Department of land development and water resources Lucknow (U.P.)

TABLE OF CONTENTS

S. No. PARTICULARS Page Nos.

1 EXCUTIVE SUMMARY

1.1 Executive Summary 05

1.2 Project At Glance 06

1.3 Introduction and Background 08

1.4 Status of Previous 10

1.5 Need and Scope for watershed development Programme 11

1.6 Weight age for the selection of the watershed 12

2 GENERAL DESCRIPTION OF PROJECT AREA 14

2.1 Location 15

2.2 Physiography 17

2.3 Climate 18

3 BASELINE SURVEY AND PARTICIPATORY RURAL APPRAISAL 20

3.1 Detail of Population 21

3.2 Land holding pattern 22

3.3 Migration: Pre Project Status 22

3.4 Micro Watershed wise Detail of Crop their Productivity & Production 23

3.5 Livestock Population 29

3.6 Horticulture Status 30

3.7 Detail of Infrastructure 31

3.8 Details of common property 42

3.9 Ground Water status 53

3.10 Irrigation status 54

3.11 Source wise Area Irrigated in IWMP II 55

Page 3: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

3

4 INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT 56

4.1 Project Implementing Agency 57

4.2 Details of Staff at PIA 58

4.3 Details of WDT 59

4.4 Watershed committee Gram Panchayat wise 60

4.5 Details of Village wise (SHGs) 77

4.6 Details of SHGs Group wise Names 83

4.7 Details of Users Group 85

4.8 Activities wise formation of users Groups 85

4.9 Convergence 87

5 CAPACITY BUILDING PLAN 88

6 EPA 93

6.1 Entry Point Activity (EPA) 94

6.2 Estimation of Run off 98

7 PHASING OF PROGRAMME AND BUDGETING 133

7.1 Details of Item wise Financial Position 134

7.2 Details of Physical and Financial Year wise Phasing 135

8 EXPECTED OUTCOMES/ BENEFITS: 136

9 Cost Norms & Design of Structure Proposed 139

10 MAPS ( Watershed Map, Micro watershed Map) 147

11 Abbriations/Reference 163

Page 4: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

4

CERTIFICATE

This is to be certified that the proposed Project (IWMP-II) comprising Eleven micro-

watersheds of district Bijnor Uttar Pradesh has been selected for its sustainable development on

watershed basis under Integrated Watershed Management Programme. The land is physically

available for proposed interventions and is not overlapping with any other schemes. It will be

developed as per Common Guidelines for Watershed Development Project-2008, GOI, New Delhi.

The significant results will be achieved through proposed interventions on soil and water

conservation, ground water recharge, availability of drinking and irrigation water, agricultural

production systems, live stock, fodder availability, livelihoods of asset less, capacity building, etc.

The proposed Detailed Project Report of IWMP-II, 2009-10 is approved for its

implementation.

IWMP-II

Dept. of LDWR, Chandpur AT Bijnor UP

Deputy Director

LDWR, Moradabad UP

Project Director

DRDA, Bijnor UP

Chief Development Officer

Distt.-Bijnor UP

Page 5: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

5

EXECUTIVE SUMMARY

All the micro-watersheds of IWMP-II, 2009-10 are situated in Najibabad Block District Bijnor, Uttar

Pradesh. The extent of latitude and longitude of the project is 29.32 to 29.70 N-S and 78.10 to 78.40 E-

W. The project consists of eleven micro-watersheds namely Himpur Pachatpura (2B4D3i4a), Kishanpur

(2B5B8c5b), Kanakpur (2B4D3i4c), Rani Kota (2B4D3i2b), Ranipur (2B5C1f1c), Jaswantpur 2B5C1f3c,

Mahavatpur Billoch (2B5C1f3b), Jhakaki (2B4D3i2c), Pooranpur Garhi (2B5C1f1b), Kamalpur (2B4D3i2d),

and Shamipur (2B5B8c4c) with total geographical area of 5427 ha, out of which 3375 ha is treatable with

total outlay of Rs. 405.00 lakh under Integrated Watershed Management Programme. The Project

Implementing Agency (PIA) is Bhoomi Sanrakshan Adhikari, Department of Land Development and Water

Resources, Chandpur in Bijnor, Uttar Pradesh.

All micro-watershed falls in agro-climatic zone of Western region representing a transitional zone of

tropical sub-humid to semi-arid and comes under hot moist semi-arid ecological sub-region. The micro-

watersheds of IWMP-I is situated at an elevation of some 202.20 to 248.20 m above mean sea level and

has relief from 14 to 34 m. General topography of the watershed is mild to gentle.

Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided into five

classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3-5. 5. Per cent areal extent of different slope classes in IWMP-II micro-

watershed is shown in Page no. The dominant slope category in the micro-watershed is 0.5 to 1% (49.57)

1 to 3% (29.43), 3 to 5 (21%). On an average 28 per cent population is scheduled caste. The watershed

is water scarce. Expected runoff is worked out as 40% per cent annual rainfall. The watershed is

dominated by cow and Buffalo.

To achieve the sustainable development, all kinds of activities related to natural resource

management, production systems and livelihood options for asset less people are described in Page no. to

the total cost of the project is Rs. 405.00 lakh. All the activities of natural resource conservation are

marked on the map of proposed plan.

Major crops of the watershed are urd, moong, Sugarcane, during kharif and, wheat in.Rabi.

Page 6: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

6

1.2 PROJECT AT A GLANCE

1 Name of Project IWMP-2nd

2 Name of Block (s) Najibabad

3 Name of district Bijnor

4 Name of State U.P

5 Name of Watershed IWMP 2nd

6 Name of Micro watershed/ code with Coordinate latitude Longitude Latitude

1 Himpur Pachatpura 2B4D3i4a 78.10 29.32

2 Kishanpur 2B5B8c5b 78.15 29.70

3 Kanakpur 2B4D3i4c 78.18 29.42

4 Rani Kota 2B4D3i2b 78.22 29.41

5 Ranipur 2B5C1f1c 78.20 29.43

6 Jaswantpur 2B5C1f3c 78.28 29.52

7 Mahavatpur 2B5C1f3b 78.30 29.51

8 Jhakaki 2B4D3i2c 78.20 29.32

9 Puranpur 2B5C1f1b 78.18 39.25

10 Kamalpur 2B4D3i2d 78.31 29.70

11 Shamipur 2B5B8c4c 78.20 29.40

Page 7: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

7

Project Period 2009-10 to 2013-14

Name of gram Panchayats No.- 18 Kharif 1687

Names of concerned villages-(No) 42 Rabi 1659

Total Geographical area of

Project (ha) 5427

Productivity of important crops

(Q/ha.)

Treatable area (ha) 3375 Urd 4.00

Forest Area 120 Moong 3.50

Land under Agriculture use 4292 Jowar 4.50

Total Project cost (Lakh) 405 Bajara 4.50

Cost to be met through convergence

- Wheat 20-22

Project period 4 Years Paddy 15 - 20

Formation of Watershed

committees 18 Pulse And Oil seed (Masoor) 4-5

No. of WCs 18 Sugar Cane 450

No. of members 196 Pea 4-5

Formation of SHGs 33 Ground water status (m) 4.50-16.00

Total SHG Nos 92 Milk Production (Liters) 2.50 lt.

Female SHG Nos 12 Average income per family (Rs.) 20000

Total No. of members 995 (1) Land holding families 4550

Formation of UGs 22 (2) Land less/ poor families 720

No. of Ugs 54 Employment generation

No. of members 612 (1) During Project Period 67800

Important Outcome indicators - (2) After project 90300

(1) Rainfed area (ha.) 3742 (3) Area under crops (ha.)

(2) Area under irrigation (ha.) 550

Pasture 2

Page 8: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

8

YEAR WISE PHASING (PHYSICAL & FINANCIAL) OF IWMP-II, BIJNOR

Area : ha Amount : In Lacs

S. No.

Particulars

2010-11 2011-12 2012-13 2013-14 Total

Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy

1 Administrative cost-10% 7.90 11.14 11.14 10.33 40.50 -

2 Monitering-1% 0.77 1.11 1.11 1.05 4.05 -

3 Evalution-1% 1.01 0.91 0.91 1.22 4.05 -

4 Entry Point Activity-4% 16.20 - - - 16.20 -

5 Institution & Capacity Building-5% 10.13 5.06 5.06 - 20.25 -

6 DPR-1% 4.05 - - - 4.05 -

7 Watershed Dev. Work-56% 34.02 506 53.30 793 53.30 793 86.18 1283 226.80 3375

8 Livilihood Activity-9% 3.28 16.58 16.58 - 36.45 -

9 Production System & Micro Enterprises-10% 3.65 18.43 18.43 - 40.50 -

10 Consolidation-3% - - - 12.15 12.15 -

Total 81.00 506 106.54 793 106.54 793 110.93 1283 405.00 3375

Page 9: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

9

Budget for Various Components (IWMP–II, BIJNOR)

S.

No. Budget Component

Per

cent

Total

(lakhs)

A.

1. Administrative 10 40.50

2. Monitoring 1 4.05

3. Evaluation 1 4.05

B.

Preparatory Phase

1. Entry Point Activities 4 16.20

2. Institution and Capacity Building 5 20.25

3. Detailed Project Report (DPR) 1 4.05

C.

Watershed Works Phase

1. Watershed Development Works 56 226.80

2. Livelihood Activities for the asset less persons 9 36.45

3. Production System and Micro Enterprises. 10 40.50

D. Consolidation Phase 3 12.15

GRAND TOTAL 100 405.00

Page 10: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

10

CHAPTER-1

INTRODUCTION & BACKGROUND

Page 11: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

11

Introduction & Background

1.3 Status of watershed programme and approved plan by Steering committee, Govt. of India and

status of previous Detailed Project Reports for Bijnor district of Uttar Pradesh is given in following Tables

1.1, 1.2.

Status of watershed programme District- Bijnor

Details No. Area (ha.)

Total Micro watersheds in the district 410 456100

Workable Micro Watersheds 278 362774

Micro Watersheds already treated by LDWR & other Agencies Uttar Pradesh 101 100175

Micro Watersheds (MWS) available for treatment (At the time of start of IWMP in the

district) 177 262599

Table 1.2: Approved plan (PPRs) by Steering Committee (SC)/Govt. of

Year Project MWS Area (Treatable)

(ha)

Project Cost

(Rs. Lakh)

Name of

PIA

Date of

Sanction by

S.C. Got. Of India

2009-

10 IWMP-2nd 11 3375 405.00

B.S.A LDWR, Bijnor-I,

U.P. 30/04/10

Page 12: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

12

1.4 Status of previous DPRs

S. No. Approved Project

Status of DPR

under preparation/ prepared/approved by SLNA with date

Treatable Area ha

Project

Area (Geographical)

ha

Project cost

Rs.(Lakh)

Project period

(Fin. Year from.......q

......)

PIA

1 IWMP-2nd Prepared / under

Revision 3375 5427 405.00 2010/11to2013/14

B.S.A LDWR, Bijnor-II,

UP

1.1 Project Background

Integrated Watershed Management Programme-II comprises Eleven micro-watershed namely

Himpur Pachatpura (2B4D3i4a) , Kishanpur (2B5B8c5b), Kanakpur (2B4D3i4c), Rani Kota (2B4D3i2b),

Ranipur (2B5C1f1c), Jaswantpur (2B5C1f3c), Mahavatpur Billoch (2B5C1f3b), Jhakaki (2B4D3i2c),

Pooranpur Garhi (2B5C1f1b), Kamalpur (2B4D3i4c), Shamipur (2B5B8c4c), watershed project is

situadated in Najibabad Block of District Bijnor and spread over in 42 villages of 18 gram Panchayat. The

total geographical area of the IWMP-2nd 5427 ha, out of which 3375 ha is treatableunder Integrated

Watershed Management Programme (IWMP-2nd).

Page 13: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

13

1.5 Need and Scope for Watershed Development

Watershed project

Micro Watersheds

(MWS) detail

Micro watersheds

code

Treatable Area (ha)

Name of Watershed in which

MWS is falling (River / Nala

name)

IWMP-II Himpur Pachatpura 2B4D3i4a 396.58 Gagan River

IWMP-II Kishanpur 2B5B8c5b 373.58 Choiya River

IWMP-II Kanakpur 2B4D3i4c 272.30 Gagan River

IWMP-II Rani Kota 2B4D3i2b 244.27 Gagan River

IWMP-II Ranipur 2B5C1f1c 599.55 Malan River

IWMP-II Jaswantpur 2B5C1f3c 485.31 Malan River

IWMP-II MahavatpurBilloch 2B5C1f3b 200.46 Malan River

IWMP-II Jhakaki 2B4D3i2c 182.90 Gagan River

IWMP-II Pooranpur Garhi 2B5C1f1b 208.14 Malan River

IWMP-II Kamalpur 2B4D3i2d 198.12 Gagan River

IWMP-II Shamipur 2B5B8c4c 213.79 Choiya River

Total 3375.00

Western U.P region was in a grip of severe drought continuously and rains from 2004 to 2009.

Watershed project was selected with following objectives:

Long Term Objectives:

To optimize productivity of the land

To restore ecological balance in degraded and fragile eco-system

To narrow down the disparity between rainfed and irrigated areas

To create sustained employment opportunities

Page 14: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

14

1.6 Criteria of Weightage for selection of watershed

District

Name

of the

Project

No. of

micro-

watersheds

proposed

to be

covered

Proposed

project

area

(ha)

Proposed

cost (Rs.

in lakh)

Weightage

Bijnor IWMP-

II 11 3375 405.00

i ii iii iv v vi vii viii ix

7.5 10 5 10 0 0 10 5 10

x xi xii xiii xiv Total

10 10 15 0 0 92.50

1.7 Details of ongoing watershed programme:

Presently, no watershed development programme is going on in the watershed.

# Criteria and weight age for selection of Watershed

Criteria Maximum

Score Ranges & Scores

Poverty index (% of poor to population)

10

Above 80 % (10)

80 to 50 % (7.5)

50 to 20 % (5)

Below 20 % (2.5)

% of SC/ ST population

10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)

Actual wages

5

Actual wages are significantly lower than

minimum wages

(5)

Actual wages are equal to or higher

than minimum wages (0)

Page 15: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

15

% of small and marginal farmers

10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)

Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)

Moisture index/

DPAP/ DDP Block

15

-66.7 & below (15)

DDP Block

-33.3 to -66.6 (10)

DPAP Block

0 to -33.2

(0) Non DPAP/ DDP Block

Area under rain-fed agriculture

15 More than 90 % (15)

80 to 90 % (10) 70 to 80% (5) Above 70 % (Reject)

Drinking water 10 No source (10) Problematic village

(7.5) Partially covered (5) Fully covered (0)

Degraded land 15 High – above 20 % (15) Medium – 10 to 20 %

(10) Low- less than 10 %

of TGA (5)

Productivity potential of the land

15

Lands with low production & where productivity can be significantly enhanced

with reasonable efforts (15)

Lands with moderate production & where productivity can be

enhanced with reasonable efforts

(10)

Lands with high production & where productivity can be

marginally enhanced with reasonable

efforts (5)

Contiguity to another watershed that has

already

been developed/ treated

10

Contiguous to previously treated watershed &

contiguity within the micro watersheds in the project

(10)

Contiguity within the micro watersheds in the project but non

contiguous to previously treated

watershed (5)

Neither contiguous to previously treated

watershed nor contiguity within the micro watersheds in

the project (0)

Cluster approach in the plains (more than

one contiguous micro-watersheds in

the project)

15

Above 6 micro-watersheds in cluster (15)

4 to 6 micro watersheds in cluster

(10)

2 to 4 micro watersheds in cluster

(5)

Cluster approach in the hills (more than

one contiguous micro-watersheds in

the project)

15

Above 5 micro-watersheds in cluster (15)

3 to 5 micro watersheds in cluster

(10)

2 to 3 micro watersheds in cluster

(5)

150 150 90 41 2.5

Page 16: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

16

CHAPTER- 2

GENERAL DESCRIPTION OF PROJECT AREA

Page 17: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

17

GENERAL DESCRIPTION OF PROJECT AREA

2.1 Location:

The micro-watersheds of IWMP-II are located in Najibabad block of Bijnor district. It is about 35 km. from

Bijnor on Najibabad road. Location (lat/long), Gram Panchayat, villages and its geographical area for each micro-

watershed is depicted in Total area of the project is 5427 ha, out of which 3375 ha is treatable area.

Micro-watershed wise details of location, Gram Panchayat, villages and geographical

area of IWMP- II

S. No.

Name of micro watershed

with Code

Latitude / Longitude

Name of GP

Names of villages

Area of village included

in MWS (Geographical

Treatable Area

Details of important

/approach road with distance km

1 Himpur

Pachatpura 2B4D3i4a

78.10 29.32 Himpur Pachatpura

Garmalpur Kanakpur

Himpur Pachatpura Murshatpur Kishanpur

Akberpur Aonla Kanakpur

123.22 5.32

103.10 108.80 99.67

396.58 Najibabad To

himpur Pachatpura 6 Km

2 Kishanpur 2B5B8c5b

78.15 29.70 Shamipur Issepur

Gadmalpur Jahanabad Himpur Pachatpura

Shamipur Issepur

Garmalpur Kishanpur

Akberpur Aonla Jahanabad

Murshatpur

61.49 74.9

93.77 50.00

107.08 25.00 56.08

373.58 Najibabd To

Kishanpur Road 6 km

3 Kanakpur 2B4D3i2d

78.18 29.42 Kanakpur,Garmalpur

Kanakpur Ajampur Gaji

Saray Said Ghora Kishanpur

Akberpur Aonla

109.31 123.28 50.00 10.92 5.56

272.30 Najibabd To

Kanakpur Road 10 km

4 Rani Kota 2B5C1f3c

78.22 29.41 Kanakpur,

Ahmadpur Sadat, Himpur Pachatpura

Kanakpur Ahmadpur Sadat

Rampuri Mojampur Sadat

Himpur Pachatpura Ranikota

107.39 21.63 52.92 40.26 14.22 35.00

244.27 Najibabd To

Ranikota Road 6km

Page 18: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

18

5 Ranipur

2B5C1f1c 78.20 29.43 Bijori,Bhogpur,

Bijori Manupura Bhogpur

Malookwali

160.12 96.84

357.76 89.23

599.55 Najibabd To

Ranipur Road 6 km

6 Jaswantpur 2B5C1f3c

78.28 29.52 Bhogpur,Jaswantpur, Shamipur, Parvatpur

Makdompur

Bhogpur Jaswantpur,

Meerpur Dargu, Shamipur julfkarpur

115.23 226.25 90.10 65.00 58.00

485.31 Najibabd To

Jaswantpur Road 5 km

7

Mahavatpur Billauch

2B5C1f3b

78.30 29.51 Parwatpur Makdompur,

Akberpur Chauganwa ,Maujampur Tulsi

Mahavatpur Billauch Gulam Alipur Nathe

Julfkarpur AkberpurChauganwa

A , Mahavatpur Gaurwa

Dharampur Malahpur

Maujampur Tulsi B.A Maujampur Tulsi A

5.00 56.20

135.15 71.10 83.41 76.00 65.00 38.00 37.20

200.46

Najibabd To Mahavatpur

Billauch Road 9 km

8 Jhakaki

2B4D3i2c 78.20 29.32

Ahmadpur Sadat Kanakpur Bhadola

Maujampur Sadat Saray saiyad Ghora

Ajampur Gaji Ghakkaki Bhadoola

59.00 91.90 32.00

182.90 Najibabd To Gulalwali By Road10 km

9 Pooranpur

Garhi 2B5C1f1b

78.18 39.25 Bhogpur,

Pooranpur gadhi Malookwali

Pooranpur Gadhi 42.50

165.64 20814

Najibabd To Veerpur By Road7km

10 Kamalpur 2B4D3i2d

78.31 29.70 Issepur Mathurapur mor Kamalpur

Mathurapur Mor

121.00 77.12

198.12 Najibabd To

Veerpur By Road 8 km

11 Shamipur 2B5B8c4c

78.20 29.40 Shamipur,Ranipur,

Parvatpur Makdoompur ,Issepur

Shamipur Ebriahimpur Raju

Julfkarpur Parvatpur

Makdoompur Kamalpur

73.35 4.40

81.00 54.54

213.79 Najibabd To Sahanpur By

Road6 km

Grand Total 5427.00 3375.00

Page 19: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

19

2.2 Physiography

Slope: Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided

into five classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3-5% and more than 5 per cent. Per cent areal extent of

different slope classes in IWMP-II micro-watershed is shown in The dominant slope category in the micro-

watershed are 1-3 per cent (78%) followed by 3-5 per cent 5, (22%).

Areal extent of various slope classes in the micro-watershed of IWMP II

S. No. Name of MWS & code

Slope range wise area (ha) Total

Project

Area (ha) 0-0.5% 0.5-

1.0% 1-3% 3-5%

>5%

Undulating Terraced

1 Himpur

Pachatpura 2B4D3i4a -- 197.00 118.80 80.78 80.78 -- 396.58

2 Kishanpur 2B5B8c5b -- 186.50 111.00 76.08 76.08 -- 373.58

3 Kanakpur 2B4D3i4c -- 135.00 81.50 55.80 55.80 -- 272.30

4 Rani Kota 2B4D3i2b -- 121.00 73.20 50.07 50.07 -- 244.27

5 Ranipur 2B5C1f1c -- 296.50 172.20 130.85 130.85 -- 599.55

6 Jaswantpur 2B5C1f3c -- 240.70 145.50 99.11 99.11 -- 485.31

7 Mahavatpur 2B5C1f3b -- 101.00 59.00 40.46 40.46 -- 200.46

8 Jhakaki 2B4D3i2c -- 90.00 52.00 40.90 40.90 -- 182.90

9 Pooranpur Garhi 2B5C1f1b -- 102.70 60.50 44.94 44.94 -- 208.14

10 Kamalpur 2B4D3i2d -- 97.00 58.20 42.92 42.92 -- 198.12

11 Shamipur 2B5B8c4c -- 106.00 61.00 46.79 46.79 -- 213.79

Total 1673.40 992.90 708.70 708.70 -- 3375.00

Page 20: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

20

Climate

The annual rainfall of the Western region varies from 759 to 1020 mm, about 90% of which is

received during South-West monsoon period (Singh et al. 2002). The major part of the rainfall is received

during the month of July and August. The length of growing season in Western ranges between 90 to 150

days depending upon rainfall and temperature regimes. The winter rains are erratic, occasional, meager

and uncertain. The total rainy days/year vary from 30-45 in the region with an average of 37. The

distribution of rainfall is very erratic. Low rainfall and drought are common features. Long dry spells

during rainy season are also experienced often, which adversely affect the crops. It has been observed

that in a cycle of 5 years, 2 are normal, 2 drought years and 1 is excessive rainfall year (Tiwari et al.

1998).

The climate of Bijnor is characterized by a hot dry summer and cold winter and is marked for high

variability of rainfall year to year. There are primarily four seasons: – Dry Summer season – from March

to May i.e. before advent of monsoon, moist summer season – from June to September (Monsoon)

transition period - in October and November, which is the post monsoon period, and winter season – from

December to February The coldest months in the year are December and January. Average monthly

rainfall and temperature

Page 21: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

21

Average monthly rainfall at IWMP-II

Month

Rainfall in mm.

2004 2005 2006 2007 2008 2009 2010 2011 Average

January 11.10 4.80 0.00 0.70 0.00 4.00 10.60 9.60 8.86

February 0.00 0.40 0.00 31.40 0.00 26.20 140.00 32.20 66.13

March 0.00 13.00 30.10 17.50 0.00 7.60 --- 12.20 6.60

April 10.40 1.80 0.00 0.10 2.80 8.60 7.40 15.60 10.53

May 4.60 6.40 22.40 13.90 18.20 28.70 32.40 101.20 54.10

June 95.30 39.40 50.90 69.50 583.20 36.00 16.40 137.70 63.36

July 135.90 196.40 170.10 82.30 244.00 66.60 842.60 273.30 394.16

August 286.60 127.80 80.90 99.90 206.80 315.00 295.40 415.80 342.06

September 57.00 106.20 27.50 36.50 90.30 246.50 304.00 22.60 191.03

October 47.80 0.00 6.80 0.00 0.00 15.60 5.00 --- 6.86

November 0.00 0.00 0.00 0.00 24.30 4.20 --- -- 1.40

December 0.00 1.40 0.10 0.80 0.00 ---- 21.50 -- 7.16

Total 648.70 497.60 388.80 352.60 1169.60 759.00 1675.30 1020.20 1152.25

Page 22: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

22

CHAPTER- 3

BASELINE SURVEY

Page 23: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

23

3.1: Demographic Features in the project area (IWMP-II, Bijnor)

S.

No

Name of Micro

Watershed Name of village

Total Population Population of SC/ST

Total Male Female Total Male Female

1 Himpur Pachatpura Himpur Pachatpura

Garmalpur Kanakpur 4200 2530 1670 1220 730 490

2 Kishanpur

Shamipur Issepur Gadmalpur

Jahanabad Himpur Pachatpura

4070 2410 1660 1017 603 414

3 Kanakpur Kanakpur,Garmalpur 3130 1880 1250 940 580 360

4 Rani Kota

Kanakpur, Ahmadpur

Sadat,Himpur Pachatpura

3300 1950 1350 1020 640 380

5 Ranipur Bijori,Bhogpur, 9560 5820 3740 2720 1630 1090

6 Jaswantpur

Bhogpur,Jaswantpur, Shamipur, Parvatpur

Makdompur 8370 5030 3340 2160 1250 910

7 Mahavatpur Billoch

Parwatpur Makdompur,

Akberpur Chauganwa

,Maujampur Tulsi

2900 1750 1150 820 470 350

8 Jhakaki

Ahmadpur Sadat Kanakpur Bhadola

2700 1620 1080 800 460 340

9 Pooranpur Garhi Bhogpur,

Pooranpur gadhi 2650 1590 1060 730 430 300

10 Kamalpur Issepur Mathurapur

mor 2910 1740 1170 810 480 330

11 Shamipur

Shamipur,Ranipur, Parvatpur

Makdoompur ,Issepur

2850 1720 1130 805 465 340

Total 46640 28040 18600 13042 7738 5304

Page 24: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

24

3.2: Soil and Land Holding Pattern

Majority of the land of the project is heavy textured soil. Category wise details of farmer and their

irrigated area are described in

Details of Soil texture in IWMP-I Bijnor.

S.

No. MWS Project

Area in different Soil Group (ha)

Total Light textured

soil (sand, loamy sand)

Medium textured soil

(Sandy loam, loam, silt loam)

Heavy

textured soil (Clayey

1 Himpur Pachatpura 42.20 313.80 40.58 396.58

2 Kishanpur 38.50 295.30 39.78 373.58

3 Kanakpur 28.10 213.70 30.50 272.30

4 Rani Kota 32.00 191.80 20.47 244.27

5 Ranipur 61.10 470.50 67.95 599.55

6 Jaswantpur 51.00 390.00 44.31 485.31

7 Mahavatpur Billoch 20.30 161.00 19.16 200.46

8 Jhakaki 20.10 143.60 19.20 182.90

9 Pooranpur Garhi 21.20 158.80 28.14 208.14

10 Kamalpur 20.70 161.10 16.32 198.12

11 Shamipur 23.40 170.00 20.39 213.79

Total 358.60 2669.60 346.80 3375.00

3.3: Migration Pre Project Status

S.

No.

No. of Village No. of Persons

Migrating

No. of Days per year of

Migration

Major Reasons for migrating

1 2 3 4 5

1 47 110 170 Unemployment & Low wages

Page 25: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

25

3.4: Micro-watershed wise details of Crops, their Productivity & Production

Name of MWS: Himpur Pachadpura

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 120.00 - 22-24

2 Jowar, Bazra - 134.58 - 4-5

3 Urd/Mung 5.00 - - -

Total

B Rabi

1 Wheat 82.00 - 20-22 -

2 Pea 5.00 - 4-5 -

3 Masoor 4.00 - 4-5 -

C Zaid

Sugar cane 46.00 - 700-800 -

Total 142.00 254.58

Name of MWS: Kishanpur

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy

140.00 - 20-22

2 Jowar, Bazra

113.50 - 4-5

3 Urd/Mung 8.00

4.80

Total

B Rabi

1 Wheat 52.00 20

2 Pea 5.00 4-5

3 Masoor 7.00 4-5

C Zaid

Sugar Cane 48.00

700-800

Total 120.00 253.58

Page 26: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

26

Name of MWS: Kanakpur

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 110.30 - 24-25

2 Jowar, Bazra - 70.00 - 4-5

3 Urd/Mung 5.00 - - -

Total

B Rabi

1 Wheat 65.00 - 20-22 -

2 Pea 7.00 - 4-5 -

3 Masoor 8.00 - 4-5 -

C Zaid

Sugar cane 12.00 - 700-800 -

Total 92.00 180.30

Name of MWS: Ranikota

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 70.00 - 22-23

2 Jowar, Bazra - 69.27 - 4-5

3 Urd/Mung 5.00 - 4-5 -

Total

B Rabi

1 Wheat 5.00 - 21 -

2 Pea 5.00 - 4-5 -

3 Masoor 5.00 - 4-5 -

C Zaid

Sugar cane 40.00 - 700-800 -

Total 105.00 139.27

Page 27: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

27

Name of MWS: Ranipur

Name of MWS: Jaswantpur

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 250.00 - 20-22

2 Jowar, Bazra - 151.00 - 4-5

3 Urd/Mung 20.00 - 4-5 -

Total

B Rabi

1 Wheat 70.00 - 20-22 -

2 Pea 8.00 - 4-5 -

3 Masoor 7.00 - 4-5 -

C Zaid

Sugar cane 60.00 - 700-800 -

Total 165.00 401.00

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 170.00 - 20-22

2 Jowar, Bazra - 150.00 - 4-5

3 Urd/Mung 3.00 - 4-5 -

Total

B Rabi

1 Wheat 40.00 - 20-22 -

2 Pea 3.00 - 4-5 -

3 Masoor 3.00 - 4-5 -

C Zaid

Sugar cane 60.00 - 700-800 -

Total 109.00 320.00

Page 28: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

28

Name of MWS: Mahawatpur Billoch

Name of MWS: Jhakaki

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 70.00 - 20-22

2 Jowar, Bazra - 29.00 - 4-5

3 Urd/Mung 11.00 - 4-5 -

Total

B Rabi

1 Wheat 30.00 - 20-22 -

2 Pea 3.00 - 4-5 -

3 Masoor 3.00 - 4-5 -

C Zaid

Sugar cane 20.00 - 700-800 -

Total 71.00 99.00

S. No. Crop. Area (ha)

Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 60.00 - 20-24

2 Jowar, Bazra - 55.00 - 4-5

3 Urd/Mung 5.00 - 4-5 -

Total

B Rabi

1 Wheat 20.00 - 20-22 -

2 Pea 6.00 - 4-5 -

3 Masoor 6.00 - 4-5 -

C Zaid

Sugar cane 27.00 - 700-800 -

Total 64.00 115.00

Page 29: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

29

Name of MWS: Pooranpur Garhi

Name of MWS: Kamalpur

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 80.00 - 20-22

2 Jowar, Bazra - 70.00 - 4-5

3 Urd/Mung 8.00 - 4-5 -

Total

B Rabi

1 Wheat 24.00 - 20-21 -

2 Pea 5.00 - 4-5 -

3 Masoor 5.00 - 4-5 -

C Zaid

Sugar cane 21.00 - 700-800 -

Total 63.00 150.00

S. No. Crop. Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 60.00 - 20-24

2 Jowar, Bazra - 50.00 - 4-5

3 Urd/Mung 10.00 - 4-5 -

Total

B Rabi

1 Wheat 28.00 - 20-21 -

2 Pea 5.00 - 4-5 -

3 Masoor 7.00 - 4-5 -

C Zaid

Sugar cane 22.00 - 700-800 -

Total 72.00 110.00

Page 30: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

30

Name of MWS: Shamipur

S.

No. Crop.

Area (ha) Productivity (q/ha)

Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy - 75.00 - 20-24

2 Jowar, Bazra - 60.00 - 4-5

3 Urd/Mung 7.00 - 4-5 -

Total

B Rabi

1 Wheat 30.00 - 20-21 -

2 Pea 5.00 - 4-5 -

3 Masoor 6.00 - 4-5 -

C Zaid

Sugar cane 28.00 - 700-800 -

Total 76.00 135.00

Page 31: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

31

3.5: LIVESTOCK POPULATION

The watershed I.W.M.P 2nd 1has 10915 cows, 19740 Buffaloes, 12804 Bullocks, 8047 Goats,

1090 Pigs, 1004 Sheep and 5982 Poultry. The majority of the peoples are depended on Buffaloes and

Cows. The micro‐watershed wise detail of the Livestock is given below

Detail of Live Stock (I.W.M.P‐2nd) Bijnor

S. No.

Name of the Watershed

Watershed Code

Buffaloes Cows Bullocks Goat Pig Sheep Poultry Total

1 Himpur

Pachatpura 2B4D3i4a 2210 1220 1710 560 105 50 510 6365

2 Kishanpur 2B5B8c5b 2050 1150 1250 440 120 60 370 5440

3 Kanakpur 2B4D3i4c 1700 900 1100 760 90 80 502 5132

4 Rani Kota 2B4D3i2b 1560 875 1202 810 110 40 550 5147

5 Ranipur 2B5C1f1c 3100 1710 2200 1500 170 162 1008 9850

6 Jaswantpur 2B5C1f3c 2900 1602 1705 1330 150 151 900 8738

7 Mahavatpur

Billoch 2B5C1f3b 1210 705 808 606 70 102 480 3981

8 Jhakaki 2B4D3i2c 1170 660 705 510 62 90 430 3627

9 Pooranpur

Garhi 2B5C1f1b 1290 703 717 518 70 90 420 3808

10 Kamalpur 2B4D3i2d 1250 680 702 503 68 87 410 3700

11 Shamipur 2B5B8c4c 1300 710 705 510 75 92 402 3794

Total 19740 10915 12804 8047 1090 1004 5982 59582

Page 32: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

32

3.6: Horticulture Status

S. No.

Name of micro

watershed with code

Name of village

Name of Important horticultural crop

Whole Fruit Crop Scattered Fruit Crop

Name Area ha.

Productivity

q/ha

Production

q No

Productivity

q/No.

Production

q

1 Himpur

Pachatpura

Himpur Pachatpura Garmalpur Kanakpur

Mango 8.00 80 640 30 0.60 18.00

2 Kishanpur

Shamipur Issepur Gadmalpur

Jahanabad Himpur Pachatpura

Mango

Guava

4.00

3.50

80

120

320

420

30

25

0.60

0.80

18.00

20.00

3 Kanakpur Kanakpur,Garmalpur Mango 4.50 80 360 40 0.60 24.00

4 Rani Kota

Kanakpur, Ahmadpur

Sadat,Himpur Pachatpura

Mango 5.00 80 400 20 0.60 12.00

5 Ranipur Bijori,Bhogpur, Mango 4.50 80 360 20 0.60 12.00

6 Jaswantpur

Bhogpur,Jaswantpur, Shamipur, Parvatpur

Makdompur Guava 6.00 120 720 30 0.60 18.00

7 Mahavatpur

Billoch

Parwatpur Makdompur,

Akberpur Chauganwa

,Maujampur Tulsi

Vijaypur 5.00 80 400 20 60 12.00

8 Jhakaki

Ahmadpur Sadat Kanakpur Bhadola

Mango 3.50 80 280 25 60 15.00

9 Pooranpur Garhi Bhogpur,

Pooranpur gadhi Mango 4.00 80 320 30 60 18.00

10 Kamalpur Issepur Mathurapur

mor Mango 3.50 80 280 20 60 12.00

11 Shamipur

Shamipur,Ranipur, Parvatpur

Makdoompur ,Issepur

Mango 4.00 80 320 20 60 12.00

Page 33: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

33

3.7: Details of infrastructure in IWMP-II, Bijnor

S.

No.

Name of Micro

Watershed Parameters Status

1

Himpur

Pachatpura

2B4D3i4a

i Name of villages connected to the main road by an all-weather road

Himpur Pachatpura

ii Village's Name provided with electricity Kishanpur ,Akberpur Anwala ,

iii No. of households without access to drinking water -

iv

No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P)

03

(S)

-

(HS)

-

(VI)

-

v Names of villages with access to Primary Health Centre Available -01

vi Names of villages with access to Veterinary Dispensary -----

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis N.A

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii

No. of milk collection centers

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U)

-

(S)

-

(PA)

-

(O)

03

xiii Name of villages with access to Anganwadi Centre Himpur Pachatpura

xiv Community centre, Panchayat Ghar Available

Page 34: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

34

Details of infrastructure in IWMP-II, Bijnor

S.

No.

Name of Micro

Watershed

Parameters Status

2 Kishanpur

2B5B8c5b

i Name of villages connected to the main road by an all-weather road

Kishanpur

ii Village's Name provided with electricity Shamipur ,Issepur ,Gadmalpur

iii No. of households without access to drinking water -

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational

institution(VI)

(P)

03

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre Available -01

vi Names of villages with access to Veterinary Dispensary Available

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centers

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Kishanpur,Gadmalpur

xiv Community centre, Panchayat Ghar Available

Page 35: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

35

Details of infrastructure in IWMP-II, Bijnor

S.

No.

Name of Micro

Watershed

Parameters Status

3 Kanakpur

2B4D3i4c

i Name of villages connected to the main road by an all-weather road

Najibabad To Kanakpur

ii Village's Name provided with electricity Kanakpur,Ajampur Gaji

iii No. of households without access to drinking water -

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational

institution(VI)

(P)

04

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary

Dispensary

N/A

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centers

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Kanakpur,Ajampur Gaji

xiv Community centre, Panchayat Ghar Available

Page 36: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

36

Details of infrastructure in IWMP-II, Bijnor

Sr.

No

Name of Micro

Watershed

Parameters Status

4 Rani Kota

2B4D3i2b

i Name of villages connected to the main road by an

all-weather road

Najibabad To Ranikota

ii Village's Name provided with electricity Kanakpur ,Ahmadpur Sadat

iii No. of households without access to drinking water -

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational

institution(VI)

(P)

04

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

-----

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centers

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Kanakpur ,Ahmadpur Sadat

xiv Community centre, Panchayat Ghar Available

Page 37: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

37

Details of infrastructure in IWMP-II, Bijnor

Sr.

No

Name of Micro

Watershed

Parameters Status

Ranipur

2B5C1f1c

i Name of villages connected to the main road by an all-weather road

Najibabd To Ranipur

ii Village's Name provided with electricity Bijori,Bhogpur,Malokwali

iii No. of households without access to drinking water

-

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher

Secondary(HS)/ vocational

institution(VI)

(P)

03

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

-------

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centers

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre

Bhogpur,Malokwali

xiv Community centre, Panchayat Ghar Available

Page 38: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

38

Details of infrastructure in IWMP-II, Bijnor

Sr.

No

Name of Micro

Watershed

Parameters Status

6 Jaswantpur

2B5C1f3c

i Name of villages connected to the main road by an all-weather road

Najibabd To Jasvantpur

ii Village's Name provided with electricity Bhogpur,Shamipur

iii No. of households without access to drinking water

-

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational

institution(VI)

(P)

03

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

----------

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centers

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Jasvantpur

xiv Community centre, Panchayat Ghar Available

Page 39: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

39

Details of infrastructure in IWMP-II, Bijnor

Sr.

No

Name of Micro

Watershed

Parameters Status

7 Mahavatpur

2B5C1f3b

i Name of villages connected to the main road by an all-weather road

Najibabad To Mahavatpur Billoch

ii Village's Name provided with electricity Jasvantpur,Akberpur

chaugava

iii No. of households without access to drinking water

-

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher

Secondary(HS)/ vocational

institution(VI)

(P)

04

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

---------

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Mahavatpur Billoch

xiv Community centre, Panchayat Ghar Available

Page 40: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

40

Details of infrastructure in IWMP-II, Bijnor

Sr.

No

Name of Micro

Watershed

Parameters Status

8 Jhakaki

2B4D3i2c

i Name of villages connected to the main road by an all-weather road

Najibabad To Jhakkaki

ii Village's Name provided with electricity Bhadola,Ahmadpur Sadat

iii No. of households without access to drinking water -

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational

institution(VI)

(P)

03

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary

Dispensary

---------

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Jhakkaki,Bhadola

xiv Community centre, Panchayat Ghar Available

Page 41: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

41

Details of infrastructure in IWMP-II, Bijnor

Sr.

No

Name of Micro

Watershed

Parameters Status

9 Pooranpur

Garhi

2B5C1f1b

i Name of villages connected to the main road by an all-weather road

Najibabad To Pooranpur

ii Village's Name provided with electricity Pooranpur Gadhi

,Kharullahpur

iii No. of households without access to drinking water -

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational

institution(VI)

(P)

03

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Available -01

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Pooranpur garhi

xiv Community centre, Panchayat Ghar Available

Page 42: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

42

Details of infrastructure in IWMP-I, Bijnor

Sr.

No

Name of Micro

Watershed

Parameters Status

10 Kamalpur

2B4D3i2d

i Name of villages connected to the main road by an all-weather road

Najibabad To Kamalpur

ii Village's Name provided with electricity Mathurapur

mor,Jasvantpur

iii No. of households without access to drinking water -

iv No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational

institution(VI)

(P)

04

(S)

02

(H)

-

(VI)

-

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Mathurapur mor

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks N.A

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Kamalpur

xiv Community centre, Panchayat Ghar Available

Page 43: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

43

Details of infrastructure in IWMP-II, Bijnor

S.

No

Name of Micro

Watershed Parameters Status

11 Shamipur

2B5B8c4c

i Name of villages connected to the main road by an all-weather road

Najibabad To Shamipur

ii Village's Name provided with electricity Mahavatpur Billoch ,Gadmalpur

iii No. of households without access to drinking water

-

iv

No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P)

02

(S)

02

(H)

01

(VI)

01

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Shamipur

vii Names of villages with access to Post Office 01

viii Names of villages with access to Banks 01

ix Names of villages with access to Markets/ mandis Available

x Names of villages with access to Agro-industries N.A

xi Total quantity of surplus milk deficit NIL

xii

No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U)

-

(S)

-

(PA)

-

(O)

04

xiii Name of villages with access to Anganwadi Centre Shamipur

xiv Community centre, Panchayat Ghar Available

Page 44: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

44

3.8: Details of common property resources In IWMP-II, Bijnor

S. No.

Names of MWS with

code

CPR Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment

(ha)

Pvt.

persons

Govt.

Revenue PRIs Other

Pvt.

persons

Govt.

(Specify

dept

PRI Other

1

Himpur

Pachatpura

2B4D3i4a

Wasteland/ degraded land

396.58 - - - 396.58 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - - - -

Village Ponds/ Tanks - - 0.60 - - - - 0.60

Community

Buildings - - 1.50 - - - - 1.50

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of

worship - - 0.50 - - - - 0.50

Habitat, Chak marg, Sector, Road

etc

- 14.40 - - - -

Total 396.58 14.40 2.60 - 396.58 - - 2.60

Page 45: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

45

Details of common property resources in IWMP-II, Bijnor

S.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment

(ha)

Pvt.

persons

Govt.

Revenue

PRIs Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

2

Kishanpur

2B5B8c5b

Wasteland/ degraded land

373.58 - - - 373.58 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - - - -

Village Ponds/ Tanks - 1.20 - - 1.20 -

Community Buildings - 1.80 - - 1.80 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of worship

- 0.50 - - 0.50 -

Habitat, Chakmarg, Sector, Road

etc

- 11.30 - - 11.30 -

Total 373.58 11.30 3.50 - 373.58 11.30 3.50 -

Page 46: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

46

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRIs Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

3

Kanakpur

2B4D3i4c

Wasteland/ degraded land

272.30 - - - 272.30 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - - - -

Village Ponds/ Tanks - - 1.20 - - - 1.20 -

Community Buildings - - 3.00 - - - 3.00 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of worship

- - 0.75 - - - 0.75 -

Habitat, Chakmarg, Sector, Road etc

- 10.80 - - 10.80 -

Total 272.30 10.80 4.95 - 272.30 10.80 4.95 -

Page 47: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

47

Details of common property resources in IWMP-II, Bijnor

S.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

4

Rani Kota

2B4D3i2b

Wasteland/

degraded land

244.27 - - - 244.27 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks - - 1.30 - - - 1.30 -

Community Buildings - - 1.70 - - - 1.70 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of

worship

- 9.20 0.60 - - 9.20 0.60 -

Habitat, Chakmarg, Sector, Road

etc

- - - -

Total 244.27 9.20 3.60 - 244.27 9.20 3.60 -

Page 48: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

48

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

5

Ranipur

2B5C1f1c

Wasteland/ degraded

land

599.55 - - - 599.55 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks - - - - - - - -

Community Buildings - - 4.20 - - - 4.20 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of

worship

- 0.70 - - 0.70 -

Habitat, Chakmarg,

Sector, Road

etc

- 12.10 - - 12.10 -

Total 599.55 12.10 4.90 - 599.55 12.10 4.90 -

Page 49: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

49

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

6

Jaswantpur

2B5C1f3c

Wasteland/

degraded land

485.31 - - - 485.31 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks

- - 1.00 - - - 1.00 -

Community Buildings - - 1.20 - - - 1.20 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of worship

- 1.10 - - 1.10 -

Habitat, Chakmarg,

Sector, Road

etc

- 9.50 - - 9.50 -

Total 485.31 9.50 3.30 - 485.31 9.50 3.30 -

Page 50: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

50

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

7

Mahavatpur

2B5C1f3b

Wasteland/

degraded land

200.46 - - - 200.46 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks

- - 1.70 - - - 1.70 -

Community Buildings - - 1.20 - - - 1.20 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of worship

- 1.00 - - 1.00 -

Habitat, Chakmarg,

Sector, Road

etc

- 9.20 - - 9.20 -

Total 200.46 9.20 3.90 - 200.46 9.20 3.90 -

Page 51: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

51

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

8

Jhakaki

2B4D3i2c

Wasteland/ degraded

land

182.90 - - - 182.90 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks - - 0.90 - - - 0.90 -

Community Buildings - - 2.20 - - - 2.20 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of

worship

- 1.00 - - 1.00 -

Habitat, Chakmarg,

Sector, Road

etc

- 9.20 - - 9.20 -

Total 182.90 9.20 4.10 - 182.90 9.20 4.10 -

Page 52: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

52

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

9

Pooranpur Garhi

2B5C1f1b

Wasteland/ degraded

land

208.14 - - - 208.14 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks - - 0.70 - - - 0.70 -

Community Buildings - - 1.80 - - - 1.80 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of

worship

- 0.60 - - 0.60 -

Habitat, Chakmarg,

Sector, Road

etc

- 7.10 - - 7.10 -

Total 208.14 7.10 3.10 - 208.14 7.10 3.10 -

Page 53: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

53

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

10

Kamalpur

2B4D3i2d

Wasteland/ degraded

land

198.12 - - - 198.12 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks - - 1.00 - - - 1.00 -

Community Buildings - - 1.50 - - - 1.50 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of

worship

- 0.70 - - 0.70 -

Habitat, Chakmarg,

Sector, Road

etc

- 8.40 - - 8.40 -

Total 198.12 8.40 3.20 - 198.12 8.40 3.20 -

Page 54: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

54

Details of common property resources in IWMP-II, Bijnor

Sr.

No

Names of

MWS with

code

CPR

Particulars

Total Area (ha)

Area owned/ In possession of

Area available for treatment (ha)

Pvt.

persons

Govt.

Revenue

PRI Other Pvt.

persons

Govt.

(Specify

dept

PRI Other

11

Shamipur

2B5B8c4c

Wasteland/ degraded

land

213.79 - - - 213.79 - - -

Pastures - - - - - - - -

Orchards - - - - - - - -

Village Woodlot - - - - - - - -

Forest - - - - - -

Village Ponds/ Tanks - - 0.70 - - - 0.70 -

Community Buildings - - 1.40 - - - 1.40 -

Weekly Markets - - - - - -

Permanent markets - - - - - -

Temples/ Places of

worship

- 1.00 - - 1.00 -

Habitat, Chakmarg,

Sector, Road

etc

- 6.90 - - 6.90 -

Total 213.79 6.90 3.10 - 213.79 6.90 3.10 -

Page 55: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

55

3.9: Ground Water Status in IWMP-II, Bijnor

S.

No.

Name &

Code of

Micro watershed

Name of Village

Depth of Ground Water Table

(Below Ground

in Meter

No. of

Observation well

Remarks

Before

monsoon

After

monsoon

1 Himpur

Pachatpura 2B4D3i4a

Himpur Pachatpura Murshatpur Kishanpur Akberpur Aonla Kanakpur

8.10 7.10 40

2 Kishanpur 2B5B8c5b

Shamipur Issepur Garmalpur Kishanpur Akberpur Aonla Jahanabad Murshatpur

7.00 5.50 20

3 Kanakpur 2B4D3i4c

Kanakpur Ajampur Gaji Saray Said Ghora Kishanpur Akberpur Aonla

9.20 7.70 26

4 Rani Kota 2B4D3i2b

Kanakpur Ahmadpur Sadat Rampuri Mojampur Sadat Himpur Pachatpura Ranikota

8.00 7.00 30

5 Ranipur 2B5C1f1c Bijori Manupura Bhogpur malookwali 9.20 8.10 40

6 Jaswantpur 2B5C1f3c

Bhogpur Jaswantpur,Meerpur Dargu,Shamipur julfkarpur

8.20 7.00 23

7 Mahavatpur 2B5C1f3b

Mahavatpur Billauch Gulam Alipur Nathe Julfkarpur Akberpur Chauganwa A ,

Mahavatpur Gaurwa Dharampur Malahpur Maujampur Tulsi B.A Maujampur Tulsi A

9.40 8.20 10

8 Jhakaki 2B4D3i2c Ahmadpur Sadat Kanakpur Bhadola 9.20 8.00 14

9 Pooranpur Garhi

2B5C1f1b Bhogpur,Pooranpur gadhi 9.58 8.20 15

10 Kamalpur 2B4D3i2d

Issepur Mathurapur mor 10.50 9.10 24

11 Shamipur 2B5B8c4c

Shamipur,Ranipur,Parvatpur Makdoompur ,Issepur

8.10 7.00 17

Page 56: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

56

3.10: Irrigation Status in IWMP-II, Bijnor

S. No.

Name & Micro Watershed with code

Name of Village

Gross Cultivated Area Net cultivate

Area

Gross Irrigated Area Net Irriegated

Area

RainFed Area

Kharif Rabi Zaid Total Kharif Rabi Zaid Total

1 Himpur

Pachatpura

2B4D3i4a

Himpur Pachatpura Murshatpur Kishanpur Akberpur Aonla Kanakpur

201.00 172.00 23.58 346.30 396.58 80.00 55.00 7.00 142.00 142.00 254.58

2 Kishanpur 2B5B8c5b

Shamipur Issepur Garmalpur Kishanpur Akberpur Aonla Jahanabad Murshatpur

190.00 150.00 827.18 373.38 72.00 48.00 - 120.00 120.00 253.58

3 Kanakpur

2B4D3i4c

Kanakpur Ajampur Gaji Saray Said Ghora Kishanpur Akberpur Aonla

170.00 102.00 231.46 272.30 50.00 37.00 5.00 92.00 92.00 180.30

4 Rani Kota 2B4D3i2b

Kanakpur Ahmadpur Sadat Rampuri Mojampur Sadat Himpur Pachatpura Ranikota

180.00 64.27 418.13 244.27 56.00 40.00 9.00 105.00 105.00 139.27

5 Ranipur

2B5C1f1c

Bijori Manupura Bhogpur malookwali

390.00 180.00 29.55 433.50 599.55 105.0 50.00 10.00 165.00 165.00 434.55

6 Jaswantpur 2B5C1f3c

Bhogpur Jaswantpur,Meerpur Dargu,Shamipur julfkarpur

290.00 160.00 35.51 362.40 485.31 60.00 40.00 9.00 109.00 109.00 376.31

7 Mahavatpur 2B5C1f3b

Mahavatpur Billauch Gulam Alipur Nathe Julfkarpur Akberpur Chauganwa A , Mahavatpur Gaurwa Dharampur Malahpur Maujampur Tulsi B.A Maujampur Tulsi A

130.00 70.46 297.98 200.46 40.00 30.00 1.00 71.00 71.00 129.46

8 Jhakaki

2B4D3i2c

Ahmadpur Sadat Kanakpur Bhadola

102.00 60.00 20.90 235.09 182.90 30.00 30.00 4.00 64.00 64.00 118.90

9 Pooranpur

Garhi 2B5C1f1b

Bhogpur,Pooranpur gadhi 130.00 70.14 313.61 208.14 50.00 12.00 1.00 63.00 63.00 145.14

10 Kamalpur 2B4D3i2d

Issepur Mathurapur mor 120.00 70.00 8.12 486.09 198.12 40.00 26.00 6.00 72.00 72.00 126.12

11 Shamipur

2B5B8c4c

Shamipur,Ranipur,Parvatpur Makdoompur ,Issepur

160.00 40.00 13.79 297.66 213.79 40.00 32.00 4.00 76.00 76.00 137.79

Total 3375 1079 2296

Page 57: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

57

3.11: Source wise Area Irrigated in IWMP-II, Bijnor (area in ha)

S. No.

Name Micro watershed with code

Name of Village Canal area

State Tube wells

Tanks Open Well

Bore wells Lift

Irrigation Othres

(specify) total

Irrigation Remark

No Area No Area No Area No Area No Area

1 Himpur

Pachatpura

2B4D3i4a

Himpur Pachatpura Murshatpur Kishanpur

Akberpur Aonla Kanakpur - 1 22.00 - - - 75 120.00 - - - - 142.00

2 Kishanpur

2B5B8c5b

Shamipur Issepur

Garmalpur Kishanpur Akberpur Aonla

Jahanabad Murshatpur

10.00 2 40.00 - - - 48 70 - - - - 120.00

3 Kanakpur

2B4D3i4c

Kanakpur Ajampur Gaji

Saray Said Ghora Kishanpur

Akberpur Aonla

12 - - - - - 42 80 - - - - 92.00

4 Rani Kota 2B4D3i2b

Kanakpur Ahmadpur Sadat

Rampuri Mojampur Sadat

Himpur Pachatpura Ranikota

15 - - - 54 90 - - - - 105.00

5 Ranipur 2B5C1f1c

Bijori Manupura Bhogpur malookwali

20 1 24.00 - - - 67 121.00 - - - - 165.00

6 Jaswantpur 2B5C1f3c

Bhogpur

Jaswantpur,Meerpur Dargu,Shamipur

julfkarpur

15 1 22.00 - - - 42 72 - - - - 109.00

7 Mahavatpur 2B5C1f3b

Mahavatpur Billauch Gulam Alipur Nathe Julfkarpur Akberpur Chauganwa A , Mahavatpur Gaurwa Dharampur Malahpur

Maujampur Tulsi B.A Maujampur Tulsi A

20 1 21 - - - 15 30 - - - - 71.00

8 Jhakaki 2B4D3i2c

Ahmadpur Sadat

Kanakpur

Bhadola

20 - - - 26 44 - - - - 64.00

9 Pooranpur

Garhi

2B5C1f1b

Bhogpur,Pooranpur gadhi - 1 18 - - - 30 45 - - - - 63.00

10 Kamalpur

2B4D3i2d Issepur Mathurapur mor - - - 38 72 - - - - 72.00

11 Shamipur 2B5B8c4c

Shamipur,Ranipur,Parvatpur

Makdoompur ,Issepur - 1 21 - - - 32 55 - - - - 76.00

Page 58: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

58

CHAPTER- 4

INSTITUTIONAL BUILDING & PROJECT

MANAGMENT

Page 59: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

59

INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT

Project Implementing Agency

The Project Implementing Agency (PIA) is Soil Conservation Officer, Department of Land

Development and Water Resources, IWMP-II, Bijnor, Uttar Pradesh. The PIA was given responsibility to

develop the micro-watershed by District Watershed Development Unit (DWDU) and State Level Nodal

Agency (SLNA) considering its vast experiences in handling land and water management issues in the

region. The PIA has well experienced trained and sufficient staff to handle the watershed management

programme efficiently. Most of the staff of PIA has exposure of several watershed projects. In addition the

PIA has access for technical backstopping from the ICAR viz. IGFRI and NRCAF, and KVK located at Bijnor

. Details of PIA are presented in subsequent section.

4.1: Details of Project Implementing Agency (PIA), IWMP-II, Bijnor

S. No. Particulars of PIA

(i) Date of selection of PIA 16-03-2010

(ii) Type of organization State Govt. Agency

(iii) Name of organization Department of Land Development and Water Resources, Uttar

Pradesh

(iv) Designation & Address

Unit Bijnor

Bhoomi Sanrakshan Adhikari, Land Development and Water Resources, Chandpur at BIJNOR (U.P.)

(v) Telephone BSA- 07376757856

(vi) Fax 01342-260938

(vii) E-mail [email protected]

Page 60: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

60

Detail of staff at PIA, IWMP-II BIJNOR

S.

No. Designation Name M/F Qualification

Field of Experience &

Period Remarks

1 B.S.A. Er. R.K. Ram M Diploma in Ag Eng. 25 -

2 Junior Engineer Er. S.D Goel M Diploma in civil Eng. 31

3 Junior Engineer Er. V.P. Singh M Diploma in Ag Eng. 31

4 Accountant Sh. Prdeep kumar Agarwal M M.Com 31

5 Draft men Ram Shankar M Graduate 32

6 Junior Clerk Sh.krishan kumar tiwari M High School

7 ASCI Jai Bhagwan M ” 33

8 ASCI R.K. Pathak M Inter Diploma 33

9 ASCI S.S. Punia M Graduate Diploma 32

10 ASCI Devendra Singh M Inter Diploma 31

11 ASCI Aman kumar M MSc (Ag) 8

12 ASCI Sanjay Kumar M BSc (Ag) & MA 5 Months

13 ASCI Shashi Kant Tyagi M BSc (Ag) 5 Months

14 Jiledar Sh.Mohan lal M Intermedeate (canal

Law)

15 Irrigation Supervisor

Gore Lal M Intermediate 26

16 Seench Pal Shyam Bihari Yadav M B.A. 26

17 Seench Pal Chote lal M MSc. 8

18 Seench Pal Avdesh Prasad M M.A. 8

Page 61: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

61

Details of Watershed Development Team (WDT) in the project area

Project- IWMP II, PIA- BSA, LDWR, BIJNOR-II District – BIJNOR

S.

No.

Name of WDT

member M/F Age

Qualification /

Experience

Description of

professional

training

Role/ Function

Date of appointment

of WDT

member

1 Shri S.C. Garg M 62 Inter (Ag Diploma) Soil & Water Conservation

Soil & Water Conservation

23/12/2011

2 Shri Harpal

Singh M 63

High school (Ag Diploma)

Soil & Water Conservation

Soil & Water Conservation

06/08/2011

3 Shri Harvendra

Singh M 30 MSc (Ag) Economics Ag Expert “

4 Shri Arun

Kumar M 29 MSc.( Ag) Agronomy Ag Expert “

5 Smt.Mamta F 26 B.A Social Worker Social Worker 06/08/2011

Page 62: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

62

4.4: Watershed Committee, Gram Panchayat: Shamipur Name of Project: - IWMP-II S.

No.

Nam

e o

f w

ate

r

shed

Nam

e o

f G

ram

Sa

bh

a/ G

P Name Designation M

/F S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SHG GP Educa-tional qualification

Function(s) assigned

1 Shamipur Shamipur

Smt Naima President F 5TH

Implementation of Watershed programme under the

supervision of PIA (as per

common guide lines)

Sri Hamraj Seceretary M M.A.

,,Jubeida Member F Nill

,,Rukhsana ‘’ F 5TH

,,Chota ‘’ M Nill

,,Tikam ‘’ M 12TH

,,Alfaz ‘’’’ M 8TH

,,Akram ‘’ M 5TH

,,Sarfraj ‘’ M 8TH

Moh

Usman “ M 12

TH

Kesher ‘’ M 10TH

Omprakash “ M 8TH

Smt Nazra “ M Nill

Water shed Committee, Gram Panchayat: Ranipur Name of Project: - IWMP-II

S. No.

Nam

e o

f w

ater

shed

Nam

e o

f G

ram

Sa

bh

a/

GP

Name Designation M /F

S C

ST

OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

2 Pooranpur

Garhi Ranipur

Smt Parul President F 5TH

Implementation of Watershed programme under the

supervision of PIA (as per

common guide lines)

Shri Manoj Seceretary M 10TH

,,Parveen Member M 8TH

,,Yashpal ‘’ M 10TH

,,Vijay Singh ‘’ M Nill

,,Ramesh ‘’ M Nill

,,Vedram ‘’’’ M 5TH

Smt Lilla Devi ‘’ F 5TH

,,Baby ‘’ F 8TH

,,Savita ; F Nill

shriShamsher ‘’ M 8TH

Shri Ayodhya M 5TH

Page 63: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

63

Water shed Committee, Gram Panchayat:issepur Name of Project: - IWMP-II

S. No.

Nam

e o

f w

ater

shed

Nam

e o

f G

ram

Sa

bh

a/ G

P

Name

Designation

M

/F

S

C ST

OB

C/G

en

SF M

F LF

Land

-less UG

SH

G GP

Educa-tional

qualification

Function(s)

assigned

3 Kamalpur Issepur SMT

Nirmala President F 5TH

Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

Sri Virendra

Sharma Seceretary M 10

TH

Sri Kulwant Member M Nill

,, Hardeep ‘’ M 5TH

Smt

Sharvesh Kumari

‘’ F BA

Sri Chotelal ‘’ F 8TH

Smt Kusum ‘’’’ F Nill

,,Sheela ‘’ F 5TH

Sri Prakash “ M 8TH

,,Nihal ; M 8TH

Smt Roopa ‘’ F 5TH

Sri Ramlal M Nill

,,Jai Prakash M 8TH

Page 64: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

64

Water shed Committee, Gram Panchayat: Kharullahpur Name of Project: - IWMP-II

S. No.

Nam

e o

f w

ater

shed

Nam

e o

f

Gra

m

Sab

ha/

GP

Name

Designation

M

/F

S

C ST

OB

C/G

en

SF M

F LF

Land

-less UG

SH

G GP

Educa-tional

qualification

Function(s)

assigned

4 Shamiipur Kharullahpur Sri Nipendra President M BA

Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

,,Monu Seceretary M BA

,,Munna Member M 8th

,,Ajaypal ‘’ M 10th

,,Kunwar

singh ‘’ M 8Th

,,Bharatlal ‘’ M 8th

,TejRatan ‘’’’ M BA

,,Shivkumar ‘’ M 10th

,Vijaysingh ‘’ M 10 th

SmtAmaravati ; F 5th

SmtGeetRani M 8th

,Chetram M 5th

Smt Lokesh F 8th

Page 65: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

65

Water shed Committee , Gram Panchayat:Bhadola Name of Project: - IWMP-II

Sl.

N

o.

Name of watershed

Name of

Gram

Sabha/ GP& date of constitution

Name

Shri /Smt

Designation M

/F

S

C

ST OB

C/

Ge

n

SF M

F

LF Land

-less

UG SH

G

GP Educa-tional

qualification

Function(s)

assigned

5 Jhakkaki Bhadola Smt Anshu chauhan

President F M.A Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

Sri Randheer

Seceretary M _ 10th

,,Ramphol Member F _ B.A

,,Satish ‘’ F _ 8th

,,Bhopendra ‘’ F 8th

,,Raghuveer ‘’ M 8th

,,Ankur ‘’’’ M 8th

,,Baljeet ‘’ M Nill

,,Chandrapal ‘’ M 8th

,,Mohan ; M 8th

Smt Shashi ‘’ F _ BA

,,Rachna ‘’ F 8th WDT/ASCI

Sri Bishanlal .. M Nill

,,Jaiveer -- M 8th

Page 66: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

66

Water shed Committee , Gram Panchayat: Mathurapur Mor Name of Project: - IWMP-II

S. No.

Name of Watershed

Name of

Gram

Sabha/ GP

Name

Designation

M

/F

S

C ST

OB

C/

Ge

n

SF M

F LF

Land

-less UG

SH

G GP

Educa-tional

qualification

Function(s)

assigned

6 Kamalpur Mathurapur

Mor Sri Dalveer President M 12

th

Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

,,Gurcharan Seceretary M 10th

,,Gurdev

singh Member M 10

th

,,Vishan kumar

‘’ M 5th

,,Harbhajan ‘’ M 10th

,,Daljeet ‘’ M 12th

,,Ratan ‘’’’ M 12th

,,Sardool

singh ‘’ M Nill

,,Suresh ‘’ M 8th

Smt

Simerjeet ; F Nill

,,Amarjeet

Kaur ‘’ F 12th

Sri Gurjeet M 5th

Page 67: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

67

Water shed Committee , Gram Panchayat: Pooranpur Gadhi Name of Project: - IWMP-II

Sl.

N

o.

Name of watershed

Name of

Gram

Sabha/ GP & Date

Name

Designation M

/F

S

C

ST OB

C/

Ge

n

SF M

F

LF Land

-less

UG SH

G

GP Educa-tional

qualification

Function(s)

assigned

7 Pooranpur Garhi

Pooranpur Gadhi

Smt Halima President F 5TH Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

Sri Naresh Seceretary M 5th

,,Bhagwana Member M 5th

Smt Paroo Devi ‘’ F 2

Sri Balveer ‘’ M -nill

,,Chandraprakash ‘’ M -10th

,,Omkar ‘’’’ M Nill

,,Nasir ‘’ M Nill

,,Ahsan ‘’ M Nill

Smt Guddo ; F 5th

,,Dulari ‘’ F 5th

Sri Madanpal ‘’ M 8th WDT/ASCI

,,Nasim M Nill

Page 68: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

68

Water shed Committee , Gram Panchayat:Ahmadpur sadat Name of Project: - IWMP-II

Sl.

N

o.

Name of Waershed

Name of

Gram

Sabha/ GP & date

Name

Designation M

/F

S

C

ST OB

C/

Ge

n

SF M

F

LF Land

-less

UG SH

G

GP Educa-tional

qualification

Function(s)

assigned

8 Ranikota Ahmadpur sadat

Sri Rajpal President M 12th Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

,,Arvind kumar Seceretary M 10th

,,Shishram Member M 10th

,,Dayaram ‘’ M 8th

,,Vijaypal ‘’ M Nill

,,Mukesh ‘’ M 5th

Smt Geeta ‘’’’ F 5th

,,Anita ‘’ F 5th

Sri Faijan ‘’ M Nill

,,Jai Abbas ; M 12th

Moh Hanif ‘’ M 5th

Page 69: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

69

Water shed Committee , Gram Panchayat:Jahanabad Name of Project: - IWMP-II

Sl.

N

o.

Namo of Watershed

Name of

Gram

Sabha/ GP

Name

Designation M

/F

S

C

ST OB

C/

Ge

n

SF M

F

LF Land

-less

UG SH

G

GP Educa-tional

qualification

Function(s)

assigned

9 Kishanpur Jahanabad Sri Krishan kumar

President M 12th Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

,,Rahul kumar Seceretary M Bcom

,,Rohitash Member M 5th

,,Rambahadur ‘’ M 10th

,,Shushil Sharma

‘’ M 10th

,,Vijaypal ‘’ M 12th

,,Saunath ‘’’’ M 8th

,,Pawan ‘’ M 8th

,,Chandra Prakash

‘’ M 12th

Smt Asho Devi

; F 5th

Smt Kamlesh ‘’ F 5th

Page 70: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

70

Water shed Committee , Gram Panchayat: Gadmalpur Name of Project: - IWMP-II

Sl.

N

o.

Name of Watershed

Name of

Gram

Sabha/ GP

Name

Shri /Smt

Designation M

/F

S

C

ST OB

C/

Ge

n

SF M

F

LF Land

-less

UG SH

G

GP Educa-tional

qualification

Function(s)

assigned

10 Kishanpur Gadmalpur Sri Vikram President F 10th Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

,,Rajesh Seceretary F BA

,,Kuldeep Member M 8th

,,Sukhram ‘’ F 8th

,,Ramavtar ‘’ M 12th

,,Vikram ‘’ M 12th

,,Shyam Singh

‘’’’ M 10th

,,Rajpal ‘’ M 10th

,,Natendra ‘’ M 8th

Smt Chote devi

; F Nill

Smt Munni Devi

‘’ F Nill

Page 71: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

71

Water shed Committee , Gram Panchayat: Jaswantpur Name of Project: - IWMP-II

Sl. N o.

Name of Watershe

d

Name of Gram

Sabha/ GP

Name

Designation

M /F

S C

ST

OB C/ Ge n

SF

M F

LF

Land -

less

UG

SH G

GP

Educa-tional

qualification

Function(s) assigned

11 Jaswantpur

Jaswantpur

Smt Uma Devi

President F BA Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Sri Yogendra

Seceretary M 12th

,,Megha Member M Nill

,,Hushanpal ‘’ M

5th

,,Yusuf ‘’ M 5th

,,Vinod ‘’ M 5th

,,Sanjeev ‘’’’ M

10th

,,Harpal ‘’ M

8th

,,MadanSingh

‘’ M

5th

,,Narendra ; M

BA

Smt Hukam devi

‘’ F Nill

Page 72: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

72

Water shed Committee , Gram Panchayat: Himpur Pachatpura Name of Project: -

IWMP-II

Sl. N o.

Name of Watershe

d

Name of Gram

Sabha/ GP

Name

Designation

M /F

S C

ST

OB C/ Ge n

SF

M F

LF

Land -

less

UG

SH G

GP

Educa-tional

qualification

Function(s) assigned

12 Himpur Pachatpura

Himpur Pachatpura

Sri Satyapal President M 8th Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

,,Lal Singh Seceretary M 8th

,,Ghasita Member M Nill

,,Virendra ‘’ M 10th

,,Rampal ‘’ M 8th

,,Mukhtyar ‘’ M 8th

,,Mukesh ‘’’’ M

8th

,,Kutubuddin

‘’ M

8th

,,Gajendra ‘’ M

12th

,,Kamal ; M

8th

,Resampal ‘’ M

8th

SmtVeerwala

F Nill

Page 73: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

73

Water shed Committee , Gram Panchayat: Kanakpur Name of Project: - IWMP-II

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name

Designation M /F

S C

ST OB C/

Gen

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

13 Kanakpur Kanakpur Smt Sanjo Devi

President F 8th Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Sri Rajat kumar

Seceretary M 10th

,,Sopal Member M Nill

,,Meghnath ‘’ M 5th

,,Asraf ‘’ M 5th

,,Tokir ‘’ M Nill

,,Naseem ‘’’’ M Nill

,,Mukandi ‘’ M 8th

,,Dilshad ‘’ M 8th

Smt Mamta

; F 12th

,,Anaro ‘’ F Nill

Page 74: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

74

Water shed Committee , Gram Panchayat: Bijori Name of Project: - IWMP-II

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name

Designation M /F

S C

ST OB C/

Gen

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

14 Ranipur Bijori Smt Veerwala

President F 8th Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Sri Indrajeet Seceretary M MA

,,Dhara singh Member M BA

,,Tejpal ‘’ M 5th

,,Veersingh ‘’ M Nill

,,Shyamsingh ‘’ M 12th

,,Rohtash ‘’’’ M 12th

,,Netram ‘’ M 8th

,,Jagansingh ‘’ M Nill

Smt Savita ; F 5th

Smt Pooja ‘’ F 5th

Page 75: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

75

Water shed Committee , Gram Panchayat: Bhogpur Name of Project: - IWMP-II

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name

Designation M /F

S C

ST OB C/

Gen

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

15 Jaswantpur Bhogpur Sri Bhagawana

President M 12th Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

,,Arvind Seceretary M 12th

,,Anand Member M 10th

,,Ravi kishan

‘’ M Nill

,,Phool Singh

‘’ M Nill

SmtHardevii ‘’ F Nill

,,Suresh ‘’’’ M 5th

,,Devendra ‘’ M 12th

Smt Kaushlya

‘’ F 5th

Smt Hemlata

; F 5th

Sri Ramesh ‘’ M 10th

Page 76: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

76

Water shed Committee , Gram Panchayat: Parvatpur Name of Project: - IWMP-II

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name Shri /Smt

Designation M /F

S C

ST OB C/

Gen

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

16 Mahawarpur Billoch

Parvatpur Smt Sulekha

President F BA Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Sri Umesh chand

Seceretary M 10th

Sri Jagdish Member M 10th

Sri Jagesh ‘’ M 10th

Sri Sitaram ‘’ M 10th

,,ajay ‘’ M 10th

Smt Neeta ‘’’’ F 5th

Sri Rohtash ‘’ M 8th

,,Madan ‘’ M 10th

,,Satish ; M 12th

,,Chadraveer ‘’ M 12th

Page 77: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

77

Water shed Committee , Gram Panchayat: Maujampur tulsi Name of Project: - IWMP-II

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name

Designation M /F

S C

ST OB C/

Gen

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

17 Mojampur tulsi

Moh khadim President M 10TH Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Sri Najakat Seceretary M 10th

,,Samsudeen Member M 5th

,,Sabban ‘’ M 10th

,,Mo jakir ‘’ M 10th

,,Mustkim ‘’ M 5th

Smt Raesa ‘’’’ F 10th

,,Farida ‘’ F 5th

,,kamroon ‘’ F 10th

Sri Sukhdev ; M 5th

Moh hanif ‘’ M 5th

Page 78: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

78

Water shed Committee, Gram Panchayat: Akberpur Chaugawa

Name of Project: - IWMP-II

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name Shri /Smt

Designation M /F

S C

ST OB C/

Gen

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

18 Akberpur Chaugawa

Akabarpur chogawa

Sri Muneesh ahmad

President M 10TH Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Sri Udayraj Seceretary M 12th

Sri mahipal Member M 5th

Sri sattar ‘’ M 5th

Sri rattan ‘’ M 5th

,,Parvej ‘’ M Nill

Sri shivkumar

‘’’’ M 12th

Smt sheela ‘’ F 5th

,,Shakin ‘’ F 5th

Sri rajkumar

; M 5th

Sri ‘’ M 5th

M 8th

Page 79: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

79

4.5: Village wise details of Self Help Groups (SHGs) in the project area IWMP-II

Project- IWMP II District – Bijnor

Sr.

No.

Name of

MWS

Names of

villages

Total no. of

Constituted/registered SHGs No. of members

No. of SC/ST in each category

No. of OBC in

each categor Date of

formation

of SHGs

With

only

Men

With

only

Women

With

both Total Categories M F Total M F Total M F Total

1

Heempur Pachatpura

2B4D3i4a

Heempur Pachatpura

10 1 - 11 (i) Landless 5 2 7 2 2 4 6 1 7 12/08/11

- (ii) SF - - - - - - - - -

- (iii) MF 3 1 - -- - - - - --

- Total 8 3 11 2 2 4 6 1 7 -

Heempur

Pachatpura 11 - - 11 (i) Landless 5 5 6 - 6 5 - 5 10/09/11

- (ii) SF 2 - 2 - - - - - - -

- (iii) MF 4 - 4 - - - - - - -

- Total 11 - 11 6 - 6 5 - 5

Murshadpur 8 5 - 13 (i) Landless 4 2 6 5 3 8 3 2 5 22/10/11

- (ii) SF 3 3 6 - - - - - - -

- (iii) MF 1 - 1 - - - - - - -

- Total 8 5 13 5 3 8 3 2 5 -

2 Kishanpur

2B5B8c5b Kishanpur 12 1 - 13 (i) Landless 4 1 5 - - - 12 1 13 10/09/11

Page 80: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

80

- (ii) SF 4 - 4 - - - -

- (iii) MF 4 - 4

- Total 12 1 13 - - - 12 1 13

Kishanpur 11 - - 11 (i) Landless 7 - 7 8 - 8 3 - 3 25/10/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF - - -

- Total 11 - 11 8 - 8 3 - 3

Kishanpur 10 2 - 12 (i) Landless 8 2 10 5 1 6 5 1 6 05/11/11

- (ii) SF 1 - 1 - - - - - -

- (iii) MF 1 - 1 - -

- Total 10 2 12 5 1 6 5 1 6

3 Kanakpur

2B4D3i2d Kanakpur 10 1 - 11 (i) Landless 6 - 6 3 - 3 7 1 8 13/08/11

- (ii) SF 5 - 5 - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 11 3 - 3 7 1 8

Kanakpur 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 18/09/11

- (ii) SF -- - - -- - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 11 - 11 - - -

Kanakpur 8 4 - 12 (i) Landless 3 2 5 5 3 8 3 1 4 25/09/11

- (ii) SF 3 2 5 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 8 4 12 5 3 8 3 1 4

4 Ranikota

2B4D3i2b Ranikota - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 17/11/11

- (ii) SF - - - - - - - - -

Page 81: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

81

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Akberpur Avla 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 25/11/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 11 - 11 - - -

Rumpuri 9 4 - 13 (i) Landless 5 3 8 6 3 9 3 1 4 05/12/11

- (ii) SF 2 1 3 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 9 4 13 6 3 9 3 1 4

5 Ranipur

2B5C1f1c Bijori 13 - - 13 (i) Landless 9 9 13 - 13 - - - 16/11/11

- (ii) SF 2 - 2 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 13 - 13 13 - 13 - - -

Bijori 13 - - 13 (i) Landless 8 - 8 13 - 13 - - - 25/11/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 13 - 13 13 - 13 - - -

Manupura 10 2 - 12 (i) Landless 5 1 6 6 2 8 4 - 4 15/12/11

- (ii) SF 2 1 3 - - - - - -

- (iii) MF 3 - 3 - - - - - -

- Total 10 2 12 6 2 8 4 - 4

6 Jasvantpur

2B5C1f3c Malookwali 13 - - 13 (i) Landless 7 - 7 7 - 7 6 - 6 17/08/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF 2 - 2 - - - - - -

Page 82: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

82

- Total 13 - 13 7 - 7 6 - 6

Bhogpur 12 - - 12 (i) Landless 6 - 6 7 - 7 5 - 5 10/09/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 12 - 12 7 - 7 5 - 5

Jasvantpur 9 4 - 13 (i) Landless 4 2 6 5 3 8 4 1 5 12/10/11

- (ii) SF 2 1 3 - - - - - -

- (iii) MF 3 1 4 - - - - - -

- Total 9 4 13 5 3 8 4 1 5

7 Mahavatpur

Billoch 2B5C1f3b

Mahavatpur Billoch

11 - - 11 (i) Landless 6 - 6 2 - 2 9- - 9 14/08/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 11 - 11 2 - 2 9- - 9

Mahavatpur Billoch

11 - - 11 (i) Landless 8 - 8 7 - 7 4 - 4 08/09/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 7 - 7 4 - 4

Mahavatpur Billoch

10 2 - 12 (i) Landless 6 2 8 9 2 11 1 - 1 19/09/11

- (ii) SF 2 - 2 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 10 2 12 9 2 11 1 - 1

8 Jhakkaki

2B4D3i2c Jhakkaki 8 3 - 11 (i) Landless 5 - 5 4 2 6 4 1 5 05/08/11

- (ii) SF 4 - 4 - - - - - -

Page 83: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

83

- (iii) MF 2 - 2 - - - - - -

- Total 11 - 11 4 2 6 4 1 5

Jhakkaki 14 - - 14 (i) Landless 9 - 9 8 - 8 6 - 6 02/09/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 14 - 14 8 - 8 6 - 6

Jhakkaki 11 - - 11 (i) Landless 6 - 6 8 - 8 3 - 3 27/09/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 11 - 11 8 - 8 3 - 3

9

Pooranpur Gadhi

2B5C1f1b

Pooranpur Gadhi

- 14 - 14 (i) Landless 14 - 14 - 14 14 - - - 15/02/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total 14 - 14 - 14 14 - - -

Pooranpur

Gadhi 11 - - 11 (i) Landless 8 - 8 7 - 7 4 - 4 08/06/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 7 - 7 4 - 4

Pooranpur

Gadhi - 14 - 14 (i) Landless - 14 14 8 - 8 6 - 6 10/08/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 14 14 8 - 8 6 - 6

10

Kamalpur

Kamalpur

-

11

-

11

(i) Landless

11

11

-

8

8

-

3

3

24/02/11

Page 84: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

84

2B4D3i4c -

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 8 8 - 3 3

Kamalpur 11 - - 11 (i) Landless 4 - 4 4 - 4 7 - 7 06/05/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF 3 - 3 - - - - - -

- Total 11 - 11 4 - 4 7 - 7

Issepur 8 4 - 12 (i) Landless 6 3 9 5 3 8 3 1 4 16/06/11

- (ii) SF 1 1 2 - - - - - -

- (iii) MF 1 - 1 - - - - - -

- Total 8 4 12 5 3 8 3 1 4

11 Shamipur

2B5B8c4c Shamipur 11 - - 11 (i) Landless 4 - 4 - - - 11 - 11 20/02/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF 3 - 3 - - - - - -

- Total 11 - 11 - - - 11 - 11

Shamipur 11 - 11 (i) Landless - 11 11 - 8 8 - 3 3 25/04/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 8 8 - 3 3

Shamipur 10 2 - 12 (i) Landless 4 2 6 4 2 6 6 - 6 11/06/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 10 2 12 4 2 6 6 - 6

Total SHG -92, formed -33, formed in next year -59

Page 85: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

85

4.6: Details of Self Help Groups (SHGs) in the project area

S.

No.

Name of

micro

watershed

Name of

village

Name of

group

SHG

Date of

constitution

Name of

Adhyaksh

Name of

Sachiv

Total No. of Members Name of

Bank and

Address

Account

No. & Date

Up to

date

Saving

Rs.

Group

activities Women Sc/St Other Total

1

Himpur Pachatpura

Himpur Pachatpura

Shiv Ashram 12/08/11 Sri Gajendra

Singh Sri Reshampal

Singh 1 4 6 11

P.N.B kotdwar road Najibabad

1834000100158988 2750 Dairy

Himpur

Pachatpura Bajrang 10/09/11

Sri Satyapal Singh

Sri Yeshpal singh

- 6 5 11 Under Process - Dairy

Mursatpur Mumtaj 22/10/11 Bakil Moh. Ali 5 3 5 13 Under Process - Tailoring

2 Kishanpur

Kishanpur

Prachin Shiv

10/09/11

Sri Ram Avtar singh

Sri Narendra 1 2 10 13 P.N.B kotdwar road Najibabad

1834000100158854 3900 Dairy

Kishanpur Sri Ram 25/10/11 Sri dinesh

kumar Sri Mukesh

kumar - 8 3 11 Under Process -

Bee Keeping

Kishanpur Krishana 05/11/11 Sri Rakesh

kumar Sri Amar singh 2 6 4 12 Under Process - Dairy

3 Kanakpur Kanakpur Balmiki 13/08/11 Sri Rajat kumar

Dilshad 1 3 7 11 P.N.B kotdwar road Najibabad

1834000100158881 2000 Piggries

Kanakpur Bharat 18/09/11 Sanjeev Pretam - 11 11 Under Process - Poultry

Kanakpur Mahan 25/09/11 Sarfaraj Nasir 4 4 4 12 Under Process - Poultry

4 Ranikota Ranikota Ravi 17/11/11 Sri mukesh Sri Naresh 11 - - 11 Under Process - Poultry

Akberpur Avla Bhola 25/11/11 Sri Ajay kumar

Sri Krishan kumar

- 11 - 11 Under Process 2200 Dairy

Rumpuri Ravidas 15/12/11 Faijan Sri Anubhav 4 6 3 13 Under Process - Dairy

5 Ranipur Bijori Dr.Bheem Rao

Ambedkar 16/11/11 Sri Rohitash Sri Netram - 13 - 13

P.N.B kotdwar road Najibabad

1834000100158696

2500 Dairy

Bijori Jai Bheem 25/11/11 Sri Ram

singh Sri Dhanesh - 13 - 13

P.N.B kotdwar road Najibabad

1834000100158863 3000 Dairy

Ranipur Shri Ganesh 15/12/11 Shri Sachin Shri Mohit 2 6 4 12 Under Process - Poultry

6 Jaswantpur Malookwali Radhey 17/08/11 Shri

Devendra Shri Komal - 7 6 13

P.N.B kotdwar road Najibabad

1834000100159011 - Dairy

Bhogpur Ramesh 10/09/11 Shri Ramlal Shri Suresh - 7 5 12 Under Process - Poultry

Page 86: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

86

Jaswantpur Gopal 12/10/11 Shri

Mukesh Shri Harpal 4 5 4 13 Under Process - Poultry

7 Mahawatpur

Billoch Mahawatpur

Billoch Indica 14/08/11

Shri Seeta Ram

Shri Jagesh - - 11 11 Under Process 2200 Tailoring

Mahawatpur

Billoch Suzuki 08/09/11

Shri Somendra

Shri Noubat Singh

- 7 4 11 Under Process - Goatry

Mahawatpur

Billoch Dayal 19/09/11 Shri Bhopal

Shri Kapit Tomar

2 9 1 12 Under Process - Dairy

8 Jhakaki Jhakaki Shiv om 5/08/11 Shri

Virendra Shri Ajay Sharma

3 4 4 11 P.N.B kotdwar road Najibabad

1834000100158872 2500 Dairy

Jhakaki Mahadev 02/09/11 Shri Komal Shri Suresh - 8 6 14 Under Process - Bee

Keeping

Jhakaki Mahesh 27/09/11 Shri Shyam

Singh Shri Charat

Singh - 8 3 11 Under Process - Dairy

9 Pooranpur

Garhi Pooranpur

Garhi Ambedker 15/02/11 Smt Dulari Smt Sarvesh 14 - - 14

P.N.B kotdwar road Najibabad

1834000100159002 2800 Tailoring

Pooranpur

Garhi Om sai 08/06/11 Sri Charan Sri Harpal - 7 4 11 Under Process - Poultry

Pooranpur

Garhi Pratigya 10/08/11 Smt Neelam Smt Monika 14 - - 14 Under Process - Tailoring

10 Kamalpur Kamalpur Shanti 24/02/11 Smt Rashmi Smt Neha 11 - - 11 Under Process - Tailoring

Kamalpur Gandhi 06/05/11 Shri Lekhraj Shri Sanjeev - 8 3 11 Under Process - Bee

Keeping

Issepur Shambhu 16/06/11 Shri

Chanchal Sharma

Shri Veeru 4 5 3 12 Under Process - Goatry

11 Shamipur Shamipur Yuva Dal 20/02/11 Moh. Iftkar Moh Masroor - - 11 11 P.N.B kotdwar road Najibabad

1834000100158997 2500 Poultry

Shamipur Najrana 25/04/11 Sakeela Sameema 11 - - 11 Under Process - Tailoring

Shamipur Hindustan 11/06/11 Mustkeen Nazeem Ali 2 4 6 12 Under Process - Dairy

Page 87: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

87

4.8: Details of Formation of User Groups (UGs)

User Groups were formed on the basis of beneficiaries of different natural resource conservation

activities to be constructed in the watershed. The location of the activities/group mentioned in Table 4.8

can be seen on the proposed plan available in the map section.

Table: Activity wise formation of user groups

S. No.

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

1. Himpur Pachatpura

Himpur Pachatpura

Jai kishan

14/10/2011 Ram singh Krishan kumar

1 5 6 12 Under Process

Rs12/hr Irrigation done

Murshatpur Jai hind 02/11/2011 Chote singh

Natthu - 3 8 11 Under Process

Rs12/hr Crop Production

done

2 Kishanpur Kishanpur Shiv 17/10/2011 Manoj Virendra - 5 6 11 Under Process

Rs12/hr Irrigation done

Kishanpur Bajrang 05/11/2011 Sandep Rajesh 3 5 5 13 Under Process

Rs12/hr Crop Production

done

3 Kanakpur Kanakpur Krishna 08/10/2011 Shakil Naem - 5 6 11 Under Process

Rs12/hr Irrigation done

Kanakpur Shiv Balmiki

07/11/2011 Chote singh

Gajendra - 4 8 12 Under Process

Rs12/hr Crop Production

done

4. Ranikota Jogirumpuri Bheem 03/11/11 Om prakash

Ramnath - 5 6 11 Under Process

Rs12/hr Irrigation done

Akberpur

Avla

Sri Ram 17/11/11 Ajay kumar

Mool chand

- 7 4 11 Under Process

Rs12/hr Crop Production

done

5

Ranipur Bijori Ravidas 25/11/11 Dhara singh

Ram singh 2 6 5 13 Under Process

Rs12/hr Irrigation done

Ranipur Sant kabir

08/12/11 Dhanesh Sita Ram - 7 4 11 Under Process

Rs12/hr Crop Production

done

6. Jasvantpur Mallookwali Arjun 12/10/11 Rahul kumar

Munnu sungh

- 6 5 11 Under Process

Rs12/hr Irrigation done

Bhogpur Shiva 28/11/11 Kripal Suresh 1 7 4 12 Under Process

Rs12/hr Crop Production

done

7. Mahavatpur Billoch

Mahavatpur Billoch

Sumo 16/11/11 Nobat singh

Harpal singh

- 6 5 11 Under Process

Rs12/hr Irrigation done

Page 88: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

88

Mahavatpur Billoch

ganesh 21/12/11 Mukesh kumar

Krishan kumar

- 4 7 11 Under Process

Rs12/hr Crop Production

done

8 Jhakkaki Jhakkaki Gandhi 23/11/11 Jaipal Sandep 1 4 6 11 Under Process

Rs12/hr Irrigation done

Jhakkaki Narayan 01/12/11 Sonu Sumit 1 7 4 12 Under Process

Rs12/hr Crop Production

done

9 Pooranpur Gadhi

Pooranpur

Gadhi

Kanhaiya

07/11/11 Khemsingh

Praveen - 5 6 11 Under Process

Rs12/hr Irrigation done

Pooranpur

Gadhi

Sangam 20/12/11 Jaisingh Avdesh 1 5 6 12 Under Process

Rs12/hr Crop Production

done

10 Kamalpur Kamalpur Hanuman

14/11/11 Omkar Girdhari - 5 6 11 Under Process

Rs12/hr Irrigation done

Issepur Ganaga 02/12/11 Asharam Manoj - 4 7 11 Under Process

Rs12/hr Crop Production

done

11 Shamipur Shamipur Allah 29/11/11 Najim Moh Alam

- 5 6 11 Under Process

Rs12/hr Irrigation done

Shamipur Khuda hafij

23/12/11 Intkar Jamil - 4 7 11 Under Process

Rs12/hr Crop Production

done

Total user Groups -54 has been Formed -22 Remaining UGs in Process -32 formed - 22 @ 25000 =5.45 Remaining -32 @25000=8.00 Total -13.45

Page 89: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

89

Details of Fund flow of Watershed Committee Accounts in IWMP-II, Bijnor (Amount in Rs.)

S.

No

Name of

MWS

with code

Name of

watershed

committee

(WC)

Opening

Balance

Deposit Withdrawal

Interest

accrued

Closing

balance

DRDA/ ZP

cheque

No./date

Amount

/ Date of deposit

in

WC Account

Total amount

available in WC

Account as on

31.03.2011

Amount

with

dra

wn

by Cash/ Cheque

Date of

withdra

wal

Purpose

of

withdrawal

1 Himpur

Pachatpura 2B4D3i4a

Himpur Pachatpura

------------ 31/03/11 3.56922 ------------ 257000 09/08/11

04/08/11 ------------ 8132 108054

2 Kishanpur 2B5B8c5b Kishanpur ------------ 31/03/11 3.36222 ------------ 265000 17/08/11 ------------ 6415 77637

3 Kanakpur 2B4D3i4c Kanakpur ------------ 31/03/11 2.45070 ------------ 100000 09/08/11 ------------ 6756 151826

4 Rani Kota 2B4D3i2b Rani Kota ------------ 31/03/11 2.19843 ------------ 175000 17/08/11 ------------ 4158 49001

5 Ranipur 2B5C1f1c Ranipur ------------ 31/03/11 5.39595 ------------ 302000 4/11/11 ------------ 15584 253179

6 Jaswantpur 2B5C1f3c Jaswantpur ------------ 31/03/11 4.36779 ------------ 350000 17/08/11 ------------ 6222 93001

7 Mahavatpur

Billoch 2B5C1f3b Mahavatpur ------------ 30/07/11 1.80414 ------------ - - ------------ 3519 183933

8 Jhakaki 2B4D3i2c Jhakaki ------------ 15/06/11 1.64610 ------------ 164400 17/03/11 ------------ 4611 4921

9 Pooranpur

Garhi 2B5C1f1b Puranpur ------------ 15/06/11 1.87326 ------------ 187220

17/03/11

2/08/11 ------------ 2161 2267

10 Kamalpur 2B4D3i4c Kamalpur ------------ 13/07/11 1.78308 ------------ 177960 24/12/11 ------------ 3008 3356

11 Shamipur 2B5B8c4c Shamipur ------------ 13/07/11 1.92411 192360 21/12/11 ------------ 3669 3720

Total 30.37500

Page 90: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

90

4.9: Convergence in IWMP-II, Bijnor

Several programmes are running in the area which are sponsored by Central and State Govt. and

could be converged with watershed programmes. Some of them are listed in below. The details of the

activities to be carried out under convergence in the project are mentioned.

List of Central/State sponsored schemes

S. No.

Name of Programme Implementing Agency Objectives of the Programme

1 Seed Distribution Programme (Pulse

Development & ISOPAM U.P. Agriculture Deptt

To increase seed replacement ratio for higher

productivity

2 Pump set Distribution (Food Security

Mission Agriculture Deptt Providing irrigation

3 Training Programme Agriculture Deptt, KVK

District RolarDevelopment in instititute haldaur

Capacity building of the farmers

4 HDPE pipe Agriculture Deptt

5 National Horticulture Mission (NHM) Horticulture Deptt. Increasing the area under fruits and

vegetables

6 Sanitation Programme Gram Vikash To make hygienic condition in the rural

areas

7 MGNERGA (Bunding, Farm Pond, Adarsh

Jalashay, Blast well, Chakroad, etc.) Gram Panchayat

To provide work to the all village personnel

under the rojgar guarantee yojana

8 Dept. of Animal Husbandry U.P. Animal Husbandry To improve the productivity of livestock

9 Afforestation Deptt. of Forest U.P.

10 NABARD (Agriculture & SMC Deptt. Of Agriculture

Page 91: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

91

CHAPTER- 5

CAPACITY BUILDING PLAN

Page 92: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

92

CAPACITY BUILDING PLAN

The capacity building of various stake holders will be given very high priority as the watershed is to

be developed in participatory mode. Capacity building initiative plays very important role in human

resource development of watershed.

List of identified training institutes for capacity building

S. No.

Name of Training institute

Address Designation of the Head of institute

Type of Institute

Area(s) of specialization

No. of training assigned

No. of persons

to be trained

Allocation to be made to the institute

1 2 3 4 5 6 7 8 9

1

Hind Swaraj trust ralegan sidhi Ahmad

Nagar (Maharashtra)

Ahmad Nagar

(Maharashtra)

Director

General/

Principal

Inter State Level

Soil & Watershed Management, Agriculture, Horticulture, Production

System, Livelihood for landless

person, Animal Husbandry etc.

01 01

Ahmad Nagar

(Maharashtra)

2

Land Development

and Water

Management Training

center Beli kalan

Lucknow.

Beli Kalan Lucknow.

Director State Level

Formation of SHG and water

management 01 30 State Level

Page 93: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

93

Training to stakeholders on participatory watershed management

S. No.

Client Group

Title of the programme / duration / time

Objectives Coverage / Topics

Training methodology

Training institutions

1 Interstate 1- 20/11/10 to 4/12/10 Training

Orientation,

Livelihood,

enterprises,

Watershed

Management

etc.

Skill

Development Ahmad Nagar

2

State

Level (PIA

& SHG)

7/02/2011 to 09/02/2011 Training

Orientation,

Livelihood,

enterprises,

Watershed

Management

etc.

Skill

Development Belikalan (Lucknow.)

3

SBBP

Agriculture

University

Meerut

19/01/11 to 20/01/2011 28/01/11 to 29/01/11 (KVK Nagina)

Training

Skill

development

of Farmers

Skill

Development

Agriculture University

Meerut.

Page 94: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

94

Table 5.3: Capacity Building Plan

Level of

Stake Holder

2009-10 2010-11 2011-12 2012-13 2013-14

Total

Target

(no.)

Training/

Person

Achiev

ment

(no.) Training/

Person

Target

(no.)

Training/

Person

Achiev

ment

(no.) Training/

Person

Target

(no.) Training /Person

Achiev

ment

(no.) Training /Person

Target

(no.) Training/Person

Target

(no.) Training/Person

Target

(no.) Training/Person

Achiev

ment

(no.) Training/

Person

Inter State Level

- - 1/1 1/1 1/1 - - - - -

SLNA Level

- - 1/38 1/28 - - - - - -

State level

- - - - 5/14 5/14 - - - -

PIA Level

- - 01/18 1/02 1/03 - - -

WDT Level

- - 1/05 - 02/05 - - -

WC Level

- - 2/209 02/200 5/510 - - - - -

Other - - 1/400 - 2/02 - - - - -

TOTAL - - 7/661 5/231 16/545 5/14 - - - -

Page 95: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

95

Details of Institution Capacity Building Annual Action Plan

First Year Second Year

S. No.

Level Total No. of Person

No of Person to

be Trained

No. of Training to

be conducted

Training days

Total cost Rs in Lakh

No of Person to

be Trained

No. of Training to

be conducted

Training days

Total cost Rs in Lakh

1 Inter

state 1 1 1 15 0.075 1 1 1 0.075

2 SLNA - - - - 0.81 14 5 3 1.05

3 WCDC 15 15 1 2 0.30 15 1 2 0.30

4 PIA 18 18 1 2 0.36 18 1 2 0.36

5 WDT 5 5 1 2 0.06 5 1 3 0.09

6 SHG'S 90 180 1 3 1.08 180 2 2 1.44

7 UG'S 56 112 1 1 0.34 112 2 1 0.67

8 WC 19 209 2 1 2.09 209 1 1 1.04

9 OTHER - 400 1 1 1.20 270 1 1 0.81

TOTAL 1274 6.315 974 5.835

Third Year Fourth year G. Total

No of Person to be Trained

No. of Training to

be conducted

Training days

Total cost Rs in Lakh

No of Person to be Trained

No. of Training to

be conducted

Training days

Total

cost Rs in Lakh

Person Cost Rs in Lakh

- - - -- - -- - -- 2 0.15

- - -- 0.45 - - - - - 1.26

15 1 1 0.15 - - - - 45 .75

18 2 2 0.72 18 1 2 0.36 72 1.80

5 1 3 0.09 5 1 2 0.06 20 0.30

180 2 1 0.72 102 1 1 1.02 642 4.26

112 2 1 0.67 100 1 1 0.30 436 1.98

209 1 1 1.04 110 1 1 0.55 737 4.72

87 1 1 0.26 285 2 1 1.71 1392 5.03

474 410 335 4.00 3346 20.25

Note –specific traininig –On Identified and recommended by SLNA

Page 96: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

96

CHAPTER- 6

ENTRY POINT ACTIVITIES

WATERSHED DEVELOPMENT WORK

LIVELIHOOD ACTIVITIES PRODUCTION SYSTEM ACTION PLAN

Page 97: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

97

6.1: Entry Point Activities (EPA)

Entry point activities are executed with the consent of stake holders and it helped in winning the

confidence of the villagers for moving ahead the other programmes of watershed. In total 18 EPA

activities are executed in the project area which costed Rs. 16.209. Photographs of entry point activities

done in the project are given below:

Name of PIA

Name of Project

Year Name of

Block

Name of project/ Name of village

Code of project

E.P.A cost

in lakh Detail of Works

1 2 3 4 5 6 7 8

LDWR I Bijnor

IWMP II

2009-10 Nijibabad

Himpur Pachatpura

2B4D3i4a 1.903 E.w. Filling in Primary

School & road construction

Kishanpur 2B5B8c5b 1.793 Connecting road

Kanakpur 2B4D3i4c 1.307 E.W. filling in road and Khandja Construction

Rani Kota 2B4D3i2b 1.172 E.W. Filling in road, Nali

and Khandja construction

Ranipur 2B5C1f1c 2.877 E.W. filling in Ambedker

park

Jaswantpur 2B5C1f3c 2.329 E.W. filling in Ambedker park and Primary school.

Mahavatpur Billoch

2B5C1f3b 0.962 E.W. filling in Primery school and Chak road.

Jhakaki 2B4D3i2c 0.877 E.W. filling in Primary

school.

Pooranpur Garhi 2B5C1f1b 1.000 E.W. filling in primary

school.

Kamalpur 2B4D3i4c 0.950 E.W. filling in School and

chak road

Shamipur 2B5B8c4c 1.026 E.W. filling in primary school and chak road

Total 16.209

Page 98: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

98

Entry Point Photographs

Page 99: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

99

Page 100: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

100

Details of Livelihood Activities in the project area

During discussions with the village communities by our Livelihood experts, several activities were

discussed with them. The main objectives of these discussions were:

Assure one livelihood option to poor families

Assured livelihood for at least 300 days in a year

At least one daily job per family SCs/BPL/ very poor families.

Form SHGs would be imparted skill training on identified Economic Activities and it is proposed to impart

them trainings. It is proposed to lend revolving fund of Rs. 25000/- to each SHG/individuals formed in the

watershed villages. Since the members from SHGs/landless are very poor, they do not have resources to

start micro enterprises. It is envisaged that they should be assisted and given loan of this amount in the

shape of Revolving Fund Assistance (RFA) so that they do not get trapped by money lenders. Funds thus

given on loan are recoverable from SHGs/individuals in easy installments. It is also proposed to impart

skill training to at least 10 unemployed youth from each village and give them trainings of their choice so

that they establish some small enterprises. It is further proposed to give them interest free loan of Rs.

12000/- each as Revolving Fund Assistance (RFA) to meet their urgent needs of funds for establishing

micro enterprises. Such funds recovered could either be back to SHGs/ individuals so some other SHGs/

individuals depending upon assessment of their respective needs. It is proposed to form 2 SHGs in each

village and identify at least 10 youths in each village for imparting training and giving Revolving Fund.

Activities that is likely to be taken up by SHGs/ individuals

Page 101: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

101

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-II,

DISTRICT- BIJNOR Amount in lacs

S. No. Gram Panchayat Total Amount Livelihood Activities 9% of the Total project Cost

2010-11 2011-12 2012-13 2013-14 Total

1 Ahmadpur Sadat 2.18 0.00 0.59 0.70 0.89 2.18

2 Akberpur Chaugava 1.68 0.00 0.45 0.54 0.69 1.68

3 Bhadola 2.13 0.00 0.58 0.68 0.87 2.13

4 Bhogpur 2.13 0.00 0.58 0.68 0.87 2.13

5 Bijori 2.63 0.00 0.71 0.84 1.08 2.63

6 Gadmalpur 1.88 0.00 0.51 0.60 0.77 1.88

7 Himpur Pachatpura 2.43 0.00 0.66 0.78 1.00 2.43

8 Issepur 1.88 0.00 0.51 0.60 0.77 1.88

9 Jahanabad 1.93 0.00 0.52 0.62 0.79 1.93

10 Jasvantpur 2.13 0.00 0.58 0.68 0.87 2.13

11 Kanakpur 2.13 0.00 0.58 0.68 0.87 2.13

12 Kharullahpur 1.88 0.00 0.51 0.60 0.77 1.88

13 mathurapur mor 2.43 0.00 0.66 0.78 1.00 2.43

14 Maujampur Tulsi 2.11 0.00 0.57 0.68 0.87 2.11

15 Parvatpur Makdoompur 2.63 0.00 0.71 0.84 1.08 2.63

16 pooranpur gadi 2.03 0.00 0.55 0.65 0.83 2.03

17 Shamipur 2.23 0.00 0.60 0.71 0.91 2.23

Total 36.44 0.00 9.84 11.66 14.94 36.44

Page 102: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

102

LIVELIHOOD ACTION PLAN-LAP

DETAILS OF LIVELIHOOD ACTIVITIES AT GLANCE UNDER IWMP-II, DISTRICT- BIJNOR

S. No.

Gram Panchayat

General Merchant Shop Goat Keeping Poultry Carpentry

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

1 Ahmadpur Sadat

1 1 2 1 1 2 1 1 1 1

2 Akberpur Chaugava

1 1 1 1 1 1 1 1

3 Bhadola 1 1 1 1 1 1 2 1 1

4 Bhogpur 1 1 1 1 2 1 1 1 1

5 Bijori 1 1 2 1 1 2 1 1 2 1 1

6 Gadmalpur 1 1 1 1 1 1 1 1

7 Himpur Pachatpura

1 1 1 3 1 1 2 1 1 1 1

8 Issepur 1 1 1 1 1 1 1 1

9 Jahanabad 1 1 1 1 2 1 1 1 1

10 Jasvantpur 1 1 1 1 1 1 2 1 1

11 Kanakpur 1 1 1 1 2 1 1 1 1

12 Kharullahpur 1 1 1 1 1 1 1 1

13 Mathurapur Mor

1 1 2 1 1 2 1 1 2 1 1

14 Maujampur Tulsi

1 1 1 1 2 1 1 1 1

15 Parvatpur Makdoompur

1 1 2 1 1 2 1 1 2 1 1

16 Pooranpur Gadi

1 1 1 1 1 1 1 1

17 Shamipur 1 1 1 1 2 1 1 2 1 1

Page 103: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

103

DETAILS OF LIVELIHOOD ACTIVITIES AT GLANCE UNDER IWMP-II, DISTRICT- BIJNOR

S. No.

Gram Panchayat

Tailoring Fishries Weaving Black Smith

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

20

10

-11

20

11

-12

20

12

-13

20

13

-14

To

tal

1 Ahmadpur

Sadat 1 1 1 1 1 1 1 1

2 Akberpur Chaugava

1 1 1 1 1 1 1 1

3 Bhadola 1 1 2 1 1 1 1 1 1

4 Bhogpur 1 1 2 1 1 1 1 1 1

5 Bijori 1 1 2 1 1 1 1 1 1

6 Gadmalpur 1 1 2 1 1 1 1 1 1

7 Himpur Pachatpura

1 1 1 1 1 1 1 1

8 Issepur 1 1 2 1 1 1 1 1 1

9 Jahanabad 1 1 1 1 1 1 1 1

10 Jasvantpur 1 1 2 1 1 1 1 1 1

11 Kanakpur 1 1 2 1 1 1 1 1 1

12 Kharullahpur 1 1 2 1 1 1 1 1 1

13 Mathurapur Mor

1 1 1 1 1 1 1 1

14 Maujampur

Tulsi 1 1 1 1 1 1 1 1 2

15 Parvatpur Makdoompur

1 1 2 1 1 1 1 1 1

16 Pooranpur Gadi

1 1 2 1 1 2 1 1 1 1

17 Shamipur 1 1 2 0 1 1 1 1

Approx Rate- General Merchant Shop @ Rs. 25000/- per shop., Goat Keeping @ Rs. 25000/- per Goat and 02 Goat will be given per beneficiary costing Rs. 3000/- per number, Poultry -(Chuja, feed and other support item) per beneficiary @ Rs.25000/-, Carpentry @ Rs. 15000/- per beneficiary , Tailoring @ Rs.

20000/- per beneficiary, Fishries @ Rs. 15000/- per beneficiary, Weaving@ 25000/-, Black Smithy @ 15000/- per bebeficiary.

Page 104: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

104

Propose Livelihood Expenditure on Different Activities IWMP-II, Bijnor

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

Amount in lacsGeneral Merchant Shop 5.75

Goat Keeping 6.75

Poultry 5.75

Carpentry 2.55

Tailoring 5.60

Fishries 2.55

Weaving 4.25

Black Smith 3.24

Livelihood Expenditure on Different Activities

Page 105: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

105

PRODUCTION SYSTEM & MICRO ENTERPRIS (10%)

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-II, DISTRICT-

LALITPUR Amount in lacs

S. No. Gram Panchayat Total Amount

PRODUCTION SYSTEM & MICRO ENTERPRISES ACTIVITIES 10% of the Total project Cost

2010-11 2011-12 2012-13 2013-14 Total

1 Ahmadpur Sadat 2.13 0.00 0.57 0.68 0.87 2.13

2 Akberpur Chaugava 2.35 0.00 0.64 0.75 0.96 2.35

3 Bhadola 2.17 0.00 0.59 0.70 0.89 2.17

4 Bhogpur 1.87 0.00 0.50 0.60 0.77 1.87

5 Bijori 2.51 0.00 0.68 0.80 1.03 2.51

6 Gadmalpur 2.01 0.00 0.54 0.64 0.82 2.01

7 Himpur Pachatpura 2.59 0.00 0.70 0.83 1.06 2.59

8 Issepur 2.55 0.00 0.69 0.82 1.05 2.55

9 Jahanabad 2.24 0.00 0.60 0.72 0.92 2.24

10 Jasvantpur 2.43 0.00 0.66 0.78 0.99 2.43

11 Kanakpur 2.45 0.00 0.66 0.78 1.00 2.45

12 Kharullahpur 2.92 0.00 0.79 0.93 1.20 2.92

13 mathurapur mor 2.16 0.00 0.58 0.69 0.89 2.16

14 Maujampur Tulsi 2.38 0.00 0.64 0.76 0.98 2.38

15 Parvatpur Makdoompur 2.33 0.00 0.63 0.74 0.95 2.33

16 pooranpur gadi 2.77 0.00 0.75 0.89 1.14 2.77

17 Shamipur 2.66 0.00 0.72 0.85 1.09 2.66

Total 40.50 0.00 10.94 12.96 16.61 40.50

Page 106: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

106

DETAILS OF PRODUCTION SYSTEM & MICRO ENTERPRISES ACTIVITIES AT GLANCE UNDER IWMP-II,

DISTRICT- BIJNOR

S. No.

Gram Panchayat

CROP DEMOSTRATION

Wheat Paddy Bajra Urd Moong

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

1 Ahmadpur Sadat 0 1

1 2 0 1 1

2 0 2 1

3 0 1 1 1 3 0

1 1 2

2 Akberpur Chaugava 0 1 1

2 0

1 2 3 0

1 1 2 0

2 1 3 0

2

2

3 Bhadola 0

1 2 3 0 1

1 2 0 1 2

3 0 1

1 2 0 1

1 2

4 Bhogpur 0 1

1 2 0

1 1 0

1 1 2 0 1 2

3 0 1

1 2

5 Bijori 0 1

1 2 0 1 2

3 0 1

2 3 0 2

1 3 0 1

2 3

6 Gadmalpur 0

1

1 0

1

1 0 1 1 1 3 0

1 2 3 0 1 1

2

7 Himpur Pachatpura 0 1 2 1 4 0 1

1 2 0

2 1 3 0 1 1

2 0

2 1 3

8 Issepur 0 1

1 2 0 1

2 3 0 1

1 2 0 1 2 1 4 0 1 2

3

9 Jahanabad 0

1 1 2 0

1 1 2 0 1 1

2 0 2

1 3 0

1 1 2

10 Jasvantpur 0 1 1 1 3 0

1

1 0 2 1 1 4 0

1 2 3 0 2

1 3

11 Kanakpur 0

2 1 3 0 1

1 2 0

1 1 2 0 1 1 1 3 0 1 2

3

12 Kharullahpur 0

1

1 0 1 2 2 5 0 1

2 3 0 1 2 1 4 0 1

1 2

13 mathurapur mor 0 1

1 2 0

1

1 0 2 1 1 4 0 1

1 2 0

1 2 3

14 Maujampur Tulsi 0 1 2 1 4 0 1

1 2 0

1 1 2 0

1 1 2 0 1 1

2

15 Parvatpur Makdoompur 0

1

1 0 1 1

2 0

2 1 3 0 1 2

3 0 1 2 1 4

16 pooranpur gadi 0 2 1 2 5 0

1

1 0 1 1 2 4 0

2 2 0

1 2 3

17 Shamipur 0

1 1 2 0 1

1 2 0 2 1

3 0 1 2 1 4 0 2 1

3

Page 107: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

107

DETAILS OF PRODUCTION SYSTEM & MICRO ENTERPRISES ACTIVITIES AT GLANCE UNDER IWMP-II,

DISTRICT- BIJNOR

S. No.

Gram Panchayat

ANIMAL HUSBANDRY HORTICULTURE NURSURY SEED

DISTRIBUTION

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

2010-1

1

2011-1

2

2012-1

3

2013-1

4

Tota

l

1 Ahmadpur Sadat 0 1

1 0

1 1 0 1 1

2 0

1 1

2 Akberpur Chaugava 0

1

1 0 1

1 2 0

1 1 0 1

1 2

3 Bhadola 0

1 1 2 0

1

1 0

1

1 0

1 1

4 Bhogpur 0 1

1 0 1

1 0

1 1 0 1 1

2

5 Bijori 0

1 1 0

1 1 2 0

1 1 2 0

1 1

6 Gadmalpur 0 1 1 1 3 0 1

1 0 1

1 0 1

1

7 Himpur Pachatpura 0

1

1 0

1

1 0

1 1 2 0

1 1 2

8 Issepur 0 1

1 0

1 1 0 1

1 2 0 1

1 2

9 Jahanabad 0

1 1 2 0 1

1 0

1

1 0

1 1 2

10 Jasvantpur 0

1

1 0

1 1 0 1

1 2 0

1 1 2

11 Kanakpur 0 1

1 2 0

1

1 0

1 1 2 0 1

1

12 Kharullahpur 0 1 1

2 0 1

1 2 0 1 1

2 0

1

1

13 mathurapur mor 0

1 1 0

1 1 2 0

1 1 0 1

1 2

14 Maujampur Tulsi 0

1 1 2 0 1

1 2 0

1

1 0

1

1

15 Parvatpur Makdoompur 0 1

1 2 0

1

1 0 1

1 2 0

1 1

16 pooranpur gadi 0

1 1 0 1

1 2 0 1

1 2 0 1

1 2

17 Shamipur 0 1

1 2 0

1 1 0

1 1 2 0

1 1 2

Approx Rate: Crop demonstration is wheat @ Rs. 13000/ha, Paddy @ Rs.16800/ha, Bajra @ Rs. 7200/ha, Urd @ Rs. 6500/ha, Moong @ Rs.

6500/ha, Seed Distribution @ Rs. 20000/-, Horticulture toolkit @ Rs. 15000/- and Nursery @ Rs. 22000/- , Animal Husbandry @ 20000/-

Page 108: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

108

Wheat5.33 lacs,13%

Paddy5.88 lacs,14%

Bajra3.46 lacs,9%

Urd3.19 lacs, 8%

Moong2.86 lacs, 7%

SEED DISTRIBUTION5.20 lacs, 13%

ANIMAL HUSBANDRY5.20 lacs, 13%

HORTICULTURE3.45 lacs, 8%

NURSURY5.94 lacs, 15%

Other14.59 lacs, 35%

Crop Demonstration

Page 109: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

109

The above action plan has been prepared according to the need and resources available in the

project area. Individual activity fund distribution has been made the details would be given beneficiary

wise in the project file. Demonstration of crop, animal husbandry camp distribution of sheed and

plantation of fruit trees are the essential requirement of the project area. Therefore the above plan has

been constituted according to the aforesaid activity and the funds were allocated as per the norms.

MAJOR PROBLEMS OF THE WATERSHEDS

Moisture stress-Drought conditions

Erosion hazard

Excess runoff.

Land degradation

Low fertility of soil

Ground water depletion/Low ground water table, poor quality of groundwater

Low cropping intensity

Lack of technical knowledge

Lack of irrigation facilities

Low productivity of crops

Low availability of drinking water for human as well as animals

Overgrazing

Poor vegetative cover

Poor/low productive breeds of miltch animals

Lower milk production

Lack of feed & fodder availability

Non availability of wood/fuel

Lack of proper market facilities

Lack of educational, transportation, medical & health care facilities

Low wages

Small land holdings

Low income of the households

Page 110: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

110

Lack of employment opportunity.

Migration from the project area.

An annual action plan for the entire activity of the project according to availability of budget has

been proposed for the annual schedule from 2010 to 2014.The details given below.

ANNUAL ACTION PLAN

Financial Progress Watershed Works Fin. : in Lacs

For Project Proposed 2010-11

MWS Name & Code

Activity Gram Panchayat Target as AAP

2010-11 2011-12 2012-13 2013-14 Total

Himpur Pachatpura 2B4D3i4a Kishanpur 2B5B8c5b

Kanakpur 2B4D3i2d Rani Kota

2B5C1f3c Ranipur 2B5C1f1c

Jaswantpur 2B5C1f3c

Mahavatpur Billauch

2B5C1f3b Jhakaki

2B4D3i2c Pooranpur Garhi

2B5C1f1b Kamalpur 2B4D3i2d Shamipur 2B5B8c4c

Land Development

Ahmadpur Sadat Akberpur Chaugava

Bhadola Bhogpur

Bijori Gadmalpur

Himpur Pachatpura

Issepur Jahanabad Jasvantpur Kanakpur

Kharullahpur

mathurapur mor Maujampur Tulsi

Parvatpur Makdoompur

pooranpur gadi

Shamipur

Afforestation 0.00 2.73 3.34 4.04 10.11

Horticulture 0.00 1.12 1.36 1.65 4.13

Agriculture 0.00 0.00 0.00 0.00 0.00

SMC 0.00 0.00 0.00 0.00 0.00

Contour Bunding 0.00 19.16 23.42 28.39 70.97

Bench terracing 0.00 0.00 0.00 0.00 0.00

Others FB/MB/PFB 0.00 14.61 17.86 21.64 54.11

Veg. & Engg. Structures

0.00 0.00 0.00 0.00 0.00

Earthen Checks 0.00 7.57 9.25 11.21 28.03

Gully Plugs 0.00 2.67 3.26 3.96 9.89

Loose Boulders 0.00 0.00 0.00 0.00 0.00

Others 0.00 1.66 2.03 2.46 6.15

WHS 0.00 0.00 0.00 0.00 0.00

Farm Ponds 0.00 0.00 0.00 0.00 0.00

Checkdams/Tanks 0.00 7.21 8.82 10.69 26.72

Nallah Bunds 0.00 1.40 1.71 2.08 5.19

Percolation Tanks 0.00 0.00 0.00 0.00 0.00

Ground Water

Recharge Structures 0.00 1.23 1.50 1.82 4.54

Others WHB/SB 0.00 1.88 2.30 2.78 6.96

Sub Total

61.24 74.84 90.72 226.80

Page 111: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

111

MWS Name & Code

Livelihood Gram Panchayat GMS G K

P C T F W B S Amount

Himpur Pachatpura

2B4D3i4a Kishanpur 2B5B8c5b Kanakpur 2B4D3i2d

Rani Kota 2B5C1f3c Ranipur

2B5C1f1c Jaswantpur 2B5C1f3c

Mahavatpur Billauch

2B5C1f3b Jhakaki

2B4D3i2c

Pooranpur Garhi

2B5C1f1b Kamalpur 2B4D3i2d Shamipur 2B5B8c4c

General Merchant Shop @ Rs.

25000/- per shop.,

Goat Keeping @

Rs. 25000/- per Goat and 02 Goat

will be given per

beneficiary costing Rs. 3000/- per

number, Poultry -

(Chuja, feed and other support

item) per

beneficiary @

Rs.25000/-, Carpentry @ Rs.

15000/- per

beneficiary , Tailoring @ Rs.

20000/- per

beneficiary, Fishries @ Rs.

15000/- per

beneficiary,

Weaving@ 25000/-, Black

Smithy @ 15000/-

per bebeficiary.

Ahmadpur Sadat 2 2 1 1 1 1 1 1 2.18

Akberpur Chaugava 1 1 1 1 1 1 1 1 1.68

Bhadola 1 1 2 1 2 1 1 1 2.13

Bhogpur 1 2 1 1 2 1 1 1 2.13

Bijori 2 2 2 1 2 1 1 1 2.63

Gadmalpur 1 1 1 1 2 1 1 1 1.88

Himpur Pachatpura 3 2 1 1 1 1 1 1 2.43

Issepur 1 1 1 1 2 1 1 1 1.88

Jahanabad 1 2 1 1 1 1 1 1 1.93

Jasvantpur 1 1 2 1 2 1 1 1 2.13

Kanakpur 1 2 1 1 2 1 1 1 2.13

Kharullahpur 1 1 1 1 2 1 1 1 1.88

mathurapur mor 2 2 2 1 1 1 1 1 2.43

Maujampur Tulsi 1 2 1 1 1 1 1 2 2.11

Parvatpur Makdoompur 2 2 2 1 2 1 1 1 2.63

pooranpur gadi 1 1 1 1 2 2 1 1 2.03

Shamipur 1 2 2 1 2 0 1 1 2.23

Sub Total 23 27 23 17 28 17 17 18 36.44

Page 112: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

112

MWS

Name & Code

Production

System & Microenterprises

Gram Panchayat S D

A H

H T

N

Crop Demonstration

Amount W P B U M

Himpur

Pachatpura

2B4D3i4a Kishanpur

2B5B8c5b

Kanakpur 2B4D3i2d

Rani Kota

2B5C1f3c Ranipur

2B5C1f1c

Jaswantpur

2B5C1f3c Mahavatpur

Billauch

2B5C1f3b Jhakaki

2B4D3i2c

Pooranpur Garhi

2B5C1f1b

Kamalpur

2B4D3i2d Shamipur

2B5B8c4c

Crop

demonstration is wheat @ Rs.

13000/ha, Paddy

@ Rs.16800/ha,

Bajra @ Rs. 7200/ha, Urd @

Rs. 6500/ha,

Moong @ Rs. 6500/ha, Seed

Distribution @ Rs.

20000/-,

Horticulture toolkit @ Rs. 15000/-

and Nursery @ Rs.

22000/- , Animal Husbandry @

20000/-

Ahmadpur Sadat 1 1 1 2 2 0 3 3 2 2.13

Akberpur Chaugava 2 1 2 1 2 2 2 3 2 2.35

Bhadola 1 2 1 1 3 1 3 2 2 2.17

Bhogpur 2 1 1 1 2 1 2 3 2 1.87

Bijori 1 1 2 2 2 0 3 3 3 2.51

Gadmalpur 1 3 1 1 1 0 3 3 2 2.01

Himpur Pachatpura 2 1 1 2 4 1 3 2 3 2.59

Issepur 2 1 1 2 2 2 2 4 3 2.55

Jahanabad 2 2 1 1 2 1 2 3 2 2.24

Jasvantpur 2 1 1 2 3 0 4 3 3 2.43

Kanakpur 1 2 1 2 3 1 2 3 3 2.45

Kharullahpur 1 2 2 2 1 2 3 4 2 2.92

mathurapur mor 2 1 2 1 2 0 4 2 3 2.16

Maujampur Tulsi 1 2 2 1 4 1 2 2 2 2.38

Parvatpur Makdoompur 1 2 1 2 1 0 3 3 4 2.33

pooranpur gadi 2 1 2 2 5 0 4 2 3 2.77

Shamipur 2 2 1 2 2 1 3 4 3 2.66

Sub Total 12 11 10 12 18 7 21 23 19 40.50

Grand Total

303.75

Page 113: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

113

CHAPTER-7

PHASING OF PROGRAMME & BUDGETING

Page 114: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

114

FINANCIAL BREAKUP OF VARIOUS COMPONENT IN TERMS OF % OF IWMP-II, DISTRICT- BIJNOR

Amount in Lacs

S. No.

MWS Code & Name

Pro

ject

Are

a

Prop

osed

Am

ou

nt

Ad

min

istr

ati

ve

10

%

EP

A 4

%

In

sti

tuti

on

an

d C

B

5%

DP

R 1

%

Wate

rsh

ed

develo

pm

en

t w

ork

56

%

Liv

elih

ood

fo

r

assetl

ess 9

%

Prod

ucti

on

syste

m

an

d

Mic

ro

en

terp

ris

es

10

%

Mo

nit

orin

g 1

%

Evalu

ati

on

1%

Co

nsolid

ati

on

3%

To

tal

10

0%

1

2B4D3i4a

Himpur Pachatpura

396.58 47.59 4.76 1.90 2.38 0.48 26.65 4.28 4.76 0.48 0.48 1.43 47.59

2 2B5B8c5b

Kishanpur 373.58 44.83 4.48 1.79 2.24 0.45 25.10 4.03 4.48 0.45 0.45 1.34 44.83

3 2B4D3i4c

Kanakpur 272.30 32.68 3.27 1.31 1.63 0.33 18.30 2.94 3.27 0.33 0.33 0.98 32.68

4 2B4D3i2b

Rani Kota 244.27 29.31 2.93 1.17 1.47 0.29 16.41 2.64 2.93 0.29 0.29 0.88 29.31

5 2B5C1f1c

Ranipur 599.55 71.95 7.19 2.88 3.60 0.72 40.29 6.48 7.19 0.72 0.72 2.16 71.95

6 2B5C1f3c

Jaswantpur 485.31 58.24 5.82 2.33 2.91 0.58 32.61 5.24 5.82 0.58 0.58 1.75 58.24

7

2B5C1f3b

Mahavatpur Billoch

200.46 24.06 2.41 0.96 1.20 0.24 13.47 2.16 2.41 0.24 0.24 0.72 24.06

8 2B4D3i2c

Jhakaki 182.90 21.95 2.19 0.88 1.10 0.22 12.29 1.98 2.19 0.22 0.22 0.66 21.95

9 2B5C1f1b

Pooranpur Garhi 208.14 24.98 2.50 1.00 1.25 0.25 13.99 2.25 2.50 0.25 0.25 0.75 24.98

10 2B4D3i2d

Kamalpur 198.12 23.77 2.38 0.95 1.19 0.24 13.31 2.14 2.38 0.24 0.24 0.71 23.77

11 2B5B8c4c

Shamipur 213.79 25.65 2.57 1.03 1.28 0.26 14.37 2.31 2.57 0.26 0.26 0.77 25.65

Total 3375 405.00 40.50 16.20 20.25 4.05 226.80 36.45 40.50 4.05 4.05 12.15 405.00

Page 115: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

115

YEARWISE PHYSICAL AND FINANCIAL BREAK UP OF WORK COMPONENT OF IWMP-II, DISTRICT- BIJNOR Amount in Lacs, Phy. in ha.

Watershed Development Works

S. No.

MWS Code & Name

Project Area

Proposed Amount

2010-11 2011-12 2012-13 2013-14 TOTAL

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 2B4D3i4a Himpur

Pachatpura 396.58 26.65 53.10 3.57 115.80 7.78 113.30 7.61 114.37 7.69 396.58 26.65

2 2B5B8c5b Kishanpur

373.58 25.10 50.02 3.36 109.09 7.33 106.73 7.17 107.74 7.24 373.58 25.10

3 2B4D3i4c Kanakpur

272.3 18.30 36.46 2.45 79.51 5.34 77.80 5.23 78.53 5.28 272.30 18.30

4 2B4D3i2b Rani Kota

244.27 16.41 32.71 2.20 71.33 4.79 69.79 4.69 70.45 4.73 244.27 16.41

5 2B5C1f1c Ranipur

599.55 40.29 80.28 5.40 175.07 11.76 171.29 11.51 172.91 11.62 599.55 40.29

6 2B5C1f3c

Jaswantpur 485.31 32.61 64.98 4.37 141.71 9.52 138.65 9.32 139.96 9.41 485.31 32.61

7 2B5C1f3b

Mahavatpur Billoch

200.46 13.47 26.84 1.80 58.53 3.93 57.27 3.85 57.81 3.88 200.46 13.47

8 2B4D3i2c Jhakaki

182.9 12.29 24.49 1.65 53.41 3.59 52.25 3.51 52.75 3.54 182.90 12.29

9 2B5C1f1b Pooranpur

Garhi 208.14 13.99 27.87 1.87 60.78 4.08 59.47 4.00 60.03 4.03 208.14 13.99

10 2B4D3i2d Kamalpur

198.12 13.31 26.53 1.78 57.85 3.89 56.60 3.80 57.14 3.84 198.12 13.31

11 2B5B8c4c Shamipur

213.79 14.37 28.63 1.92 62.43 4.19 61.08 4.10 61.66 4.14 213.79 14.37

Total 3375 226.80 451.91 30.38 985.50 66.22 964.24 64.80 973.35 65.41 3375.00 226.80

Page 116: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

116

CHAPTER -8

CONSOLIDATION / EXIT STRATEGY

Page 117: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

117

WATERSHED DEVELOPMENT FUND

The major source of financial assistance after post implementation period is Watershed Development

Fund. The contribution of it will come mainly from the fund generated.

USER CHARGES

Various user groups will be formed in village. These user groups will collect user according to the

designated rules formed during the formation of user group. These funds will be transferred to the WDF

funds as per these formulated rules. The secretary of watershed committee (WC) shall maintain the

records.

SUSTAINABILITY AND ENVIRONMENT SECURITY

In the proposed watershed management plan of I.W.M.P.-7 Lalitpur watershed, proper blending of

bio engineering measures will be applied on 60% of the total watershed area. Based on the results of

studies conducted in this region, it is estimated that more 50% of the watershed area will be treated and

consequently the soil loss and runoff from the area is expected to be reduced by 70% and 65%

respectively. The proposed land use plan will improve the land utilization index and crop diversification

index significantly as compared to the existing one. It will help in maintaining ecosystem integrity on

sustained basis along with improving the livelihood security of the farming community.

Page 118: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

118

ECONOMIC ANALYSIS

Economic analysis of the project was carried by taking direct benefits and costs considering 25 year

project life at 10 per cent discount rate. For this purpose of economic analysis, whole watershed

development plan was divided into three sectors namely,

Agriculture, horticulture and forest/fuel wood plantation. Net present value (NPV), Benefit cost ratio (BC)

ratio criteria were employed to judge the economic efficiency of each enterprise and sector.

AGRICULTURE

In rainfed agriculture the development cost can be recovered within one year as the present rainfed

agriculture is being done on well maintained field, therefore, does not require much investment.

Page 119: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

119

CHAPTER-9

EXPECTED OUTCOME

Page 120: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

120

8.1: EXPECTED OUTCOMES/ BENEFITS:

S. No. Particulars of Items Unit Pre Execution Post Execution

1 Gross Cultivated area Ha. 2700 3900

2 Cropping intensity % 140 215

3 Agricultural Production

A

I

II

III

IV

Food Production

Cereals-

Pulses-

& Oil seed

Jawan Babare

Qtl.

185

800

3050

335

B

I

II

Fodder Production

Dry Fodder-

Green Fodder-

Qtl. 520

760

930

1250

C

I

Fuel Production (qtls)

Arhar + Mustard Plants Qtl. 1.40 2.90

4 Average Household Income per annum Rs Lakh 21000 32000

5 Milk Production Liter 76000 140000

6 Irrigated area Ha. 822 1514

7 Rainfed area Ha. 2553 1858

8 Additional area under Agro-Harte/Forestry. Ha. - 340

9 Employment Generation man days. No. 67800 92300

10 Women Benefitted by SHGs and IGA No. - 200

11 Value of land Rs Lakh per Hactare Rs Lakh 8 to 10 12 to 14

12 Average ground water table BGL M 8.20 7.00

13 Benefit Cost Ratio 1:60:1

Page 121: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

121

CHAPTER-10

COST NORMS & DESIGN OF STRUCTURE

PROPOSED

Page 122: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

122

Estimate of drop Spillway For 5 ha Catchment.

S.no Item Nos. Lenth Width Hight/Dept

h Qt

1

E/W in Foundation

Head Wall EXN 2 2.00 0.35 0.70 1.54

Side Wall 2 1.65 0.55 0.70 1.27

Side Wall Exn 2 1.00 0.55 0.70 0.77

crest Wall Exn 1 1.30 0.80 0.70 0.728

Toe Wall 1 1.30 0.55 0.70 0.50

Apron 1 1.30 1.30 0.40 0.676

Total 5.484

2

C.C.Work 1:4:8

head Wall EXN 2 2.00 0.55 0.15 0.33

Side well 2 1.65 0.55 0.15 0.272

Side well Exn 2 1.00 0.55 0.15 0.165

Crest Wall 1 1.30 0.8 0.15 0.156

Toe Wall 1 1.30 0.55 0.15 0.107

Apron 1 1.30 1.3 0.20 0.338

Total 1.368

3

B/W 1:4

head Wall EXN 2 1.8 0.45 1.40 0.268

Page 123: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

123

Side Wall Exn 2 1.55 0.45 0.65 0.906

Side wall up to toe Exn Toe 2 1.55+.65/2 0.45 0.80 2.12

Side Well abobe to Exn Top 1 1.30 0.7 0.25 0.227

Crest Well up to Apron 1 1.30 .45+.70/2 0.80 0.598

Crest well abobe to Apron side well Exn 1 0.90 0.45 0.65 0.526

Toe Wall 1 1.30 0.45 0.45 0.263

Total 48.90

4

P/W 1:4

Head Wall EXN Top 2 1.8 0.45

1.62

Crest Top 1 1.3 0.45

0.585

Crest V/S 1 1.3

0.6 0.78

crest D/S 1 1.3

0.84 1.092

Side Well Top 2 .65+1.20/2 0.45

1.665

Side Well Exn 2 0.9 0.45

0.81

Toe Wall Top 1 1.3 0.45

0.585

Toe Wall Top in side 1 1.3

0.2 0.26

Side Wall in abobe the Toe Wall 2

0.45 0.4 0.18

Side Abobe the Crest 2

0.45 0.4 0.36

Head Wall V/S 1 1.3

0.6 0.78

Head Wall Exn V/S 2 1.8

1 3.6

Side Wall inside Botem 2 1.55

0.4 1.24

Side Wall inside Top 2 1.55+.65/2

0.8 1.76

Total 15.317

Say 15.32

Page 124: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

124

Summary of Work

1 Earth Work 5.49

2 C.C. Work 1:4:8 1.368

3 Brick Work 6.908

4 PlasteringWork 15.32

Material and Cost Anailysis

Name of Work Quantity Brick Cement Course Cent Gitty

C.C Work 1:4:8 1.368 0 4.65 0.615 1.258 --

Brick Work 6.908 3178 12.43 1.865 0 --

PlasteringWork 15.32 0 1.68 0.229 0 --

Total 3178 18.76 2.709 1.258 --

Say 3178 18.76 2.709 1.258 --

Rate 3797 300 1184 1112 Total

Cost

Cost 12066.9 5628 3208.65 1401.1 22304.6

Page 125: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

125

Expenditure of Labour

S. No. Name of Work Quantity Skilled Unskilled

1 Earth Work 5.49 - 1.66

2 C.C Work 1:4 1.368 0.27 6.29

3 B/W/1:4 6.908 6.9 13.8

4 PlasteringWork

1:4 15.32 1.91 2.87

5 Water Quiring 0 0 5

Total 9.08 29.62

Rate 230 120 Total Cost

Cost 2088.4 3554.4 5642.8

Total Cost

Material -22304.60

Labour -5642.80

Cartage-2230

Total-30177.40 Say Rupees -30000

Estimate of Field Out let

S. No. Earth Work Nos. Lenth Width Hight/Depth Qt

1 Head Wall 1 2.4 0.6 0.8 1.15

Side Wall 2 2.5 0.4 0.5 1

Tank 1 1.1 1 0.5 0.55

Total 2.7

2 EW 1:4:8

Head Wall 1 2.4 0.6 0.15 0.21

Side Wall 2 2.5 0.4 0.15 0.3

Rapta 1 2.5 0.6 0.15 0.225

Tank 1 1.1 1 0.15 0.165

Total 0.9

Page 126: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

126

3 Brick Work 1:4:8

Head Wall 1 2.26 0.35 0.6 0.474

Caller 2 0.6 0.23 0.4 0.11

Side Wall 2 2.5 0.23 0.6 0.69

Rapta 1 2.5 0.6 0.11 0.165

Tank 2 0.73 0.23 0.5 0.167

Tank 1 0.6 0.23 0.5 0.069

Toe Wall 1 1.06 0.23 0.62 0.151

Total 1.661

4 P/W

Coller 2 0.6 0.23 - 0.27

P/W 2 2 0.6 0.4 0.96

2 0.23 0.4 - 0.18

Side Wall

Top 2 2.5 0.23 - 1.15

2 2.5 0.25 - 1.25

2 2.5 0.3 - 1.5

Rapta 1 2.5 0.6 - 1.5

2 0.5 0.23 - 0.23

Tank 1 1.06 0.23 - 0.24

Total 7.28

5 B/F 2 0.5 0.3 - 0.3

Tank 1 0.6 0.3 - 1.8

1 0.5 0.6 - 0.3

1 1.06 0.23 - 0.24

1 0.6 0.41 - 0.24

1 1.06 0.3 - 0.31

Total 10.47

Page 127: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

127

Summary of Work

1 Earth Work 2.7

2 C.C Work 1:4:8 0.9

3 Brick Work 1:4 11cm 0.165

23cm 1.661

4 PlasteringWork 10.47

Anylysis of Materials

S. No. Name of Work Quantity Brick Cement Coarse Sand Gitty

1 C.C Work 1:4:8 0.90 - 3.06 0.405 0.828

2 Brick Work 11cm 0.165 78 0.23 0.039 -

23cm 1.661 764 2.98 0.448 -

3 P/W 1:4 10.47 - 1.15 0.157 -

Total 842 7.42 1.049 0.83

Say 1.05

@ 3797 300 1184 1112

Cost 3197.00 2226 1243.20 922.95

Total Cost ---------- ------ ------- ------- 7589.20

Page 128: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

128

Expenditure of Labour

S. No. Name of Work Quantity Skilled Unskilled

1 Earth Work 2.70 - 0.81

2 C.C Work 1:4 0.90 0.18 4.14

3 B/W/1:4 1.826 1.82 3.64

4 PlasteringWork 1:4 10.47 1.30 1.96

5 Water Quiring - - 5.00

Total 3.30 15.55

Rate 230.00 120.00 Total Cost

Cost 759.00 1866.00 2625.00

Cost on material -7589.20

Cost on Labour -2625.00

Total-10214.20

Say Rupees-10000

Page 129: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

129

CHAPTER-11

MAPS

Page 130: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

130

MAPS

An attempt has been made to map the surface of the project area,as per the instruction of the

common guide lines-2008.All the thematic maps have been prepared through using remote sensing and

geographical information system(G.I.S.)technique, following the norms of of the NationalMapPolicy-2006.

The details of the thematic maps have been given below

1. Project Area Map

2. Land use/Land cover Map

3. Soil Texture Map

4. Soil Depth Map

5. Soil Erosion Map

6. Action Plan Map (Code- 2B5C1f1b)

Page 131: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

131

Page 132: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

132

Page 133: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

133

Page 134: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

134

Page 135: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

135

Page 136: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

136

Page 137: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

137

Page 138: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

138

Page 139: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

139

Page 140: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

140

Page 141: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

141

Annexure-1

Detail cost Estimate of IWMP II Watershed of MWS code - 2B1C7e1e (Pooranpur Garhi )

Contour Bund

S. No. Activity Area Khasra No Hight Cross Section =(Top+Base)/2 *Hight

E.W Rate Cost Top Base Hight C.S

1 CB-1 1.50 150 160 0.45 2.25 0.60 0.81 129.60 32.57 4221

2 CB-2 0.33 149 35 0.45 2.25 0.60 0.81 28.35 32.57 923

3 CB-3 1.22 149 130 0.45 2.25 0.60 0.81 105.30 32.57 3430

4 CB-4 1.83 149 195 0.45 2.25 0.60 0.81 157.95 32.57 5144

5 CB-5 1.45 146 155 0.45 2.25 0.60 0.81 125.55 32.57 4089

6 CB-6 1.77 144 125 0.45 2.25 0.60 0.81 101.25 32.57 3298

7 CB-7 0.80 141 85 0.45 2.25 0.60 0.81 68.85 32.57 2242

8 CB-8 0.65 141 70 0.45 2.25 0.60 0.81 56.70 32.57 1847

9 CB-9 0.61 141 65 0.45 2.25 0.60 0.81 52.65 32.57 1715

10 CB-10 0.56 140 60 0.45 2.25 0.60 0.81 48.60 32.57 1583

11 CB-11 1.92 133 205 0.45 2.25 0.60 0.81 166.05 32.57 5408

12 CB-12 0.28 140 30 0.45 2.25 0.60 0.81 24.30 32.57 791

13 CB-13 1.12 133 120 0.45 2.25 0.60 0.81 97.20 32.57 3166

14 CB-14 0.33 140 35 0.45 2.25 0.60 0.81 28.35 32.57 923

15 CB-15 1.08 132 115 0.45 2.25 0.60 0.81 93.15 32.57 3034

16 CB-16 0.61 132 65 0.45 2.25 0.60 0.81 52.65 32.57 1715

17 CB-17 1.12 132 120 0.45 2.25 0.60 0.81 97.20 32.57 3166

18 CB-18 0.85 128 90 0.45 2.25 0.60 0.81 72.90 32.57 2374

19 CB-19 0.75 128 80 0.45 2.25 0.60 0.81 64.80 32.57 2111

20 CB-20 0.80 127 85 0.45 2.25 0.60 0.81 68.85 32.57 2242

21 CB-21 1.12 126 120 0.45 2.25 0.60 0.81 97.20 32.57 3166

22 CB-22 1.17 153 125 0.45 2.25 0.60 0.81 101.25 32.57 3298

23 CB-23 0.98 153 105 0.45 2.25 0.60 0.81 85.05 32.57 2770

24 CB-24 0.37 153 40 0.45 2.25 0.60 0.81 32.40 32.57 1055

25 CB-25 0.37 154 40 0.45 2.25 0.60 0.81 32.40 32.57 1055

26 CB-26 0.33 154 35 0.45 2.25 0.60 0.81 28.35 32.57 923

Page 142: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

142

27 CB-27 0.94 154 100 0.45 2.25 0.60 0.81 81.00 32.57 2638

28 CB-28 0.70 154 75 0.45 2.25 0.60 0.81 60.75 32.57 1979

29 CB-29 0.65 154 70 0.45 2.25 0.60 0.81 56.70 32.57 1847

30 CB-30 0.47 155 50 0.45 2.25 0.60 0.81 40.50 32.57 1319

31 CB-31 1.22 164 130 0.45 2.25 0.60 0.81 105.30 32.57 3430

32 CB-32 0.98 165 105 0.45 2.25 0.60 0.81 85.05 32.57 2770

33 CB-33 0.52 166 55 0.45 2.25 0.60 0.81 44.55 32.57 1451

34 CB-34 0.65 166 70 0.45 2.25 0.60 0.81 56.70 32.57 1847

35 CB-35 1.12 166 120 0.45 2.25 0.60 0.81 97.20 32.57 3166

36 CB-36 0.94 167 100 0.45 2.25 0.60 0.81 81.00 32.57 2638

37 CB-37 1.08 167 115 0.45 2.25 0.60 0.81 93.15 32.57 3034

38 CB-38 0.80 196 85 0.45 2.25 0.60 0.81 68.85 32.57 2242

39 CB-39 1.22 195 130 0.45 2.25 0.60 0.81 105.30 32.57 3430

40 CB-40 0.85 193 90 0.45 2.25 0.60 0.81 72.90 32.57 2374

41 CB-41 0.28 192 30 0.45 2.25 0.60 0.81 24.30 32.57 791

42 CB-42 0.43 190 45 0.45 2.25 0.60 0.81 36.45 32.57 1187

43 CB-43 0.47 190 50 0.45 2.25 0.60 0.81 40.50 32.57 1319

44 CB-44 0.42 190 45 0.45 2.25 0.60 0.81 36.45 32.57 1187

45 CB-45 0.47 214 50 0.45 2.25 0.60 0.81 40.50 32.57 1319

46 CB-46 4.00 198 350 0.45 2.25 0.60 0.81 283.50 39.08 11079

47 CB-47 3.31 198 400 0.45 2.25 0.60 0.81 324.00 39.08 12662

48 CB-48 1.06 127 110 0.45 2.25 0.60 0.81 89.10 39.08 3482

49 CB-49 0.77 126 90 0.45 2.25 0.60 0.81 72.90 39.08 2849

50 CB-50 1.44 109 160 0.45 2.25 0.60 0.81 129.60 39.08 5065

51 CB-51 1.44 109 170 0.45 2.25 0.60 0.81 137.70 39.08 5381

52 CB-52 3.15 94 270 0.45 2.25 0.60 0.81 218.70 39.08 8547

53 CB-53 1.44 77 150 0.45 2.25 0.60 0.81 121.50 39.08 4748

54 CB-54 1.71 78 220 0.45 2.25 0.60 0.81 178.20 39.08 6964

55 CB-55 0.86 78 130 0.45 2.25 0.60 0.81 105.30 39.08 4115

56 CB-56 0.30 77 100 0.45 2.25 0.60 0.81 81.00 39.08 3165

57 CB-57 1.53 80 200 0.45 2.25 0.60 0.81 162.00 39.08 6331

58 CB-58 1.03 80 160 0.45 2.25 0.60 0.81 129.60 39.08 5065

Page 143: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

143

59 CB-59 0.28 56 48 0.45 2.25 0.60 0.81 38.88 39.08 1519

60 CB-60 0.65 57 70 0.45 2.25 0.60 0.81 56.70 39.08 2216

61 CB-60 0.95 58 100 0.45 2.25 0.60 0.81 81.00 39.08 3165

Sub Total 192000

G.P.- Akberpur chaugava

62 CB-60 0.37 125 40 0.45 2.25 0.60 0.81 32.40 39.08 1266

63 CB-60 0.28 126 30 0.45 2.25 0.60 0.81 24.30 39.08 950

64 CB-60 0.85 123 90 0.45 2.25 0.60 0.81 72.90 39.08 2849

65 CB-60 0.28 122 30 0.45 2.25 0.60 0.81 24.30 39.08 950

66 CB-60 0.28 121 30 0.45 2.25 0.60 0.81 24.30 39.08 950

67 CB-60 0.56 119 60 0.45 2.25 0.60 0.81 48.60 39.08 1899

68 CB-61 2.35 140 250 0.45 2.25 0.60 0.81 202.50 39.08 7914

69 CB-61 0.65 139 70 0.45 2.25 0.60 0.81 56.70 39.08 2216

70 CB-61 0.38 137 30 0.45 2.25 0.60 0.81 24.30 39.08 950

71 CB-62 0.48 136 40 0.45 2.25 0.60 0.81 32.40 39.08 1266

72 CB-62 0.66 142 60 0.45 2.25 0.60 0.81 48.60 39.08 1899

73 CB-62 0.66 144 60 0.45 2.25 0.60 0.81 48.60 39.08 1899

Sub Total 25007

Page 144: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

144

MARGINAL BUND

S. No. Activity Area Khasra No Hight

Cross Section =(Top+Base)/2 *Hight E.W Rate Cost

Top Base Hight C.S

1 MB-1 0.59 141 35 0.60 3.60 1.00 2.10 73.50 39.08 2872

2 MB-2 1.43 132 85 0.60 3.60 1.00 2.10 178.50 39.08 6976

3 MB-3 1.01 128 60 0.60 3.60 1.00 2.10 126.00 39.08 4924

4 MB-3 2.02 127 120 0.60 3.60 1.00 2.10 252.00 39.08 9848

5 MB-3 1.01 125 60 0.60 3.60 1.00 2.10 126.00 39.08 4924

6 MB-3 0.85 124 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

7 MB-4 2.78 165 165 0.60 3.60 1.00 2.10 346.50 39.08 13541

8 MB-5 2.02 21 120 0.60 3.60 1.00 2.10 252.00 39.08 9848

9 MB-5 1.68 199 100 0.60 3.60 1.00 2.10 210.00 39.08 8207

10 MB-6 0.67 198 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

11 MB-6 0.51 196 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

12 MB-6 0.67 195 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

13 MB-6 0.85 194 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

14 MB-7 1.35 195 80 0.60 3.60 1.00 2.10 168.00 39.08 6565

15 MB-7 0.67 196 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

16 MB-7 1.01 197 60 0.60 3.60 1.00 2.10 126.00 39.08 4924

17 MB-8 2.19 155 130 0.60 3.60 1.00 2.10 273.00 39.08 10669

18 MB-9 1.01 109 60 0.60 3.60 1.00 2.10 126.00 39.08 4924

19 MB-9 2.7 110 160 0.60 3.60 1.00 2.10 336.00 39.08 13131

20 MB-9 0.67 115 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

21 MB-10 0.85 91 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

22 MB-10 0.85 90 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

23 MB-10 4.05 88 240 0.60 3.60 1.00 2.10 504.00 39.08 19696

24 MB-10 0.85 87 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

25 MB-10 0.85 86 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

26 MB-10 1.78 85 70 0.60 3.60 1.00 2.10 147.00 39.08 5745

27 MB-10 1.35 113 80 0.60 3.60 1.00 2.10 168.00 39.08 6565

28 MB-11 1.35 92 80 0.60 3.60 1.00 2.10 168.00 39.08 6565

Page 145: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

145

29 MB-11 0.67 91 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

30 MB-11 0.67 90 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

31 MB-12 0.67 91 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

32 MB-12 0.67 90 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

33 MB-13 0.51 90 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

34 MB-14 0.85 52 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

35 MB-14 1.18 53 70 0.60 3.60 1.00 2.10 147.00 39.08 5745

36 MB-14 0.51 54 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

37 MB-14 0.68 55 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

38 MB-14 0.68 56 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

39 MB-14 0.85 57 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

40 MB-15 1.52 64 90 0.60 3.60 1.00 2.10 189.00 39.08 7386

41 MB-16 1.7 65 100 0.60 3.60 1.00 2.10 210.00 39.08 8207

42 MB-17 0.85 35 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

43 MB-17 0.51 71 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

44 MB-17 0.51 70 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

45 MB-17 1.85 67 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

46 MB-17 1.7 66 110 0.60 3.60 1.00 2.10 231.00 39.08 9027

47 MB-18 1.85 83 100 0.60 3.60 1.00 2.10 210.00 39.08 8207

48 MB-18 0.85 98 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

49 MB-19 1.35 83 80 0.60 3.60 1.00 2.10 168.00 39.08 6565

50 MB-20 1.01 90 60 0.60 3.60 1.00 2.10 126.00 39.08 4924

51 MB-21 4.03 72 357 0.60 3.60 1.00 2.10 749.70 39.08 29298

52 MB-22 3.71 70 250 0.60 3.60 1.00 2.10 525.00 39.08 20517

Sub Total 67.00 8341.20 325974

Page 146: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

146

Gram Panchayat- Akaberpur Chaugawan Village- Mahawatpur (North)

53 MB-23 0.45 2 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

54 MB-23 0.75 4 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

55 MB-23 0.75 7 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

56 MB-23 0.75 8 50 0.60 3.60 1.00 2.10 105.00 39.08 4103

57 MB-24 2.70 10 180 0.60 3.60 1.00 2.10 378.00 39.08 14772

58 MB-25 2.85 10 100 0.60 3.60 1.00 2.10 210.00 39.08 8207

59 MB-26 1.50 24 96 0.60 3.60 1.00 2.10 201.60 39.08 7879

60 MB-27 0.60 11 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

61 MB-27 1.20 12 80 0.60 3.60 1.00 2.10 168.00 39.08 6565

62 MB-28 0.60 11 40 0.60 3.60 1.00 2.10 84.00 39.08 3283

63 MB-28 1.35 12 90 0.60 3.60 1.00 2.10 189.00 39.08 7386

64 MB-29 0.90 27 60 0.60 3.60 1.00 2.10 126.00 39.08 4924

65 MB-30 1.50 26 100 0.60 3.60 1.00 2.10 210.00 39.08 8207

66 MB-30 0.80 31 100 0.60 3.60 1.00 2.10 210.00 39.08 8207

67 MB-31 0.24 43 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

68 MB-31 0.10 44 20 0.60 3.60 1.00 2.10 42.00 39.08 1641

69 MB-31 0.10 45 30 0.60 3.60 1.00 2.10 63.00 39.08 2462

Sub Total 17.14 2406.60 94000

Page 147: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

147

CHECK DAM

S. No. Activity Area Khasra No Hight

Cross Section =(Top+Base)/2 *Hight E.W Rate Cost

Top Base Hight C.S

1 CD-1 6.97 167, 155, 154, 153

120 2.00 9.50 2.50 14.37 1724.40 50.57 87202.91

120 9.50 1140.00 2.46 2804.40

15 14.00 1.05 220.50 36.36 8017.38

2 CD-2 4.04

153, 150

60 2.00 9.80 2.60 15.34 920.40 51.60 47492.64

60 9.80 588.00 2.46 1446.48

17 14.00 1.05 249.90 36.36 9086.36

3 CD-3 6.74

149

80 2.00 10.00 2.65 15.90 1272.00 51.60 65635.20

80 10.00 800.00 2.46 1968.00

30 10.00 1.20 360.00 36.36 13089.60

4 CD-4 3.67

146

50 2.00 10.00 2.65 15.90 795.00 51.60 41022.00

50 10.00 500.00 2.46 1230.00

16 8.00 1.10 140.80 36.36 5119.49

5 CD-5 4.68

123

50 2.00 11.00 3.00 19.50 975.00 52.64 51324.00

50 11.00 550.00 2.46 1353.00

30 10.00 1.20 360.00 36.36 13089.60

6 CD-6 6.67 90 120 2.00 11.00 3.00 19.50 2340.00 49.18 115081.20

7 CD-7 5.1

90

60 2.00 11.00 3.00 19.50 1170.00 52.64 61588.80

60 11.00 660.00 2.46 1623.60

21 10.00 1.10 231.00 36.36 8399.16

8 CD-8 9.23 120

120 2.00 11.00 3.00 19.50 2340.00 52.64 123177.60

16.5 11.00 181.50 2.46 446.49

Page 148: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

148

1- Abstract G.P Pooranpur Garhi

S. No. Name of work Area E.W. Rate Cost No of structure

Total Cost Total Cost Small Big

1 Contour Bund 62.20 5260 32.57

& 39.08

1.92 - - - - 1.92

2 Marginal Bund 67.00 8342 39.08 3.26 5 - 5 0.30 3.56

check Dem/G.P 47.10 13000 - 6.15 - 2 2 0.60 6.75

Afforation 4.90 - 5133 0.25 - - - - 0.25

Horticulture 2.00 - 10000 0.2 - - - - 0.2

Total 183.20 26602

11.78

12.68

2- Abstract G.P Akberpur Chaugawa

S.No Name of work Area E.W. Rate Cost No of structure

Total Cost Total Cost Small Big

1 Contour Bund 7.80 640 39.08 0.25

0.25

2 Marginal Bund 17.14 2406 39.08 0.94 2 - 2 0.12 1.06

check Dem/G.P - - - - - - - -

Afforation - - - - - - - - -

Horticulture - - - - - - - -

Total 24.94 3046

1.19 2 - 2 0.12 1.31

Grant Total 208.14 29648 - 12.97 7 2 9 1.02 13.99

ASCI J.E. B.S.A.

Page 149: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

149

CHAPTER -12

ABBRIVIATIONS/

REFERENCES

Page 150: Department of land development and water resources …upldwr.up.nic.in/.../Bijnor/DPR_BIJNOR_IWMP_II_09_10_updated.pdf · 3.8 Details of common property 42 3.9 Ground Water status

150

LIST OF ABBRIVIATIONS/REFERENCES

DOLR Department of Land Resources

IWMP Integrated Watershed Management Programme

SLNA State Level Nodal Agency

CGL Common Guidelines

PIA Project Implementing Agency

BSA Bhoomi Sangrakshan Adhikari

WDT Watershed Development Team

WC Watershed Committee

UC User Group

SHG Self Help Group

CB Contour Bund

MB Marginal Bund

PFB Peripheral Bund

REFERENCES

Common Guideline of watershed development-2008.