Page 1: Designing Next Generation Data Centres
Page 2: Designing Next Generation Data Centres
Page 3: Designing Next Generation Data Centres
Page 4: Designing Next Generation Data Centres
Page 5: Designing Next Generation Data Centres

Data Explosion• 1bn new web pages created daily

• Data creation to increase

5-fold in 2 years

• Video expected

to be 50% of

internet traffic

by 2012

• Enterprise storage

requirements increase

50% every year

Page 6: Designing Next Generation Data Centres

••

••

Page 7: Designing Next Generation Data Centres
Page 8: Designing Next Generation Data Centres
Page 9: Designing Next Generation Data Centres
Page 10: Designing Next Generation Data Centres
Page 11: Designing Next Generation Data Centres

11

Page 12: Designing Next Generation Data Centres

12

Page 13: Designing Next Generation Data Centres

13

Page 14: Designing Next Generation Data Centres

14

Page 16: Designing Next Generation Data Centres

16

Nexus 5548Catalyst 6509-V-E

Page 17: Designing Next Generation Data Centres

17

Top Of Rack or End of Row

Page 18: Designing Next Generation Data Centres

18

Page 19: Designing Next Generation Data Centres

19

Page 20: Designing Next Generation Data Centres

20

Page 21: Designing Next Generation Data Centres

21

CPU 1 CPU 2

Appliance 1 - UCS C210-M2

Core 1 Core 2 Core 3 Core 4 Core 1 Core 2 Core 3 Core 4

UCM – Pub & TFTP UCM – SubscriberUnity Connection Presence

CPU 1 CPU 2

Appliance 2 - UCS C210-M2

Core 1 Core 2 Core 3 Core 4 Core 1 Core 2 Core 3 Core 4

UCM – Subscriber Unity Connection PresenceUCM – Subscriber

2 cores =

Page 22: Designing Next Generation Data Centres

22

Page 23: Designing Next Generation Data Centres

23

Page 24: Designing Next Generation Data Centres

24

Page 25: Designing Next Generation Data Centres

25

Equipment Quantity Size in U Typical Power Max BTU

VSS Cat 6509-VE 2 21 1558.70w 6469.53

Nexus 5548 2 1 390w <1998

Nexus 2248 2 1 110w 322

Nexus 2232 2 1 270w 806

UCS210-M2 2 2 343w 1168

Total Per DC 25 2671.7 10763.53

Site Total 50 5343.4 21527.06

Equipment Quantity Size in U Typical Power Max BTU

Cat 6509-VE 2 21 1558.70w 6469.53

Cat 6509-VE DC 2 21 3395.28w 17051.29

MCS-7845 4 2 257w 875

MCS-7835 4 2 189w 645

Total Per DC 50 5845.98 26560.82

Site Total 100 11691.96 53121.64

Page 26: Designing Next Generation Data Centres

26

Page 27: Designing Next Generation Data Centres

27

Page 28: Designing Next Generation Data Centres

28

Page 29: Designing Next Generation Data Centres

29

Page 30: Designing Next Generation Data Centres

All content in this presentation is protected – © 2008 American Power Conversion Corporation

PUE – Power Utilisation Effectiveness &

Enhanced Capital Allowance (ECA)

Richard Symons

Data Centre Specialist

June 2011.

Page 31: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

Agenda

● HOW IS ENERGY EFFICIENCY DEFINED?

● POWER AND COOLING EFFICIENCY CALCULATIONS

● ECA IS FOR ENERGY SAVING TECHNOLOGY

● WHAT QUALIFIES ?

● ENERGY TECHNOLOGY LIST ( ETL)

● HOW CAN CUSTOMER CLAIM ECA ?

Page 32: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

How is efficiency defined?

Power usage effectiveness (PUE) and Data Center infrastructure efficiency (DCIE)

PUE is a ratio of total power coming into the data center to the power going

to the IT.

For example if it takes 1.5 times as much energy to run your data center as

than is required to for just the IT equipment.

DCIE is represented as a percentage of IT load power divided by total data

center power, and is the inverse of PUE.

Higher DCIE values indicate a more efficient data center.

Page 33: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

Carbon footprint

● Vary parameters

● Experiment with “What if”

● Make tradeoffs

Power/cooling efficiency

Data Center Capital Cost

Make informed decisions BEFORE you invest in your data center

Page 34: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

Enhanced Capital Allowance

(ECA) Scheme for Energy

Saving Technologies

Page 35: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

Enhanced Capital Allowance for energy-

saving technologies

● The Carbon Trust manages the Energy Technology List (ETL) and promotion

of the ECA scheme on behalf of Government.

● To help bring about a low carbon economy and reduce UK CO2 emissions by:

1. Influencing the design, availability, and uptake of the most energy-efficient

equipment types within the remit of the scheme;

2. Promoting the ETL as a principal procurement tool for designers,

specifiers and purchasers interested in energy-saving capital equipment.

Page 36: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

ETL – Technology Groups

● Air-to-air energy recovery

● Automatic monitoring and targeting equipment (

● Boilers

● CHP

● Compact heat exchangers

● Compressed air equipment

● Heat pumps for space heating

● HVAC Equipment

● Lighting

● Motors and Drives

● Pipe insulation

● Refrigeration equipment

● Solar thermal systems

● Warm air and radiant heaters

● Uninterruptable Power Supply

Businesses may claim

100% first-year capital

allowance

Page 37: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

More information from . . .

● ECA Scheme for energy-saving technologies

Information for purchasers

- www.eca.gov.uk/energy

- Carbon Trust Advice Line on 0800 085 2005 or email [email protected]

● HM Revenue & Customs

● www.hmrc.gov.uk/manuals/camanual/CA23100.htm

● Tel: 020 7147 2541

Page 38: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

FINANCIAL GAINS FOR CUSTOMER

DUE TO ECA SCHEME

●EXAMPLE of ECA claim : If Client X made a profit of

£100,000 during current tax year and had purchased ECA

certified UPS project worth £70,000 during the same tax

year, then Client X will pay tax on £30,000 (£100,000 less

£70,000) only, instead of £100,000

●** UPS Project cost benefit includes : UPS systems,

delivery & offloading including craneage, direct install cost

covering cabling, battery build, project management, any

site modifications and UPS project specific professional

fees too.

Page 39: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

FINANCIAL GAINS FOR CUSTOMER

DUE TO ECA SCHEME

● Usual rate of capital allowance for plant and machinery is

20% p.a. on sliding scale basis and is spread over a

number of years.

●However with ECA the customer is allowed by HMRC to

use up the full cost of the UPS project ** as capital

allowance within the first year of purchase.

●This ECA scheme indirectly boosts the cash flow for the

customer for the first year.

●The ECA allowance is written off against customer’s own

taxable profit.

Page 40: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

Questions?

Page 41: Designing Next Generation Data Centres

APC by Schneider Electric – Giles Pattison – 7th April 2011

Nick Morris, NextiraOne

Senior Design Consultant

Page 42: Designing Next Generation Data Centres
Page 43: Designing Next Generation Data Centres
Page 44: Designing Next Generation Data Centres

Page 45: Designing Next Generation Data Centres

Page 46: Designing Next Generation Data Centres

Page 47: Designing Next Generation Data Centres

Page 48: Designing Next Generation Data Centres

Page 49: Designing Next Generation Data Centres

Page 50: Designing Next Generation Data Centres

Snap-in

blanking

panel

Page 51: Designing Next Generation Data Centres

Page 52: Designing Next Generation Data Centres

Page 53: Designing Next Generation Data Centres

Page 54: Designing Next Generation Data Centres

Page 55: Designing Next Generation Data Centres

Page 56: Designing Next Generation Data Centres

Page 57: Designing Next Generation Data Centres

Page 58: Designing Next Generation Data Centres
Page 59: Designing Next Generation Data Centres
Page 60: Designing Next Generation Data Centres

Applications & Data

Operations

Organisation (people &

processes)

Objectives & StrategyFinancials

Architecture

Page 61: Designing Next Generation Data Centres
Page 62: Designing Next Generation Data Centres
Page 64: Designing Next Generation Data Centres
Page 65: Designing Next Generation Data Centres
Page 66: Designing Next Generation Data Centres

??

Page 67: Designing Next Generation Data Centres

Customers

Employees

Sales in 2010

Service Experts

Fortune Euro

Top 100 Companies

Services

Direct sales and service

presence in 16 countries

Page 68: Designing Next Generation Data Centres