Design and Analysis of Water Treatment Plant
Design of Water Treatment Plant
Project by,N.Kannan (212712103017 )V.Sai Prasad (212712103023 )S.Subramanian (212712103305 )
Guided by,Mr.G.Arun M.E.AP/CivilSVCE.
INTRODUCTIONSriperumbudur is a town in theIndianstate ofTamil Nadulocated 40kilometers southwest of the city ofChennai. It is known for being the birthplace of Sri Ramanuja.In 1999,Hyundai, one of the initial investors, arrived at Sriperumbudur. By 2008, Sriperumbudur had become aspecial economic zone with over US$2 billion invested by companies primarily in the automotive and electronics sectors.Coordinates: 12.97N 79.95E
Country : India
State : Tamil Nadu
District : Kanchipuram
Elevation : 37m (121ft)
Weather : 34C, Wind NE at 5 km/h 56% Humidity
Metro water will soon run through taps and pipelines in the satellite township of SriperumbudurSriperumbudur has been chosen to be developed as a satellite town under the Centrally-sponsored scheme of Urban Infrastructure Development Sriperumbudur in Kancheepuram district.Metro water is scrutinising bids to execute water supply and drainage projects worth Rs.90 crore in Sriperumbudur. Work orders will be issued shortly, an official said.
The cost will be shared among the Union and State governments and the Sriperumbudur town panchayat in the ratio of 80:10:10.Though there are many major manufacturing and automobile industries around the Sriperumbudur belt, it presents a picture of neglect like several peripheral areas in the Chennai Metropolitan Area.
Steps Involved STEP 1: Population Forecasting
STEP 2: Water demand
STEP 3: Design of Water Treatment Plant
CENSUS NameDistrictPopulation
01-03-1991Population
01-03-2001Population
01-03-2011SriperumbudurKanchipuram13,09116,15624,864POPULATION FORECASTING METHODSArithmetical Increase Method Geometrical Increase MethodIncremental Increase MethodDecreasing Rate MethodSimple Graphical MethodComparative Graphical MethodMaster Plan MethodThe Apportionment MethodLogistic curve Method
Census Year Population 199113,0912001 16,156201124,8649SourceOffice of the Registrar General and Census Commissioner (web), Delimitation Commission of India (web), Rand McNally International Atlas 1994, School of Planning & Architecture (web).
Forecasted PopulationYear
Population by Arithmetic increase method Population by Geometric increase method Population by Incremental increase method Population by Decreasing rate method 2041 42,524
61,890
76,3822,41,697 Water treatment plant is designed for an period of three decades and so population is forecasted for three decades. Adopting the incremental increase method of forecasting in calculating the amount of water supplied . Population forecast for three decades, From (2011- 2041) = 76,382 persons Estimated population in 2041 is 76,382 persons Domestic water demandAs per IS1172 1993,The minimum domestic water consumption for Indian town and cities with full flushing system are given below
AssumptionsAverage daily Demand = Population * Average water consumption.
Maximum water demand= 1.8* Average daily demand.
Average daily demand= 76382*200 lpcd= 15276400 lit/day= 15.27 MLD
Maximum water demand = 1.8* 15.27=27.50MLD
Design ParametersThe overall design of the wastewater treatment plant consists of 3 stages:i)Primary treatment which consists of screening, grit removal and sedimentationii)Secondary treatment consists of a bioreactor iii)Tertiary treatment consists of nitrogen removal, adsorption and pH control.
Raw water