Issues raised Action TakenDRI Issue RBI requested to allow all IAY
beneficiaries to avail loan
(letter dated 20th Dec. ‘12)
Uploading of data on MIS - linkage
of release of 2nd installment
Condition relaxed for current
financial year subject to
achievement of
(i) 40% of NE states
(ii) 100% for other States
before the next installment
Difficulty in liaisoning with the
State /District on the MIS issue
Bihar, J&K , HP & Gujarat have
appointed Nodal Officers
Matter taken up with others
From Last PRC…
Issues raised Action Taken
IFSC Code of RRBs are not
available
Matter being followed with the
States
Inability to absorb funds under
Homestead scheme
Funds can be absorbed into Normal
IAY on request from DRDA’s on IFD
approval
From Last PRC…
Improving Governance…
• Status of Permanent IAY Waitlist
Not finalised and painted
• Status of creation of State funds
– Arunachal Pradesh
– Meghalaya
– Mizoram
– Meghalaya
Progress of MISReporting of Houses Sanctioned (as on 14.1.2013)
State MPR MIS (%) MIS to MPR
No. of districts
uploading photos
No. of Photos uploade
d
Arunachal Pradesh 1789 0 0 0 0
Manipur 1339 1063 79.39 0 0
Meghalaya 10,456 7,480 71.54 1 23
Mizoram 945 774 81.9 4 228
Nagaland 0 0 0 0 0
Sikkim 0 1 0 0 0
Tripura 0 5421 0 2 761
Progress of MIS…
• Slow progress in data uploading on AwaasSoft
• Slow progress in uploading photographs of
houses
• Beneficiary profiles uploaded on AwaasSoft are
incomplete
Preparing for DBT…
• Digitisation of beneficiary profiles needs to be
speeded up
• Task is to be completed by 31st January, 2013
• Bank/ post office accounts numbers of the
beneficiaries needs to be uploaded
• Aadhaar number or Enrolment Number – in case where the enrolment has taken place but Aadhaar number is yet to be
given
• TIN number is states where NPR is in place
Special packages…
StatesSanction Year Amount Released (Rs. in lakh)
Name of the Package Target Reasons for Pending
Ist 2nd
Arunachal Pds. 2011-12 1 23.1
5% (Fire Victim)
Original copy of the request is required.
Manipur 2009-10 1 20.79 1 20.79 5%UC/AR not received for settle the case.
2009-10 2 167.181 1 154.69Border
UC/AR not received for settle the case from Chandel and 2nd instalment not availed by Senapati.
Sikkim 2011-12 1 126 1 5% district not claimed for 2nd installment
Tripura 2010-11 1 22.344 Border district not claimed for 2nd installment
2010-11 4 3284.663 4 3284.663Incentive 15050UC/AR not received for settle the case.
2011-12 4 1543.48 Incentive 7072 district not claimed for 2nd installment except Dhalai district
State Annual Target
Total Houses Sanctioned
Houses under construction
HousesCompleted
%age of targetachieved
Arunachal Pradesh
8339 1883 651 1581 18.96
Manipur 7238 2139 2615 1992 27.52
Meghalaya
12608 10421 7749 3283 26.04
Mizoram 2687 1327 95 1354 50.39
Nagaland 8343 0 0 0 0
Sikkim 1596 0 0 0 0
Tripura 16245 1628 1628 0 0
Physical Performance 2012-13As on 31/12/2012 (In lakhs units)
Financial Performance 2012-13
State Central Allocation
Central Release
Total Available funds
Utilization of funds
%age Utilisati
on
Unspent Balances
Arunachal Pradesh
36.40 16.53 20.08 6.75 33.61 13.33
Manipur 31.59 14.60 20.47 8.16 39.89 12.31
Meghalaya
55.03 27.52 39.51 32.51 82.29 7.0
Mizoram 11.72 5.86 10.53 5.54 52.64 4.99
Nagaland 36.41 18.20 18.21 0 0 0
Sikkim 6.96 3.48 3.48 0 0 0
Tripura 70.90 35.45 39.26 0 0 0
(In lakhs of Rupees)
Arunachal Pradesh• Revised balance sheet & Original State request for
reimbursement - Rs. 23.100 lakh reimbursed under
Calamity Relief - Fire (5%) IAY to Lower Subansiri
Under examination• Proposal for 1988 additional houses for Kurung
Kurmey as special package (border)
• Proposals submitted – 9/16 districts– Released – 1– Objections conveyed – 2 – Under examination - 6
Manipur• Reply of pending C&AG para No. 8.6 and 9.3(b) has been
received which is under perusal• Chandel & Bishnupur have not been released 1st
installment due to non submission of proposal
Under examination• Rs. 364.52 lakh to Churachandpur district- CM’s request• Proposals submitted – 5 / 9 districts
– Funds released - 1 (Ukhrul)– IFD - 1 – Objection conveyed – 1 (Imphal West)– Under examination - 2
Meghalaya
• District East Khasi Hills yet to fulfill condition
imposed at 1st installment 2012-13
Under examination
• Proposals submitted – 6 / 7 districts
– Funds released - 1
– Objection conveyed – 3
– Under examination – 2
Sikkim
• No progress reported - Rs. 126.00 cr. released
under 5% IAY during 2011-12
Under examination
• Proposals submitted – None
Tripura
• Progress not reported - Rs.15.43 cr. released
under homestead incentive during 2011-12
Under examination
• Proposals submitted – 6 / 8 districts
– Objection conveyed – 2
– Under examination - 4
Issues in Release of 2nd installment
• Status of Checklist of additional information vide
letter dated 16.11.2012
• Bank details of DRDAs have not registered in
CPSMS before submitting the proposal
• Conditions imposed while releasing 1st installment
not yet fulfilled
New Decisions
• Enhancement of unit assistance to Rs. 70,000
(plain areas) & Rs. 75,000 (difficult areas)
• Assistance of Rs.9000 for construction of toilet
from NBA
• Assistance to purchase house sites enhanced to
Rs.20,000
• Administrative expenses of 4%
Knowledge Network
• Web-based repository of knowledge in the rural housing
sector, in collaboration with IIT, HUDCO.
• Showcases best practices and case studies in cost effective
and sustainable habitat building from various states
www.ruralhousingnetwork.com
Initiatives you can use…