Design and Construction Phasing of Large Wastewater Storage Lagoons for a Spray Irrigation Facility
![Page 2: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/2.jpg)
• Case Study Introduction
• Design Constraints
• Design Solutions
• Conclusions
Overview
![Page 3: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/3.jpg)
• Major Food and Beverage Manufacturer
• Generates up to 500,000 gpd wastewater
• Land applies pre-treated wastewater on 450 acre spray field system under permit
• Needed additional storage capacity for spray field management purposes.
Case Study: Irrigation Storage Lagoon Design
![Page 4: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/4.jpg)
Original Wastewater Management System
![Page 5: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/5.jpg)
Design Constraints
• Operational
• Horizontal Boundaries
• Vertical Boundaries
• Construction considerations
![Page 6: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/6.jpg)
• Near by residents are concerned about potential for odors
• Owner plans to operate the lagoon empty as often as possible.
• Some near by residents have been known to shoot at random objects for target practice.
• The resulting process must be bullet proof (literally)
Operational Constraints (or “Living with your neighbors”)
![Page 7: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/7.jpg)
• If the lagoon is empty, it will be exposed to extremes of ambient temperature.
• White liner material was selected to minimize temperature extremes.
• If the lagoon is empty liner material will be subjected to potential wind uplift.
• Liner must ballasted against wind uplift.
Considerations for operating the lagoon empty
![Page 8: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/8.jpg)
• Must maintain overflow safety for pump station wet well at all times.
• Construction must be phased so that existing lagoon remains in service until new construction is in service.
• New storage lagoons must have capacity below overflow level
Operation During Construction
![Page 9: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/9.jpg)
Horizontal Boundaries
• [insert existing conditions plan]
![Page 10: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/10.jpg)
Vertical Constraints
• Bottom of new lagoons below overflow of existing pump station overflow.
• Bottom of new lagoons above seasonal high water table.
• Top of berm below dam safety threshold
![Page 11: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/11.jpg)
Construction Phase I
![Page 12: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/12.jpg)
Construction Phase I
![Page 13: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/13.jpg)
Construction Phase I
• [add Phase I site plan]
![Page 14: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/14.jpg)
Construction Phase II
![Page 15: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/15.jpg)
Construction Phase II
• [add Phase II site plan]
![Page 16: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/16.jpg)
[insert hydraulic profile]
Construction Phase II
![Page 17: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/17.jpg)
System Operation
![Page 18: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/18.jpg)
A Working System
![Page 19: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/19.jpg)
[insert photo of overlooking both lagoons]
[insert final hydraulic profile]
A working system
![Page 20: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/20.jpg)
• Consider how the final system will be operated
• Consider vertical and horizontal boundaries
• Consider construction phasing
• Importance of material selection
Conclusions
![Page 21: Design and Construction Phasing of Large Wastewater ... · NC AWWA-WEA Fall Conference November 18, 2014 Design and Construction Phasing of Large Wastewater Storage Lagoons for a](https://reader034.vdocuments.site/reader034/viewer/2022042123/5e9e0356470e0840c75e50f6/html5/thumbnails/21.jpg)