing the need for, and providing supporting infrastructure and natural
resources for economic development.
PPS12 also states that Core strategies may allocate strategic sites for development. These should be those sites
considered central to achievement of the strategy. Progress on the core strategy should not be held up by inclusion
of non strategic sites.
PPS12 (p20) sets out the concept of ‘soundness’.
The site accords with the above National Planning Guidance as it is located in a sustainable location with good
access to existing infrastructure and facilities. The proposed mixed-use of the site will deliver both residential and
employment provision and integrate new and existing communities in accordance with the national aims and
objectives. The proposed development is deliverable in terms of infrastructure provision and also provides for the
exibility for development across the district.
The South East Plan (May 2009)
The South East Plan was adopted in May 2009. Canterbury City is identied within the Plan as one of 22 Regional Hubs
across the South East region where new housing development and economic activity is to be located in areas close
to or accessible by public transport.
The prime focus for development across the South East should be at urban areas or adjacent to urban areas with 60%
of all new development to be on previously developed land. In addition, the plan seeks to address the extensive
regeneration needs of a number of areas including East Kent and Ashford.
The whole of Canterbury District including Herne Bay is located within the East Kent and Ashford Sub Region.
The SEP sets the regional and local housing requirement for the period 2006 -2026. The SEP has set Canterbury District
an annual target of 510 dwellings per annum or 10,200 units from 2006-2026. Canterbury City Council is required
to deliver this level of housing in accordance with the general policies of the plan via the preparation of the City
Council’s LDF.
Whilst the SEP sets the main focus for development to be located towards the Regional Hub of Canterbury, it does
provide for policies that ensure that other towns and villages in the area can remain vibrant and active. Employment
uses of a suitable scale and character and that a broad balance between new housing and new jobs will also be
sought.
2.0 Planning Context
To be “sound” a core strategy should be JUSTIFIED, EFFECTIVE and
consistent with NATIONAL POLICY.
“Justied” means that the document must be:
• founded on a robust and credible evidence base;
• the most appropriate strategy when considered against the
reasonable alternatives;
“Effective” means that the document must be:
• deliverable;
• exible;
‘Local Authorities and development agencies will work together to encourage new economic impetus
throughout the coastal towns including the following:
i. regeneration measures will create high quality urban environments within the coastal towns.
vii the smaller towns of Deal, Faversham, Herne Bay and Whitstable should develop stronger local service
functions and mixed employment uses of a scale and character suitable to their size.
A broad balance between new housing and new jobs will be sought at each urban area at a level commensurate
with the size and character of the town.’
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 8/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
8
The Previous Promotion of the Hillborough Site
The Hillborough site was promoted at the Local Plan Inquiry into the First Review of the Canterbury District Local Plan.
The Hillborough site was rejected by the Local Plan Inspector, in his report of June 2005, as he considered there to bean absence of real need for any development on the land in the plan period, i.e. up to 2011.
The Local Plan sought to allocate sites under circumstances that have now signicantly altered: for example, the
period of the plan was to 2011 whilst the Core Strategy will run to 2026; the number of dwellings to be provided was
signicantly fewer than will be required in the Core Strategy; the acknowledged need for a step change in the
housing requirements across the South East including in Canterbury District; and, the current economic downturn.
There are compelling reasons to reconsider strategic development at Hillborough including:
• The positive role that it could play in assisting with the regeneration of the town;
• How it could meet the specic needs of Herne Bay and help deliver the signicant amount of new developmentrequired by the South East Plan; and:
• The dangers of concentratingall strategic development in and around Canterbury in terms of limiting exibility,opportunity, choice and delivery in the housing market and restricting development that would boost the
economy of coastal towns such as Herne Bay.
Emerging Local Development Framework The Local Plan is relatively up to date and therefore the Local Development Framework (LDF) is at an initial stage. The
key document is the Core Strategy through which strategic developments, such as the opportunity at Hillborough,
would be promoted. The latest timetable for the Core Strategy, as at August 2009, is set out below. This submission is
made to assist in this process. The promoters of the site wish to work with all parties to formulate a mutually supportive
proposal.
LDF Document LDF St age o f P reparation Dat e/Co mments
Core Strategy Options Document (Reg 25) November 2009
Preferred Options July 2010
Submission Summer 2011
Examination Late 2011
Inspectors Report Spring 2012
Adoption Summer 2012
Herne Bay Action Area Plan
A Herne Bay Area Action Plan is under preparation and was consulted upon prior to submission to the Secretary ofState. This Action Plan deals with central Herne Bay and considers themes to regenerate and attract investment into
the town. Development at Hillborough is outside the scope of the AAP, but could be complimentary to the AAP’s
objectives. The peripheral development of this site will naturally enhance the economy of the Town Centre by virtue
of increasing the critical mass and sustaining the level of population in Herne Bay. This will ensure the vitality and
viability of the Town Centre remains and strengthens in future years.
A Developer Contribution SPD is also proposed for consultation in Spring 2010. This will set out the contributions/
infrastructure that new development is expected to deliver.
2.0 Planning Context
The site would go someway to achieving the aims and objectives of the Herne Bay Area Action Plan. For example
table 2 below sets out the current and future expenditure per person for retail goods in Herne Bay to 2031. As can beseen the projected retail expenditure per person is predicted to increase over time.
Tabl 2: Cnvninc an Cpain expnitu Fcat (p a)
Table 3 demonstrates the expenditure forecast from the site up to 2026 (700 dwellings) and up to 2031 (1,200
dwellings). Based on an average household size of 2.3 people, the population expenditure forecast (2026) would
be a total spend per annum of £2,892,554 for convenience goods and £9,675,813 for comparison goods from the
population of the site. This increases to £5,134,665 for convenience goods and £20,769,647 for comparison goods if
the overall site yields 1,200 units by 2031. This is a signicant factor when considering the future housing allocation at
Herne Bay and would support the aspirations and objectives of the AAP.
Tabl 3: Tt al Cnvninc an Cpain G expnitu Fcat
Convenience Goods Retail Expenditure Comparison Goods Retail Expenditure
2007 2021 2026 2031 2007 2021 2026 2031
(£000) (£000) (£000) (£000) (£000) (£000) (£000) (£000)
1,683 1,735 1,796 1,860 2,970 4,799 6,009 7,525
Y ear No. o f Dwell ings Househo ld S ize P opulat io n Convenience Compari so n
Goods (£) Goods (£)
2026 700 2.3 1,610 2,892,554 9,675,813
2031 1,200 2.3 2,760 5,134,665 20,769,647
Tabl 1: LdF Titabl
SOURCE: Experian Expenditure Report
NOTES: 2007 gure provided by Experian includes Special Forms of Trading
Ultra-long term growth rates taken from Experian Retail Planner Brieng Note 6.0 as follows:
convenience goods: 0.70 %
comparison goods: 4.60 %
Special Forms of Trading deducted from 2021, 2026 and 2031 gure as follows:
2021 convenience 6.5 comparison 13.9
2026 convenience 6.5 comparison 13.9
2031 convenience 6.5 comparison 13.9
SOURCE: No. of dwellings in 2026 and 2031 are BW estimates
Household size is a BW estimate based on Experian Data
Convenience and Comparison Goods gures taken from Table 1, multiplied by population
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 9/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
9
2.0 Planning Context
sua• DevelopmentinCanterbur yDistrictistobefocusedonpreviouslydevelopedlandintheprincipalurban
aa, i.. Cantbu, hn Ba an wittabl;
• CanterburyisidentiedasaRegionalHubintheSouthEastPlanandwillbeexpectedtodeliverahighlvl f tatgic vlpnt;
• T seP al nu t Catal Tn ain vibant an a apptin a uitabl lvl f huingan eplnt allcatin;
• RegenerationofHerneBayisakeyaimofplanningpolicyandanAreaActionPlanisbeingpreparedt lp liv gnatin;
• ThesiteisconsideredtosignicantlycontributetoachievingtheaimsandobjectivesoftheSEPandt AAP;
• FocusingallstrategicdevelopmentinCanterburywillnotdirectlyassistinregeneratingHerneBayort t n f hn Ba, f xapl in t f affabl uing, cnic gt f t TnCnt an utaining it cnic viabilit;
• TheSouthEastPlanemphasiseshousingdeliveryacrosstheSouthEast;
• ArangeofsitesacrosstheDistrict,includingstrategicgreeneldsites,arerequiredintheCoreStrategytobringchoiceandopportunitytothehousingmarketandexibilitytothedeliveryofhousingwithint ditict; an,
• Landat Hillborough iswellplaced intermsof theexistingbuiltformof Herne Bay, isrelativelyuncntain in nvinntal t an i ll lcat t t tatgic a ntk an cntlbuilt an pitt plnt vlpnt an ul cplnt t gnatin f hnBa.
Strategic Housing Land Availability AssessmentA Strategic Housing Land Availability Assessment (SHLAA) is also being prepared as a key background document
to the LDF. Canterbury City Council is basing its methodology for its SHLAA on the Protocol for Kent and Medway
(September 2008) released by Kent County Council. This guidance seeks to ensure continuity between the Local
Authorities in Kent when preparing their SHLAA’s and determining the deliverability of sites for redevelopment. It
is designed to complement the national guidance on the production of SHLAA’s and provide an over-arching
framework in Kent and Medway, but accepts that each LPA will determine the scope of its own SHLAA under para.
25 of the CLG guidance.
The City Council invited the submission of sites to be considered in the SHLAA and the deadline for submitting sites
closed on 30 September 2008. The Council will be using the guidance to assess the suitability, availability and
deliverability of sites and it is envisaged that all the sites will be assessed by early Summer 2009 and the report
published in December 2009. The Hillborough site has been submitted to the Council for consideration in the SHLAA.
This document being an elaboration and enhancement of the original SHLAA Submission.
Housing Requirement 2006 - 2026
• The SEP requires CCC to deliver 10,200 units between 2006 - 2026 (510pa).
• Between 2006 - 08 there were a total of 1,922 completions in the District.
• This means that a total of 8,278 units are required to be completed for the remainder of the plan period
(460pa).
• In the Annual Monitoring Report (December 2008), CCC considers 3,924 units will be delivered through existing
allocations and extant permissions.
• This leaves a total of 4,354 units required to be allocated within the District in the emerging LDF.
Notwithstanding the identied requirement to allocate approximately 4,300 units in the emerging LDF and whilst
previous completions have been healthy against requirements and projected completions appear healthy, the
following has to be taken into account:
• Completions are very unlikely to match annual requirements in the current economic climate; and,
• Projected completions for years 2009/10 (1,106) and 2010/11 (1,692) look very optimistic compared with historiccompletions and particularly optimistic in the current climate where the severity and length of the economicdownturn is unknown. Accordingly, a higher number of allocation sites is expected if the existing commitments
are not delivered and housing targets not met.
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 10/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
10
3.0 Why Hillborough / Herne Bay?
Herne BayHerne Bay is an important town within Canterbury District. Whilst the main focus for future development is to be located
in Canterbury, which is identied as a Regional Hub in the South East Plan, it should not preclude development at
Herne Bay. It is important that a proportion of the overall housing requirement is delivered outside of Canterbury City
to ensure that the overall growth can be successfully achieved without detriment to Herne Bay itself.
A number of towns situated along the north Kent Coast have historically required signicant regeneration, but have
seen a recent trend in upward investment and Herne Bay is no exception. This has led to an improvement in the
vitality and viability of the town. It is essential to continue this upward trend particularly in a period of economic
uncertainty and ensure that a good supply of housing, that is both suitable and available, is delivered in this location.
This ensures that there is a choice of housing in a place where people want to live and sustains a viable critical mass
of population at Herne Bay. This is a key objective for the Government. Focusing all strategic housing development
at Canterbury risks undermining the recent and planned improvements to Herne Bay and could further widen the
difference in economic performance between Canterbury and Herne Bay.
Figure 1 demonstrates the current Index of Multiple Deprivation of Canterbury District. The information has been
sourced from the latest Experian Data. Figure 1 identies the Wards that constitute Herne Bay (Greenhill and Eddington,
Herne and Broomeld, Heron, Reculver and West Bay) and demonstrates how each ward performs against each
other, Canterbury District, Kent and the National average. The IMD is made up of the following factors:
• Barriers to Housing and Services,
• Health and Deprivation,• Crime and Disorder,
• Living Environment,
• Income,
• Skills and Training, and
• Employment and Education.
Development of employment, and good quality housing would assist at reducing the existing deprivation in Herne
Bay.
F I G U r e 1
HERNE BAY
WHITSTABLE
M2
T H A N
E T W A Y
I S L A N
D R OA
D
S H F O R A
C A N T E R B U
R Y R O A D
W I N C
H E A P
S T U R
R Y R O
A D
R H E I M S W A Y
I S L A
N D R O A D
T H AN E T W AY
I S L A N
D R O
A D
T HA N E T
W A Y
C A N T
E R B U
O A
THANET W AY
I S L A
N D R O A
D
T HA N E T WA
Y
P E A N
H
I L L
LIT TLEBOURNE ROAD CAN T E R B U R Y R OA D
H E
R N E
B A Y
R O A D
H O N E Y H I L L
B O
R S T A L
H I L L
C L A P H A M
H I L L
W H I T S T A B L E
R O A
D
N E W
D O V E
R R O A D
T H A N E T
W A Y
C A N T
E R B U R Y R O
A D
T H A
N E T WA Y
T H AN E T W A Y
Reculver
Herneand Broomfield
Greenhill andEddington
WestBay Heron
. .
Canterbury Deprivation Summary (2007)
0 - 20% (Most Deprived)
20 - 40%
40 - 60%
60 - 80%
80 - 100% (Least Deprived)
Application Site
Canterbury Average = 56%Kent Average = 57%Herne Bay Average = 51%
HERNE B
H IT T B LE
M
T H A N
E T A Y
I S L A
RA
S H F O R D OA
C A
B U R Y
R O
A D
I N C H
E A P
S T U R
R Y R
A D
R H E I A
I S L A
N D R
A D
H N E W Y
I S L A
R A
T A
E T A Y
C A N T
E R B U
O A
TH NET
I S L A N
R A
T T
Y
P E A
I L L
LIT TLE OURNE ROD C N
U Y O
H
E
A YH
N E Y H I L L
O
T A L
I L L
C L A P H A
H I L L
H I T S T A B L E R
O A D
N E
D O V E
R R O A D
H N E
C A N T
E R B U R Y
R O A D
H A T
Y
T H N W A
R c ul r
Hrn nd Broom i l d
r nhill ndEddington
tB Hron
IMD Summary Deprivation
, 7. .
-
-
-
-
-
===
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 11/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
11
3.0 Why Hillborough / Herne Bay?
HillboroughThe site is situated to the east of Herne Bay and is bound to the north and east by residential development and
commercial development to the west. The site extends southwards over the railway line to the A299 Thanet Way.
The site is approximately 1.5km from the Town Centre and 3km from the railway station. A number of local shops and
services are located on Ruculver Drive, Beltinge to the north of the site. As such, it is considered to be sustainable
site adjoining the dened urban boundary of Herne Bay. The development of this site will round off the only pocket
of land left north of the railway line and create a dened eastern boundary to Herne Bay.
The site is well placed in transport terms being l ocated close to the railway station and vehicular access onto the
A299. The site can also be accessed via more local pedestrian accesses or Bus only routes and results in an overall
reduced impact on Herne Bay.
Growth of Herne BayTabl 4: etiat Natual Ppulatin Inca
Table 4 demonstrates that:
• Estimated population in 2007 for Canterbury District is 147,077 people and for Herne Bay its 38,424 (i.e 26.1% of total
population).
• The population of Herne Bay (38,424) is comparable to Canterbury City (42,938), a difference of 4,514 people (see
g 2)
• Estimated number of households in Herne Bay for 2007 is 16,445 units which equates to 2.3 people per household
(38,424 \ 16,445 = 2.3).
• Estimated natural population increase for Herne Bay to 2027 is 44,807 (i.e. increase of 6,383 people).
• Assuming 2.3 people per household the potential household increase required to accommodate the estimated
natural population growth is 2,775 units.
A key objective for Herne Bay in the adopted Local Plan is to improve the employment and leisure opportunities.
This has attempted to be achieved in the Local Plan by the allocation/approval of a number of new employment
opportunities, such as Altira Business Park (adjacent to this site). However, the Local Plan has a plan period up to 2011
and the emerging LDF needs to plan to 2026.
This site is best placed to increase this employment opportunity and is the natural growth to the Altira Business Park.Furthermore, the site is also considered the natural growth for the town’s residential housing being adjacent to existing
area of Beltinge and Hillborough.
The site is signicant in size and this brings with it benets that a large number of smaller sites around Herne Bay could
not deliver (such as provision for a new primary school). Furthermore, the likelihood of delivery is greater and the
overall master plan and concepts can be delivered rather than ‘ad hoc’ inll developments around Herne Bay. The
size of the site allows for the delivery of growth to be phased in accordance with a comprehensive masterplan. This
provides for exibility in the delivery of growth, which is important given that the Core Strategy will run to 2026.
Population Comparison of Canterbury City, Herne Bay and Whitstable in 2007 and 2027
42,938
55,782
44,807
33,998
38,424 38,464
0
10,000
20,000
30,000
40,000
50,000
60,000
2007 2027
Experian Population Estimates
N u m b e r o f P e o p l e
Canterbury City (Wards)
Herne Bay (Wards)
Whitstable (Wards)
F I G U r e 2 - P o P U L A T I o N P r o J e C T I o N s
Canterbury
City (Wards)
Herne Bay
(Wards)
Whitstable
(Wards)
Canterbury District
Population Estimate 2007 42,938 38,424 33,998 147,077
Household Estimate 2007 17,688 16,445 14,851 61,294
Population Projections 2027 55,782 44,807 38,464 177,204(2007 Experian Ltd)
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 12/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
12
3.0 Why Hillborough / Herne Bay?
Justication of Housing in Herne BayGiven that the increase in population at Herne Bay is set to rise by approximately 6,383 people (2,775 households),
it will be necessary to provide housing and employment opportunities for those future residents. It is estimated that
a development of 1,200 units would generate a population yield of approximately 2,760 people. This is based on
an average of 2.3 people per household. Whilst the strategic development would not provide sufcient housing
for all the estimated population growth, it would signicantly contribute towards meeting Herne Bay’s estimated
population growth, as well as delivering the associated community infrastructure required.
Furthermore, the South East Plan allocates 10,200 units to Canterbury District. This gure is based upon a number of
factors including population increases, past housing completions and employment opportunities and a signicant
underlying need for an increase in housing.
.
LONDON
BRIGHTON HOVE
CHICHESTER
DEAL
EGHAM
HYTHE
DOVER
EPSOM
ASCOT
LEWES
ESHER
HAYES
MARLOW
PINNER
SLOUGH
HORLEY
WOKING
BUSHEY
MORDEN
PURLEY
SUTTON
BARNET
ILFORD
RAINHAM
ASHFORD
FARNHAM
LANCING
CROYDON
HORSHAM
REDHILL
HOCKLEY
ASHFORD
CHATHAM
MARGATE
CRAWLEY
DORKING
HAMPTON
BARKING
FELTHAM
BROMLEY
ENFIELD
ROMFORD
EDGWARE
WEMBLEY
WINDSOR
UXBRIDGE
TADWORTH
COULSDON
HASTINGS
HOUNSLOW
BENFLEET
LOUGHTON
ROCHFORDRAYLEIGH
AMERSHAM
BASILDON
WICKFORD
RAMSGATE
HASSOCKS
WORTHING
DAGENHAM
CHIGWELL
DARTFORDRICHMOND
CATERHAM
CHERTSEYSURBITON
SOUTHALL
HASLEMERE
SANDHURST
BRACKNELL
BRENTWOOD
SHEERNESS
TONBRIDGE
WESTERHAMSEVENOAKS
MAIDSTONE
FAVERSHAM
HERNE BAYROCHESTER
GRAVESEND
GODALMING
GUILDFORDALDERSHOT
UPMINSTER
BRENTFORD
NORTHWOOD
MAIDENHEAD
BILLERICAY
FOLKESTONE
WHITSTABLE
EASTBOURNE
PEACEHAVEN
PULBOROUGH
TEDDINGTON
FARNBOROUGH
CHISLEHURST
BROADSTAIRS
LEATHERHEAD
BOREHAMWOOD
POTTERS BAR
LEIGH-ON-SEA
BEACONSFIELD
HIGH WYCOMBE
BURGESS HILL
BOGNOR REGIS
WEST WICKHAM
CANVEY ISLAND
SITTINGBOURNE
LITTLEHAMPTON
RICKMANSWORTH
WALTHAM ABBEY
SOUTH OCKENDON
GERRARDS CROSS
HAYWARDS HEATH
EAST GRINSTEAD
TUNBRIDGE WELLS
SHOREHAM-BY-SEA
IVER
OXTED
COBHAM
RADLETT
ARUNDEL
BAGSHOT
ASHTEAD
STEYNING
HENFIELD
MIDHURST PETWORTH
HINDHEAD
GODSTONE
CRANLEIGH
LINGFIELD
EDENBRIDGE
FOREST ROW
WARLINGHAM
INGATESTONE SOUTHMINSTER
WEST BYFLEET
BILLINGSHURST
VIRGINIAWATER
ABBOTS LANGLEYGREAT MISSENDEN
STANFORD LE HOPE
BURNHAM-ON-CROUCH
Levels of Commuting fromHerne Bay Study Area (Wider Context)
Copyright Experian Ltd, Navteq 2007. Based upon Crown Copyright material.
Commuter Count
0 - 5 0
51 - 150
151 - 300
301 - 700
701 - 12,000
HerneBayStudyArea
LONDON
BRIGHTON HOVE
CHICHESTER
DEAL
EGHAM
HYTHE
DOVER
EPSOM
ASCOT
LEWES
ESHER
HAYES
MARLOW
PINNER
SLOUGH
HORLEY
WOKING
BUSHEY
MORDEN
PURLEY
SUTTON
BARNET
ILFORD
RAINHAM
ASHFORD
FARNHAM
LANCING
CROYDON
HORSHAM
REDHILL
HOCKLEY
YATELEY
ASHFORD
CHATHAM
MARGATE
CRAWLEY
DORKING
HAMPTON
BARKING
FELTHAM
BROMLEY
ENFIELD
ROMFORD
EDGWARE
WEMBLEY
WINDSOR
UXBRIDGE
TADWORTH
COULSDON
HASTINGS
HOUNSLOW
BENFLEET
LOUGHTON
ROCHFORDRAYLEIGH
AMERSHAM
BASILDON
WICKFORD
RAMSGATE
HASSOCKS
WORTHING
DAGENHAM
CHIGWELL
DARTFORDRICHMOND
CATERHAM
CHERTSEYSURBITON
SOUTHALL
HASLEMERE
BRACKNELL
BRENTWOOD
SHEERNESS
TONBRIDGE
WESTERHAMSEVENOAKS
MAIDSTONE
FAVERSHAM
HERNE BAYROCHESTER
GRAVESEND
GODALMING
GUILDFORDALDERSHOT
CAMBERLEY
UPMINSTER
BRENTFORD
NORTHWOOD
MAIDENHEAD
BILLERICAY
FOLKESTONE
WHITSTABLE
EASTBOURNE
PEACEHAVEN
PULBOROUGH
TEDDINGTON
FARNBOROUGH
CHISLEHURST
BROADSTAIRS
LEATHERHEAD
BOREHAMWOOD
POTTERS BAR
LEIGH-ON-SEA
BEACONSFIELD
HIGH WYCOMBE
BURGESS HILL
BOGNOR REGIS
WEST WICKHAM
CANVEY ISLAND
SITTINGBOURNE
LITTLEHAMPTON
RICKMANSWORTH
WALTHAM ABBEY
SOUTH OCKENDON
GERRARDS CROSS
HAYWARDS HEATH
EAST GRINSTEAD
TUNBRIDGE WELLS
SHOREHAM-BY-SEA
IVER
OXTED
COBHAM
RADLETT
ARUNDEL
LIPHOOK
BAGSHOT
ASHTEAD
STEYNING
HENFIELD
MIDHURST PETWORTH
HINDHEAD
GODSTONE
CRANLEIGH
LINGFIELD
EDENBRIDGE
FOREST ROW
WARLINGHAM
INGATESTONE SOUTHMINSTER
WEST BYFLEET
BILLINGSHURST
VIRGINIAWATER
STANFORD LE HOPE
BURNHAM-ON-CROUC H
Levels of Countywide Commutinginto the Herne Bay Study Area
Copyright Experian Ltd, Navteq 2007. Based upon Crown Copyright material.
Volume of Commuting In
0 - 10
11 - 30
31 - 200
201 - 500
501 - 7180
HerneBayStudyArea
Given that approximately a quarter of the District’s population is located in Herne Bay, there is a strong and reasoned
justication to allocate strategic sites in this location to meet the future needs of this part of the District. This reects
the normal practice of allocating new housing development in accordance with the settlement hierarchy of the
District.
Figures 3 and 4 show in essence outbound commuting is in balance with inbound commuting. If employment and
residential development does not grow in line with the natural projected growth, then this balance of commuting will
be skewed. Such an effect would be detrimental to public transport and the impact on the trafc network
F I G U r e 3 F I G U r e 4
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 13/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
13
Census Data from 2001 identies that the greatest percentage of employment use in Herne Bay is Wholesale and
Retail; Motor and Goods Repair followed by Health and Social Work. The site could deliver employment opportunities
by enlarging the size of Altira Business Park. This could provide Industrial/Ofce development and would enhance the
attractiveness of the area and encourage further business development. The provision of this type of employment
could broaden the economic basis of Herne Bay and strengthen further its commercial role. The site therefore
provides the opportunity to meet the future need in both population/housing terms as well as employment terms
that are expected in Herne Bay.
This accords with the ndings of the Employment Land Estimate that has been undertaken by Colin Buchanan on
behalf of Kitewood, to assess the level of employment provision likely to be required up to 2026 and inform the
masterplan proposals. This is detailed later in this document.
3.0 Why Hillborough / Herne Bay?
Econmically Active Residents by Industry
1 ,
5 6 7
8 7
2 ,
8 6 0
6 6 2
1 , 1
8 6
5 2 3 1
, 3 4 7
8 0 4
1 , 2
3 8
2 , 1
1 8
7 3 5
3
5 ,
3 7 0
2 , 9
8 8
3 ,
8 1 5
1 , 6
8 7
5 , 6
4 1
3 ,
3 9 6
7 , 3
9 3
7 ,
7 7 0
2 ,
8 3 7
6
3
1 5 1
2 1 6 4
1 ,
3 9 9
1 0 ,
3 1 5
4 ,
4 9 5
6 6
6 6
2 1 1
2 1 9
2 2
0
2000
4000
6000
8000
10000
12000
A g r i c u l t
u r e ,
h u n t i n g
, f o r e s t r y
F i s h i n
g
M i n i n
g & q u a r r y i n g
M a n u
f a c t u
r i n g
E l e c t r i c i t y ,
g a s &
w a t e
r s u p
p l y
C o n s t r u
c t i o n
W h o
l e s a l e &
r e t a i
l t r a d e ;
m o t o
r a n d
g o o d s r
e p a i r
H o t e l s
& r e s t a
u r a n t s
T r a n s p o r t ,
s t o r a g e
& c o m m u
n i c a t i o n
s
F i n a n
c i a l i n
t e r m e
d i a t i o
n
R e a l
E s t a t
e ,r e n t i n g
& b u s i n
e s s a
c t i v i t i e s
P u b l i
c a d m i n i s t r a
t i o n &
d e f e n
c e , s o c i a l
s e c u r i t y
E d u c a t i o n
H e a l t h
& s o c i a l w
o r k
O t h e
r c o m
m u n i t y
, s o c i a l
& p e r s o n a l s
e r v i c
e a c t i v i t i e s
P r i v a t e
h o u s e h o l d
s w i t h
e m p l o
y e d p
e r s o n s
E x t r
a - t e r
r i t o r i a l
o r g a n i s a
t i o n s
& b o
d i e s
Industry
N o . o f P e o p l e
Herne Bay
(Wards)Canterbury
District
Percentage Split of Industry Workers in Herne Bay against Canterbury District
17.714.2
18
29.1
41
3127.7
22
31 31
23.8 23.6
16.7
27.2 25.922.7
50
0
10
20
30
40
50
60
A g r i c u l t u r e ,
h u n t i n g
, f o r e s t r y
F i s h i n
g
M i n i n
g & q u
a r r y i n g
M a n u
f a c t u
r i n g
E l e c t r i c i t y ,
g a s &
w a t e r
s u p p l y
C o n s t r u
c t i o n
W h o
l e s a l e &
r e t a i l t
r a d e ; m
o t o r
a n d
g o o d s r
e p a i r
H o t e l s
& r e s t a
u r a n t s
T r a n s p o
r t ,s t o r a g e
& c o m m u
n i c a t i o n
s
F i n a n c i a l i n
t e r m
e d i a t i o n
R e a l E
s t a t e ,
r e n t i n g
& b u s i n
e s s a
c t i v i t i e s
P u b l i
c a d m i n i
s t r a t i o n
& d e f e n
c e , s o c i a l
s e c u r i t y
E d u c a t i o n
H e a l t h
& s o c i a l w
o r k
O t h e
r c o m
m u n i t y
, s o c i a l
& p e r s o n a l s
e r v i c
e a c t i v i .
. .
P r i v a t e
h o u s e h o l d
s w i t h
e m p l o
y e d p e r s o
n s
E x t r a
- t e r r i t o r
i a l o r g a
n i s a t i o n s &
b o d i e
s
Industry
% o
f W o r k e r s i n H e r n e B a y
% of Industry Workers in Herne Bay
F I G U r e 5
sua• IMDSummaryDeprivationidentiesareasinneedofimprovementinHerneBay.
• AreaswithinHeronandGreenhillandEddingtonwerethemostdeprivedareaswithinthetargetwardsit hn Ba avaging 51% pivatin cpa t a Knt avag f 57%.
• T ppulatin in hn Ba i xpct t natuall inca b 6,383 ppl up t 2027.
• CommutingpatternsidentifyabalancedsituationbetweenCanterburyCityandHerneBay.
• T it i cni t b abl t accat t natual inca in ppulatin ilt alaintaining t balanc f c-cunting b pviing intial vlpnt an plntvlpnt.
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 14/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
14
4.0 The Options for Herne Bay
Residential OptionsOver the years, Herne Bay has maximised its coastal location resulting in a settlement pattern that extends widely
from east to west, but narrow from north to south. A high proportion of development has historically been sandwiched
between the railway line and the coastline, but over the years, as the town has grown, areas such as Greenhill and
Eddington have extended southwards beyond the railway line towards the A299. Only the areas of Broomeld and
Herne have extended further beyond the A299 towards Canterbury.
The recent completion of the A299 Thanet Way has resulted in a new physical and physiological barrier to the south.
The land that now lies between the existing residential areas, the railway line and the A299 is considered the most
appropriate place to locate future strategic development. This is due to this area being well located to the existing
town and being contained by built development and therefore having less of an impact (and an acceptable
impact) on the wider landscape in comparison to locations to the south of the A299.
A number of sites in Herne Bay were promoted through the last Local Plan Review. The Inspector commented upon
the sites and justied the reasons as to why they were either suitable (and therefore allocated) or not suitable at that
time and omitted from the Local Plan (purple sites). Furthermore, in 2002, an Urban Housing Capacity Study identied
a number of sites within the settlement boundary that could be developed for residential purposes.
Plan 1 and table 5 identify a number of sites that were either omitted from the Local Plan or are possible future
locations for development in Herne Bay. The table identies the advantages and disadvantages of each location
and states (if applicable) the Inspector’s reasoning for their omission. The table further concludes on the advantages
and disadvantages of those sites when considering the future development options for Herne Bay.
The South East Plan covers the period to 2026 and requires signicantly more new housing within Canterbury District
annually than that required in the Local Plan. Therefore, the circumstances under which the Local Plan Inspector
assessed potential sites at Herne Bay in the Local Plan review have signicantly changed. This is important context to
the preparation of the Core Strategy.
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 15/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
15
4.0 The Options for Herne Bay
P L A N o F P o T e N T I A L h o U s I N G L o C A T I o N s
P L A N 1
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 16/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
16
4.0 The Options for Herne Bay
No Site Name No of Units/Area Local Plan Inspector’s Comments Advantages Disadvantages
Lcal Plan oiin sit
1. Vincent Nurseries,
Eddington Lane
60 Units • Clearly an urban site where a good design would not
detract the Conservation Area.
• No evidence to refute the Councils claim of ooding.
• Useful site but technical details need to be addressed
before site can be justied for development.
• Within Urban Boundary.
• Close to Railway Station and access to A299.
• Relatively Modern Development opposite.
• Within Flood Zone 2 .
• Still in operational use.
• Within Conservation Area.
• Would drain to Plenty Brook.
• Upstream ood alleviation possible subject to third party
agreement.
2 . Se as ide Ca ra va n Pa rk,
Studd Hill
18 Units • Planning permission has been granted for 15-18 units
already.
• Sees no reason to allocate the site on this basis.
• Permission for residential development granted at time
of Local Plan Inquiry but not implemented as of February
2009.
• Part within Coastal Protection Zone.
• Part outside the Urban Boundary.
• Access to site very poor.
• Still in part used as Caravan Site.
3. Hillborough Business Park,
Sweechbridge Road
- • Useful affordable and basic employment on site of up to
34 users.
• Loss of this specic Employment Space is too great.
• Potential longer term redevelopment possibility.
• Within Urban Boundary.
• Browneld Site.
• As close to town centre as existing allocations.
• Loss of current employment space.
• Still in operational use.
• Possible partial residential development on undeveloped
land at the rear of the site.
4. L an d sou th of Gr ee nh il l,Herne Bay
- • Arable land south of strong clear Urban Area.• Agricultural land is vulnerable, open countryside to A299.
Exposed views from north, south and east.
• Physical characteristics of the land are much better than
housing scheme - however well landscaped.
• Number of better less sensitive locations to accommodate
development.
• Adjacent to existing urban boundary.• Close to Railway Station.
• Part land allocated for educational community uses.• Adjacent to special landscape area and green gap.
• Very open countryside.
• Long at vistas to countryside.
• Plotland in multiple ownership.
5. Land at Studd Hill • Urban Boundary now shows this site as in Countryside and
also within green gap.
• Support the council’s notion that the site does not
constitute permanent development and that it is important
to retain the green gap by designating as a ‘non-urban’ site.
• Adjacent to urban boundary.
• Potentially Browneld site.
• In green gap.
• Outside urban boundary.
• Within Leisure Education designation.
6. Land east of Broomeld,
Herne Bay
- • Development would involve a marked eastward
expansion into open countryside unrelated to existing
urban form.
• Whatever shortages exist locally of community facilities,
this large scale loss of open land is a disproportionately
large price to pay.
• Adjacent to urban boundary. • Adjacent to conservation area.
• Open countryside.
• Unrelated expansion.
• Some distance from railway line and Town Centre.
• No dened or enclosed setting.
• Very open site.
• Poor access.
7. L an d Be twe en Ca nte rbu ry
Road and Bushyelds
Road
135-225 • S it e i s some dis tance f rom U rban Boundary.
• Isolated site in open Countryside.
• Entirely inappropriate for housing.
• Open countryside.
• In Conservation Area.
• Village core some distance away with limited services.
• Access difcult.
Tabl 5
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 17/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
17
4.0 The Options for Herne Bay
No Site Name No of Units/Area Local Plan Inspector’s Comments Advantages Disadvantages
8. Land at Hillborough,
Herne Bay
• Allocation of land in this location has little merit in the
next few years given the already proposed and favoured
allocations for both residential and employment.• Development at Canterbury makes more planning sense
but should not harm the historic city or sensitive environs.
• Signicant site in sustainable location as far from town
centre as existing allocated housing and employment
sites.• Adjacent to existing urban boundary
• Provision of new community and associated benets
• Good access to A299 and Railway station
• Parts are designated good quality agricultural land.
rv Allcat sit
9. Land at Mill Lane 260 unit • Release of site dependent on provision of appropriate
scheme to alleviate ooding of the Plenty Brook.
• Site Implemented and Under Construction
10. Land at Richmond Drive 40 units • Notional capacity for 40 units • Site adjoins recently constructed development
• Reserve Allocation Site
• Lost appeal on housing supply grounds.
ot Ptntial sit
11. Gol f Driving Range,
Bullockstone Road
66 units Appeal refused for 66 units Adjacent to urban boundary
Previously Developed Land
Appeal recently Dismissed
ot Ptntial Aa
A West of Herne Bay - No comment In Green Gap
In Flood Zone
Adjacent High Landscape Value Areas
B Herne Bay Golf Course - No comment Proximity to Railway Station
Within Urban Boundary and A299
Landscape vistas southwards
Current Open Space/Leisure Use
Flood Risk Zone
C South of Broomeld - No comment Topography
Landscape Impact
Distance from Herne Bay Town Centre
Potential impact on Conservation Areas
D West of Beltinge - No comment Proximity to Town Centre
Less Landscape Impact
Access to A299
Distance from Railway Station
Increase linear nature of Town
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 18/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
18
Aspreviouslyidentied,thesitehashadalonghistoricLocalPlanpromotion.Assuch,ithasbeensubjecttoa
nub f tcnical tui t a an nu t vlpnt f ti it i uitabl an acivabl.
Access and Highways SummaryWhilst specic highways matters will be dealt with at a later stage (i.e. the submission of any planning application),
highways studies undertaken for the previous promotion and reviewed in April 2009 have established potential
points of access and general highway principles that should be incorporated into the development of the site.
Strategic development at Hillborough is compatible with the highway network provided that local improvements
are delivered.
A recent Highways Assessment (Colin Buchanan, April 2009 - see Technical Appendices) has established that there
are a number of potential access points to the site and that a number of these should be utilised to ensure that
vehicular access is distributed across the site and not focused at one point. The study also found that the increase
in trip generation, would not be detrimental to Herne Bay’s road network, subject to the implementation of various
access points and internal road structure (i.e. one way streets etc).
The site is very well located adjacent the A299 with excellent connections to both east and west Kent. As a result,
trafc associated with the proposed development could access the site from existing junctions on the A299 without
needing to travel through Herne Bay.
It is proposed that the Thanet Way/Sweechbridge Road junction would be the principle point of access. This is
already a sub-standard junction, and this development proposes an upgraded junction and a new westbound
merge lane onto Thanet Way. Access will also be gained from the Margate Road roundabout and land has already
been safeguarded to allow for a future left turn lter lane to accommodate future growth.
It was established that a bus only access could be situated on the northern boundary to access Beltinge and provide
for a new bus route through the site. Furthermore, a number of footpaths and cycle paths utilising the existing rights
of ways would be provided to promote sustainable modes of transport. This includes improving the existing rail
bridges.
It is considered that the Access and Highways position accords with the advice as set out in PPG13: Transport (March
2001) and seeks to promote more sustainable transport choices, to promote accessibility to jobs, shopping, leisure
facilities and services by public transport, walking and cycling, and to reduce the need to travel, especially by the
car. The proposed urban extension is in a sustainable location and the indicative layout of the scheme includes the
provision of a principal vehicular access, together with pedestrian and cycle way links as well as proposed bus only
route.
Employment ProvisionColin Buchanan have prepared a report that reviews the proposed future employment demand in Canterbury
from 2016 - 2026 and the current draft CCC Employment Land Review for the whole district undertaken by Savills.
It is acknowledged that there are sufcient allocations of employment land in the Herne Bay/Whitstable (coastal)
market to accommodate business needs to 2016. It is calculated that new employment land is required for the 2016
- 2026 period.
table 6 prepared by Colin Buchanan identies the estimated demand for employment oor space by use class and
in total for the period 2016 - 2026 in Canterbury District:
Tabl 6: dan f eplnt Flpac B1-B8 U 2016-2026Use Class Estimated employment
by use class (sqm)
Floorspace ratios
(DTZ) sqm per
worker
Floorspace need
2016-2026 (sqm)
B1 1,242 18 22,359
B2 903 38 34,320
B8 448 78 34,906
Total Space 2,593 n/a 91,548
The total estimated oorspace need for Canterbury District over this period is 91,548 sqm. The Annual Business Inquiry
gures show the share of employment in the coastal sub-market (ie the coastal towns of Herne Bay and Whitstable)
has remained stable at 27% of the total district. Applying this percentage to the total oorspace estimate would give
a requirement for this area of a district of approximately 24,500 sqm.
Table7:SummaryCalculations:TheFloorspaceRequirement
Requirement/Loss
Employment Floorspacein 2016-2026 (sqm)
Share to Herne Bay/ Coastal
Projected Need -Herne Bay / Coastal
Additionalemployment 91,584 27% 24,728
Estimated Loss 111,425 27% 30,085
Total 203,009 n/a 54,812
The projected need for employment oorspace in Herne Bay based on demand from additional employment
and estimated annual losses between 2016 and 2026 is 54,812 sqm. This gure is above the proposed quantum of
employment oorspace proposed at Hillborough, which envisages 12 ha of employment land being provided at an
employment oorspace density similar to the adjoining Altira Business Park. It could therefore yield some 33,860 sq m
of B1/B2/B8 oorspace. This would leave 20,680 sqm of oorspace or approximately 7.3 hectares of employment land
to be provided elsewhere in the Coastal Towns to meet this trend-based projection.
As such, the site provides a signicant amount of oor space to re-address this imbalance post 2016. The continuation
of Altira Business Park would be a natural progression of an under construction employment site in Herne Bay that
would ensure its delivery.
5.0 Technical Studies and Consultation Responses
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 19/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
19
Ecological SummaryAn ecology survey (Tom La Dell - July 2009) established that there is limited ecological value on the site. This is due to the current
operational use of the site as arable farm land. It is therefore considered that an opportunity exists to provide for a suitable habitat
for wildlife to return to the site, partially in conjunction with on site surface water retention facilities. The report also addresses the
impact of the development on the Coastal Special Protection Area. It concludes that:
• The impact of additional people visiting the Country Park due to the proposed development of 700 dwellings pre 2026 and
the subsequent 500 dwellings at Hillborough on the wildlife of the Special Protection Area will be so small in the context of
existing visitor numbers as to be insignicant.
• The SPA and surrounding area already attracts signicant visitor numbers from a wide catchment area that extends beyond
Herne Bay.
• Canterbury City Council proposes a signicant increase in visitor numbers in the Reculver Masterplan.
• The proposals have been accepted in principle by Natural England.
• The area is already actively marketed and promoted for tourists to visit.
• The Hillborough proposals identify signicant open spaces as part of the proposals in order to provide the opportunity for the
future residents to enjoy informal recreation areas that will be rich in wildlife. This provision is considerably greater than the
average for Herne Bay.
• The existing effect of dogs running on the mudats, water sports and shermen digging for bait are much more problematic
issues which can only be dealt with by way of information to the public.
• Such disturbances could be reduced if the public increased their appreciation of the sensitivity of the area.• If it is thought that any mitigation measures are required in relation to the proposed development information boards can be
provided. These would provide information relating to the sensitivity of the area to certain leisure activities about the habitats
of the SPA including their international importance. This is considered as the most effective form of any mitigation in relation
to the Hillborough proposals.
Landscape Summary
The site is not subject to any special landscape designations unlike other areas adjoining the urban edge of Herne Bay. The
development of the site would not be detrimental to the surrounding landscape given that it is contained with built development
including the A299 and the existing urban edge of Herne Bay. The A299 provides for a defensible boundary and the impact of
strategic development on the site on the wider landscape is minimal.
Furthermore, signicant landscaping proposals form part of the masterplan that will enhance the existing situation. Open Space
will be provided that will open up what is currently a private site to the public domain. The Landscape impacts are not considered
detrimental and are in accordance with PPS7.
Agriculture Land SummaryThe site is currently farmed and is identied as being good quality agricultural land. It is proposed to relocate the good quality
top soil to poor quality farmland in the Herne Bay area. There is no net loss of good quality agricultural land as a result of these
mitigation measures.
Archaeology SummaryAn archaeological desktop report has been undertaken by Swale Archaeological Trust. The area is known to have archeological
remains and the site would be subject to full archaeological works and mitigation measures when necessary.
5.0 Technical Studies and Consultation Responses
sua
Considerable work has been and continues to be undertaken on site which has established that there are no
major constraints that would prevent strategic development of the site in principle. Reports and surveys are
continued to be updated to support a strategic development at Hillborough as it is promoted through the
Core Strategy to demonstrate that the scheme is deliverable and would not have any harmful effects that
cannot be adequately mitigated.
Drainage/Flooding Summarya) Flood Risk
Communication with the Environment Agency has established that the site is not at any tidal or surface water oodrisk. However, the drainage of the site has been highlighted as an important consideration in the development of
the site.
b) Surface Water Drainage
The site currently drains away through existing watercourses which are currently identied as being at capacity.
It is therefore essential that any development proposals include attenuation and/or Sustainable Urban Drainage
Systems to ensure that the surface water run-off from built development is appropriate. Given the size of the site, it
is considered that existing watercourses and new sustainable urban drainage features could be accommodated
on site. These features could also be used to benet the local area, including the provision of ponds to promote the
ecological value back into the site. This also further enhances any landscaping features on the site. The proposals
are in accordance with the guidance contained in PPS25: Development and Flood Risk.
Service Utilities SummaryInvestigations into whether there are any gas and water pipes on site have been made. It has been established that only
one sewer runs through the site. There is no other apparatus on site which would be affected by the development.
There is an identied requirement to upgrade the mains water system to ensure there is sufcient capacity to both the
site and existing users. This can be secured through development at the site.
Community FacilitiesA number of community facilities have been identied as being decient in the area. Furthermore, it is understood that
educational facilities could not accommodate the likely increase in pupil yield from the development. As a result, and
subject to an up to date assessment, a new primary school could form part of the development.
Furthermore, it is proposed that a dual use community centre could be accommodated on site to serve the new
community. A local centre including retail shops and a doctors surgery and/or dentist could be provided. This
would ensure the impact of the development of existing services is minimal and would help to create a sustainable
development.
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 20/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
20
WASTE WATER
TREATMENT
WORKS
R e c u l v
e r R o a
d
R E S
I D E N T
I A L
EMPLOYMENT
A2 9 9 T hane t Wa y
p u b l i c
f o o t p
a t h C H
4 7
rear gardens
S w e e c h b
r i d g e R
o a d
r e a r g a r d e n s
2 5
3 0
(under construction)
C H 5 2
3 5
3 0
25
A
B
D
D
D
E
F
F
C H 4 8
C H 5
1
3 5
C
6.0 Design Principles
Site Appraisal• Visual Sensitivity. A local ridgeline at 36/37m Above Ordnance
Datum (AOD) runs north/south through the centre of the Site.This is the most visually sensitive area of the Site, however, it is
only visible from local viewpoints (rear gardens to north/west/
east and from the A299/local environs to the south). Views
from the north and west are contained by urban development.
Land to the south and east is low and at resulting in no middle
distance/long views into Site.
• Two open views into Site from elevated road bridges across the
A299, Thanet Way.
• Access points: suitable vehicular access from south and east
near to A299 junctions (refer to C on Site appraisal plan).
The Highways Assessment concludes that access points from
north and east are likely to have an impact on the local road
network. Therefore access D is more suitable for a bus only link
(a short distance from Reculver Road) as well as an emergency
access/pedestrian/cycle link. Access points E are more suitable
as a green link, i.e. pedestrians and cycles.
• The Site is bisected by a railway which is predominantly in
cutting and screened by vegetation. A noise assessment will
highlight any necessary noise mitigation. There are three bridges
across the railway linking the two halves of the Site; A. Bogshole
Bridge which is a footpath, B. May Street Bridge which provides
a narrow access for vehicles and C. Sweech Bridge which
forms part of the existing Highway Network. It is envisaged that
May Street Bridge will be trafc controlled for the development
of the site up to 2026. Bogshole Bridge is only required for the
development post 2026.
• There are some public rights of way and tracks across the Site,
two of which have become truncated by the construction of
the A299.
• The Site comprises agricultural land and is largely devoid of
vegetation apart from a few lengths of hedge, three areas of
copse and some young screen planting which was planted as
part of the A299 construction and lies outside but adjacent to
the Site.
• There is a network of open drainage ditches across the Site.
• An existing sewer runs across the Site from northwest to south
east. An easement of 3m eitherside of the sewer is required (no
built development)
• To the east of Sweechbridge Road lies the sewage works.
Subject to discussions with the Local Authority and Water Board,
it may be necessary to provide a cordon sanitaire around the
sewage works – a buffer between the works and any proposed
residential development.
s I T e A P P r A I s A L P L A N
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 21/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
21
Herne Bay
W a n t s
u m W a l k
No r t h Sea
Saxon Shore Wa y
g r e e n
l i n k s t o
e x i s t ing resident i al h i n t e r l a n d
n e w r e
s i d e n t i a
l
employment(under
construction)
e xtend
emplo yment
l o c a l cen t r e
n e w r e s i d e n t i a l
A299
primary school
employmentallocation
r a i l w a y
Broomfield
6.0 Design Principles
d e V e L o P m e N T o P P o r T U N I T I e s P L A N
Development Opportunities
• Create a permeable edge and green links to the existing residential hinterland.
• Provide residential and mixed use development.
• Extend employment development eastwards between the railway and the
A299.
• Improve connections across the railway (enhance/rebuild bridge connections)
• Extend green links to connect to recreational footpaths and Saxon Shore Way.
• Create a new central focus comprising open space/primary school and a new
local centre in the eastern part of the Site which will benet both the new and
existing communities.
The area of land at Hillborough provides the opportunity for the creation of an integrated
new community that would also contribute substantially to the needs of the wider
community. In light of the ndings of the preceding technical studies, it has been possible
to establish certain principles of development that have been environmentally-led from
the outset. This has enabled the preparation of an illustrative master plan that identies the
scope of the development to provide for:
It is considered the whole site could accommodate circa. 1,200 dwellings. However, in the
emerging Core Strategy period (up to 2026), the realistic development from the site would
be 700 residential dwellings and 12ha employment oorspace plus associated landscaping
and infrastructure improvements. Development of this magnitude is commensurate to
Herne Bay and will go towards enhancing the prosperity of the town whilst supporting the
wider spatial strategy for the District. The development would be in accordance with the
South East Plan. Post 2026, the extension of the residential element of the site could deliver
a further 500 units in the context of the new LDF time frame.
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 22/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
22
proposed
residential 200 units
proposed residential 500 units
local centreprimary
school
1
2
potential long termdevelopment post 2026
500 units
Altira Business Park
(under construction) proposed business p
ark
A B
R e c u l v e
r R o a
d
Broomfield
screen planting / bund
r a i l w a y
S w e e c
h b
r i d
g e
R o a d
A299
proposedon-slip
road
Hawthorn Corner employment allocation
+ 1 resi unit
.
Design Principles• Link existing residential hinterland to new residential community, promoting sustainable links and encouraging
increased use of public transport and alternatives to the car (pedestrian/cycle/bus).
• Create a green grid or permeable network of pedestrian and cycle links across the Site, linking a series of open
spaces and amenities (such as allotments, play areas, upgraded cycle jump area, existing woodland/copse, new
wetland area with pond). Promote a healthy, active lifestyle. Provide a safe, direct local network of footpaths
with good natural surveillance (new dwellings fronting onto footpaths and open space).
• Create a new focus to the Site; a new community heart. Provide a local centre in the eastern part of the Site with
a walkable neighbourhood (500m radius or 3 min cycle, 6 min walk), comprising local amenities such as a shops,
doctor’s surgery and/or dentist, community centre, pub. In the centre of the Site provide an extensive area of
open space overlooked by houses and a primary school.
• Pre 2026 provide a bus link into the eastern half of the Site (a loop from Sweechbridge Road).
There is also potential to extend the bus r oute into the western part of the Site, post 2026.
• Link to longer recreational routes (Saxon Shore Way, Wantsum Walk)
• Retain existing copse vegetation and create new areas of native planting which
encourage biodiversity.
• Create two new wetland areas and ponds, one within an area of open
space, the other for wildlife with no public access.
• Create new swales as part of a sustainable drainage strategy,designed as an integral part of the landscape structure
comprising green corridors, pedestrian routes and
cycleways.
• Improve links across the railway; Pre 2026 upgrade
May Street Bridge (tidal ow with trafc lights),
Post 2026 new bridge crossing east of
Bogshole Bridge.
• Extend employment development
eastwards between the railway
and A299.
If developments incorporate local shops and facilities, are close
to public transport, and include attractive, safe pedestrian andcycling routes, this will help reduce car usage without reducing car
accessibility or car ownership. It will also enable a high quality of life
for those least likely to own a car - the very young and the very old. THE KENT DESIGN GUIDE
“ ”
6.0 Design Principles
d e s I G N P r I N C I P L e s P L A N
l r
Existing urban extent
(predominantly residential)
Housing Allocated (60 units)
Proposed residential
Employment
Proposed primary school
Proposed open space / sports
Screen Planting / green corridors
Proposed wetland
Vehicular access point
Railway bridges
A Potential new bridged
access at later date
B Existing bridge (May Street)
improved (tidal flow andtraffic lights
Green links(pedestrian/cycle)
Proposed local centre
(community centre / shops)
1
2
Pond within area of open
space
Pond/wildlife area.No public access
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 23/26
23
7.0 Masterplan
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
Illustrative Masterplan
Open Space 15 ha
P 2026
Approximately 700 residential units (200 south
of railway, 500 north of railway) comprising 1 to
5-bed accommodation (20 ha @ 35 dph plus
circa. 70 high density units within mixed use
local centre).
A mixed-use local centre 2.00 ha including retail,
community centre, high density residential.
Signicant level of Affordable Homes integrated
within the development with key worker
accommodation.
Primary School (2 form entry) 2 ha, shared use
with local community after school hours.
eplntBusiness Park 12 ha
Pt 2026
Approximately 500 residential units.
Minimum Level 3 Code for Sustainable Homes
I L L U s T r A T I V e m A s T e r P L A N
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 24/26
The ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
24
7.0 Deliverability of the Site
Deliverability of the Site
As part of seeking to achieve a step-change in housing delivery, PPS3 and PPS12 seeks to ensure that a exibleand responsive supply of land is delivered. Paragraph 52 of PPS3 details that the supply of land is required,
together with adopted planning policies and implementation strategies, to facilitate the delivery of housing in
such numbers (and of such a type) which meets up-to-date housing supply objectives.
LPAs are required to identify sufcient ‘deliverable’ sites which are able to deliver a rolling 5-year supply of housing
in accordance with well informed annual targets. In order to be considered deliverable, paragraph 54 indicatesthat such sites should be:
- ‘available’: the site is available now;
- ‘suitable’: the site offers a sustainable location for development now and would contribute to the creation
of sustainable, mixed communities; and
- ‘achievable’: there is a reasonable prospect that housing will be delivered on the site within ve years.
In addition to sites being required to be deliverable, PPS3 also introduces the concept of ‘developable’ (para
56), and in this respect sites should be in a suitable location for housing development and there should be a
reasonable prospect that the site is available for, and could be developed at the point envisaged. Paragraph11 also requires LPAs to provide for an evidence-based policy-approach, including the preparation of a
Strategic Housing Land Availability Assessment (SHLAA). The Site was put forward for assessment in the SHLAA in
September 2008 demonstrating that the site was suitable, available and achievable.
The SHLAA Practice Guidance (July 2007) provides advice on undertaking SHLAA’s and determining thedeliverability of sites submitted. Stage 7 of the assessment details how sites are assessed against the criteria of
being suitable (stage 7a), available (stage 7b) and achievable (stage 7c).
Strategic Housing Land Availability AssessmentsPractice Guidance
www.communities.gov.ukcommunity,opportunity,prosperity
Topic Comments Conclusion
Suitable Policy Restrictions The Site does not currently have any policy designations covering it. The siteis within close proximity to an SPA albeit that the impact is minimal.
The Site is located on the edge of the existing settlement boundary andbound by Thanet Way. The settlement boundary is anticipated to bereviewed through the LDF.
No overriding Policyrestrictions.
Physical Problemsor limitations
The access points and infrastructure upgrades have been discussed withKCC Highways. All service utilities have been investigated and agreedpositions reached.
Initial ecological, landscape, archeological and agricultural surveys haveindicated that there is nothing preventing the development of this site inprinciple.
No physicalproblems.
Potential Impacts The Site is bound by Thanet Way and a Railway Line dissects the site. Thesite backs onto existing built development including to the north and west.
The impact on the wider landscape setting is minimal and considered to besignicantly less than other more sensitive areas in Herne Bay.
The Environment Agency has conrmed its position and providednotication of mitigation measures required for the site.
No physicalproblems.
EnvironmentalConditions
There are no adverse conditions that would be experienced by futureresidents.
No adverseconditions.
Available Legal Ownership The Site is owned and controlled by Kitewood.
All development for the period up to 2026 is unconstrained by ownership.For development after 2026 agreements will be need from Network Railand A E Estates (Developers) Limited both of whom previously supportedthe proposal.
No legal ownershipissues or ransomstrips.
Intent of Owner Kitewood is a well established developer in the region and nationally. Intent to developidentied.
Achievable Economic Viability The Site has been in control of Kitewood for a signicant period of time andas such many costs associated with land acquisition have been bournealready. It is considered the site remains viable.
No viability issues.
Market Factors Herne Bay is an attractive coastal town and the immediate surroundingenvironment provides for a pleasant vista for future residents. It isanticipated that the current market will have improved by the time the
Core Strategy is adopted and therefore sales rates are anticipated to begood at the time of Delivery.
No Issue.
Cost Factors The Site is greeneld and therefore there is limited site preparation worksrequired prior to commencement. Section 106 contributions will beestablished through any application process.
No Issue.
Delivery factors The Developer is committed to delivering this site for mixed usedevelopment.
No delivery issues.
Table 8 identies the criteria as set out in Stage 7 of the SHLAA practice guidance and provides information as to how this site achieves
these tests.
Tabl 8: dlivabilit Citia
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 25/26
ProPosed sUsTAINABLe UrBAN eXTeNsIoN
South of Hillborough, Herne Bay
25
8.0 The Way Forward
T ppal clal ntat tat t t utainabl ptin f a ix-u uban xtnin in
hn Ba li t t at f t tn at hillbug. Ti cunt al t ut t iptanc f allcating
tatgic vlpnt at hn Ba, in aitin t tatgic vlpnt in an aun Cantbu. T
environmental design-ledapproachwillcreatea highqualitybuiltenvironment thatfullyrespectsand
enhancesitsurroundings.Itmaximisestheopportunitytomakeamoreefcientuseofexistingservicesand
faciliti in cl pxiit t t it, an pvi t pptunit t cu futu vic an faciliti f
xiting an n int.
Technical Appraisals
Technical appraisals will continue to be updated to monitor the existing position and ensure that the proposals take
on board the latest design and technical solutions. Liaison with Statutory Consultees will continue in order to gain a
comprehensive understanding of all the issues involved in progressing and implementing the proposed mixed-use
development.
MasterplanThe technical appraisals have fed into the masterplan at this stage which has been drawn up to aid discussions
and demonstrate the approximate scale of mixed-use development that can be delivered on this site and the
associated community and landscape benets.
These concept designs and masterplan will continue to be reviewed in light of ongoing discussions, technical studies,consultations and the latest emerging good practice guidance on design.
Future ConsultationFollowing consultation with Canterbury City Council, it is proposed to undertake further studies necessary in order to
continue to promote the site and inform the emerging Local Development Framework process, specically the Core
Strategy which can allocate strategic development.
Furthermore, we intend to consult with the local community and other key local stakeholders in order to recognise
their potential concerns or aspirations with the new community.
8/3/2019 Development Framework Document
http://slidepdf.com/reader/full/development-framework-document 26/26