Revised 12-10-2013 DEPARTMENT OF PUBLIC WORKS STORMWATER REMEDIATION FEE CREDIT APPLICATION MULTI-FAMILY & NON- RESIDENTIAL PROPERTY EXAMPLE

Upload: buidiep

Post on 20-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Revised 12-10-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER REMEDIATION FEE

CREDIT APPLICATION

MULTI-FAMILY & NON-

RESIDENTIAL PROPERTY

EXAMPLE

 

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER REMEDIATION FEE CREDIT APPLICATION

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

The following information must be completed for all properties applying for a Stormwater

Remediation Fee Credit. Multiple stormwater best management practices (BMPs) may be included

in the credit assessment, but must be located and identified on the property.

(Check the Appropriate Box)

INITIAL APPLICATION SUBMITTAL FOR UP TO 50% CREDIT

RECERTIFICATION APPLICATION

(Stormwater Remediation Fee ID No.:____________)

OWNER INFORMATION:

NAME:_____Dr. Dennis Alex Chesapeake_______________

(First) (Middle) (Last)

PHONE:___410-555-7666 ____________________(Office)_______410-555-6777_____________(Cell)

EMAIL:[email protected]________________________________________________

STREET ADDRESS:___1000 Bestgate Road, Suite 100______________________________________

CITY:____Annapolis_________________________________STATE:___Maryland________________

ZIP CODE:__21401_________________

OWNER’S REPRESENTATIVE (QUALIFIED PROFESSIONAL):

NAME:_________Rick Eddie Bay_____________

(First) (Middle) (Last)

PHONE:___410-555-8776____________________(Office)_______443-555-1191_____________(Cell)

EMAIL:[email protected]_________________________________________________________

NAME OF COMPANY:____Stormwater Management Specialist, Inc.__________________________

STREET ADDRESS:_____100 Severn River Road__________________________________________

CITY:____Severn____________________________________STATE:___Maryland________________

ZIP CODE:__21122________________

PROFESSIONAL REGISTRATION TYPE AND LICENSE NO. (PE;01313):__PE, 03233___________

PROPERTY INFORMATION:

BUSINESS NAME (IF APPLICABLE):__Chesapeake Community Center________________________

STREET ADDRESS:_____1000 Bestgate Road, Suite 100_____________________________________

CITY:____Annapolis_________________________________STATE:___Maryland________________

ZIP CODE:__21401_________PARCEL NO./TAX ACCOUNT NO.:__District - 02 Subdivision – 000

Account Number -90072299_____________________________________________________________

PROPERTY SIZE (ACRES):____4.0 acres_____IMPERVIOUS SURFACE (ACRES):__3.2 acres____

BRIEF DESCRIPTION OF STORMATER BMP(S) AT EACH LOCATION ON THE PROPERTY

Drainage Area (DA) #1 – Permeable Pavement (A-2), Landscape Infiltration (M-3), Bio-Swale (M-8);

DA#2 – Permeable Pavement (A-2), Micro Bioretention (M-6); DA#3 – Micro Bioretention (M-6);

DA#4 – Permeable Pavement (A-2), Micro Bioretention (M-6); DA#5 – Permeable Pavement (A-2),

Landscape Infiltration (M-3); DA#6 – Micro Bioretention (M-6); Building Area – Green Roof (A-1)

and Micro Bioretention (M-6), and a structural Infiltration Trench (I-1).

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __1__ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:__DA-1;A-2;#1 (Permeable Pave)

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.23____ acres BMP DA Impervious Area: ____0.23____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___2000__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #1 the targeted ESD volume is 3,950 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __2__ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:__DA-1;M-3;#2 (Landscape Infilt)

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.28____ acres BMP DA Impervious Area: ____0.28____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___1521__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #1 the targeted ESD volume is 3,950 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __3__ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:__DA-1;M-8;#3 (Bio-Swale)

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.29____ acres BMP DA Impervious Area: ____0.29____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___1,719__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #1 the targeted ESD volume is 3,950 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __4__ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:__DA-1;A-2;#4 (Permeable Pave)

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.16____ acres BMP DA Impervious Area: ____0.16____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___1,334__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #1 the targeted ESD volume is 3,950 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __5__ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:DA-2;M-6;#5 Micro Bio-retention

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.46____ acres BMP DA Impervious Area: ____0.46____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___1,800__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #2 the targeted ESD volume is 2,950 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __6__ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:DA-3;M-6;#6 Micro Bio-retention

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.34____ acres BMP DA Impervious Area: ____0.34____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___3,229__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #3 the targeted ESD volume is 2,460 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __7__ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:DA-4;A-2;#7 Permeable Pave

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.11____ acres BMP DA Impervious Area: ____0.11____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___952__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #4 the targeted ESD volume 2,215 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __8_ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:DA-4;M-6;#8 Permeable Pave

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.34____ acres BMP DA Impervious Area: ____0.34____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___1,822__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #4 the targeted ESD volume 2,215 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __9_ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:DA-5;A-2;#9 Permeable Pave

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.10____ acres BMP DA Impervious Area: ____0.10____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___857__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #5 the targeted ESD volume 2,950 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __10_ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:DA-5;M-3;#10 Permeable Pave

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.39____ acres BMP DA Impervious Area: ____0.39____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___3,647__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #5 the targeted ESD volume 2,950 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __11_ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.:DA-6;M-6;#11 Micro Bioretention

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.12___ acres BMP DA Impervious Area: ____0.12____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___390__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. Drainage area #6 the targeted ESD volume 740 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __12_ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.: DA-BD; A-2; #12 Green Roof

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.62___ acres BMP DA Impervious Area: ____0.62____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___2,565__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. For the Building the targeted ESD volume is 6400 cubic feet and the open space is

targeted ESD volume is 2, 935 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __13_ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.: DA-BD; M-6; #13 Mirco Bioret.

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____1.03___ acres BMP DA Impervious Area: ____1.03____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___1,755__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. For the Building the targeted ESD volume is 6400 cubic feet and the open space is

targeted ESD volume is 2, 935 cubic feet.

Revised 8-8-2013

DEPARTMENT OF PUBLIC WORKS

STORMWATER BEST MANAGEMENT PRACTICES (BMPs)

SUMMARY SHEET

MULTI-FAMILY & NON-RESIDENTIAL PROPERTY

(Please Print or Type)

Parcel No./Tax Account No.:____90072299___________ Summary Sheet No.: __14_ of _14__

Stormwater Remediation Fee ID No. (for Recertification):_______________________________

Stormwater Best Management Practice (BMP) Identification No.: DA-RM; I-1; #14 Infilt. Trench

A Qualified Professional (e.g. Professional Engineer, Landscape Architect) who has made an

assessment of the existing BMP design or designed the new BMP or documented the as-built

conditions or inspected the BMP should complete this form. If multiple BMPs exist on a single

property, separate Stormwater BMP Summary Sheets must be completed for each BMP. Select the

appropriate BMP from list provided or write in the type of BMP.

Site Conditions

Parcel/Site Area: ____4.0_____ acres Total Parcel Impervious Area: ____3.2_____ acres

BMP Drainage Area: ____0.15___ acres BMP DA Impervious Area: ____0.15____ acres

PE __2.1______inches, QE __0.26___ inches, Total ESDV Required ______24,600__________ cubic feet;

ESDv Per BMP ___2,033__ __ cubic feet, or Wqv __N/A___ & Cpv __ N/A _ Tc: _ N/A___

CN _ N/A , Q1 ___ N/A cfs, Q2 __ N/A ___cfs, Q10 __ N/A cfs, Q100 __ N/A cfs

Date Approved: ____5/22/11____ Date Construction Completed (As-built): _9/28/12___

See attached sheets for additional information (Stormwater Design Report, Construction Plans, As-built

Plans, Inspection Reports, Maintenance Reports, etc.): Attached Chesapeake Community Center Report

Type of BMP (Check appropriate box)

STORMWATER BMP PRACTICE

REDEVELOPMENT BMP PRACTICE

RETROFIT BMP PRACTICE

_____________________________________________________________________________________

ENVIRONMENTAL SITE DESIGN (ESD) PRACTICE

Alternative Surface

A-1 Permeable Pavers

A-2 Green Roof

A-3 Reinforce Turf

Nonstructural and

Micro-scale Practices

N-1 Disconnection of

Rooftop Runoff

N-2 Disconnection of Non-

Rooftop Runoff

N-3 Sheetflow to

Conservation Areas

Nonstructural and

Micro-scale Practices (Continued)

M-1 Rainwater Harvesting

(Cisterns and Rain Barrels)

M-2 Submerged Gravel

Wetlands

M-3 Landscape Infiltration

M-4 Infiltration Berms

M-5 Dry Wells

M-6 Micro-Bioretention

M-7 Rain Gardens

M-8 Swales (Bio-swales,

Wet swales)

M-9 Enhanced Filters

Revised 8-8-2013

Type of BMP (Continued)

STRUCTURAL BMPs

Infiltration

I-1 Infiltration Trench

I-2 Infiltration Basin

Filtration

F-1 Surface Sand Filter

F-2 Underground Sand

Filter

F-3 Perimeter Sand

Filter

F-4 Organic Filter

F-5 Pocket Sand Filter

F-6 Bioretention

Open Channel Practices

O-1 Dry Swale

O-2 Wet Swale

Wetland Practices

W-1 Shallow Wetland

W-2 Extended Detention

Wetland

W-3 Pond/Wetland

W-4 Pocket Wetland

Ponds

Wet Ponds Practices

P-1 Micropool Extended

Detention

P-2 Wet Pond

P-3 Wet Extended

Detention Pond

P-4 Multiple Pond

P-5 Pocket Pond

Other

O-1 Hydrodynamic Structure (e.g., Stormceptor, Bay Saver, etc.)

O-2 Underground Extended Detention

O-3 ______________________________________________________________

----------------------------------------------------------------------------------------------------

(Please attach the appropriate documentation demonstrating request such as additional information on

the BMP type, Drainage Area Maps showing location of BMPs, As-built Construction Plans, Approved

Stormwater Management Report, Inspection and Maintenance Reports and Checklists, Summary

Sheets documenting % of Treatment, etc.).

Additional Information or Comments: Chesapeake Community Center is divided oin to eight areas

for the ESD volume calculations; please see attached report for specific details on each area. The

Total ESD volume is 24,600 cubic feet that is divided into 6 specific drainage areas, buildings, and

open space. For the remaining volume a structural practice was added to meet the total required

volume. Therefore, an infiltration trench was added with an ESD Volume of 2,033 cubic feet. The

infiltration trench is 15 ft. x 45 ft. x5 ft. deep.

 

Chesapeake Community Center (Example)

Green Roof

Permeable Pavement

Landscape Infiltration

Micro Bioretention

Revised 12-10-2013