department of energy corporate network (doenet)
DESCRIPTION
Department of Energy CORPORATE NETWORK (DOEnet). Office of the Associate CIO for Operations Site Coordinating Committee Video Teleconference December 13, 2000. Agenda. Introductions Network Performance/Operations Implementation/Design Review Network Security Open Discussion/Next Meeting. - PowerPoint PPT PresentationTRANSCRIPT
Department of Energy CORPORATE NETWORK (DOEnet)
Office of the Associate CIO for Operations
Site Coordinating Committee Video TeleconferenceDecember 13, 2000
Agenda
IntroductionsNetwork Performance/OperationsImplementation/Design ReviewNetwork SecurityOpen Discussion/Next Meeting
Network Outages
October Outages 2 Circuit or PVC Outages
EML (New York, NY)WAPA (Denver, CO)
4 Hours of Site Outages
Help Desk Activities
November 2000 – 16 Tickets 2 Circuit Outages 3 HQ Configuration - Router 1 HQ Configuration - Firewall 3 Performance Anomalies 2 Site Configuration 1 Site Hardware 1 Power 3 Other / NTF / Request
Implementation StatusInitial Connectivity
Carlsbad Area Office - Local Exchange Carrier has provided Sprint with a delivery date of January 2001 for a circuit into Carlsbad.
Implementation Status - DS-3 Circuits Upgrades
Idaho Operations Office - On hold
NREL/Golden - On hold
Ohio Field Office - On hold
DOEnet Design Review
Evaluating Carrier Recommendations Reduce PVC Size/potential cost savings Deliver full T-1s or bundled T-1s where DS-3s
cannot be justified
Add traffic to the networkActions to “right size” network
Network Security Pilot - 10 Sites
DOEnet Security Enhancements partially completed
Objective - Address Office of Assurance Review
Methods Provide network perimeter protection
Stateful Inspection Firewalls Implement network intrusion
detection capability at each site
Network Security PilotIndividual Site Status
Richland Ops Completed Oakland Ops Completed SPRO (New Orleans) Completed WAPA Completed Oak Ridge Ops Completed NREL/Golden Completed Nevada Ops Completed Albuquerque Ops Scheduled
12/14/00 Chicago Ops Postponed Idaho Ops Postponed
Customer Service & Support
Help Desk 877-823-3205 Network Operations & Security
(Firewall)Voice Mail automatically rings to
Network Engineer on-call (importance of leaving a message)
Continue to coordinate requirements as soon as they are known
General Information
Request for Connectivity Bonneville Power Administration
Compliance with connection requirements verified - cutover pending
Connectivity will be established with BPA/HQ
Next Meeting(s)
SCC Video Teleconference - January 10, 2000
DOEnet HQ Team
Federal Project Manager Rich Otis 301-903-5310Project Coordinator Toni Love 757-365-0039Network Engineers Kellep Charles (KC)
Hieu DangWarren JordanGreg MagannBobby Rizvi
Help Desk 877-823-3205