SUMMER • Q3 2020TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
0955
_073
020
Connecting You With TexasDENTON COUNTY PLANNED MOBILITY PROJECTSUTP (2020 UNIFIED TRANSPORTATION PROGRAM) PROJECTS IN PLANNING 10 YEAR LIST
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
CONTACT INFORMATIONEmily McCann – Public Information Officer (214) 320-4485 • [email protected]
DENTON COUNTY MOBILITY PROJECTS IN PLANNING (UNFUNDED; SUMMER Q3 2020)
# CSJ Hwy Project Limits Description Est. Let Date Est. Cost Funding
Status
1 0081-13-065 I-35W Dale Earnhardt Way to S of I-35E/I-35W IC Construct 0 to 4-lane FRs; construct grade separations and ramps Sep-2025 $310 M Unfunded
2 0081-03-049 US 377 SH 114 to S of FM 1171 Reconstruct and widen 2-lane rural highway to 4-lane divided urban Aug-2045 $52 M Unfunded
3 0196-01-108 I-35E Turbeville Rd. to US 77 Reconstruct 6/8 to 8 GP lanes; reconstruct and convert 2 reversible to 4 concurrent MLs Aug-2045 $501.4 M Unfunded
4 1311-01-055 FM 1171 W of FM 156 to I-35W Construct 0 to 6-lane divided roadway Sep-2027 $76 M Unfunded
5 2250-02-013 SL 288 US 380 W of Denton to I-35 at LP 288 Construct 2-lane rural roadway on new location Phase 1 of Ultimate frwy. - extension of LP 288 Sep-2026 $20 M Unfunded
6 2250-02-014 SL 288 I-35W S of Denton to US 380 W of Denton Construct 0 to 2-lane rural roadway (Phase 1 of Ultimate freeway - extension of LP 288) Sep-2026 $37 M Unfunded
7 0353-02-037 SH 114 I-35W to BI-114K Construct new 4-lane rural freeway Aug-2023 $63 M Unfunded
8 1951-01-011 FM 1515 Masch Branch St. to Bonnie Brae St. Widen 2-lane rural roadway to 6-lane divided urban Aug-2028 $37 M Unfunded
9 0135-10-061; 0135-10-062
US 380/ US 377
From I-35 to Collin County Line Feasibility Study to Determine Options for Improving Mobility for the US 380 Corridor TBD TBD Unfunded
10 0353-09-003 SH 114 BI-114K to East of US 377 Construct 0 to 6 Lane Grade Separation Over US 377 Aug-2025 $15 M Unfunded
11 0081-04-038 US 377 N of Hickory Creek to FM 1830 Reconstruct and widen 2-lane rural highway as 4-lane divided urban Aug-2045 $11.2 M Unfunded
12 1315-01-030 FM 1385 US 380 to FM 455 Construct new roadway lanes Jun-2024 $132 M Unfunded
13 2979-01-011 FM 2931 US 380 to FM 428 Construct new roadway lanes Jun-2024 $68 M Unfunded
14 0081-06-040 US 377 US 380 to N of BS 377E Reconstruct and widen 2-lane undivided roadway to 4-lane divided facility (Ultimate 6-lane) Aug-2028 $128 M Unfunded
15 2352-02-024 FM 2449 FM 156 to W of I-35W Feasibility study for widening 2-lane urban to 4-lane urban (Ultimate 6-lane) TBD TBD Unfunded
16 0081-13-050 I-35W SH 114 to I-35/I-35E interchange Widen and reconstruct 4-lane rural to 6-lane urban MLs and 2/4-lane to 4/6-lane FRs Aug-2025 $339 M Unfunded
17 1059-01-047 FM 1173 FM 156 to I-35 Widen and reconstruct 2-lane rural to 6-lane urban divided with a raised median Aug-2040 $50 M Unfunded
18 1310-01-045 FM 407 FM 156 to FM 1830 Feasibility study to determine options for improving mobility for the FM 407 arterial corridor TBD TBD Unfunded
* 0081-05-048 FM 428 East Winsor Drive to West Sherman Drive Feasibility study TBD TBD TBD
ESTIMATED TOTAL $2 B+
TxDOT graphicSOURCE: Texas Department of Transportation.
DENTON COUNTY UTP MOBILITY PROJECTS IN PLANNING; (PROJECTS IN PLANNING 10 YEAR LIST)
# CSJ Hwy Project Limits Description Est. Let Date
Est. Cost
Funding Status
19 0196-02-124** I-35E Dallas C/L to FM 407Reconstruct/convert 2-lane reversible to 4-lane concurrent MLs; 6 to 6/8 CD lanes; 4/6 to 2/6 continuous FRs; reconstruct existing 8 GPLs; 2/6 to 2/8 concurrent FRs
TBD $746 M Partially
20 0196-02-125** I-35E FM 407 to Turbeville Rd.Reconstruct existing 4 GPLs(NB only); widen & convert 2 reversible to 4 concurrent MLs; widen 4/6 to 4/8 lane continuous FRs
TBD $671 M Partially
ESTIMATED TOTAL $1.4 B
*Unmapped.
**UTP Mobility Projects in Planning (Projects in Planning 10 Year List)
35E
35W
1
2
3
4
5
6
7
8
9
10
11
13
1214
15
16
17
18
19
20
455455
455
428 428428
428
35W
35E
DNT
377
380
377
377
TARRANT CO.
DENTON CO. DENTON CO.
COOKE CO.
DENTON CO.
DENT
ON CO
.
COLL
IN CO
.
DENT
ON CO
.
COLL
IN CO
.
51
2450
2450
1173
1173
2622
2153
Hackberry
Hebron
Sanger
Aubrey
Lincoln Park
Cross Roads
Oak Point
The Colony
Lewisville
Coppell
CopperCanyon
HickoryCreek
Corinth
Shady Shores
Krum
Bolivar
Ponder
Northlake
Justin
FlowerMound
RoanokeTrophy Club
PilotPoint
Krugerville
Argyle
DENTONDentonMunicipalAirport
Texas MotorSpeedway
Ray RobertsLake
GrapevineLake
LewisvilleLake
156
156
156
407
407 407407
288
720
288
423
3163
2449
1830
1171 1171
2499
2499
2499
21642931
121
121
190
121
121
114
114
170
423
380
380 3771385
380
455
Corral City
35
35
35
377
377
Mobility Projects in Planning (Unfunded)
UTP Mobility Projects in Planning (Funded)
N
2 miles
NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of SUMMER Q3 2020.