Deployment of RES
technologies
Twinning project CREG/
CNMC/ E-Control
Marrakech, 15th november 2016
![Page 2: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/2.jpg)
Twinning Project
2
General Twinning principles
Twinning is an initiative of the European
Commission
Partnership cooperation between public adm.
of EU MS and Beneficiary Country (BC)
Transfer of MS Expertise to BC
BC selects the MS partner
BC retains ownership of the project in all
stages
![Page 3: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/3.jpg)
Twinning Project CREG/ CNMC/
E-Control
3
Components
Component 1: Consumer protection/ quality of public service
Component 2: Concession holders/ pricing policy
Component 3: RES and cogeneration
Component 4: Data management
Component 5: ITC and cross-border tariffs
Component 6: High Performing Organization
![Page 4: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/4.jpg)
4
Components
0
20
40
60
80
100
120
140
Total 400 Expert/ days
Twinning Project CREG/ CNMC/
E-Control
![Page 5: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/5.jpg)
Time Line Component 3
5
2015 2016 2017
Project month S O N D E F M A M JN JL A S O N D E F M A M JN JL
A3.1: RES support
scheme
A3.2: Auditing RES
plants
A3.3: RES integration
A3.4: Five-day RES and
cogeneration study tour
to Spain
![Page 6: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/6.jpg)
6
Aim
To review CREG’s scheme of feed-in tariffs (FITs) for solar
and wind power, and to develop a scheme for generation from
urban solid waste, biomass and cogeneration
Activity 3.1.
Deliverables
3.1.a. Recommendations for changes to the Algerian support scheme for solar PV and wind energy
3.1.b. Recommendations for changes to the Algerian support scheme for urban solid waste/biomass and cogeneration
![Page 7: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/7.jpg)
Aim of the Activity 3.1.
7
RES &CHP
Algerian
ambitious
Targets
![Page 8: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/8.jpg)
Aim of the Activity 3.1.
8
RES &CHP Support schemes design
Effectiveness: To achieve the targets
Control:
Governance and fraud detection
Efficiency:
Costs
![Page 9: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/9.jpg)
Activity 3.1 Total 57 Expert/days
9
0
2
4
6
8
10
12
14
Expert/days
![Page 10: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/10.jpg)
Chapters
Introduction
The Algerian electricity system and renewable
generation targets
Deliverables 3.1.a/3.1.b. Structure
10
![Page 11: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/11.jpg)
Chapters
Support schemes systems
• Support schemes commonly used in Europe
• Feed-in Tariff Sytem
• Tenders/auctions
Deliverables 3.1.a/3.1.b. Structure
11
![Page 12: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/12.jpg)
Chapters
Assumptions and data applied for tariff calculation
model
CAPEX /OPEX
Incomes
Deliverables 3.1.a/3.1.b. Structure
12
![Page 13: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/13.jpg)
Chapters
Results and updating tariff options.
Option A1 (Recommended)
Option A2
Option B1
Option B2
Deliverables 3.1.a/3.1.b. Structure
13
![Page 14: Deployment of RES technologies Twinning project CREG/ CNMC/ E …gizenergy.lifemoz-dev.com/wp-content/uploads/sites/128/... · 2017-04-09 · Twinning Project CREG/ CNMC/ E-Control](https://reader033.vdocuments.site/reader033/viewer/2022050501/5f939805ea75a258227f3b8e/html5/thumbnails/14.jpg)
Chapters
Recommendations regarding support scheme
system and updating of tariffs.
Recommendation 1
Recommendation 2
...
...
Recommendation 11
Deliverables 3.1.a/3.1.b. Structure
14
Effectiveness:
Control Efficiency