Design Activity Update Data Processing – Focus is Coordination and Use of Data Survey: Incorporation of data in plans. Apparent Right of Way. Planimetrics – surveyed elements – and utilities Existing ground surfaces. Geotechnical: Draft reports complete at bridge locations. Reports being developed for channel, walls, etc. Subsurface Utility Coordination: Coordination of reports with utility owners, developing strategies for relocation.

Upload: others

Post on 23-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity Update

• Data Processing – Focus is Coordination and Use of Data– Survey:  Incorporation of data in plans.

• Apparent Right of Way.• Planimetrics – surveyed elements – and utilities• Existing ground surfaces.

– Geotechnical:  • Draft reports complete at bridge locations.• Reports being developed for channel, walls, etc.

– Subsurface Utility Coordination:• Coordination of reports with utility owners, developing strategies for relocation.

Page 2: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity Update

• Environmental Site Assessments (ESA): − Phase 2 ESA for Upper Reach ‐ preliminary results, draft report under review by design team.

• Final, second round sampling still to be done.• One property where samples are pending.

− Draft scope still under review for Phase II ESA,  Lower Reach. 

Page 3: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity Update

• Advancing the Design:– Layout of project elements with current survey.– Paseo/walkway design.– Preliminary Civil grading design.– Planning and organizing drawing content for project elements.

Page 4: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity Update

• Advancing the Design:– Continued advancement of the Hydraulic & Hydrology Study and Design.

• More detailed numerical methods than have been used in the past.

• Completing the calibration of “existing conditions.”

Page 5: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity Update

• Advancing the Design:– Gate Facility Programming.

• Continue to define criteria for gate criteria and function.

• Continue to refine gate locations.• Upcoming workshop, planned early November.

Page 6: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity UpdateTR

AVIS STR

EET (GATE UPSTR

EAM)

Page 7: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity UpdateDO

LORO

SA STR

EET

Page 8: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity UpdateDO

LORO

SA STR

EET (DOWNSTRE

AM)

Page 9: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity UpdateBE

TWEEN SOUTH

  ALAMO & CAM

P STRE

ETS

Page 10: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

Design Activity Update

• Key Design Team Activities:– Stakeholder Coordination:  

• Responding to the input gathered on 8/23.• Development of materials for next public event.

Page 11: Design Activity Update › ... · 10/9/2014  · Design Activity Update • Environmental Site Assessments (ESA): −Phase 2 ESA for Upper Reach ‐preliminary results, draft report

END OF UPDATE