department of the premier and cabinet (dpc) submission on... · department of the premier and...
TRANSCRIPT
Ministers
SUBMISSIONS FOR STATE OF QUEENSLAND
11 MARCH 2011
Department of the Premier and Cabinet
(DPC)
To 20 February 2011
The Honourable Anna Bligh MP
Premier and Minister for the Arts
From 21 February 2011
The Honourable Anna Bligh MP
Premier and Minister for Reconstruction
The Honourable Rachel Nolan MP
Minister for Finance and The Arts
Director-General
Mr Ken Smith
A. Key Functions and Role of the Department
The DPC has two main roles:
• Assisting and providing advice to the Premier and the Cabinet; and
• Providing leadership for the public sector in delivering quality services to all
Queenslanders.
The DPC's functions include:
• Coordinating initiatives that advance government priorities;
• Supporting and advising the Premier and Cabinet, Ministers and agencies to
ensure the structures and processes of government run efficiently;
Document No: 2998420
SOQ.001.001.0057
• Providing executive and support services for the Premier and other departments;
• Leading policy coordination across government;
• Supporting Cabinet and Cabinet Committee decision-making; and
• Managing Queensland's relationships with other governments.
Arts Queensland is the Queensland Government's strategic governance organisation
for the arts in Queensland. Its responsibilities include:
• Assisting the Minister in setting the government's strategic direction for arts and
culture in Queensland;
• Advising government on policy to stimulate development of the arts and cultural
sector;
• Overseeing and reporting on the Queensland Government's investment in arts and
culture and ensuring prudent use of public funds;
• Working in partnership with the arts and culture sector to promote the State's arts
and cultural activity and build recognition of the value of arts and culture;
• Delivering the government's arts and culture agenda through developing and
administering funding programs and capital works programs; and
• Building ownership responsibi lities for arts properties, including the Queensland
Cultural Centre.
B. Departmental Structure and Operation
The work of DPC relies on close collaboration with others to provide advice to the
Premier and Ministers that is considered, timely and balanced. To do this the
department consults and works closely with networks across the public sector and
other levels of government.
As the lead agency in Queensland's public sector, the department is responsible for
policy development and coordination across government. Policy development is a
collaborative effort requiring input from a wide range of people with expert
knowledge and understanding of the issues. Similarly, the department also has a range
of operational and executive government responsibilities that must be coordinated and
delivered across the broad public spectrum.
2
Document No: 2998420
SOQ.001.001.0058
These activities are undertaken within the following organisational structure:
Office of the Director-General
• Executive Management Unit;
• Executive Correspondence Unit;
• Corporate Planning;
• Parliamentary Liaison; and
• Internal Audit and Risk Services.
Cabinet Secretary, Cabinet Services
• Cabinet Services; and
• Cabinet Legislation and Liaison.
Office of the Associate Director-General Policy Division
• Economic Policy;
• Environment Resource Policy;
• Reef Water Quality Protection Plan Secretariat;
• Intergovernmental Relations;
• Law and Justice Policy;
• Criminal Justice Research;
• Social Policy;
• Performance and Delivery Office;
• Office of the Queensland Chief Scientist; and
• Priority Projects Office.
Office of the Deputy Director-General Arts Queensland
• Arts Development;
• Arts Strategy and Planning;
• Corporate Administration Agency/ AQ Corporate; and
• The broader arts portfolio includes five Arts Statutory Bodies with their own
enabling legislation - Queensland Art Gallery, Queensland Museum, Queensland
3 Document No: 2998420
SOQ.001.001.0059
Performing Arts Trust, State Library of Queensland and Queensland Theatre
Company. These are governed by separate Boards.
Office of the Deputy Director-General Governance Division
• Business Services;
• Financial Management;
• Corporate Planning and Reporting;
• Facilities Coordination;
• Human Resource Services;
• State Affairs;
• Constitutional and Administrative Law Services;
• Executive Services;
• Government Air Wing;
• Ministerial Services;
• State Services;
• Communication Services;
• Market Research;
• Events Coordination;
• Protocol Queensland;
• Information Services;
• Corporate Information Services; and
• Information and Communication Technology.
Key policy documents that guide the department's functions and operations include:
(a) Administrative Arrangements Orders setting out the principal responsibilities of
Government Ministers and their portfolios;
(b) Queensland Cabinet Handbook;
(c) Queensland Ministerial Handbook;
(d) Queensland Executive Council Handbook;
(e) Queensland Legislation Handbook;
(f) Queensland Parliam entary Procedures Handbook;
(g) Welcome Aboard: A Guide for Members of Queensland Government Boards,
4 Document No: 2998420
SOQ.001.001.0060
Committees and Statutory Authorities;
(h) The Queensland Government Advertising Code of Conduct;
(i) Code of Conduct for the Queensland Public Service;
(j) Complaints Management Policy; and
(k) The Protocol Handbook.
There are many other lower level policy and guidance documents used within the
various organisational units of the department.
Specific Organisational Arrangements Relating to Disaster and Crisis Management
The DPC is responsible for leading Queensland's participation on a number of
national fora concerned with crisis management planning, preparation and
coordination for disaster events. These bodies include the National Emergency
Management Committee (NEMC), the National Counter-Terrori sm Committee
(NCTC), the National Critical Infrastructure Resilience Committee (NCIRC), the
Australian Health Protection Committee (AHPC) and Australian Government Crisis
Management Arrangements.
A combination of areas within both Policy Division and Governance Division have
responsibility for providing policy advice and support to DPC's representatives on
these fora, the Director-General at the Council of Australian Governments (COAG)
Senior Officers Meeting (SOM) and the Premier at COAG. Following machinery of
government changes in 2009, new coordination arrangements were put in place
through the Manager, Executive Support, DPC to better assist the government to meet
its crisis management obligations at the national level.
The Manager, Executive Support is also responsible for supporting the
Director-General in his role as Chair of the State Disaster Management Group
(SDMG) and providing the department's representation on the State Disaster
Coordination Group (SDCG). The Crisis Coordination Network is lead by
Communication Services within DPC and leads the coordination and provision of
consistent government messaging in times of a crisis or disaster.
5 Document No: 2998420
SOQ.001.001.0061
c. Specific Responsibilities under the Disaster Management Act 2003 and Other Relevant Legislation
The SDMG is chaired by the Director-General, DPC, The Executive Officer to
SDMG and secretariat support is provided by the Queensland Police Service, The
Deputy Chair of SDMG is the Director-General, Department of Community Safety,
Specific functions of DPC include:
(a) Chairing meetings of SDMG and providing central agency leadership and
coordination;
(b) Supporting and providing advice to the Premier as chair of the State Security and
Emergency Council and as leader of the government;
(c) Coordinating and liaising with the Australian Government's Crisis Coordination
Centre in relation to Queensland Government policy positions (when required);
(d) Representing Queensland at meetings of the National Crisis Committee (NCC)
when initiated by the Commonwealth;
( e) Establishing the Crisis Communications Network to coordinate government
messaging as directed by SDMG; and
(f) Establishing a Premier's Disaster Relief Appeal if requested to support
community recovery,
Policy Documents and Guidelines relating to Disaster Management utilised by DPC in
the disaster management space are the responsibility of the Department of Community
Safety and copies of these documents should be sourced from that agency, These
documents include:
(a) State Disaster Management Plan;
(b) Governance Guidelines for District Disaster Management Groups;
( c) Emergency Alert Operational Guidelines;
(d) District Disaster Management Guidelines;
(e) Queensland Emergency Alert Operational Protocol ;
(f) Standard Emergency Warning Signal (SEWS) - Rules on the use of this warning
signal in Queensland;
6 Document No: 2998420
SOQ.001.001.0062
(g) Disaster Management Arrangements Overview 2010;
(h) Operational Planning Guidelines for Local Disaster Management Groups;
(i) Disaster Management Planning Guidelines for local;
0) Disaster Management Strategic Policy Framework;
(k) Queensland Resupply Guidelines Policies and Procedures (December 2010);
(1) A Guide to Disaster Risk Management in Queensland Aboriginal and Torres
Strait Islander Communities;
(m) State of Queensland Multi-Agency Response Plan to Chemical, Biological,
Radiological Incidents;
(n) Queensland Chemical, Biological & Radiological Plan;
(0) Radiological Disaster Plan;
(p) Biological Disaster Plan;
(q) Chemical/HAZMA T Plan;
(r) National Storm Tide Mapping Model for Emergency Response;
(s) Queensland Tsunami Notification Guidelines;
(t) Queensland Evacuation Guidelines Consultation Draft; and
(u) Queensland Disaster Relief and Recovery Arrangements Guidelines.
D. Preparedness for Flooding Events Generally
Given DPC' s key role in the provision of policy advice, the department is involved
with relevant line agencies in the preparation of a number of policy documents that
have an impact on disaster management and preparation in Queensland. These
documents are considered by bodies such as Cabinet, SDMG, NEMC or COAG.
Review of Disaster Management Arrangements
A review of Queensland's disaster management arrangements was conducted by an
independent consultancy during 2009. This review was overseen by a steering
committee chaired by the Director-General DPC, the Commissioner of Police and the
Director-General, Department of Community Safety.
The consultant's Report on a Review of Disaster Management Legislation and Policy
in Queensland made recommendations to the government about ways to deliver better
outcomes in the efficiency and effectiveness of responses to communities impacted by
7 Document No: 2998420
SOQ.001.001.0063
disaster events. This included amendments to the Disaster Management Act 2003 the
Public Safety Preservation Act 1986 as well as to policy and operational arrangements
for disaster management in Queensland. Following endorsement by Cabinet
legislative amendments were given effect through the Disaster Management and
Other Legislation Amendment Act 2010. The endorsed recommendations from this
review were subsequently implemented in late 2010.
The Report on a Review of Disaster Management Legislation and Policy in
Queensland and a summary document titled Disaster Management Arrangements
Overview 2010 can be provided by the Department of Community Safety upon
request.
Following the Disaster Management and Other Legislation Amendment Act 2010,
SDMG considered and approved updates to the following policy and planning
documents to give effect to the recommendations:
(a) Updated SDMG Terms of Reference;
(b) Queensland State Disaster Management Plan;
(c) District Disaster Management Guidelines;
(d) Governance Guidelines for District Disaster Management Groups;
(e) The Queensland Resupply Guidelines;
(f) Tsunami Notification Guidelines (endorsed SDMG out of session (by flying
minute) on 2 Nov 2010); and
(g) The Disaster Management Strategic Policy Framework (endorsed out of session
(by flying minute) on 2 Nov 2010).
Emergency Alert
Emergency Alert (formerly National Emergency Warning System (NEWS)) is a
telephone-based emergency warning system that State and Territory authorities
(including Queensland) use to send voice warnings to fixed or land line telephones,
based on the location of the handset, and text warnings to mobile phones, based on the
customers billing address. The development of this system was endorsed by COAG
on 30 April 2009, and put in place through a National Partnership Agreement signed
by all jurisdictions with the exception of Western Australia.
8 Document No: 2998420
SOQ.001.001.0064
The Emergency Alert Queensland Operational Guidelines (obtainable from the
Department of Community Safety) outlines how Queensland manages and operates
the telephone based emergency alert system and is consistent with the agreement
endorsed by the Council of Australian Governments in April 2009.
This early warning system is being further developed to enable it to be expanded to
enable messages to be sent to mobile telephones based on the location of the handset.
It is anticipated that an operational system may be in place by mid 2011 following the
resolution of some technical difficulties by the major Telco providers.
Standard Emergency Warning Signal
The Standard Emergency Warning Signal (SEWS) Guideline was initially put in place
in 1999 and reflects an agreement that was reached between all States and Territories
on the use of a standard warning signal to assist in the delivery of public warnings and
messages for major emergency events. Responsibility for the management of SEWS
in Queensland rests with the Assistant Director-General of Emergency Management
Queensland (EMQ) in coordination with the Queensland Regional Director of the
Bureau of Meteorology (BOM) for meteorological purposes. In December 20 10
SDMG approved out of session the updated SEWS Guideline and this Guideline can
be sourced from the Department of Community Safety.
Australian Government Crisis Management Framework
In 20 I 0 the Australian Government put in place new crisis management arrangements
titled the Australian Government Crisis Management Framework to manage from the
Commonwealth perspective both a hazard specific crisis and those that the
Commonwealth considers requires whole-of-government coordination by the
Australian Government including matters such as terrorism, pandemics, biosecurity
incidents, international incidents , energy supply crises, significant maritime incidents,
and major natural disasters .
The arrangements recognise the primacy of State and Territory jurisdictions for these
matters and the existing bilateral arrangements that are in place to facilitate
9 Document No: 2998420
SOQ.001.001.0065
coordination and communication between Commonwealth and jurisdictional agencies.
However, the new Australian Government Arrangements enable the Prime Minister to
assume primary responsibility for leading the Commonwealth's response. The NCC is
the mechanism that allows senior officials from the Commonwealth and State and
Territory jurisdictions to collaborate and coordinate jurisdictional positions and
responsibilities during a crisis and then inform their respective political leaders
including Premiers and the Prime Minister.
National Strategy for Disaster Resilience
The National Strategy for Disaster Resilience ('the Strategy') was considered by
MCPEM and NEMC prior to its endorsement by COAG on 13 February 2011. The
Strategy is a high-level strategic direction-setting document and is the first step in
developing a national, integrated approach to disaster resilience.
Community resilience is defined in terms of general features of what a resilient
community might exhibit such as:
(a) Local awareness of natural hazard risks;
(b) Locally-led leadership in the development of resi lience-building measures;
(c) Local disaster resilience planning processes;
(d) Self-reliant individuals and families (who have prepared household plans);
(e) Local partnerships between community agencies and service delivery agencies;
(f) Resilience outcomes are considered in planning and policy making; and
(g) Wide-spread continuity planning.
Protocol for the Communication of Flooding Information for the Brisbane River Catchment Including Floodwater Releases from Wivenhoe and Somerset Dams
In mid October 2010 a working group of officers from the Department of
Environment and Resource Management, Seqwater, Queensland Police Service,
BOM, Department of Community Safety and DPC developed a protocol with the
Brisbane City Council, Ipswich City Council and the Somerset Regional Council
concerning the release of floodwaters from Wivenhoe and Somerset Dams. Whilst
this protocol was used during the flood response it is yet to be formally ratified. A
10 Document No: 2998420
SOQ.001.001.0066
copy of the draft protocol used in the 2010/2011 flood events is attached and marked
'DPC-Ol'.
The purpose of this protocol is to outline the arrangements to be followed by the
Brisbane, Ipswich and Somerset Councils, relevant Queensland Government agencies
and the BOM, which will ensure the provision of consistent and robust information to
the community, concerning potential flooding impacts for the Brisbane River
catchment. The intent of the protocol is to ensure that consistent, harmonised
information, based on agreed technical information, is communicated to the public in
a way that contributes to resilient communities.
The Manual of Operational Procedures for Flood Mitigation at Wivenhoe Dam and
Somerset Dam (administered by Segwater) is used for all darn management decisions
and informs actions taken in the management of those dams.
Call Centre Surge Capability
Arrangements are in place for Smart Service Queensland (SSQ) to provide a public
hotline during disasters . SSQ had a MoU with Centrelink which would allow SSQ to
overflow calls to the Commonwealth call-centre should it become overwhelmed (this
has never been activated) . The National Emergency Call Centre Surge Capacity
arrangements for improving surge capacity for emergency information lines were
enhanced through a new MoU between the Commonwealth Department of Human
Services and the Queensland Department of Public Works and allow Queensland to
access the broader Department of Human Services and not just those of Centrelink.
E. Preparation and Response to 2010/2011 Flood Events
SDMG was briefed on 14 October 2010 followed by Cabinet on 18 October 2010
concerning the La Nina weather pattern influencing Queensland's weather conditions
over the coming summer period.
The Bureau advised of a 75 per cent chance that Queensland would experience much
higher than average rainfall, together with the potential for a greater number of
cyclones to cross the coast, during the forthcoming storm and cyclone season.
11 Document No: 2 998420
SOQ.001.001.0067
Given the increased risks associated with a potential disaster event arising from these
weather patterns, the Premier wrote to all Ministers and Directors-General requiring
all agencies to review their role during a disaster situation to ensure they are able to
provide the necessary support and services to assist individuals and communities to
prepare, respond to, and recover from, a disaster event. This includes the provision of
accurate, timely, coordinated and consistent warnings to any community under
potential threat.
A copy of an example letter from the Premier to a Minister and a copy of an example
letter from the Premier to a Director-General are attached and marked 'DPC-02'.
All government agencies were reminded of the role they each play in a disaster and of
the provisions of the Disaster Management Act 2003. Agencies were also asked to
ensure that appropriate senior staff were rostered or placed 'on-calJ' over the
Christmas and New Year period.
Agencies were required to review their business continuity plans to ensure that, if
directly affected by a disaster, they are able to recover and resume the provision of
critical and core services as soon as possible and that all possible risk mitigation
strategies were in place to position the Queensland Government to respond
immediately to safeguard Queenslanders against the impact of any significant event.
The DPC reviewed its own preparedness arrangements to ensure that DPC could
respond to and provide timely support in the event of a disaster situation requiring
central agency involvement.
Steps were taken to ensure that Business Continuity Plans were reviewed and tested to
enable DPC to recover should an incident result in a loss of capability.
The DPC's responsibilities considered and reviewed in preparation for the summer
storm season included:
(a) Chairing the SDMG;
(b) Representing Queensland at meetings ofNCC;
12 Document No: 2998420
SOQ.001.001.0068
(c) Standing-up the Crisis Communications Network to coordinate government
messagmg;
(d) Discussions with the ABC to ensure public messaging during a significant
disaster event;
(e) Development of processes and templates, in conjunction with SSQ, to ensure that
a community information hotline and whole of government website can be
immediately established to keep the community informed;
(f) Ensuring that the Government Air Wing crew and aircraft were operational and
prepared to be deployed;
(g) Preparing to initiate special meetings of Executive Council to facilitate the
extension of any disaster declaration were put in place;
(h) Implementing a register ofDPC volunteers to assist the Department of
Communities with the establishment of Community Recovery Centres;
(i) Reviewing procedures to establish a Premier's Disaster Relief Appeal if required;
U) Chief Executive Officers of the five Arts Statutory Bodies - Queensland Art
Gallery, Queensland Museum, Queensland Performing Arts Trust, State Library
of Queensland and Queensland Theatre Company - were briefed about the
necessary preparation for potential weather events and the need to revi sit
emergency response and business continuity planning; and
(k) Reviewing Arts Queensland's Emergency Management Plan, particularly
regarding coordination of disaster preparedness and recovery at the Queensland
Cultural Centre.
The DPC also prepared a Cabinet Submission regarding a 'Schedule of Summer
Issues ' dealing with significant operational risks to governmentthat may arise over
the holiday period. This submission also suggested mitigating strategies and the first
issue on this schedule was the impact of possible adverse weather events over the
summer period.
Actions Taken by DPC
During the response and recovery phase DPC:
(a) Chaired the meetings of the SDMG and provided leadership for the government's
overall response;
13 Document No: 2998420
SOQ.001.001.0069
(b) Facilitated cross government crisis communications and public communication
strategies including the www.qld.gov.au and Premier's website;
(c) Initiated the department's business continuity plan;
(d) Established the Premier's Disaster Relief Appeal including authorisation for third
party fund raisers;
(e) Established and resourced the disbursement committee for funds raised by the
Appeal;
(f) Provided advice to Cabinet on the extent and impact ofthe flooding;
(g) Represented Queensland at meetings ofNCC to discuss the flooding event and
the role of the Commonwealth and other jurisdictions;
(h) Initiated the activation of category C & D provisions of the NDRRA
arrangements with the Commonwealth;
(i) Established the flood recovery taskforce and resourced the operation of the
taskforce;
(j) Established and resourced the Commission of Inquiry;
(k) Administratively established and resourced the Queensland Reconstruction
Authority, and
(1) Instructed the Office of the Queensland Parliamentary Counsel on the drafting of
the Queensland Reconstruction Authority Bill 2011 which established the
Queensland Reconstruction Authority (QldRA) as a new statutory authority with
responsibility for reconstruction and recovery following the floods and Tropical
Cyclone Yasi. The QldRA Bill was introduced to Parliament and declared an
urgent Bill on 16 February 2011, passed on 17 February 2011 and commenced on
assent on 21 February 2011. In addition to establishing QldRA, the Bill also
made a number of flood-related amendments to other Acts, including amending
the DM Act to correct a technical error and allow an extension of time for a
disaster declaration from 14 days to up to 28 days from the initial declaration.
During the response and recovery phase Arts Queensland:
(a) Chaired meetings of the Emergency Management Committee for the Queensland
Cultural Centre;
(b) Disseminated information about weather warnings and tidal levels from BOM to
the Arts Statutory Bodies;
14 Document No: 2998420
SOQ.001.001.0070
(c) Closed the three public car parks at the Queensland Cultural Centre on Tuesday,
11 January 2011 , with all cars having left by 7pm;
(d) Prepared advice for the Director-General (as chair ofthe SDMG) to issue to the
four Chief Executive Officers of the cultural institutions at the Queensland
Cultural Centre to close to the public on Tuesday, 11 January 2011 . Priorities for
individual Arts Statutory Bodies were taken into account, including negotiations
with commercial producer at Queensland Performing Arts Trust;
(e) Assembled disaster preparedness teams from each cultural institution by early
morning of Wednesday, 12 January 2011 to take final steps to isolate
infrastructure and safeguard collections against flood damage, and secure the
Queensland Cultural Centre site prior to the flood peak and the site 's evacuation;
(f) Assumed site access control and responsibility for all buildings at the Queensland
Cultural Centre from close of business Wednesday, 12 January 2011;
(g) Established and coordinated daily briefings with disaster recovery teams from the
four Arts Statutory Bodies about status and progress of recovery works;
(h) Commenced assessment of damage at the Queensland Cultural Centre from the
morning of Thursday, 13 January 2011 and commenced securing of vital supply
chain;
(i) Coordinated disaster recovery works across the Queensland Culture Centre
precinct with gradual handing back of buildings to Arts Statutory Bodies as
buildings achieved certification from the Queensland Government building
surveyor;
(j) Delivered the public reopening of the Queensland Cultural Centre by
16 February 2011;
(k) Continues to coordinate ongoing recovery building works at The Playhouse
Theatre, The Edge and three car parks;
(I) Provided advice to arts organisations statewide on avenues for assistance if flood
affected; and
(m) Is working with local government and arts organisations statewide to support
community cultural responses to flood impacts.
15 Document No: 2998420
SOQ.001.001.0071
F. Preparedness for Next Wet Season
The DPC will facilitate and coordinate the government wide consideration of the
recommendations of the Commission ofInquiry.
Arts Queensland will procure expert disaster management advisors to review its
emergency management plan and coordination of disaster preparedness and recovery
operations across the Queensland Cultural Centre. This will also include consultation
with the Arts Statutory Bodies and a review of their own disaster preparedness and
business continuity plans. This will inform strategy, preparations and ' flood-proofing '
capital works at the Queensland Cultural Centre for possible future natural disasters.
G. Indication of Relevant Documents Held by Department
Below is an indication of the categories or types of documents held:
(a) Cabinet documents relating to advice from the BOM and associated preparations,
summer issues, the impact of the flooding, establishment of the Taskforce and the
Queensland Reconstruction Authority;
(b) Minutes from SDMG meetings leading up to and during the flooding event;
(c) Advices and warnings received from the BOM, Seqwater and situation reports
from the State Disaster Coordination Centre;
(d) Media and cross government communication issues including the establishment
and operation of the whole of government floods website on the government
website www.qld.gov.au;
(e) Establishment of the Premier's Disaster Relief Appeal, including third party fund
raisers, Smart Service Queensland, banking and receipting matters;
(f) Correspondence in relation to the activation and provision of benefits under the
provisions of the NDRRA;
(g) Correspondence to the Premier from members of the public and members of
parliament in relation to the flooding event, its impacts and requests for
assistance;
(h) Minutes for DPC Crisis Management Team;
(i) Agenda papers and outcomes from the consideration of policy issues at national
fora such as COAG, NEMC and NCC;
16 Document No: 2998420
SOQ.001.001.0072
U) Correspondence in relation to the preparation for summer issues and the storm
season~
(k) Preparation of policy advice, legislation and executive council minutes on the
Taskforce, Commission of Inquiry and the Queensland Reconstruction Authority;
(I) Policy advice concerning the review of the disaster arrangements and associated
legislative amendments;
(m) Emergency Management Plan for the Queensland Cultural Centre;
(n) Minutes from briefings to recovery teams and Chief Executive Officers during
disaster preparedness and recovery phases at Queensland Cultural Centre; and
(0) Updates to boards of the Al1s Statutory Bodies during disaster recovery.
17 Document No: 2998420
SOQ.001.001.0073
Exhibit
DPC-Ol
DPC-02
Document No: 3000569
Index of documents attached to
DPC
Description
Draft Protocol concerning the release of
floodwaters from Wivenhoe and Somerset
Dams
Correspondence from the Premier to all
Ministers and Chief Executive Officers
SOQ 11 March Submissions
SOQ.001.001.0074
'OPC-01'
Protocol for the Communication of Flooding Information for the Brisbane River Catchment - including Floodwater Releases from
Wivenhoe and Somerset Dams
OBJECTIVE
The purpose of this protocol is to outline the arrangements to be followed by the Brisbane, Ipswich and Somerset Councils, relevant Queensland Government agencies and the Bureau of Meteorology, which will ensure the provision of consistent and robust information to the community, concerning potential flooding impacts for the Brisbane River catchment, including release of floodwater from Wivenhoe and Somerset Dams.
The intent is to ensure that consistent, harmonised information, based on an agreed single point of truth, is communicated to the public in a way that contributes to resilient communities.
BACKGROUND
Queensland's disaster management arrangements, based on disaster management groups at local, district and state level, ensure the collaborative and effective coordination of information for all hazards.
Existing local , district and state disaster management and hazard-specific plans outline arrangements and structures for disaster management, or the hazard, and amongst other things, identify the need for coordination of public communications.
This protocol adds to such plans by outlining specific arrangements necessary when advice to the community needs to be based on technical assessments from hazardspecific primary agencies and other complementary stakeholders across federal, state and local governments.
Factors such as storm surges, tides, creek flooding, flooding from the lower Brisbane River, including Lockyer Creek and the Bremer River, will influence inundation levels in Brisbane.
Wivenhoe Dam controls approximately half of the Brisbane River catchment above Brisbane City. The operational strategy for water release from Wivenhoe and Somerset Dams is governed by the Manual of Operational Procedures for Flood Mitigation at Wivenhoe Dam and Somerset Dam, henceforth referred to as the Flood Mitigation Manual.
This protocol also covers the possibility that, during an above-average wet season, the water supply level of the dams may be marg inally reduced, on a temporary basis, by small water releases. The water supply level would be returned to normal prior to the conclusion of the wet season, to avoid affecting water supply security. These changes, if they proceed, wi ll ultimately be incorporated into the Flood Mitigation Manual.
GENERAL DECISION MAKING - GUIDING PRINCIPLES
• Protection of public safety is paramount throughout both this Protocol and the Flood Mitigation Manual;
SOQ.001.001.0075
• Ililpact on the community upstream or downstream is a legitimate consideration of any risk assessment;
• Regular and consistent communications within government and to the public, in relation to flooding impacts, are essential;
• Decision-making chains regarding the communications strategy and disaster management should remain flexible;
• The Flood Mitigation Manual is used to determine how Wivenhoe and Somerset Dams will be operated during flood events.
• This Protocol does not infringe the right of any party to issue information in line with their responsibilities.
PROCESS OF COMMUNICATION
There are three stages in the process of communication:
• • •
Monitoring and Assessment Briefing and Activation Public Communications
Monitoring and Assessment :'~;i:*ilij~:>
4~~:;~::' ~~%. ,.;~;"
Communications with the public on fl06CJihg info~lii'ation, releases, are based on a continuous P'P6£l;~.~{;9f·'·· monitoring and technical assessment. The process is and evoliie's~:ifccording to the event, but will normally contain the following ';~:~~~~'l:~:::,.
• Routine monitoring of weather I eve.!'!>;. by relevant agencies via established systems "~:,,,
•
•
•
•
•
•
The Bureau (e.g. event of catchments, discus,s;~:U;ig~l~JJ~d i flood:ire~el's~<!>~~:;J:::::>. ,<{~ii~~~;~"/ . ··:;;~~ltl~\
COUll.clls monitor Cfee~ I and";:§eqwater on ol6'~r aggra\icitl'!the situati~~')
.~::;~~~~~:::;. A;lj;llli:
and warnings Severe Thunderstorm, Flood). In the
Wivenhoe and/or Somerset Dam Water Supply Authority (Seqwater)
Somerset Dam, and downstream
local runoff and flash flooding, consult with BoM i I events upstream that may contribute to and
Seqwater di~1:usses:::::a)'fd models implications of the inflows on the necessary floodwater r<~f~~,~~:::fPIi'm Wivenhoe Dam and/or Somerset Dam. The floodwater release strategy::~:t~r a balance between releasing the water quickly enough so that the flood storage capacity is available if another major rain event occurs, versus minimising downstream flooding impacts (human safety and property damage) from the releases.
Seqwater calculates the releases according to dam levels and predicted weather events in accordance with the Flood Mitigation Manual. A fundamental principle is that all floodwater should be released from the dams within seven days of the flood event peaking in Wivenhoe or Somerset Dam. This ensures the dams can cope with closely spaced major rain events.
Seqwater shares predicted floodwater releases with BoM and with the Councils.
Councils share information on the status of the Brisbane River catchment and its
2
SOQ.001.001.0076
river systems with BoM and Seq water.
• BoM undertakes modelling of the Brisbane River catchment and its river systems using Seqwater advice of actual and projected Wivenhoe Dam and/or Somerset Dam releases when these are, or are expected, to occur.
• BoM participates in technical discussions with Seqwater, Brisbane City Council, Ipswich City Council and Somerset Regional Council as necessary, to share modelling results. The discussions aim to establish technical agreement on the flood situation, on which public communications should be based.
• Councils undertake modelling, form predictions, identify flood inundation areas and assess impacts for their communities, and regularly share this information
with all relevant parties. .,;d~~~:'
During this continuous process, it may become app..i'i":i~!fit to either BoM, local governments or Seqwater that the situation is likely tp~:W.M~lt in public safety issues.
. (fmi~:~:" ,.~::~~~~:;;: .. These public safety issues may arise from C\,:,"B.~dsion to '<'r~l~{lse floodwater, a significant change in the severity and scope .of~;tne event, or a:;'g't,e,-agreed trigger-
point being reached. .";,:.:,.,:.:.:,,,.,;i~;V· ...• ,... '<''':;::.::., .. . '<.,>" '~, : ;'. ··::;~~~t~"
Any of the agencies may initiate the putili~:l:~9mmu,~'i~ations process'<'and engage with the disaster management arrangements ·'a'~*ap~J;~p·riate.
";:::;';" - .<~:~~~~~~~=>~ The initiating agency will instigat~:?~%~9hnical staff1h:e,l.econference. Decisions from the teleconference will be disfi.iquH;~j:'j:,::tQ senriS't:~:;:,[l1anagement and media representatives of each agency. '<:jj!:!,:, "';::':::j~~:,;., ":':~U):::,
dX '<S". "ll. ;~s~:~:f:~~~::;:;~::. - "::>'
In these circumstance${~:f~~~~QCieS a§;if~,~::;i:~1\t t~~W;~~1 advice will form the basis of public communic<f£iQ'Y;s meS's·'€i@es. "::'j;J:"
<;i:~~:~t:>'· Jiij <:;i~i~l~:;> • In the case of'flobdwater<,:(eiease it co'nsiders significant, Seqwater coordinates v,·",'.-. /<·.·.v.·-: .. V{.·u>'.·'v_ _ >v.'>:_
the completion of,:lj:t,l)e:::~T'l~cnh'iC:aJ:~:Sity'9'tfbn Report - TSR (Appendix C) and provi2.~~:mb~:~:~~pd;:~l::~W: the SEQ~;~W'ater Grid Manager (according to their Em<:!tg~'ri"cy Resp',q.,llse P,I,S!D), and to relevant local governments. -::::@t;::> ·<:\l::~... '<:~r~~:::,
• Iri';,'o:tl:)er circumsta'ij:j:;es wh~~'~~ a formal technical statement would enhance clariW;L~re initiating\!llfal or';:State agency may coordinate the completion of a TSR, If(i)).i.liated, the J::~,R should be circulated to all parties.
Briefing an~:jji~~!i:~i~~1;:j::;: Consideration will ''')j'e given to the activation of the disaster management arrangements, if not already activated.
1. Councils will consider activating their Local Disaster Management Groups (LDMGs);
2. LDMGs will inform the relevant District Disaster Coordinators (DDCs);
3. The Queensland P,olice Service (QP,S) will consider initiating disaster management actions as provided for under the Disaster Management Act 2003;
4. In the case of floodwater release, the SEQ Water Grid Manager will alert the Director-General (DG) of the Department of Community Safety (DCS), DG
3
SOQ.001.001.0077
Department of Environment and Resource Management (DERM), and the local governments;
5. DG DCS will inform the DG of the Department of Premier and Cabinet (DPC) - the Chair of the State Disaster Management Group (SDMG) and will activate the State Disaster Coordination Centre (SDCC). DG DCS will also inform the Minister for Police, Corrective Services and Emergency Services;
6. DG DERM will inform the Minister for Natural Resources, Mines and Energy;
7. DG DPC will inform the Premier;
8. In the case of an extreme event, the Crisis Communications Network, chaired by DPC, may be activated at the directionAof the SDMG Chair to
-"/','-:s, coordinate public messaging from BoM, Seqwater",$I:~ Water Grid Manager,
.;-:;·x:;;v QPS, relevant Councils and DCS as per this protoco:I:r'
,,:::;~l~~;\tj::::~ 9, In the case of a non-disaster, public com,m~~~icati6'r(~~~ill be in accordance
with eXisting arrangements, supported wh:e,r:e "apprOpnaIe,,,by this protocol.
Public Communications Issues <~i!i~~f:.~iil!Iif ","','",. '~~~1!:~:i!}~::: ',........ . '.:::;::::~~. "
Each agency has its own responsibilities 'fiii~ns.sue i(lXq:!1i'i'lation commensurate with their role without prior approvals. The oblig"ho.RtiQ'ii'i:ler this protocol is to share that information with other agen~[~?" and opera~1t(:j: a fully consultative process to ensure consistent public informat'1'Q~'i~:j::i:::,::," ""::'~h"
. '~~~~~k. '<:·:~:;::~l~~~:;:::~:,>. '>·::;:i~Jk:::. . The BoM, Local Governments and"':relevarit~:::State Ge:v.ernment agencies are to maintain continual disc~:~~l:9:g,~! to en~~f~ tM~i~l5h'fU:~~~QQ ::ifi'formation is not released to the public at any tU1l1~,:~:::GeUJ:!!ne eff~!1t?,::!>:tlOuld be"made to ensure consistency by basing public com!#l'iiil'ikatiofis~on teci'\'Q[cal reports. Inter-agency consultation
,','.',«<' X·:';U N/'''''
should not cause,\~:i:({lays in ttig:~issuance::rC?f public warnings, All agencies must exchange public co:fumunicaticf~:Lat time'or:::release. No power of veto is implied
under th i~,~ff~~~~:I,.'::it~~:\~~i~W~~:it1~~j:~i~~~!:j$:::!W HarmolJise'Q'''p'uolicKi:omrifi'fnications messages will be released from the following
agerW:i~~';~:' '''~\1~1[:::;\ '<::iii:;::::::;;;::
• Bure~:I!:"of Meteoro!g:gy - concentrating on Flood Warnings which are widely dissemll:\:?!t~d to the B§.ti1 website, agencies and the media. BoM also participates in media':::~~~,2,io, tele)();~'i'on, newspaper) interviews to provide factual information regarding cib~~rvecV~:rJ'd forecast weather conditions, rainfalls and water levels;
"::::;jjiiti~~r::" • Local Governm'ehts /Local Disaster Management Groups - concentrating
on the effects of weather related events and safety for their local communities and residents. Local governments have primacy of public communications within their community, Pre-agreed community service announcements from local governments will be shared with the relevant agencies prior to public release;
• SEQ Water Grid Manager - if significant floodwater releases from Wivenhoe and Somerset dams are involved, the SEQ Water Grid Manager concentrates on the communication aspects of release timings and duration of effects as the State's lead communication agency on floodwater release. Seqwater operational staff are to ensure that technical information is communicated to the SEQ Water Grid Emergency Response Team (if activated), the SEQ Water Grid Communications Unit and relevant local governments.
4
SOQ.001.001.0078
If necessary these will be augmented by:
• Queensland Police Service - concentrating on specific community safety messaging during operations;
• Department of Community Safety - concentrating on general safety matters regarding flooding;
• Department of Premier and Cabinet (extreme events only) concentrating on consistent messages to media and agencies concerned.
Event-specific information will be released to the public as frequently as required by the severity and scope of the event. Timings of media I, " will be dependent on the event, guided by the frequency of technical :':'and may range from once a day to once an hour.
In the case of floodwater release Communications Unit will centrally track all rnrr.'m shared. The unit will liaise with the foillow'ir safety messages: • BoM; • Seqwater;
;'i~1i'!l~'~~~~~~$;, , '.>,'.:<, "Y~\:(»>
Questions from the Public \W~. '<""'::1i1~;;l~l~~~;.: .. ,.
• Councils' Media Directors; • QPS Media Director; and • DCS Media Director.
SEQ Water Grid ensure they are
rel)re,se'fifilti\les over pubic
,.~:it}~~;~:;:~l;~~~1:;::~ '::!t1j;!::::~i~\~~~~:;~' .. ···:~;:1~iij;1m1::;' All questions from th1:e:<fiublic sn:0:l,lld be 'CfiteCted to the relevant local government in the first instance:~:i~<uestions ~~p'ressly t~1~.ting to the event should be directed to the hazard-speCiffG:tp~imary a,g~Dty. Any q\l:~stions relating to the release of water should be directed tb:lilbe SE:~:§\;iiJatE!r<::Gr~d C$'mmunications Unit. Any queries about disasterw:~ml,g~~ent::~:I&~:WIg be"~'(itil~§;§ed by the relevant local and district d Isaster,:Il'ra'nagercf¢rJ~ g rol1p~.'
prot~~~~:t:):a i nte~:~!~~:~::t,t\\~:i::t~ This protO'G?:l~:K"ill be revi~~ed annually by agencies involved and exerCised, during non-operatlon!Jtseason",gJl)der DDMG arrangements .
. :,,;:~:?\,,: ,.:::;1~ili?;;;;
The protocol shouli:! .. ;:I'i:r:gvide for a review after each event of what worked and could be improved for mai'fil'gement of future events, to be led by DCS.
5
SOQ.001.001.0079
Appendix A
Communications process for the release of floodwater from Wivenhoe and Somerset Dams
Monitoring and
Assessment
Briefing and
Activations
Public communications
Yes
Routine monitoring by relevant agencies via established systems and procedures
BoM provides weather and flood forecasts and warnings
Local governments monitor creeks, local runoff
Seqwater models implications of inflows and calculates release
BoM undertakes modeling of river systems and catchments
BoM, local governments, Seqwater - technical discussions
TSR completed
Harmonised information for public safety developed
• 80M • SEQ Water Grid Communications Unit • Councils • QPS/DCS/DPC (as needed)
SEQW Grid Manager alerts DGs • DG DCS alerts DG DPC -
Chair of SDMG • SDMG alerts DDMGs • Councils alert LDMGs • DG DERM alerts Min NRM&E • State Public info arrangements
activated
No
No
Harmonised information BoM - on event SEQW Grid CU - on release Councils - on effects DCS/QPS - on safety (Extreme event)
Harmonised information 80M - on event
(State - strategic issues)
6
SEQW Grid CU - on release Councils - on effects DCS/QPS - on safety
SOQ.001.001.0080
Appendix B
ROLES AND RESPONSIBILITIES
• The Bureau of Meteorology (BoM) is the agency responsible for issuing flood warnings for the Brisbane River and its major tributaries. These, when required, include rainfall forecasts for the Brisbane catchment and predicted river heights for Brisbane City, Ipswich, Jindalee and Moggill according to established procedures.
River height predictions are agreed in consultation with Seqwater, Brisbane City Council (BCC), Ipswich City Council (ICC) and Somerset Regional Council (SRC), as required.
• Queensland Bulk Water Supply Authority (Segwater) nnPr"t Dams in accordance with the Flood Mitigation Ma information to BoM, to allow the development authorities, to assist them in quantifying likely imn,,(·t~.:::
It informs BoM and other agencies on the releases from Wivenhoe and Somerset d Wivenhoe and Somerset dams and downstream of Wivenhoe Dam.
Seqwater initiates proposed reviews undertaking consultation with L.O.'~.!,!!;IIS the production of the TSRs relatJ.mg:::~.5hr!IOodV\,atlei:'~~eleaSE!S Somerset dams.
Wivenhoe and Somerset provides dam outflow
Warnings and to local their areas .
. actual and prOjected arding inflows to
Brisbane River
Flood Mitigation Manual, Seqwater coordinates
from the Wivenhoe and
• !:illi~~QlillQ.L~ ~~~~~~~~~~ (SRC) information, both to their respective nnF,."ti()ri; nagement and their broader communities. This should incl flood warnings and river height forecasts
Councils are responsible for activating ups (LDMGs), which then undertake
f6't're:soonse in the community.
• Its with the of any updates to the Flood Mitigation Manual.
ne(:essal-y to the strategies in the manual if
• assumes a legislative role, as per the disaster provide disaster management at a district level during an
nrriVi<:inn of necessary community advice for public safety.
• Emergency Management Queensland (EMQ) provides support and general community safety advice on flooding issues, during non-operational times.
• SEQ Water Grid Communications Unit tracks the general harmonisation, but not specific detail of public messaging relating to floodwater releases, with BoM, SEQ Water Grid, Councils and DCS, as required. It does this by ensuring that each agency understands the extent of the release and that there is a general consensus as to the level of potential impacts.
7
SOQ.001.001.0081
Appendix C
TECHNICAL SITUATION REPORT
This report is as at the time of assessment, and may quickly become out of date, depending on the current events. It relies on timely information provided by Seqwater, BoM and Councils. A reply will
~~':~
be required by a specified time and if not received by that time no i,f;lJ,gJ,i,i)iation will be included. If any information is not provided, the section will remain blank.J;!J:\l'tifwili be no follow up
req u ests. 'i;j!hl1:~i~~~:l\\fill~" Each authority will provide an email and telephone conta escalates, there may be less time to respond or it may.
v ','\:;.~", all communj~a,tions. If an event
possible to re~'~'6'~!!,.to requests. ':::~t~:~>;
In floodwater releases seqwater will email advices organisation1'~ail address provided, Once a flood event is initiated, at any time ncy can contact Seq water to discuss if they have a serious concern rega,l;ciing the i " n releases provided. This would normally be by phone and followed by eri\~nl:'·~,,,?,«ever, the ..... to respond to any queries depends on the event. The frequency of advices wilr~~p~hBi9.~~~.~e sellerll' the event and the needs of each
agency ·'~i:1:!.~;: ·:~:;l·:~:;);:~~lt~.~x, seqwater will also request situati8)));i\'SEissment f~m each agency as per details outlined in this d . I then ~:Mail in return the requested information if possible or advice that it has receive"a;~.ithin the specified timeframe, it is assumed it is not being provided. <'~1'~i"
)revicle guidance to initiation of this report
8
SOQ.001.001.0082
Seqwater status of inflows and dam operations
(to include information on the current and/or predicted levels of Somerset and Wivenhoe Dams and the probable or planned release strategy with assessment as governed under the Manual of Operational Procedures for Flood Mitigation at Wivenhoe Dam and Somerset Dam)
This is Seqwater's status report on the dam levels, probable inflows and planned releases.
This has been supplied to BCC on .... . ICC on .... . SRC on .... .
Issues raised by Councils were .....
Actions taken were .....
BoM assessment (consisting of references forecasts and
time.
fm;':'R.ri<iwrJP River and other relevant Bureau f~;~);l~~E~i!l";o,pical Cyclone Warning etc) and other
or their current information and other updates or r current set of warnings and may be updated or changed at any
9
SOQ.001.001.0083
Brisbane City Council (BCC) assessment (to include predicted local inundation areas and depths of inundation based on the information)
This is an assessment as provided by Bee. A request for this information will be sent to the email address provided by Bee.
Ipswich City Council (ICC) assessment (if required) (to include predicted local inundation areas and depths of inuIlJi..i3PiCin
This is an assessment as provided by ICe. A request for address provided by ICe.
Somerset Regional (to include predicted
address
Collated and distrib
10
to the email
of inundation based on the information)
this information will be sent to the email
SOQ.001.001.0084
'DPC-02'
Premier of Queensland
For reply please quote: ESIBS - TFlf0125186 - DOC/101138801
25 October 2010
The Honourable Paul Lucas MP Deputy Premier and Minister for Health GPO Box 4B BRISBANE QLD 4001
Dear Deputy Premier
Exec.utive Building 100 George Street Brisbane
PO Box ISlaS City East Queensland 4002 Australia
Telept'IDne +617 322~ lISOO Facsimile .. 6173221 3631 Email [email protected] Website www.lhepremier.qrd.gov.au
As you are aware , Mr Jim Davidson, Regional Director, Bureau of Meteorology, has advised Cabinet of the current La Nina weather pattern influencing Queensland's weather conditions. The bureau predicts a 75 per cent chance that we will experience much higher than average rainfall over the summer months and a greater number of cyclones . These are weather patterns not seen since the early 1970s.
While Queensland is well prepared to manage natural disaster events such as cyclones, storm surges and floods , it is anticipated that these events may occur with greater intensity and frequency and quite possibly, earlier in the 2010-11 summer season.
All Government agencies have a role to play in disaster management as reflected by the membership of the State Disaster Management Group (which includes all DirectorsGeneral) and the provisions of the Disaster Management Act 2003.
Given the increased risk associated with the coming season , it is imperative that there is no complacency within agencies . Therefore , all agencies are to review their role during a disaster situation to ensure they are able to provide the necessary support and services to assist individuals and communities to prepare, respond to, and recover from, a disaster event. This includes the provision of accurate, timely, coordinated and consistent warnings to any community under potential threat.
In addition, agencies are to review their business continuity plans to ensure that, if directly affected by the disaster, they are able to recover and resume the provision of critical and core services as soon as possible.
Queensland Government
SOQ.001.001.0085
I request that you work with your Directors-General and , where appropriate, other agency Chief Executive Officers within your portfolio, to ensure that appropriate senior staff are rostered or placed 'on-call ' over the Christmas and New Year period and throughout the school holidays. This is to occur centrally and at the regional level.
My department is also coordinating the development of a submission on the 'Schedule of Summer Issues' dealing with significant operational risks that may arise over the holiday period. This submission is to be considered by Cabinet in early December.
Agency contributions to this submission have been requested separately and your review of the above staffing arrangements should be reflected in the material provided to the Department of the Premier and Cabinet for inclusion in this submission.
Thank you for your assistance in this matter.
Yours sincerely
SOQ.001.001.0086
Premier of Queensland
For reply please quole: ESIBS - TFI10125186 - DOCl101138815
25 October 2010
Mr Jim McGowan Director-General Department of Community Safety GPO Box 1425 BRISBANE QLD 4001
Dear Jim
Executive Building 100 George St reet Brisbane
PO Box IS18S City Eas! Queen sland 4002 Australia
relephone +617 J224 4500 facsimile +61 7 3221 3631 Email ThePremie [email protected] Website www.lhepremier.qld.gov.au
As you may be aware, Mr Jim Davidson , Regional Director, Bureau of Meteorology, briefed Cabinet this week concern ing the current La Nina weather pattern influencing Queensland 's weather conditions during the coming summer season.
This followed a similar presentation made at the State Disaster Management Group meeting on 12 October 2010, where the bureau advised of a 75 per cent chance that Queensland will experience much higher than average rainfall, together with the potential for a greater number of cyclones to cross the coast. Similar weather conditions have not been seen since the early 1970s.
I have written to all Ministers highlighting the need for Queensland to be well prepared for the forthcoming storm and cyclone season . While natural disasters resulting from cyclones , storm surges and floods are not uncommon in Queensland , it is anticipated that these events may occur with greater intensity and frequency and, quite possibly, earlier in the 2010-11 summer season .
All Government agencies have a role to play in disaster management as reflected by the membership of the State Disaster Management Group, and the provisions of the Disaster Management Act 2003.
Given the increased risk associated with the coming season , it is imperative that there is no complacency within agencies. Therefore, all agencies are to review the ir role during a disaster situation to ensure they are able to provide the necessary support and services to assist individuals and communities to prepare , respond to, and recover from, a disaster event. This includes the provision of accurate, timely, coordinated and consistent warnings to any community under potential threat.
Queensland Government
SOQ.001.001.0087
Agencies are also to review their business continuity plans to ensure that , if directly affected by the disaster, they are able to recover and resume the provision of critical and core services as soon as possible.
I have requested that your Minister work with you to ensure that appropriate senior staff are rostered or placed 'on-call' over the Christmas and New Year period and throughout the school holidays. Consideration of necessary staffing requirements during this period should include staff in both central office and any relevant regional or district facilities .
Your review of the above staffing arrangements should be reflected in the material that has been requested regarding the development of the 'Schedule of Summer Issues' Cabinet Submission , dealing with significant operational risks that may arise over the holiday period. This submission is to be considered by Cabinet in early December.
I ask that you work closely with my Director-General as Chair of the State Disaster Management Committee to ensure that ali possible risk mitigation strategies are in place and the Queensland Government is positioned to respond immediately to safeguard ali Queenslanders against the impact of any significant event.
Thank you for your ongoing assistance and cooperation in relation to this matter.
Yours sincerely
SOQ.001.001.0088