desmontaje de motor outlander
DESCRIPTION
como desmontar motor outlanderTRANSCRIPT
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
ENGINE REMOVAL AND INSTALLATIONSERVICE TOOLSDescription Part Number Page
ENGINE LIFTING TOOL ................................................................ 529 036 022 ........................................... 73
4.9 0.4 Nm(43 4 lbfin)
62.5 7.5 Nm(46 6 lbfft) NEW
NEW
8 1 Nm(70 9 lbfin)
NEW
= Component must be replaced when removed.NEW
NEW
NEW4 1 Nm
(35 9 lbfin)
NEW
5 1 Nm(44 9 lbfin)
13 2 Nm(115 18 lbfin)
7 1 Nm (62 9 lbf in )
NEW
vmr2015-025-001_a
vmr2015-025 69
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
PROCEDURES
ENGINE REMOVAL1. Place vehicle on a workstation equipped with
an engine-lifting hoist.2. Set transmission to park "P" and engage parking
brake.3. Carry out the following operations. Refer to ta-
ble.
OPERATIONS REFERENCES(SUBSECTION)
Release fuel pressure FUEL TANK ANDFUEL PUMP
Remove battery fromvehicle CHARGING SYSTEM
Drain engine coolantPERIODIC
MAINTENANCEPROCEDURES
Remove front body module
Remove RH footrest panelBODY
Remove air filter housing AIR INTAKE SYSTEM
Remove muffler
Remove exhaust pipesEXHAUST SYSTEM
Remove CVT air inletadapter
Remove CVT air outletadapter
CONTINUOUSLYVARIABLE
TRANSMISSION (CVT)
Disconnect starter cable STARTING SYSTEM
Disconnect TPS andIACV connectors from
throttle body
Disconnect MAPTSconnector from intake
manifold
ELECTRONIC FUELINJECTION (EFI)
Remove intake manifold INTAKE MANIFOLD
Remove spark plug cables IGNITION SYSTEM
4. Remove RH footrest support.
vmr2012-009-003_a
1. RH footrest support
5. Move throttle body aside to make room.
vmr2012-009-001
TYPICAL - THROTTLE BODY SECURED TO FRAME
6. Move the master cylinder backwards.
vmr2015-012-003_a
Step 1: Remove these fastenersStep 2: Move master cylinder assembly back
70 vmr2015-025
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
vmr2012-009-002
TYPICAL - MASTER CYLINDER SECURED TO REAR FENDER
7. Move crankcase vent hose as illustrated.
vmr2012-009-004_a
TYPICAL - LH SIDE OF ENGINE1. Crankcase vent hose
8. Disconnect both engine harness connectors(HIC).
vmr2012-009-005_a
TYPICAL - LH SIDE OF VEHICLE1. Engine harness connectors (HIC)
9. Disconnect ignition coil connector.
vmr2015-025-003_a
TYPICAL - FROM LH SIDE1. Ignition coil connector2. Locking ties to cut
10. Remove the following locking ties.
vmr2012-009-008_a
TYPICAL - UPPER ENGINE MOUNTING BRACKET.1. Locking ties to cut
vmr2015-025-002_a
1. ECM2. Locking tie to cut
vmr2015-025 71
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
11. On RH side of engine, remove oil pressureswitch cover.
vmr2012-009-009_a
TYPICAL - RH SIDE OF ENGINE1. Oil pressure switch cover
12. Cut locking ties and remove electrical har-nesses from harness support.
vmr2012-009-010_a
TYPICAL - RH SIDE OF ENGINE1. Harnesses support
13. Disconnect magneto connector from voltageregulator rectifier.
vmr2012-043-013_b
TYPICAL1. Magneto connector
14. Remove magneto harness from its locationalong vehicle and gather it in a bundle nearengine.
15. Disconnect vent hose from gearbox.
vmr2012-009-012_a
TYPICAL1. Vent hose
16. Disconnect coolant hoses as illustrated.
72 vmr2015-025
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
vmr2012-009-025_a
SOME PARTS REMOVED FOR CLARITY1. Disconnect the following coolant hoses
17. Remove main ground wire from engine.
vmr2012-009-014_a
TYPICAL - RH SIDE AFT CYLINDER1. Main ground wire
18. Remove the shift rod. Refer to SHIFTER sub-section.
vmr2015-111-001_a
1. Shift rod
Engine Lifting1. Install the ENGINE LIFTING TOOL (P/N 529 036
022) on engine.
529036022
vmr2012-009-015
TYPICAL
2. Attach hoist to engine lifting tool and pick upsome of the engine weight with the hoist.
3. Remove retaining screws from upper enginemount.
vmr2012-009-016_a
TYPICAL - LH SIDE1. Upper retaining screws
4. Remove retaining bolt from rear engine mount.
vmr2015-025 73
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
vmr2012-009-017_a
TYPICAL - LH SIDE1. Rear engine mount retaining bolt
5. Remove retaining bolt from front enginemount.
vmr2012-009-018_a
TYPICAL - LH SIDE1. Front engine mount retaining bolt
6. At forward RH end of engine, remove enginesupport plate from frame.
NOTICE Heat screws in order to releasethreadlocker prior to attempting to unscrewthem. If not done, the welded nuts may breakaway from the frame bracket.
vmr2012-009-019_a
RH SIDE1. Engine support plate screws
7. Remove the following Oetiker clamps fromfront propeller shaft.
vmr2012-009-020_a
RH SIDE1. Oetiker clamps
8. Move front propeller shaft bellows forward.
vmr2012-009-021_a
RH SIDE1. Front propeller shaft bellows
9. Remove rear propeller shaft screw from gear-box output shaft.
74 vmr2015-025
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
vmr2012-009-022_a
TYPICAL - RH SIDE1. Rear propeller shaft screw
10. Slightly lift engine and move it forward to dis-connect rear propeller shaft from engine.
11. Move rear propeller shaft yoke downwards tomake room.
vmr2012-009-023
TYPICAL
12. Move engine rearward to disconnect front pro-peller shaft from engine.
13. Remove engine from RH side of vehicle.
vmr2012-009-024
TYPICAL
ENGINE INSTALLATIONReverse the removal procedure. However, pay at-tention to the following.When installing a part, refer to its applicablesubsection for tightening torques and productsrequired.Inspect condition of engine mounts.Install engine on vehicle.Install all engine retaining bolts loosely.Install front and rear propeller shafts. Tighten re-taining screws to specification.Tighten engine mounting bolts to specification.
TIGHTENING TORQUE
Engine retaining bolts 62.5Nm 7.5Nm(46 lbfft 6 lbfft)
Reconnect all hoses, adapters and electrical con-nections.If applicable, fill engine as per specification withengine oil. Refer to PERIODIC MAINTENANCEPROCEDURE subsection.Fill and bleed cooling system. Refer to PERIODICMAINTENANCE PROCEDURE subsection.Check for any leaks.Install all remaining removed parts.Test drive vehicle to confirm proper operation.
ENGINE MOUNTSREPLACEMENTNOTE: Use the same procedure for the front andrear engine mounts.
vmr2015-025 75
-
Section02 ENGINE, CVT AND GEARBOXSubsection 01 (ENGINE REMOVAL AND INSTALLATION)
Engine Mount RemovalInsert a punch into one engine mount bushing andpush the opposite bushing out.
tmr2011-007-011
TYPICAL
Engine Mount InstallationPush in each mount bushing until it bottoms out.
76 vmr2015-025