designeddivision1design.com/d1d_pdfs/d1d_bootjackfirehall.pdf · to division1 design for design...
TRANSCRIPT
SPECIFICATIONS:Size: 7,950 sq. ft.Completion: July 2010Contact: Peter DupuisPhone: (906) 483-7917
PROJECT DESCRIPTION: After several purchases of new equipment by Bootjack Fire and Rescue, the need to expand their current fire hall became a high priority. Bootjack Fire and Rescue turned to Division1 Design for design services of a new building that would be located next to their existing facility. The design of the new structure includes ample space for storing equipment out of the harsh winter conditions as well as additional offices and meeting rooms. The new building includes in-slab heating and multiple floor drains to quickly dry the rescue vehicles during the winter months. The exterior has an attractive masonry façade with glass overhead doors.
Des
igne
d t
o D
eliv
er S
atis
fact
ion
46702 Hwy M-26 • P.O. Box 399 • Houghton, MI 49931Phone (906) 482-3000 • Fax (906) 482-3087www.division1design.com
Bootjack Fire Hall Bootjack, MI
ENGINEERED TO ENSURE SUCCESS
OUR SERVICES Pre-PlanningFeasibility StudiesSite AnalysisPermittingSurveyingEnvironmental PlanningZoning
ARCHITECTURAL DESIGNMaster PlanningConceptual Renderings Design DrawingsConstruction Drawings
ENGINEERINGGeotechnicalStructuralCivil
SUSTAINABLE DESIGNGreen building design as outlined by the U.S. Green Building CouncilBrownfield Assistance
CONSTRUCTION DOCUMENTATIONDrawingsSpecificationsProposal forms
CONSTRUCTION PROCEDURESOn-site QC InspectionsSubmittal ReviewAs-built Drawings Cost Review
PROPERTY SURVEYINGLand Divisions - Lot Splits - Site Condominiums - Platted SubdivisionsALTA Land Title SurveysMortgage SurveysLegal Descriptions
DESIGN/ENGINEERING SURVEYSTopographic Surveys - Site Design - As built locationsFloodplain & Wetland Mapping
STAKINGSite GradingUnderground UtilitiesBuilding LayoutRoadway StakingGPS Machine Control - Terrain Model Preparation - Orientation and initialization of machine control equipment to site