developing a new high-grade gold district …...in this presentation. all currencies are reported in...

34
DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT THE KHUNDII GOLD PROJECT Q2 2020 @ErdeneRes @ErdeneResource Erdene Resource Development Corp. www.erdene.com

Upload: others

Post on 15-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

DEVELOPING A NEW HIGH-GRADE GOLD DISTRICTTHE KHUNDII GOLD PROJECTQ2 2020

@ErdeneRes

@ErdeneResource

Erdene Resource Development Corp.

www.erdene.com

Page 2: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

FORWARD LOOKING STATEMENTS: This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statementsregarding the Company’s expectations in respect of its future financial position, business strategy, future exploration and production, mineral resource potential, exploration drilling,permitting, access to capital, events or developments that the Company expects to take place in the future. All statements, other than statements of historical facts, are forward-lookinginformation and statements. The words “believe”, “expect”, “anticipate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will” and similar expressionsidentify forward-looking information and statements. In addition to the forward-looking information and statements noted above, this presentation includes those that relate to: the expectedresults of exploration activities; the estimation of mineral resources; the ability to identify new mineral resources and convert mineral resources into mineral reserves; ability to raiseadditional capital and complete future financings; capital expenditures and costs, including forecasted costs; the ability of the Company to comply with environmental, safety and otherregulatory requirements; future prices of precious metals; the ability of the Company to obtain all necessary approvals and permits in connection with the development of the Khundii Project.

Such forward-looking information and statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company as of the date of suchinformation and statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual resultsto differ materially from those projected in the forward-looking information and statements. Such factors include, but are not limited to, fluctuations in the price of gold and othercommodities, the inability of the Company to raise sufficient monies to carry out its business plan, changes in government legislation, taxation, controls, regulations and political or economicdevelopments in Mongolia, the accuracy of the Company’s current estimates of mineral resources and mineral grades and its preliminary economic assessment, the accuracy of the geologyand vein structures at the Khundii Project, risks associated with mining or development activities, including the ability to procure equipment and supplies, including, without limitation, drillrigs, the speculative nature of exploration and development, including the risk of obtaining necessary licenses and permits. Many of these uncertainties and contingencies can affect theCompany’s actual performance and could cause actual performance to differ materially from those expressed or implied in any forward-looking information and statements made by, or onbehalf of, the Company.

Readers are cautioned that forward-looking information and statements are not guarantees of future performance. There can be no assurance that such information and statements will proveto be accurate and actual results and future events could differ materially from those presented in such information and statements. Forward-looking information and statements is subject toa variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking information and statements. Such risks include, but are notlimited to, the volatility of the price of gold, uncertainty of mineral resources, exploration potential, mineral grades and mineral recovery estimates, delays in exploration and developmentplans, insufficient capital to complete development and exploration plans, risks inherent with mineral acquisitions, delays in obtaining government approvals or permits, financing ofadditional capital requirements, commercial viability of mineral deposits, cost of exploration and development programs, risks associated with competition in the mining industry, risksassociated with the ability to retain key executives and personnel, the impact of COVID-19, title disputes and other claims, changes in governmental and environmental regulation that resultsin increased costs, cost of environmental expenditures and potential environmental liabilities, accidents and labour disputes. Should one or more of these risks and uncertainties materialize,or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking information and statements. Please see the Company’s AnnualInformation Form dated March 27, 2019 available on the Company’s website at www.erdene.com or on the Company’s SEDAR profile at www.sedar.com, for details of other risks facing theCompany. The Company disclaims any intention or obligation to update or revise any forward-looking information and statements whether as a result of new information, future events orotherwise, except to the extent required by applicable laws.

Peter Dalton, P.Geo. (Nova Scotia), Senior Geologist for Erdene and a “Qualified Person” under National Instrument 43-101, has reviewed and approved the scientific and technical informationin this presentation. All currencies are reported in Canadian dollars unless otherwise specified.

2

Page 3: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Advancing high-grade, near-surface, 100%-owned, gold deposits towards production

New Khundii Gold District provides exceptional discovery potential in an expanding mining region

Longest-standing international mining & exploration company in Mongolia with a Mongolia-focused teamand a strong social license to operate

3

WHAT MAKES ERDENE UNIQUE?

ERDENE AT A GLANCEFast tracking to production

Page 4: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,
Page 5: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Giant gold & copper deposits in prospective porphyry and epithermal terranes

The Central Asia Orogenic Belt hosts some of world’s largest gold and copper deposits and remains largely unexplored in Mongolia.

Deposit Type: Epithermal/ Orogenic Porphyry

KHUNDII GOLD DISTRICTAn unexplored portion of a giant gold & copper belt

Fast tracking to production

Erdene’s Projects

Khundii Gold District

Kumtor

5

Page 6: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

1 Moz open-pit, heap leach. Production started in Q2-2014.

Alluvial mining along 50 km section of Tuul River.

Produced 1.5 Moz @ approx. $500/oz cash cost. 1.6 Moz reserve, open-pit

development. Permitting stage. 0.7 Moz Au (+5 Moz Ag),@ 1.3 g/t Au. Production started

in early 2020.

BAYAN AIRAGBayan Airag LLC

ZAAMARPlacer mining

BOROOCenterra GATSUURT

OZD ATOSteppe

TSAGAAN TSAKHIRNaran Mandal BAYAN KHUNDII & ALTAN NAR

Erdene Resource Development BAYANKHONGORArtisanal mining

OYU TOLGOITurquoise Hill

OYUT ULAANXanadu

Commenced production in early 2016. Emerging gold district.

High-grade, early stage. Alluvial mining activity.61 Moz gold resource, open pit /

underground. Projecting >450,000 oz in 2021.

Emerging gold district.High-grade, early stage.

6

ERDENE AND MONGOLIAGrowing Hard Rock Gold Mining IndustryFast tracking to production

Page 7: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

▪ Established three greenfield gold and copper deposits- Zuun Mod – 2011 - Altan Nar – 2015 - Bayan Khundii – 2018

▪ Leading prospector in southwest Mongolia for over a decade- Staked licenses covering 542,000 ha- Compiled largest proprietary

geologic database of the region- Interpreted landsat and aster data- Completed geochemical sampling

program over 4,000,000 ha

▪ Improved infrastructure in a growing mining region

7

KHUNDII GOLD DISTRICTThree deposits, multiple prospects, limited exploration

Fast tracking to production

Page 8: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Mining licenses Mineralized trend Au Cu Ag Mo Pb Zn

0 5 10

kilometers

Exploration licenses

KHUNDII GOLD DISTRICT Three deposits, multiple prospects, limited exploration

Fast tracking to production

Nomin Tal

Altan Nar Deposit (Au, Ag, Zn, Pb)

Oyut Khundii

Altan Arrow

Khar Mori

Khundii North

Bayan Khundii Deposit (Au)

Zuun Mod Deposit (Cu, Mo)

Khuvyn Khar

Ulaan

Page 9: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Cut-off grades for Altan Nar are 0.7 g/t AuEq above a pit and 1.4 g/t AuEq below the same pit shell and for Bayan Khundii are gold only 0.6 g/t gold for 2018 and 0.55 for 2019.

72,000186,000

291,000 289,000102,000

318,000

751,000

839,0001.8

2.0

2.3

2.6

1.5

1.71.8

2.1

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

0.0

0.5

1.0

1.5

2.0

2.5

3.0

2015 March 2018 May 2018 Sept 2019 Oct

Inferred M&I

InferredGrad

e (g

/t)

Resources (oz)

KHUNDII GOLD DISTRICTRapidly expanding gold resources

Fast tracking to production

M&I

Page 10: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

BAYAN KHUNDII GOLD DEPOSIT

Gold Hill zone

Striker zone

Midfield zone

Camp

Dark Horse Prospect

BAYAN KHUNDII GOLD PROJECTHigh-grade, Near Surface Gold Discovery

Fast tracking to production

Our objective is to become a major regional gold producer, initially through development

of a 60,000 ounce per year, high-grade, open-pit mine at Bayan Khundii, while continuing

exploration and acquisition efforts to significantly expand operations.

Bayan Khundii – Mongolian for “Rich Valley”

Page 11: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

Koka

Pueb

lo V

iejo

Toka

Tin

dung

Olim

piad

a

Kum

tor

Mea

dowb

ank

Feko

la

Gold

en S

unlig

ht

Vern

insk

oye

Nzem

a

Mar

tabe

Tong

on

New

Libe

rty

Trop

ican

a

Long

Can

yon

Asan

ko -

Obot

an

Akye

m

Tasia

st

Sukh

ayba

rat

Otjik

oto

Biss

a Za

ndko

m

Youg

a

Nulla

gine

Varv

arin

skoy

e

Runr

uno

Nava

chab

Kura

nakh

Mer

ian

Lero

Alby

n

Bela

ya G

ora

Sigu

iri

Essa

kane

Karm

a

Hidd

en V

alle

y (M

orob

e)

Mou

nt R

awdo

n

Sadi

ola

Penj

om

Kisl

adag

Kalg

old

(Gol

drid

ge)

Ban

Houa

yxai

Rose

bel

Bald

Mou

ntai

n

Guel

b M

oghr

ein

Nery

ungr

i

Shew

usha

n

Bulg

hah

Pena

squi

to

Roun

d M

ount

ain

Salo

bo

Gold Grade (g/t)

Bayan Khundii deposit average LOM head grade 2

World average gradefor open pit gold mines 1

3.73 g/t 1.03 g/t

1. Source: Wood MacKenzie Global Gold Mine Cost database for open pit gold mines, August 20182. Refer to Erdene’s news release dated October 21, 2019 for additional information on the Pre-Feasibility Study.

ERDENE

BAYAN KHUNDII3X the average grade of open-pit mines globally

Fast tracking to production

Page 12: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Midfield Drill Highlights5.2 g/t Au / 41m6.0 g/t Au / 80m

Striker Drill Highlights6.8 g/t Au / 31m11 g/t Au / 37m

North Midfield Drill Highlights5.6 g/t Au / 37m5.3 g/t Au / 25m

150m

PFS Open-Pit Outline

Refer to Erdene’s news release dated October 21, 2019 for additional information on the Pre-Feasibility Study.

Near Surface Gold ResourcesFast tracking to production

Page 13: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

BAYAN KHUNDII: PRE-FEASIBILITY STUDY RESULTS (US$ OCTOBER 2019)

NPV (5%)

US$ 97 million @5% discount and $1,300 gold price

IRR

42%1.8 year payback

Life of Mine (LOM)

7 years

LOM Head Grade

3.7 g/t Au91% average recovery

All in Sustaining Cost (AISC)

US$ 746/ozCapital Expenditure

US$ 40 millionAverage Annual Production

61,000 ounces

$97 $121

$144 $166

$187 $210

$1,300 $1,400 $1,500 $1,600 $1,700 $1,800

NPV(5%) WITH RISING GOLD PRICE

42%50%

58%66%

73%81%

$1,300 $1,400 $1,500 $1,600 $1,700 $1,800

IRR WITH RISING GOLD PRICE

Refer to Erdene’s news release dated October 21, 2019 for additional information on the Pre-Feasibility Study.

Page 14: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

BAYAN KHUNDII GOLD PROJECTWorld Class Bankable Feasibility Study Consultants

Fast tracking to production

Hong Kong listed firm providing natural resources consulting, business valuation and risk advisory

BFS Scope: Study lead, resource geotech and hydro, financial modeling

Philippines based consulting group formed out of Ausenco’s operations offering full suite design and engineering services

BFS Scope: Process plant design and engineering

Vancouver based metallurgical testwork, interpretation, and design consulting

BFS Scope: Metallurgy

Perth-based experts in mining engineering and resource modeling

BFS Scope: Mine design (including closure) and mineral reserves statement

Australian specialists in life-of-mine waste rock and tailings management; design and operating experience at Oyu Tolgoi

BFS Scope: Mineral waste facility design and closure

Ulaanbaatar-based mining and financial advisory and execution services; Management of local design partner

BFS Scope: Internal mine design, Non-process infrastructure, procurement Facilities drawing permitting

International-Mongolian consortium of environmental and social impact assessment and management consultants; Experienced across commodities/cycle in Mongolia and globally

BFS Scope: Environmental and social impact assessment; hydrogeology

Page 15: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

BAYAN KHUNDII GOLD PROJECTGeneral Arrangement

Page 16: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

BAYAN KHUNDII GOLD PROJECTSite Plan – 1,800 tpd CIP Plant

Open Pit

Integrated Waste Facility (initial cell)ROM

Process Plant

Admin & Change Facility

Heating Plant

Renewable & Conventional Power Plant

Workshop

Fuel Station

Page 17: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

17

Key Milestone

Resource Estimate

Khundii Project PEA Study

Mining License: BK

Mining License: AN

Mongolian Feasibility

Khundii Pre-Feasibility Study

ESIA

DEIA

Bankable Feasibility Study

Project Finance

Construction Permits

Earthworks and Construction

Production

Q1 Q2 Q4Q3 Q1 Q2 Q4Q3 Q1 Q2 Q4Q3 Q1 Q2 Q4Q3

2018 2019 2020 2021 2022

CompleteIn progressPlanned

BAYAN KHUNDII GOLD PROJECTDevelopment Timetable

Fast tracking to production

Page 18: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

KHUNDII GOLD DISTRICT The Land of Blue Sky – The Upside

Fast tracking to production

Page 19: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

BAYAN KHUNDII DEPOSIT Tonnage (Mt)

Grade (g/t Au)

Contained Au (Koz)

Proven and Probable Reserve 3.5 3.7 422▪ 422,000 ounces @ 3.7g/t Proven and Probable Reserve

▪ M&I 521,000 ounces @ 3.16g/t gold

▪ Inferred resource of 103,000 ounces @ 3.68 g/t gold outside of pit

▪ Very high gold grades near surface in Midfield and SW not defined

▪ Potential extensions south and north of the pit

19

BAYAN KHUNDIIResources Available to Expand Mineable Pits

Fast tracking to production

Page 20: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Refer to Erdene’s news release dated October 21, 2019 for additional information on the Pre-Feasibility Study.

Midfield Section Looking Down Plunge of Vein

BKD-245: 81m 76.9g/t; 83m 26.8g/t

BKD-94: 68m 44.2g/t

BKD-99: 87m 20.1g/t; 89m 64.9g/t; 90m 50.5g/t

BKD-92: 120m 242.2g/t

BKD-243: 118m 90.5g/t

BKD-230: 96m 64.2g/t; 97m 42.6g/t

BKD-261: 117m 95.1g/t; 118m 128.7g/t; 119m 22.0g/t; 124m 81g/t

BKD-150: 96m 64.9g/t; 97m 55.1g/t

BKD-251: 93m 86.2g/t

BKD-98: 112m 69.2g/t; 113m 496.8g/t

BKD-90: 113m 25.7g/t

BKD-244: 112m 63.8g/t; 113m 26.8g/t; 114m 127.8g/t

BKD-242: 121m 98.7g/t

BKD-194: 124m 47.1g/t

BKD-229: 113m 14.2g/t

BKD-101: 143m 26.47g/t

BAYAN KHUNDIIUltra High-Grade Veins/Breccia Zones

Fast tracking to production

Page 21: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

21

BAYAN KHUNDIIAreas for Expansion Adjacent to Open Pit

Fast tracking to production

Bayan KhundiiProposed Pit

Bayan KhundiiExtension and Exploration Zones

Q2-2020 Condemnation Drill Area

High-Grade Gold Domain

Low-Grade Gold Domain

Exploration-Expansion Zone

500m

N

Section Line

Midfield SE

Page 22: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

BKD-266: 264m 51.9g/t

BKD-216: 156m 33.9g/t

BKD-265: 142m 48.9g/t; 24.8g/t; 46.4g/t

BKD-220: 140m 14.9g/t; 105.9g/t

BKD-265: 165m 34.6g/t

BAYAN KHUNDIIStriker West High-Grade Extension to South

Fast tracking to production

Page 23: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Gold & Striker Hills

Gold Mineralized Host: Carboniferous Volcanics

Midfield East

Un-mineralized Cretaceous and Jurassic Sediments and Volcanics

BAYAN KHUNDIIQ2 2020 Near-Surface Drilling

Fast tracking to production

Page 24: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Q4 Rock Sample Results12.1 g/t Au

15.3 g/t Au

18.2 g/t Au

ULAANGold bearing tourmaline breccia intersected in Q4-2019 drilling

BAYAN KHUNDII GOLD DEPOSIT:1.5km long soil and rock chip

gold anomaly

KHAR MORI PROSPECT: Multiple high grade gold in rock

(up to 87.8g/t Au) and soil samples expand area to ~3km2

Rock chip sample

> 10 g/t

5-10 g/t

1-5 g/t

Drill collar

Structure

32.9 g/t Au

ALTAN ARROW GOLD PROSPECT:Shallow drilling returned multiple high-grade intersections including 2m of 70 g/t Au and 2m of 23 g/t Au

87.8 g/t Au

BAYAN KHUNDIIMultiple Prospects On License

Fast tracking to production

Page 25: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Anomalous Gold Intersections

AAD-12 2m of 70 g/t

AAD-03 2m of 24 g/t

27 g/t Au 12.1 g/t Au

87.3 g/t Au

15.3 g/t Au

18.2 g/t Au

32.9 g/t Au

Dark Horse Prospect

Intense magnetic lows coincident with structural corridors with coincident high-grade gold rock chip samples at surface

DARK HORSE (KHAR MORI) GOLD PROSPECT

3-D Modelling and Structural Interpretation Further Defines

High Priority Target

3D MAGNETIC SECTION WITH NORTHEAST STRUCTURES

AA’

Page 26: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Mining licenses Mineralized trend Au Cu Ag Mo Pb Zn

0 5 10

kilometers

Exploration licenses

KHUNDII GOLD DISTRICT Three deposits, multiple prospects, limited exploration

Fast tracking to production

Nomin Tal

Altan Nar Deposit (Au, Ag, Zn, Pb)

Oyut Khundii

Altan Arrow

Khar Mori

Khundii North

Bayan Khundii Deposit (Au)

Zuun Mod Deposit (Cu, Mo)

Khuvyn Khar

Ulaan

Page 27: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

27

Resource Category Au Oz (1.9g/t)

Ag Oz (~10g/t)

Pb lbs (~0.6%)

Zn lbs (~0.6g/t)

Altan Nar 0.7g/t AuEq cut-off

Indicated 318,000 2,350,000 63,800,000 69,520,000

Inferred 186,000 866,000 49,060,000 52,140,000

ALTAN NARGold-polymetallic Resource North Of Bayan Khundii

Fast tracking to production

▪ Eighteen targets over a 5.6km trend- Exploration has been focused on Union

North and Discovery Zone prospects- Gold anomalies located along

structural trend east of Discovery Zone are most prospective

▪ Intermediate sulphidation epithermal style deposit with significant potential at depth- Average drill depth of 150 metres- Several intense geochemical and

geophysical anomalies remain untested

Page 28: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Central Zone Gap Results from Q1 -2019

28

ALTAN NAR – DISCOVERY ZONEQ1 2020 Results Return Exceptionally High Grades

Fast tracking to production

Page 29: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

29

ERDENE AND MONGOLIAStrong Technical and Social License to OperateFast tracking to production

Page 30: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

Peter AkerleyPresident & CEO

Mining executive and geologist with 25 years experience in exploration, corporate finance, project development & management of public resource companies.

Layton CroftChairman

Dr. Anna BiolikDirector

Diplomat with 30+ years experience including acting as Canadian Ambassador to Mongolia, Kazakhstan, Kyrgyzstan & Tajikistan.

David MosherDirector

Mining executive and geologist with 35 years international experience. Former President & CEO of High River Gold Mines where he developed gold mines in Burkina Faso and Russia.

John ByrneDirector

Kenneth MacDonaldDirector

25 years of leadership and management experience in Mongolia, 16 years of global mining experience with Ivanhoe Mines, Rio Tinto, Peabody Energy and Pancontinental Resources.

Cameron McRaeDirector

Mining executive, with 28 years at Rio Tinto, including as President of Oyu Tolgoi where he led construction of the US$6 billion copper-gold mine in southern Mongolia.

Finance professional with 30+ years experience in the Canadian banking industry. President of Petroleum Corp of Canada Exploration since 1997.

A Chartered Professional Accountant with 34 years of mining finance experience, including 17 years as Executive VP and CFO of Erdene.

Hedley WiddupDirector

Geologist and investment manager with 20 years experience in the evaluation and development of mining projects.

BOARD OF DIRECTORSPioneers In Mongolia’s Modern Mining Era

Fast tracking to production

30

Page 31: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

1. US$5M convertible loan from the European Bank for Reconstructionand Development (“EBRD”). Conversion of the loan principle by theEBRD would result in the issuance of approximately 33M shares.

Shareholder summaryCapital Structure (June 16, 2020)

CAD USD

Share price $0.29 $0.21

52-Wk range $0.13-$0.35 $0.09-$0.26

Market cap $54.9 M $40.6 M

Shares O/S 192.7M

Options 12.5M / Proceeds: $5.3M

Warrants 30.3M / Proceeds: $14.3M

DSU 5.0M

Shares F/D 239.6M

Cash $2.2 M $1.6M

Convertible Loan(1) $6.9M $5.0M

Tickers – TSX: ERD | MSE: ERDN

CORPORATE SNAPSHOTSupportive shareholders

Fast tracking to production

31

Retail ERD Management & Directors

Teck Resources Limited

Mongolian Shareholders

Institutional & Family Office

44%

6% 35%

7%

8%

Page 32: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

ERDENE AT A GLANCEHigh-grade, District-scale, Experienced teamFast tracking to production

Exceptionally high-grade and near surface gold deposit within a land package with district scale exploration upside

Rapid development towards production. Technical studies, permitting and financing milestones are on track

Projected annual cash flow from operation (based on $1,300 Au price) is expected to exceed the current market capitalization

Long term investor such as the EBRD, and Lion Selection Group, whose goals are aligned with the management’s objectives

Leading social license to operate in Mongolia as the company has developed community and business relationships over the past decade

REASONS TO INVEST IN ERDENE

• Exceptionally high-grade, open-pit gold deposit, projected to be shovel ready in 2020

• Low capital cost project with robust economics, targeting 60,000 oz per year production, commencing year-end 2021

• First Mover Advantage within a region with district scale potential

• Proven exploration team that discovered three deposits and multiple high-grade prospects over the past decade

• Experienced corporate development and government relations team with demonstrated ability to finance Mongolian projects and secure world class partners

• Significant ownership by board and management

• Strong shareholder base with long term institutional and retail supporters and recent European Bank of Reconstruction and Development investment

• Robust social license to operate in Mongolia with +10 years of relationship building, including the first cross-listing on the Mongolian Stock Exchange

Page 33: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

ERDENE CATALYSTSUpcoming Achievements and Milestones

Fast tracking to production

FIVE CATALYSTS FOR RE-RATING1. Bankable Feasibility Study results mid-2020 2. Bayan Khundii Drill results early Q33. Khar Mori Exploration program results Q3 20204. Project Financing process starting Q2 20205. Construction earthworks scheduled to begin late 20206. First Gold within 18 months of commencing construction

Page 34: DEVELOPING A NEW HIGH-GRADE GOLD DISTRICT …...in this presentation. All currencies are reported in Canadian dollars unless otherwise specified. 2 Advancing high-grade, near-surface,

@ErdeneRes

@ErdeneResource

Erdene Resource Development Corp.

www.erdene.com