designing the building of the future practical experience in it deployment collaborate to accelerate
TRANSCRIPT
![Page 1: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/1.jpg)
Designing the Building of the Future
Practical Experience in IT Deployment
Collaborate to Accelerate
![Page 2: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/2.jpg)
Panduit Confidential – Internal Use onlyFORM C2-0765 DATE 01JUL08
UPI Phase 2 Convergence Align
System Architecture
Converge
Systems & Software Integration
Optimize
Design Optimization Lifecycle Management
Deploy with Speed, guaranteed performance, maximize air flow, assist with cooling, recover space, provide tools to managed and increase value
PViQ DC Design
![Page 3: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/3.jpg)
CO2 Emissions from Energy Use
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
1.2
1.4
1.6
1.8
2.0
2.2
2.4Buildings
Industrial
Transportation
Source: U.S. Energy Information Administration
(Bil
lio
n M
etri
c T
on
s o
f C
O2
)
![Page 4: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/4.jpg)
Phase 1: 28,000m2
LEED Gold Building
World Class Implementation• Cisco Connected Real Estate (CRE) • Panduit Connected Building Solutions (CBS)• Panduit Data Center Solutions (DCS)
Phase 1 Capacity – >800 Employees
Key Features of Panduit WHQ
![Page 5: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/5.jpg)
Industry Gap – Connected Building Solution
Internal Alignment External Alignment
Security Sustainability Operational Efficiency
Enhanced Experience
![Page 6: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/6.jpg)
LEED Statistics &Technologies
5 Points
14Points
15 Points
13 Points
17 Points
Innovation 4 Points
RECOVERY
![Page 7: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/7.jpg)
Making a Connected Building
![Page 8: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/8.jpg)
Making a Connected Building
![Page 9: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/9.jpg)
Traditional Solution - Security
![Page 10: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/10.jpg)
Traditional Solution - BAS
![Page 11: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/11.jpg)
Traditional Solution - All Systems Deployed
![Page 12: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/12.jpg)
Think Differently Think UPI
![Page 13: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/13.jpg)
Unified Physical Infrastructure
![Page 14: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/14.jpg)
Information Technology Strategy
• Middleware and Software
• Connected Building Data Centers
• Telecommunications Rooms
• Pathways
• Consolidation and Endpoints
![Page 15: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/15.jpg)
Converged Network Pathways
•Design Consolidation
•Contracting Simplification
•Construction Speed
•Operations and Maintenance
![Page 16: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/16.jpg)
Head Quarters Benefits
Estimated Annual return of our Connected Building
$0.74/ft2 = $184,000 / year
White Paper (May 2009): “Achieving Financial and Functional Advantagesin Connected Building Solutions with the Unified Physical InfrastructureSM (UPI)”
![Page 17: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/17.jpg)
Intelligent infrastructure
Think Differently
![Page 18: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/18.jpg)
SM
Shorten Horizontal Cables Using Main Distribution Points
• Zone Distribution Areaso Reduces Cable Congestiono Reduces Power Consumptiono Rapid Deployment of
Connections
o Reduces deployment costs up by 16%
CONFIDENTIAL - For Internal Use Only
Smarter Physical DeploymentZone Cabling
www.fols.org
![Page 19: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/19.jpg)
Move to Standard Ethernet/IP
Churn Rate 22.5%
![Page 20: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/20.jpg)
Standard Cabling TopologyZone Cabling Topology
![Page 21: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/21.jpg)
Telecommunication Enclosures
![Page 22: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/22.jpg)
Connected Building Product Portfolio
![Page 23: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/23.jpg)
FM
FM
X
IT
M
F
Warehouse
MDA
Data Center
NOC
PBX
UTILS
Elec. Rm
M
F
F
M
TC
DayCare
F
MCafeteria
Kitchen
Data Cabling Video SecurityHVAC Cabling
Backbone Cabling
Access Control Cabling
Zone Enclosures
Enterprise Solution
![Page 24: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/24.jpg)
Quick Server Deployment
1. SAN Isolation
Data Centre -Zone Distribution Area Layout
![Page 26: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/26.jpg)
Connected Building Brochure •Leverage real-time information •Reduce infrastructure and systems•Deployment of platform-agnostic, open architecture.•Deliver high degree of system availability and reliability•Converge and optimize critical systems•Maximize ROI.•Drive infrastructure and business process improvements•Reduce operational costs and mitigating risk.•Create a sustainable technology infrastructure
![Page 27: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/27.jpg)
Integration Creates Value
Save $60,000 / annum for every 1000 users
![Page 28: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/28.jpg)
Power 0ver EthernetIt is a Managed DC power distribution system
IEEE 802.3af 48volts 350mamps 15watts
IEEE 802.3at51volts 600mamps 24watts
Key is 30 watts per port
![Page 29: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/29.jpg)
Powered Devices - Examples
VoIP Phones
Wireless Access Points
Security Cameras
Access Control
RFID Tracking Devices
Lighting Controllers
Industrial Devices
Smoke & Heat Detectors
Mobile Phone & PDA Chargers
Vending/Gaming Machines
Clocks
5- 8 watts8- 12 watts
10- 12 watts
8- 12 watts
![Page 30: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/30.jpg)
AC UPS
AC
AC-DC
AC-DCDC-AC
DC UPS
AC
Panduit
AC-DC
33% power loss
7% power loss
Green PoE Deployment
![Page 31: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/31.jpg)
Managing Power Distribution -PoE
Power On/Off
Power Off timed
Real Time
Pre- TimedEvent D
riven
UPS utilisation
Building Access
PanduitMidspan
![Page 32: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/32.jpg)
Panduit Customer
800 Staff Call Centre400 Too Hot400 Too Cold
Route CauseDesk Top PC 200 WattsColour Monitor 70 watts
![Page 33: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/33.jpg)
Managed POE reduces energy consumption
Data + POE
Data + POE
Power
Data
Building Access Security
Data
3.5 Watts
7 Watts
15 Watts
<30 Watts
![Page 34: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/34.jpg)
Generic Thin Client solution
Data + POE AT Power+12volts
Data
Building Access Security
Data
3 -8 Watts 15- 18 Watts
Power+5volts
Splitter
Splitter
Data
![Page 35: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/35.jpg)
Airbus A380
Think DifferentValueDC Power Distribution
Watch for OLED
LightingSignageDesk Tops
![Page 36: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate](https://reader038.vdocuments.site/reader038/viewer/2022110213/56649e755503460f94b7668b/html5/thumbnails/36.jpg)
Questions ?