NOAA FORM 76-35A U.S. DEPARTMENT OF COMMERCE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NATIONAL OCEAN SURVEY DESCRIPTIVE REPORT Type of Survey: Field Examination Registry Number: F00547 LOCALITY State: VA General Locality: Elizabeth River Sub-locality: APM Terminal, West of Lamberts Point 2007 CHIEF OF PARTY CAPT Raymond Slagle NOAA LIBRARY & ARCHIVES DATE - i -

Upload: others

Post on 14-Jul-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

NOAA FORM 76-35A

U.S. DEPARTMENT OF COMMERCE

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NATIONAL OCEAN SURVEY

DESCRIPTIVE REPORT

Type of Survey: Field Examination Registry Number: F00547

LOCALITY

State: VA General Locality: Elizabeth River Sub-locality: APM Terminal, West of Lamberts Point

2007

CHIEF OF PARTY

CAPT Raymond Slagle NOAA

LIBRARY & ARCHIVES

DATE

- i -

Page 2: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

NOAA FORM 77-28 U.S. DEPARTMENT OF COMMERCE (11-72) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

HYDROGRAPHIC TITLE SHEET

REGISTRY NUMBER:

F00547

INSTRUCTIONS: The Hydrographic Sheet should be accompanied by this form, filled in as completely as possible, when the sheet is forwarded to the Office.

State: VA

General Locality: Elizabeth River

Sub-Locality: APM Terminal, West of Lamberts Point

Scale: 1:5,000 Date of Survey: 7/23/07 and 8/6-7/07

Instructions Dated: July 13, 2007 Project Number: S-E923-TJ-07

Vessel: NOAA Ship THOMAS JEFFERSON and S3004

Chief of Party: CAPT Raymond Slagle

Surveyed by: THOMAS JEFFERSON launch and s3004

Soundings by: Reson 8101 and 8125 multibeam echosounders

Graphic record scaled by: N/A

Graphic record checked by: N/A

Protracted by: N/A Automated Plot: N/A

Verification by: Atlantic Hydrographic Branch Personnel

Soundings in: Meters Feet at MLLW

Remarks: 1) All Times are in UTC. 2) This is a Navigable Area Hydrographic Survey. 3) Projection is UTM Zone 18. Red, Bold, Italic notes in the Descriptive Report were made during Office Processing.

2

Page 3: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

Descriptive Report to Accompany Hydrographic Survey F00547

Project S-E923-TJ-07 0.2 SNM

Elizabeth River APM Terminal, West of Lamberts Point

Scale 1:5,000 July 23rd and August 6th-7th, 2007

NOAA Ship THOMAS JEFFERSON and Navigation Response Vessel s3004

A. AREA SURVEYED This field examination survey was completed as specified by Letter Instructions S-E923-TJ-07, dated July 13, 2007*. The survey area includes the newly dredged approach to the APM Terminal, West of Lamberts Point. Data acquisition was conducted on July 23 (TJ launch 3102) and August 6-7 (s3004). Concur. This survey responds to a request from the acting Mid-Atlantic Region Navigation Manager (CDR Tod Schattgen) to re-survey the APM Terminal in Portsmouth, VA, on the Elizabeth River. The construction of this new terminal included dredging the approaches to a 50-ft project depth to enable deep draft container vessels to enter. In April 2007 the THOMAS JEFFERSON surveyed this area (F00540) and discovered several shoal areas less than the 50-ft project depth. On or about July 16, APM contracted for additional dredge work to remove these shoal areas in order to achieve the 50-ft project depth.

Lineal Nautical Miles

Single Beam Only 0 Multibeam Only 26.19 Side Scan Sonar Only 0 Side Scan/Single Beam 0 Crosslines 1.22 Multibeam Developments 0 Side Scan Developments 0 Shoreline Investigation 1

Table 1: Linear Nautical Miles Acquired

Survey limits of F00547 are shown on the following page in figure 1. Coverage was extended to beyond the northeast corner of the survey area defined by the project instructions because it, too, had been dredged but left out of the original project request (see figure 1). Concur. *Filed with original field records.

3

Page 4: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

Figure 1: Survey limits and data outline of F00547 (Chart 12253, north up).

4

Page 5: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

B. DATA ACQUISTION AND PROCESSING See also Evaluation Report. Refer to a 2007 field season THOMAS JEFFERSON DAPR* for a complete description of data acquisition and processing systems, survey vessels, quality control procedures and data processing methods. Additional information to supplement sounding and survey data, and any deviations from the DAPR are included in this descriptive report. Concur. B 1. EQUIPMENT AND VESSELS THOMAS JEFFERSON launch 3102 acquired Reson 8101 MBES on July 23 and Navigation Response vessel s3004 acquired Reson 8125 MBES data on August 6-7. Concur. B 2. QUALITY CONTROL B 2.1 System Certification and Calibration Refer to NOAA Ship THOMAS JEFFERSON DAPR* and Hydrographic Systems Readiness Report (HSRR) for a complete description of system integration and initial calibration results for equipment and sensors used for this survey. Though a separate field unit, Navigation Response Vessel s3004 does not have a DAPR ready for submittal, but uses the precise-timing set-up for acquisition and processing as described in the Field Procedures Manuel for its arm-mounted Reson 8125 multibeam, and much like that described in THOMAS JEFFERON’s DAPR*. B.2.2 Sounding Coverage As per the Letter Instructions, this survey was conducted using object detection multibeam. Data from July 23 (DN 2007-204) was acquired at a launch speed of 3.5 knots with a set line spacing of 10 meters. Data acquired on August 6-7 was acquired at a speed of 3- 4.5 knots with set line spacing of 30 meters. All data were filtered to meet IHO Order 1 and to remove quality flags of zero. Due to the excess of coverage, data were filtered to remove pings beyond 30 meters from nadir on both port and starboard. Concur. B 2.3 Crosslines Multibeam echosounder cross-lines totaling 1.22 lineal nautical miles, comprising 0.5% of MBES hydrography, were acquired during the course of the survey. Crosslines were acquired with the Reson 8125 MBES on s3004 only. Achieving the required percentage of crosslines would have been inefficient due to the quantity of mainsheme lines, which were very tightly spaced. Though the minimum percentage of crosslines required by the Specifications and Deliverables (5%) was not obtained, the hydrographer is confident in the accuracy of the two systems, which vertically agree in all common areas within 5-10 cm. Concur.

*Filed with original field records.

5

Page 6: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

B 2.4 Junctions and Prior Surveys The following contemporary surveys junction with F00547 (see figure 3): Registry # Scale Date Field Party Junction side F00540 1:5000 April 2007 THOMAS JEFFERSON coincident H11599 1:10000 May-June 2006 Bay Hydrographer eastern side

Figure 3. F00547 Junction Surveys.

The original APM Terminal survey, F00540, was conducted in April 2007, which discovered depths shoaler than the project depths of 50 feet. In response to F00540, smoothing attempts were made with a rolling apparatus towed from a tug boat. Survey F00547 indicates that the smoothing attempts were somewhat successful at deepening the channel by about 10-50 cm in areas where the roller apparatus was used. However, depths shoaler than 50 feet remain within the project (see figures 4 and 5). Concur.

6

Page 7: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

Figure 4: Wire-frame Surface (F00540) v. Solid Surface (F00547), 40 cm resolution CUBE surfaces

Figure 5: Before (F00540) and After (F00547), 40 cm CUBE surfaces

7

Page 8: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

The junction between F00547 and H11598 was not compared because the data from H11598 was not readily available for comparison. B 2.5 Systematic Errors Few systematic errors were observed. Slight heave artifacts less than 5 cm are noticeable in the Reson 8125 data acquired with s3004. The data from launch 3002 is uniformly “noisy”. Concur. B 3. CORRECTIONS TO ECHO SOUNDING Caris HDCS sounding data were reduced to mean lower-low water (MLLW) using preliminary, observed tides from the primary station at Sewells Point (863-8610), with no secondary station used. The tide zone definition file E915BH_NRT2006CORP.zdf was used, though all of the data falls within a single zone (JR35, see figure 6)

. Figure 6: Final Tide Zoning

All other datum reduction procedures conform to those outlined in the DAPR*. All methods and instruments used for sound velocity correction were as described in the DAPR*. A table detailing all sound velocity casts is located in Separate II* of this Descriptive Report. Concur. *Filed with original field records.

8

Page 9: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

B 4. DATA PROCESSING B 4.1 Total Propagated Error The following TPE Parameters for tides and sound velocity were used in the processing F00547:

Tide Values Sound Speed

Values

Vessel Measured

(m) Zoning

(m) Measured

(m/s) Surface

(m/s) 3101 0.01 0.06 4 0.25

s3004 0.01 0.06 4 0.25 Table 2: TPE Parameters

B 4.2 BASE Surfaces and Mosaics The following table describes all BASE Surfaces and Mosaics submitted as part of Survey F00547:

F00547 Resolution Type Purpose F00547_40cm 40cm CUBE-shallow This survey was processed using the Combined Uncertainty and Bathymetry Estimator (CUBE) algorithm. The CUBE configuration was set to “Shallow” for the entire survey. Refer to the 2007 Data Acquisition and Processing Report*, 2007 Field Procedures Manual, and CARIS HIPS/SIPS 6.1 manual for further discussion of this processing method. Concur. C. VERTICAL AND HORIZONTAL CONTROL C 1.1 Horizontal Control The horizontal datum for this project is the North American Datum of 1983 (NAD83), zone 18. Differential GPS (DGPS) was the sole method of positioning. Differential corrections from U.S. Coast Guard beacons at Driver, VA (289 kHz), were used during this survey. No horizontal control stations were established by the field party for this survey. Concur. C 1.2 Vertical Control *Filed with original field records.

9

Page 10: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

The vertical datum for this project is Mean Lower-Low Water (MLLW). The operating National Water Level Observation Network (NWLON) station at Sewells Point (863-8610), will serve as datum control for F00547. Preliminary, zoned water levels were applied to all sounding data. Concur. A request for delivery of final, approved water levels for this survey was forwarded to N/OPS1 on August 8, 2007 in accordance with the FPM and project letter instructions. Final, approved water levels have not been applied to this survey. See also evaluation report. D. RESULTS AND RECOMMENDATIONS D.1 Chart Comparison Survey F00547 does not agree with any editions of raster chart 12253 or ENC US5VA17Min. This survey is of an area in which a new shipping terminal was recently constructed and dredged. Chart update is required of the entire surveyed area. Concur. D.2 Additional Results D.2.1 Automated Wreck and Obstruction Information Service (AWOIS) Items No AWOIS items were assigned to F00547. Two AWOIS items were assigned and addressed by preceding survey F00540. Concur. D.2.4 Shoreline Seven Trimble Backpack positions were taken to define the extents of the pier. These positions have already been emailed to HQ (see F00547_Email.doc in Appendix 5, Supplemental Survey Records and Correspondence), but are also here submitted in the PreProcess folder. Concur. D.2.5 Charted Features All features and item investigations are described in detail in Appendix II (Survey Feature Report) of this report. Do not concur. No features were located by F00547, therefore, no features are discussed in Appendix II (Survey Feature Report). D.2.6 Charted Pipelines and Cables There is a charted sewer line in the southwest corner of the sheet. The line was not visible in the bathymetry, and no further investigation was made. Concur. D.2.7 Bridges, Ferry Routes, and Overhead Cables There are no ferry routes, bridges, or overhead cable crossings within the limits of the survey. Concur.

10

Page 11: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

D.3 Dangers to Navigation and Shoals D 3.1 Dangers to Navigation No new dangers to navigation were identified during F00547. Concur. D 3.2 Shoals No shoaling was identified in F00547. Concur. D.4 Aids to Navigation Aids to navigation have been placed in the surveyed area to mark the channel approaching the terminal. All were found to be accurately charted when visually checked against the s3004’s position in Hypack and the proposed chartlett. Concur. D.5 Coast Pilot Information Review of the Coast Pilot was not required of F00547. Concur. D.6 Miscellaneous D.7 Bottom Samples Bottom samples were not acquired during F00547 because s3004 does not have a bottom sampler. Concur. D.8 Adequacy of Survey This survey is considered complete and adequate to supersede charted depths within the common area as per requirements specified in the Project Letter Instructions. Concur.

11

Page 12: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

S-E923-TJ-07 F00547

E. APPROVAL As Hydrographer conducting the processing of F00547, I have ensured that standard field surveying and processing procedures were followed in producing this examination in accordance with the Office of Coast Survey Hydrographic Surveys Division’s Field Procedures Manual, and NOS Hydrographic Surveys Specifications and Deliverables. Field operations for this field examination survey were conducted by myself and the Field Operations Officer of NOAA Ship THOMAS JEFFERSON. All field sheets, this Descriptive Report, and all accompanying records and data are approved. All records are forwarded for final review and processing to N/CS33, Atlantic Hydrographic Branch. Survey F00547 is adequate to supersede charted soundings in their common areas. No supplemental reports are submitted with this DR. Approved and Forwarded: ________________________________ LT(jg) Briana Welton, NOAA Mid-Atlantic Region Hydro Team Leader Navigation Response Branch

12

Page 13: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

Appendix I

Danger to Navigation No Dangers to Navigation were located during Survey F00547.

Page 14: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

Appendix II

Survey Features Report

No features were located during Survey F00547.

Page 15: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

Appendix V

Supplemental _Survey_Correspondence

Page 16: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

F00547 NOTES F00547 TJ_3102_Reson8101 2007-204 108_1856 True Heave file does not match Navigation time. F00547 TJ_3102_Reson8101 2007-204 109_1850 True Heave file does not match Navigation time. F00547 TJ_3102_Reson8101 2007-204 163_1701 True Heave file does not match Navigation time. F00547 TJ_3102_Reson8101 2007-204 106_1909 True Heave file does not match Navigation time. F00547 TJ_3102_Reson8101 2007-204 107_1902 True Heave file does not match Navigation time.

True Heave loading start: 2007-205 09:45:05 F00547 TJ_3102_Reson8101 2007-204 163_1701 True Heave file does not match Navigation time. True Heave loading end: 2007-205 09:45:19 (Elapsed time 00:00:14) Tide loading start: 2007-205 10:01:17 Tide loading end: 2007-205 10:01:22 (Elapsed time 00:00:05) Sound Velocity Correction start: 2007-205 10:01:34 F00547 TJ_3102_Reson8101 2007-204 146_1533 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 150_1552 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 151_1557 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 148_1543 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 147_1538 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 141_1507 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 145_1526 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 147_1530 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 144_1521 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 143_1516 All time stamps are after the time for the data. F00547 TJ_3102_Reson8101 2007-204 149_1547 All time stamps are after the time for the data. Sound Velocity Correction end: 2007-205 10:02:46 (Elapsed time 00:01:12) Sound Velocity Correction start: 2007-205 10:31:01 Sound Velocity Correction end: 2007-205 10:31:48 (Elapsed time 00:00:47) Merge start: 2007-205 10:35:21 Merge end: 2007-205 10:35:38 (Elapsed time 00:00:17) TPE start: 2007-205 10:44:12 TPE end: 2007-205 10:44:35 (Elapsed time 00:00:23) New BASE Surface start: 2007-205 10:46:50 New BASE Surface end: 2007-205 11:04:49 (Elapsed time 00:17:59) Apply Filter start: 2007-205 11:18:02 Applying observed depth filters... Filter lines start: 2007-205 11:18:02 Filter lines end: 2007-205 11:20:42 (Elapsed time 00:02:40) Completed successfully. Apply Filter end: 2007-205 11:20:42 (Elapsed time 00:02:40)

Page 17: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,
Page 18: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

BJW 8/6/07: True Heave loading start: 2007-218 15:35:32 True Heave loading end: 2007-218 16:17:12 (Elapsed time 00:41:40) Tide loading start: 2007-218 16:25:37 Tide loading end: 2007-218 16:25:41 (Elapsed time 00:00:04) Sound Velocity Correction start: 2007-218 16:25:52 Sound Velocity Correction end: 2007-218 16:31:04 (Elapsed time 00:05:12) Merge start: 2007-218 16:32:02 Merge end: 2007-218 16:34:04 (Elapsed time 00:02:02)

BJW 8/7/07 Filtered all data 30 meters port/stbd.

Page 19: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

From <[email protected]> Sent Tuesday, August 14, 2007 4:05 pm To [email protected] Cc [email protected] Bcc Subject F00547 Final Progress Sketch attached Attachments F00547_Final_Progress_Sketch.zip 7K From <[email protected]> Sent Friday, August 10, 2007 2:52 pm To [email protected] Cc [email protected] [email protected] [email protected] Bcc Subject F00547 Survey Outline Attached Attachments F00547_Outline.zip 1K From <[email protected]> Sent Friday, August 10, 2007 11:58 am To Jeremy McHugh <[email protected]> Cc Bcc Subject Re: F00547 Water Level Request Hi Jeremy, I think I have the project cd files for F00540 and not F00547. If you have the progress sketch template for F00547 handy, will you email it to me? That would be easiest I think. The survey outline for F00547 is attached. Many thanks, Bri P.S. Happy Friday! ----- Original Message ----- From: Jeremy McHugh <[email protected]> Date: Wednesday, August 8, 2007 12:02 pm Subject: Re: F00547 Water Level Request > Hi Bri, Thanks for copying me on the request. Don't forget to > submit the > survey outline. Thanks! > > [email protected] wrote: > > Good morning, > > > > A request for final, approved water levels for survey F00547 is > > attached. The original project was assigned to THOMAS > JEFFERSON, but > > I have taken over the last bit of data acquisition and final > > processing. Please send the final, approved tides to me as I

Page 20: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

> have the > > complete data set. > > > > Many thanks, > > > > Bri > > > > LTJG Briana Welton, NOAA > > Mid-Atlantic Region Hydro Team Leader > > Navigation Response Branch > > > > > > -- > Jeremy McHugh > Geodesy Program liaison to the Commerce and Transportation Goal Team > [rotational assignment through DEC 14 2007] > NOAA's National Geodetic Survey > 301-713-9879 x205 > > From <[email protected]> Sent Thursday, August 9, 2007 11:09 am To Christiaan VanWestendorp <[email protected]> Cc Bcc Subject Re: acquisition log for F00547 Found it. Many thanks. Bri ----- Original Message ----- From: Christiaan VanWestendorp <[email protected]> Date: Thursday, August 9, 2007 9:57 am Subject: Re: acquisition log for F00547 > Hi, Bri, > > The day I gave you our data was the day I forgot about it. (-: > Have at > the DR! The acquisition log was in the raw data folder with the > name > 3102_Acquisition_Log_204.xls. All of our acquisition and > processing > logs are digital now. Let me know if you have any other questions. > > - Chris > > [email protected] wrote: >

Page 21: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

> >Hey Chris, > > > >How's it going? Well, I hope. > > > >I know we didn't really discuss it, but if it's okay with you, > I'm > >going to write up a quick DR and submit this survey as one > package. > > > >How are you guys doing acquisition logs- digitally, on paper, > etc? Do > >I have the log from DN204? I searched for .xls files in the > folders > >you gave me, but didn't have any luck. What would its name be if > I > >had it? > > > >V/r, > > > >Bri > > > > > > > > From <[email protected]> Sent Thursday, August 9, 2007 9:26 am To [email protected] Cc Bcc Subject acquisition log for F00547 Hey Chris, How's it going? Well, I hope. I know we didn't really discuss it, but if it's okay with you, I'm going to write up a quick DR and submit this survey as one package. How are you guys doing acquisition logs- digitally, on paper, etc? Do I have the log from DN204? I searched for .xls files in the folders you gave me, but didn't have any luck. What would its name be if I had it? V/r, Bri From <[email protected]> Sent Wednesday, August 8, 2007 10:43 am To Cc [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

Page 22: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

[email protected] [email protected] [email protected] Monica Cisternelli <[email protected]> Bcc Subject Re: F00547 Water Level Request Sure. The project is S-E923-TJ-07. It's also listed in the pdf document attached. Best, Bri ----- Original Message ----- From: Smooth Tides <[email protected]> Date: Wednesday, August 8, 2007 9:44 am Subject: Re: F00547 Water Level Request > Hi Bri, > Could you send us the project number as well? > Thanks, > Hydro Planning Team > > [email protected] wrote: > > Good morning, > > > > A request for final, approved water levels for survey F00547 is > > attached. The original project was assigned to THOMAS > JEFFERSON, but > > I have taken over the last bit of data acquisition and final > > processing. Please send the final, approved tides to me as I > have the > > complete data set. > > > > Many thanks, > > > > Bri > > > > LTJG Briana Welton, NOAA > > Mid-Atlantic Region Hydro Team Leader > > Navigation Response Branch > > > From <[email protected]> Sent Monday, July 30, 2007 10:23 am To [email protected] Cc Bcc Subject Fwd: undesignated snding plot attached- F00547 Attachments APM_Terminal_July23_2007.tif 465K This is the same sounding plot with no designated soundings. Gene and I compared the two surveys a bit last week, but did not conclude anything.

Page 23: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

-------------------------------------------------------------------------------- ----- Original Message ----- From <[email protected]> Date Thu, 26 Jul 2007 10:00:48 -0400 To [email protected]> Subject undesignated snding plot attached- F00547 From <[email protected]> Sent Wednesday, July 25, 2007 9:35 am To Gerd Glang <[email protected]> Cc Howard Danley <[email protected]> Tod Schattgen <[email protected]> Shepard Smith <[email protected]> Jeffrey Ferguson <[email protected]> Doug Baird <[email protected]> [email protected] Bcc Subject Re: F00547- Maersk Terminal Survey- TJ data from July 23 Roger. I'm holding off on more field work until I hear more. Attached is a chartlett with the sounding plot and the same color map that I sent yesterday. V/r, Bri -------------------------------------------------------------------------------- ----- Original Message ----- From Gerd Glang <[email protected]> Date Tue, 24 Jul 2007 15:33:03 -0400 To [email protected] Subject Re: F00547- Maersk Terminal Survey- TJ data from July 23 -------------------------------------------------------------------------------- Bri, I'd like to suggest you wait on completing the unfinished survey areas. If, based on this data, we see that the dredge roller operation did not accomplish what APM wanted, there's no point in wasting your time and burning more fuel. My recommendation is to wait until next week & discuss with Shep, and then APM, to see how they want to proceed. Howard - your thoughts?

Page 24: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

G2 CDR Gerd Glang, NOAA Chief, Hydrographic Surveys Division NOAA Office of Coast Survey 301-713-2700, x124 [email protected] wrote: Attached is the 50 cm resolution DTM of the 8101 data TJ acquired yesterday. Zoned, observed (unverified), water levels are applied. I used the same color scheme that Shep used: Shoaler than 45 ft Purple 45 to 50 feet continuous red (45) to orange (50) 50-52 feet continuous light blue to dark blue Deeper than 52 feet- Dark Blue If you play "one of these things is not like the other" and compare this to the previous DTM, it doesn't look like the roller apparatus cut the cookie. At any rate, I will survey the rest of the area tomorrow and do some XLs, too, to evaluate how well the two data sets junction. V/r, Bri -------------------------------------------------------------------------------- File: APM_Terminal_July23_2007_Desig.jpg From <[email protected]> Sent Tuesday, July 24, 2007 2:00 pm To Shepard Smith <[email protected]> Cc Gerd Glang <[email protected]> Howard Danley <[email protected]> Tod Schattgen <[email protected]> Bcc Subject F00547- Maersk Terminal Survey- TJ data from July 23 Attachments F00547_50cm_shallow.zip 1.2MB

Page 25: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

Attached is the 50 cm resolution DTM of the 8101 data TJ acquired yesterday. Zoned, observed (unverified), water levels are applied. I used the same color scheme that Shep used: Shoaler than 45 ft Purple 45 to 50 feet continuous red (45) to orange (50) 50-52 feet continuous light blue to dark blue Deeper than 52 feet- Dark Blue If you play "one of these things is not like the other" and compare this to the previous DTM, it doesn't look like the roller apparatus cut the cookie. At any rate, I will survey the rest of the area tomorrow and do some XLs, too, to evaluate how well the two data sets junction. V/r, Bri -------------------------------------------------------------------------------- Lee, Attached is the geotiff I promised this morning. I opened it up in Hypack and it came in fine. We used UTM Zone 18, NAD83. There is also a tfw file if necessary for registration. I have a zipped xyz file as well that I will send in a second email. The color map is as follows: Shoaler than 45 ft Purple 45 to 50 feet continuous red (45) to orange (50) 50-52 feet continuous light blue to dark blue Deeper than 52 feet- Dark Blue Let me know if you have any problems with this file. Best Regards, Shep

Page 26: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

UNITED STATES DEPARMENT OF COMMERCE National Oceanic and Atmospheric Administration National Ocean Service Silver Spring, Maryland 20910

Page 27: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

JR35Time Corrector +6 minsRange Corrector x 1.09Reference 8638610

Final Tidal Zoningfor S-E923-TJ-2007, F000547

APM Terminal, West of Lamberts Point, VA8638610 HAMPTON ROADS

Page 28: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

Version 1.0

AHB PRE-COMPILATION PROCESS

REGISTRY No. F00547 PROJECT No. S-E923-TJ-07 FIELD UNIT NOAA Thomas Jefferson and NRT 7

(S3004) PRE-COMPILER Bridget Williams LARGEST SCALE CHART 12253, edition 45, 20071001 CHART SCALE 1:20000 SURVEY SCALE 1: 5000 DATE OF SURVEY 07/23/07 and 8/6-7/07 CONTENT REVIEW DATE 20080506

Components File Names Product Surface PS_F00547_5k_50mrad_80cmres.hns Shifted Surface PS_F00547_5k_50mrad_80cm_Shifted.hns Contour Layer PS_F00547_5k_50mrad_80cm_Contours.hob

Survey Scale Soundings F00547_SS_Soundings.hob Chart Scale Soundings F00547_CS_Soundings.hob

Feature Layer F00547_Features.hob Meta-Objects Layer F00547_MetaObjects_RRV.hob

Blue Notes F00547_BlueNotes.hob SPECIFICATIONS:

I. COMBINED SURFACE: No Combined Surface a. Fieldsheet Location: H:\COMPILATION\F00547_E923-

TJ\AHB_F00547\Fieldsheets\F00547 II. PRODUCT SURFACE (SOUNDINGS):

a. SOUNDINGS DERIVED FROM: F00547_40cm_shallow_Final b. Depth

i. Minimum: 3.431 m ii. Maximum: 17.9 m

PRODUCT SURFACE (CONTOURS): a. Scale: 1: 5000 b. Radius: 10 m c. Resolution: 80 m

III. CONTOUR LAYER: a. Use a Depth List: F00547_NOAA_depth_curves_list.txt

0.000 0.914 1.829 3.658 5.486 9.144

H:\Compilation\F00547_E923-TJ\AHB_F00547\COMPILE\Working\Reports\F00547_Precompile_Log.doc January 16, 2008

Page 29: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

Version 1.0

10.973 b. Output Options:

i. Create contour lines: 1. Line Object: DEPCNT 2. Value Attribute: VALDCO

IV. SOUNDING SELECTION: a. Selection Criteria:

i. Radius ii. Shoal biased

iii. Use Single-Defined Radius: 12.3 distance on ground (m) iv. Filter: Generalized !=1

V. FEATURES: a. Brought in from Survey

Total No. 0 b. Brought in from ENC

ENC: US5VA17M, US5VA15M Total No. 1

VI. META-OBJECTS: a. M_COVR attributes

Acronym Value INFORM F00547 SORDAT 20070807 CATCOV 1 SORIND US,US,survy,F00547

b. M_QUAL attributes Acronym Value

CATZOC A2 INFORM F00547,S-E923-TJ-07,NOAA S/V Thomas

Jefferson, NRT 7 (s3004) POSACC 10 SORDAT 20070807 SORIND US,US,survy,F00547 SUREND 20070807 SURSTA 20070723 TECSOU Multibeam

c. DEPARE attributes Acronym Value

DRVALV 1 11.000 DRVALV2 59.000 SORDAT 20070807 SORIND US,US,survy,F00547 INFORM F00547

VII. NOTES: F00547 was not restored properly, the ESAR version was not on file. The BAG, F00547.bag was restored from the BathyDatabase, and the ESAR document with the xml for the Final were maintained. Caris was unable to support generalizing a product surface from this bag. An output message of an error -1 was produced.

H:\Compilation\F00547_E923-TJ\AHB_F00547\COMPILE\Working\Reports\F00547_Precompile_Log.doc January 16, 2008

Page 30: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

Version 1.0

As the fieldsheet had only unverified tides applied, final tides were applied by AHB. TPE was recomputed following what was listed in the F00547_DR and Thomas Jefferson DAPR (Table 1). Tide Values Sound Speed Values Vessel Measured (m) Zoning (m) Measured (m/s) Surface (m/s) 3101 0.01 0.06 4 0.25 S3004 0.01 0.06 4 0.25 Table 1. TPE parameters applied to fieldsheet F00547_40cm_Shallow_AHB The Cube surface created followed the parameters of the field and the ESAR final xmls. After cleaning of fliers, the fieldsheet was finalized as a greater of two values with no depth thresholding.

H:\Compilation\F00547_E923-TJ\AHB_F00547\COMPILE\Working\Reports\F00547_Precompile_Log.doc January 16, 2008

Page 31: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

F00547

ATLANTIC HYDROGRAPHIC BRANCH EVALUATION REPORT to Accompany

Survey F00547 (1:5,000)

This Evaluation Report has been written to supplement and/or clarify the original Descriptive Report. Sections in this report refer to the corresponding sections of the Descriptive Report. B. DATA ACQUISITION AND PROCESSING B.1 DATA PROCESSING

This Evaluation Report has been written to supplement and/or clarify the original Descriptive Report. Sections in this report refer to the corresponding sections of the Descriptive Report.

HSTP PYDRO version 7.3 r2239 CARIS HIPS/SIPS version 6.1 SP1 CARIS Bathy Manager version 2.1 DKART INSPECTOR, version 5.0 Build 732 SP1 CARIS HOM version 3.3 CARIS S57 Composer version 1.0

B.2. QUALITY CONTROL B.2.1. H-Cell

The AHB source depth grid for the survey’s nautical chart update product entailed the field’s original 40 centimeter grids, combined at 80 centimeter resolution. The survey scale selected soundings were extracted from the 80 centimeter resolution combined surface at a scale of 1:5,000. The selected sounding set is 10 to 20 times the number of charted depths generated at a scale of 1:20,000. The chart scale selected soundings are a subset of the survey scale selected soundings. The surface model was referenced when selecting the chart scale soundings, to ensure that the selected soundings portrayed the bathymetry within the common area.

The pre-compilation products or components (Stand Alone HOB files (SAHOB)) are detailed in the Pre-Compile Process Log attached at the end of this document. The SAHOB files included sounding selections (SOUNDG), features (MORFAC) , meta objects (M_COVR, M_QUAL), depth areas (DEPARE) and cartographic Blue Notes. The individual SAHOB files were inserted into one BASE Editor feature layer and exported to S57 format in order to create the H-Cell deliverable. The completed H-Cell was exported as an File (ENC.000) in S-57 format with all values in metric units. The metric equivalent ENC.000 file was then converted to NOAA

Page 32: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

F00547

chart scale units (ENC_CS.000) with all values measured in feet following NOAA sounding rounding rules. Chart compilation was performed by Atlantic Hydrographic Branch personnel in Norfolk, Virginia. Compilation data will be forwarded to Marine Chart Division, Silver Spring, Maryland. The F00547 CARIS H-Cell final deliverables include the following products:

US500547_CS.000 1:20,000 Scale F00547 H-Cell with Chart Scale Selected

Soundings US500547_SS.000 1:5,000 Scale F00547 Selected Soundings (Survey Scale) US500547_Bluenotes.000 1:20,000 Scale F00547 Cartographic Notes B.2.2. Junctions

Junction analysis is not required due in fact that F00547 was conducted after attempts to flatten and deepen the survey area were made. The descriptive report adequately addresses junctions. C. VERTICAL AND HORIZONTAL CONTROL

Final vertical correction processing was completed by the Atlantic Hydrographic Branch personnel. The office personnel applied verified water levels in conjunction with the final tidal zoning for F00547. Sounding datum is Mean Lower Low Water (MLLW). Vertical datum is Mean High Water (MHW)

Horizontal control used for this survey during data acquisition is based upon the North American Datum of 1983 (NAD83), UTM projection zone 18. Office ENC processing of this survey required translating the datum to meet S-57 ENC requirements. . D. RESULTS AND RECOMMENDATIONS D.1 CHART COMPARISON 12253 (45th Edition, Oct/07)

Corrected through NM 10/20/2007 Corrected through LNM 10/16/2007 Scale 1:20,000

ENC Comparison US5OH11M.000 Norfolk Harbor and Elizabeth River Edition 14 Update Application Date 2008-01-16 Issue Date 2008-05-23 References: Chart 12253

Page 33: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

F00547

D.1.1 Hydrography Controlling depth of 49 feet - Survey F00547 soundings should supersede all charted bathymetry in the survey area. The Charted note “49 FT APR 2007” shown on chart 12253 in the vicinity of Latitude 36° 52' 40.732" N, Longitude 076° 20' 25.311"W should be revised to “49 FT AUG 2007”. All soundings shoaler than 49 feet within the dredge area are contained in the US500547_CS.000 H-Cell and should be charted. Dolphins - One charted dolphin (MORFAC) exists within the survey limits of F00547 at Latitude 36° 52' 49.446" N, Longitude 076° 21' 03.818"W. This feature was copied from the ENC into H-Cell US500547_CS.000. It is recommended that it be retained as charted. Additionally the adjacent dolphin that is outside the survey limits in the vicinity of Latitude 36° 52' 48.850" N, Longitude 076° 21' 03.650"W should be retained as charted. This adjacent feature is addressed in the US500547_Bluenotes.000 H-Cell. D.2. ADDITIONAL RESULTS None. D.2.1. Aids to Navigation

All ATON’s addressed and positioned are discussed in the DR. AHB recommends deferring the charting disposition of these navigational aids to Marine Chart Division, Nautical Data Branch. D.3. MISCELLANEOUS

Chart compilation was done by Atlantic Hydrographic Branch personnel, in Norfolk, Virginia. Compilation data will be forwarded to Marine Chart Division, Silver Spring, Maryland. See Section D.1. of this report for a list of the Raster Charts and Electronic Navigation Charts (ENC) used for compiling the present survey: D.4. ADEQUACY OF SURVEY

The present survey is adequate to supersede the charted bathymetry within the common area. Any features not specifically addressed either in the H-Cell BASE Cell File or the Blue Notes should be retained as charted. Refer to the Descriptive Report for further recommendations by the hydrographer.

Page 34: Descriptive Report to Accompany Hydrographic …...S-E923-TJ-07 F00547 Descriptive Report to Accompany Hydrographic Survey F00547 Project S-E923-TJ-07 0.2 SNM Elizabeth River APM Terminal,

F00547

APPROVAL SHEET F00547

Initial Approvals:

The completed survey has been inspected with regard to survey coverage, delineation of depth curves, representation of critical depths, cartographic symbolization, and verification or disproval of charted data. All revisions and additions made to the H-Cell files during survey processing have been entered in the digital data for this survey. The survey records and digital data comply with National Ocean Service and Office of Coast Survey requirements except where noted in the Descriptive Report and the Evaluation Report.

All final products have undergone a comprehensive reviews per the Hydrographic

surveys Division Office Processing Manual and are verified to be accurate and complete except where noted. ___________________________________ Bridget Williams Hydrographic Intern Atlantic Hydrographic Branch ___________________________________ Edward A. Owens Physical Scientist Atlantic Hydrographic Branch

I have reviewed the H-Cell files, accompanying data, and reports. This survey and accompanying Marine Chart Division deliverables meet National Ocean Service requirements and standards for products in support of nautical charting except where noted. Approved: ___________________________________ Shepard Smith Lieutenant Commander, NOAA Chief, Atlantic Hydrographic Branch